012800 Field Engineering_Single Prime.pdf

PDF 10 KB Posted

Attached to
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2
Solicitation number
36C24420R0075
Issued by

About this file

This document provides specifications for a field engineering services contract related to Parking Garage Project Number 693-222 for the Department of Veterans Affairs in Wilkes-Barre, Pennsylvania. The selected contractor will be responsible for professional surveying services including verifying layout information and property boundaries, establishing and maintaining permanent benchmarks, locating existing utilities, and performing layout and measurement for building foundations, column grids, floor levels and other project elements. The contractor will also be required to furnish information to adjust, move or relocate any existing structures or utilities affected by construction and coordinate with local authorities. The specifications establish quality standards requiring an experienced, licensed land surveyor and describe administrative requirements for the contractor's surveying log and as-built documentation.

View the file

Other files

File Type Posted
Parking Garage Arch Dwgs Add 1.pdf PDF
A6.2 Signage.pdf PDF
015000TempFacilitiesControls.pdf PDF
VMAC_Sketch_SKE-1.pdf PDF
084113 Aluminum Storefront Systems.pdf PDF
057200 Ornamental Fence and Gates.pdf PDF
097753 Living Wall System.pdf PDF
019100 Gen Commis.docx DOCX document
013526 Safety Requirements.docx DOCX document
S02 36C24420R0075 Amend 2.pdf PDF
S02 Q_A Parking Structure Solicit.pdf PDF
S02 Pricing Sheet.pdf PDF
36C24420R0075_6.docx DOCX document
010000 General.docx DOCX document
024100 Demolition.docx DOCX document
150002002 - VAMC Wilkes-Barre Parking Structure FINAL Geotechnical Report 11-30-15.pdf PDF
095113 Acoustical Panel Ceilings.pdf PDF
014535 Special Inspections.docx DOCX document
017419 Const Waste Mgmt.doc DOC document
022113 Site Surveys.docx DOCX document
087100 Door Hardware.pdf PDF
107300 Exterior Canopy System.pdf PDF
015719 Temp Envir Cont.doc DOC document
013323 Shop dwgs Product Data.docx DOCX document
015816 Temp Int Signage.docx DOCX document
042000 Unit Masonry Assemblies.pdf PDF
074515 Composite Wall Panel.pdf PDF
014219 Reference Standards.docx DOCX document
014500 Quality Control.docx DOCX document
S02 Solicitation 36C24420R0075 AMD 0001.pdf PDF
EXHIBIT D -SampleTransmittalLetter Past Performance Evaluation Questionnaire.docx DOCX document
36C24420R0075_5.docx DOCX document
EXHIBIT E PastPerformanceQuestionnaire.docx DOCX document
36C24420R0075_4.docx DOCX document
P03 JA Tyco SimplexGrinnell.pdf PDF
P03 JA Yale Lock.pdf PDF
S04 Site Visit Sign-in.pdf PDF
P03 JA Johnson Controls.pdf PDF
075323 EPDM Single-Ply Membrane Roofing.pdf PDF
014500.docx DOCX document
071113 Bituminous Dampproofing.pdf PDF
034133 Precast Structural Pretensioned Concrete.pdf PDF
264313.pdf PDF
017900 Warranties_Single Prime.pdf PDF
S02 Dwg S3-S5.pdf PDF
012700 Cutting and Patching_Single Prime.pdf PDF
061000 Rough Carpentry.pdf PDF
111200 Parking Control Equipment.pdf PDF
210512.pdf PDF
233400.pdf PDF
Show 40 more

Latest 50 of 165 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARKING GARAGE PROJECT NUMBER 693-222

DEPARTMENT OF VETERANS AFFAIRS

WILKES-BARRE, PENNSYLVANIA

012800 - 1

SECTION 012800 - FIELD ENGINEERING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. General: This Section specifies administrative and procedural requirements for field-engineering services including, but not limited to, the following:

1. Professional surveying services

B. Related Sections: The following Sections contain requirements that relate to this Section:

1. Division 1 Section "Project Coordination" for procedures for coordinating field engineering with other construction activities.

1.3 QUALITY ASSURANCE

A. Surveyor Qualifications: Engage a land surveyor registered in Pennsylvania, to perform required land-surveying services.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify layout information shown on the Drawings in relation to the property survey and existing benchmarks before proceeding to lay out the Work. Locate and protect existing benchmarks and control points. Preserve permanent reference points during construction.

1. Do not change or relocate benchmarks or control points without prior written approval. Promptly report lost or destroyed reference points or requirements to relocate reference points because of necessary changes in grades or locations.

2. Promptly replace lost or destroyed Project control points. Base replacements on the original survey control points.

PARKING GARAGE PROJECT NUMBER 693-222

DEPARTMENT OF VETERANS AFFAIRS

WILKES-BARRE, PENNSYLVANIA

012800 - 2

B. Establish and maintain a minimum of two (2) permanent benchmarks on the site, referenced to data established by survey control points.

1. Record benchmark locations with horizontal and vertical data on Project Record Documents.

C. Existing Utilities and Equipment: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities, including private utilities, and other construction. If the location of known or suspected underground utilities cannot be verified, notify the Owner and Architect.

1. Prior to construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping.

3.2 PERFORMANCE

A. Work from lines and levels established by the property survey. Establish benchmarks and markers to set lines and levels at each story of construction and elsewhere as needed to locate each element of the Project. Calculate and measure required dimensions within indicated or recognized tolerances. Do not scale drawings to determine dimensions.

1. Advise entities engaged in construction activities of marked lines and levels provided for their use.

2. As construction proceeds, check every major element for line, level, and plumb.

B. Surveyor's Log: Maintain a surveyor's log of control and other survey work. Make this log available for reference.

1. Record deviations from required lines and levels, and advise the Architect when deviations that exceed indicated or recognized tolerances are detected. On Project Record Drawings, record deviations that are accepted and not corrected.

2. Upon completion of foundation walls, major site improvements, and other work requiring field-engineering services, prepare a certified survey showing dimensions, locations, angles and elevations of construction and sitework.

C. Site Improvements: Locate and lay out site improvements, including pavements, stakes for grading, fill and topsoil placement, utility slopes, and invert elevations.

D. Building Lines and Levels: Locate and lay out batter boards for structures, building foundations, column grids and locations, floor levels, and control lines and levels required for mechanical and electrical work.

E. Existing Utilities: Furnish information necessary to adjust, move or relocate existing structures, utility poles, lines, services or other appurtenances located in or affected by construction. Coordinate with local authorities having jurisdiction.

END OF SECTION 012800