512-23-154_FA101 Bid Add 2.pdf
PDF 630 KB Posted
- Solicitation number
- 36C24526R0014
About this file
This document is a Fire Alarm Plan for Level One of the Loch Raven Construct Consolidated Boiler Spaces project located in Baltimore, Maryland. The architectural drawing (FA101) details the fire alarm system layout for a Veterans Affairs (VA) facility, with specific technical requirements including fire alarm module installations for generator monitoring, specialized fire alarm devices for gas booster and propane rooms that must be explosion-proof and rated for Class I Division II environments, a tamper switch connection for the exterior sprinkler system's post indicator valve, and fire alarm modules to interface with the access control system for door release upon fire alarm activation. The document is marked as a Bid Document with the project number 512-23-154, dated 07/07/2025, and includes a recent revision (Bid Addendum 2) on 01/12/26.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F A
C P
S
F
F F F
F
F
AIM AIM AIM
VS
VS
VS
PS
VS
AOM
F F
A B C D E
E.1 E.5 F
2.6
2.1
1.6
ELECTRICAL
108 BOILER ROOM
LOCKERS - MEN
TOILET/
LOCKERS -
WOMEN
109TOILET/
SHOWER
WATER
TREATMENT
BREAK AREA
Exterior
EXT
CONTROL ROOM
GENERATOR
FUEL TANK YARD
GAS BOOSTER
HAC
15, WP
15, WP
15 3075
75 75
AREA OPEN TO
THE EXTERIOR
WP
PROPANE
75, WP
WP
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/0
V A
M C
L o c h
R a v e n
B o ile r C o n s o lid a ti o n /0
V
A L
R B o ile r C o n s o lid a ti o n
R
F
.r v t
/1
/2
:4
:1
A
M
1/12/2026 10:49:12 AM1/12/2026 10:49:12 AM
FA101
FIRE ALARM PLAN - LEVEL ONE Loch Raven Construct Consolidated Boiler Spaces
BALTIMORE MD
512-23-154
07/07/2025 PJ DML
BID DOCUMENTS
1/4" = 1'-0"F1
FIRE ALARM PLAN - LEVEL ONE
NN
0 2' 4' 8' 12'
1/4" = 1'-0"
1 PROVIDE FIRE ALARM MODULES FOR MONITORING OF THE GENERATOR
FOR THE FOLLOWING CONDITIONS: GENERATOR FAULT, GENERATOR
RUNNING, AND GENERATOR IN NON-AUTO POSITION.
2 ALL FIRE ALARM DEVICES LOCATED WITHIN THE GAS BOOSTER ROOM OR
THE PROPANE ROOM MUST BE RATED FOR A CLASS I DIVISION II
ENVIRONMENT IN ACCORDANCE WITH NFPA 70. FIRE ALARM DEVICES
SHALL BE EXPLOSION PROOF. CONDUITS SHALL BE SEALED.
3 PROVIDE TAMPER SWITCH CONNECTION FOR EXTERIOR SPRINKLER
SYSTEM POST INDICATOR VALVE (PIV). REFER TO CIVIL PLANS FOR
ACTUAL LOCATION OF PIV.
4 PROVIDE FIRE ALARM MODULE(S) FOR ACCESS CONTROL SYSTEM PANEL
TO INITIATE DOOR RELEASE UPON ACTIVATION OF FIRE ALARM SYSTEM.
KEYED NOTES
Revisions Date
2 Bid Addendum 2 01/12/26
| Sheets |
| FA101 - FIRE ALARM PLAN - LEVEL ONE |
| FX001 - FIRE SUPPRESSION ABBREVIATIONS, LEGEND, AND GENERAL NOTES |
File details come from the government source that posted it. Updated .