This document provides specifications for a field engineering services contract related to Parking Garage Project Number 693-222 for the Department of Veterans Affairs in Wilkes-Barre, Pennsylvania. The selected contractor will be responsible for professional surveying services including verifying layout information and property boundaries, establishing and maintaining permanent benchmarks, locating existing utilities, and performing layout and measurement for building foundations, column grids, floor levels and other project elements. The contractor will also be required to furnish information to adjust, move or relocate any existing structures or utilities affected by construction and coordinate with local authorities. The specifications establish quality standards requiring an experienced, licensed land surveyor and describe administrative requirements for the contractor's surveying log and as-built documentation.
View the file
Other files for this federal contract opportunity
Show all 50
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARKING GARAGE PROJECT NUMBER 693-222
DEPARTMENT OF VETERANS AFFAIRS
WILKES-BARRE, PENNSYLVANIA
012800 - 1
SECTION 012800 - FIELD ENGINEERING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. General: This Section specifies administrative and procedural requirements for field-engineering services including, but not limited to, the following:
1. Professional surveying services
B. Related Sections: The following Sections contain requirements that relate to this Section:
1. Division 1 Section "Project Coordination" for procedures for coordinating field engineering with other construction activities.
1.3 QUALITY ASSURANCE
A. Surveyor Qualifications: Engage a land surveyor registered in Pennsylvania, to perform required land-surveying services.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify layout information shown on the Drawings in relation to the property survey and existing benchmarks before proceeding to lay out the Work. Locate and protect existing benchmarks and control points. Preserve permanent reference points during construction.
1. Do not change or relocate benchmarks or control points without prior written approval. Promptly report lost or destroyed reference points or requirements to relocate reference points because of necessary changes in grades or locations.
2. Promptly replace lost or destroyed Project control points. Base replacements on the original survey control points.
PARKING GARAGE PROJECT NUMBER 693-222
DEPARTMENT OF VETERANS AFFAIRS
WILKES-BARRE, PENNSYLVANIA
012800 - 2
B. Establish and maintain a minimum of two (2) permanent benchmarks on the site, referenced to data established by survey control points.
1. Record benchmark locations with horizontal and vertical data on Project Record Documents.
C. Existing Utilities and Equipment: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities, including private utilities, and other construction. If the location of known or suspected underground utilities cannot be verified, notify the Owner and Architect.
1. Prior to construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping.
3.2 PERFORMANCE
A. Work from lines and levels established by the property survey. Establish benchmarks and markers to set lines and levels at each story of construction and elsewhere as needed to locate each element of the Project. Calculate and measure required dimensions within indicated or recognized tolerances. Do not scale drawings to determine dimensions.
1. Advise entities engaged in construction activities of marked lines and levels provided for their use.
2. As construction proceeds, check every major element for line, level, and plumb.
B. Surveyor's Log: Maintain a surveyor's log of control and other survey work. Make this log available for reference.
1. Record deviations from required lines and levels, and advise the Architect when deviations that exceed indicated or recognized tolerances are detected. On Project Record Drawings, record deviations that are accepted and not corrected.
2. Upon completion of foundation walls, major site improvements, and other work requiring field-engineering services, prepare a certified survey showing dimensions, locations, angles and elevations of construction and sitework.
C. Site Improvements: Locate and lay out site improvements, including pavements, stakes for grading, fill and topsoil placement, utility slopes, and invert elevations.
D. Building Lines and Levels: Locate and lay out batter boards for structures, building foundations, column grids and locations, floor levels, and control lines and levels required for mechanical and electrical work.
E. Existing Utilities: Furnish information necessary to adjust, move or relocate existing structures, utility poles, lines, services or other appurtenances located in or affected by construction. Coordinate with local authorities having jurisdiction.
END OF SECTION 012800