Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 Federal contract opportunity
Solicitation number
36C24420R0075
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This document contains a pricing sheet for a parking structure project and details of a related federal contract opportunity notice. The pricing sheet lists the total price for the complete parking structure project and provides options for price reductions by removing specific scopes of work, including removing the top parking tier, exterior stairs, and decorative facade paint. The federal contract opportunity is a solicitation to construct a new parking garage at a VA medical center campus for between $10-20 million. It is a set-aside for verified service-disabled veteran-owned small businesses and will use a tiered evaluation process including large businesses. Offerors are required to provide all labor, materials and equipment to complete the project according to the drawings and specifications by the required completion date while complying with all applicable federal, state and local regulations.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--693-222 | Parking Structure Solicitation Amendment 2, newest first.
File Type Posted
095113 Acoustical Panel Ceilings.pdf PDF
019100 Gen Commis.docx DOCX document
015816 Temp Int Signage.docx DOCX document
014535 Special Inspections.docx DOCX document
013323 Shop dwgs Product Data.docx DOCX document
042000 Unit Masonry Assemblies.pdf PDF
36C24420R0075_6.docx DOCX document
EXHIBIT D -SampleTransmittalLetter Past Performance Evaluation Questionnaire.docx DOCX document
36C24420R0075_5.docx DOCX document
S04 Site Visit Sign-in.pdf PDF
P03 JA Yale Lock.pdf PDF
321723 Pavement Markings.pdf PDF
321216 Asphalt Paving.pdf PDF
320523 Cement and Concrete for Exterior Improvements.pdf PDF
280513.pdf PDF
265100.pdf PDF
260526.pdf PDF
238200.pdf PDF
233700.pdf PDF
233400.pdf PDF
233100.pdf PDF
230511.pdf PDF
221436.pdf PDF
210511.pdf PDF
099123 Painting.pdf PDF
024100.docx DOCX document
022113.docx DOCX document
017700 Contract Closeout_Single Prime.pdf PDF
017419.doc DOC document
017700a Contract Closeout Master Punch List_Single Prime.pdf PDF
013526.docx DOCX document
012900 Applications for Payment_Single Prime.pdf PDF
S02 ParkStructure Electrical Dwg.pdf PDF
Pstruct Dwg 21-25.pdf PDF
Pstruct Dwg 5-10.pdf PDF
Pstruct Dwg 1-2.pdf PDF
Arch Dwg 6-10.pdf PDF
S02 Dwg T1-S2.pdf PDF
EXHIBIT E - Past Performance Questionnaire.docx DOCX document
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
36C24420R0075_3.docx DOCX document
334000 Storm Sewer Utilities.pdf PDF
316326 Drilled Caissons.pdf PDF
312319 Dewatering.pdf PDF
280526.pdf PDF
264313.pdf PDF
280500.pdf PDF
260533.pdf PDF
260519.pdf PDF
260511.pdf PDF
Show all 50

Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING SHEET FOR TOTAL PROJECT

AND PRICE REDUCTIONS

Total Price for complete Parking Structure Project: $__________________________

(copy from SF1442 Block 17)

While this project is planned for full funding, conditions may necessitate scope of work reductions to meet available funding. Areas for price reductions are identified and to be priced as listed.

Reduction 1: Subtract $__________from Total Price to remove Tier #4 from base project

Reduction 1 Adjusted Total Price: $_____________________

Reduction 2: Subtract $____________ from Total Price to remove exterior stairs from the southeast corner

Reduction 2 Adjusted Total Price: $_____________________

Reduction 3: Subtract $___________ from Total Price to remove decorative façade-paint precast structure only

Reduction 3 Adjusted Total Price: $_____________________

Reduction 4: Subtract $__________ from Total Price to remove temporary parking

Reduction 4 Adjusted Total Price: $_____________________