S02 Pricing Sheet.pdf

PDF 184 KB Posted

Attached to
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2
Solicitation number
36C24420R0075
Issued by

About this file

This document contains a pricing sheet for a parking structure project and details of a related federal contract opportunity notice. The pricing sheet lists the total price for the complete parking structure project and provides options for price reductions by removing specific scopes of work, including removing the top parking tier, exterior stairs, and decorative facade paint. The federal contract opportunity is a solicitation to construct a new parking garage at a VA medical center campus for between $10-20 million. It is a set-aside for verified service-disabled veteran-owned small businesses and will use a tiered evaluation process including large businesses. Offerors are required to provide all labor, materials and equipment to complete the project according to the drawings and specifications by the required completion date while complying with all applicable federal, state and local regulations.

View the file

Other files

File Type Posted
Parking Garage Arch Dwgs Add 1.pdf PDF
A6.2 Signage.pdf PDF
015000TempFacilitiesControls.pdf PDF
VMAC_Sketch_SKE-1.pdf PDF
084113 Aluminum Storefront Systems.pdf PDF
057200 Ornamental Fence and Gates.pdf PDF
097753 Living Wall System.pdf PDF
019100 Gen Commis.docx DOCX document
013526 Safety Requirements.docx DOCX document
S02 36C24420R0075 Amend 2.pdf PDF
S02 Q_A Parking Structure Solicit.pdf PDF
36C24420R0075_6.docx DOCX document
010000 General.docx DOCX document
024100 Demolition.docx DOCX document
150002002 - VAMC Wilkes-Barre Parking Structure FINAL Geotechnical Report 11-30-15.pdf PDF
095113 Acoustical Panel Ceilings.pdf PDF
014535 Special Inspections.docx DOCX document
017419 Const Waste Mgmt.doc DOC document
022113 Site Surveys.docx DOCX document
087100 Door Hardware.pdf PDF
107300 Exterior Canopy System.pdf PDF
015719 Temp Envir Cont.doc DOC document
013323 Shop dwgs Product Data.docx DOCX document
015816 Temp Int Signage.docx DOCX document
042000 Unit Masonry Assemblies.pdf PDF
074515 Composite Wall Panel.pdf PDF
014219 Reference Standards.docx DOCX document
014500 Quality Control.docx DOCX document
S02 Solicitation 36C24420R0075 AMD 0001.pdf PDF
EXHIBIT D -SampleTransmittalLetter Past Performance Evaluation Questionnaire.docx DOCX document
36C24420R0075_5.docx DOCX document
EXHIBIT E PastPerformanceQuestionnaire.docx DOCX document
36C24420R0075_4.docx DOCX document
P03 JA Tyco SimplexGrinnell.pdf PDF
P03 JA Yale Lock.pdf PDF
S04 Site Visit Sign-in.pdf PDF
P03 JA Johnson Controls.pdf PDF
075323 EPDM Single-Ply Membrane Roofing.pdf PDF
014500.docx DOCX document
071113 Bituminous Dampproofing.pdf PDF
034133 Precast Structural Pretensioned Concrete.pdf PDF
264313.pdf PDF
017900 Warranties_Single Prime.pdf PDF
S02 Dwg S3-S5.pdf PDF
012700 Cutting and Patching_Single Prime.pdf PDF
061000 Rough Carpentry.pdf PDF
111200 Parking Control Equipment.pdf PDF
012800 Field Engineering_Single Prime.pdf PDF
210512.pdf PDF
233400.pdf PDF
Show 40 more

Latest 50 of 165 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING SHEET FOR TOTAL PROJECT

AND PRICE REDUCTIONS

Total Price for complete Parking Structure Project: $__________________________

(copy from SF1442 Block 17)

While this project is planned for full funding, conditions may necessitate scope of work reductions to meet available funding. Areas for price reductions are identified and to be priced as listed.

Reduction 1: Subtract $__________from Total Price to remove Tier #4 from base project

Reduction 1 Adjusted Total Price: $_____________________

Reduction 2: Subtract $____________ from Total Price to remove exterior stairs from the southeast corner

Reduction 2 Adjusted Total Price: $_____________________

Reduction 3: Subtract $___________ from Total Price to remove decorative façade-paint precast structure only

Reduction 3 Adjusted Total Price: $_____________________

Reduction 4: Subtract $__________ from Total Price to remove temporary parking

Reduction 4 Adjusted Total Price: $_____________________

File details come from the government source that posted it. Updated .