024100 Demolition.docx
DOCX document 21 KB Posted
- Attached to
- Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 Federal contract opportunity
- Solicitation number
- 36C24420R0075
About this file
This document package includes a demolition specification and a related federal contract solicitation. The demolition specification outlines requirements for the demolition and removal of buildings, utilities, and other structures at the Wilkes-Barre VA Medical Center in Pennsylvania as part of a parking garage project. Key details specified include protection measures during demolition, utility disconnections, debris removal, and cleanup requirements.
The federal contract solicitation seeks offers to construct a new parking structure to accommodate approximately 435 vehicles on the existing VA campus in Wilkes-Barre. The project scope includes all labor, materials, tools, equipment, permits, testing, and reports. The magnitude of the project is estimated between $10-20 million. This is a set-aside for Service-Disabled Veteran-Owned Small Businesses utilizing tiered evaluation procedures down to the large business tier. Offerors must comply with applicable wage and hour laws. Pricing must be in whole dollars. The solicitation may be canceled before award.
View the file
Other files for this federal contract opportunity
Show all 50
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARKING GARAGE PROJECT NUMBER 693-222
DEPARTMENT OF VETERANS AFFAIRS
WILKES-BARRE, PENNSYLVANIA
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 DESCRIPTION:
This section specifies demolition and removal of buildings, portions of buildings, utilities, other structures and debris from trash dumps shown.
1.2 RELATED WORK:
| A. | Demolition and removal of roads, walks, curbs, and ongrade slabs outside buildings to be demolished: Section 31 20 00, EARTH MOVING. |
| B. | Safety Requirements: Section 01 35 26 Safety Requirements Article, ACCIDENT PREVENTION PLAN (APP). |
| C. | Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS. |
| D. | Reserved items that are to remain the property of the Government: Section 01 00 00, GENERAL REQUIREMENTS. |
| E. | Environmental Protection: Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS. |
| F. | Construction Waste Management: Section 017419 CONSTRUCTION WASTE MANAGEMENT. |
| G. | Infectious Control: Section 01 35 26, SAFETY REQUIREMENTS, Article 1.12, INFECTION CONTROL. |
1.3 PROTECTION:
| A. | Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures. Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT PREVENTION. |
| B. | Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations. Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS. |
| C. | Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled. |
| D. | Provide enclosed dust chutes with control gates from each floor to carry debris to truck beds and govern flow of material into truck. Provide overhead bridges of tight board or prefabricated metal construction at dust chutes to protect persons and property from falling debris. |
| E. | Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily. |
| F. | In addition to previously listed fire and safety rules to be observed in performance of work, include following: |
| 1. | No wall or part of wall shall be permitted to fall outwardly from structures. |
| 2. | Maintain at least one stairway in each structure in usable condition to highest remaining floor. Keep stairway free of obstructions and debris until that level of structure has been removed. |
| 3. | Wherever a cutting torch or other equipment that might cause a fire is used, provide and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers. |
| 4. | Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 4500 mm (15 feet) of fire hydrants. |
| G. | Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Medical Center property; any damaged items shall be repaired or replaced as approved by the Resident Engineer. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal works. Repairs, reinforcement, or structural replacement must have Resident Engineer’s approval. |
| H. | The work shall comply with the requirements of Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS. |
| I. | The work shall comply with the requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article 1.7 INFECTION PREVENTION MEASURES. |
1.4 UTILITY SERVICES:
| A. | Demolish and remove outside utility service lines shown to be removed. |
| B. | Remove abandoned outside utility lines that would interfere with installation of new utility lines and new construction. |
PART 2 - PRODUCTS (Not Used)
PART 3 – EXECUTION
3.1 DEMOLITION:
| A. | Completely demolish and remove buildings and structures, including all appurtenances related or connected thereto, as noted below: |
| 1. | As required for installation of new utility service lines. |
| 2. | To full depth within an area defined by hypothetical lines located 1500 mm (5 feet) outside building lines of new structures. |
| B. | Debris, including brick, concrete, stone, metals and similar materials shall become property of Contractor and shall be disposed of by him daily, off the Medical Center property to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the Resident Engineer. Break up concrete slabs below grade that do not require removal from present location into pieces not exceeding 600 mm (24 inches) square to permit drainage. Contractor shall dispose debris in compliance with applicable federal, state or local permits, rules and/or regulations. |
| C. | In removing buildings and structures of more than two stories, demolish work story by story starting at highest level and progressing down to third floor level. Demolition of first and second stories may proceed simultaneously. |
| D. | Remove and legally dispose of all materials, other than earth to remain as part of project work, from any trash dumps shown. Materials removed shall become property of contractor and shall be disposed of in compliance with applicable federal, state or local permits, rules and/or regulations be hauled to VA specified disposal site . All materials in the indicated trash dump areas, including above surrounding grade and extending to a depth of 1500mm (5feet) below surrounding grade, shall be included as part of the lump sum compensation for the work of this section. Materials that are located beneath the surface of the surrounding ground more than 1500 mm (5 feet), or materials that are discovered to be hazardous, shall be handled as unforeseen. The removal of hazardous material shall be referred to Hazardous Materials specifications. |
| E. | Remove existing utilities as indicated or uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Resident Engineer. When Utility lines are encountered that are not indicated on the drawings, the Resident Engineer shall be notified prior to further work in that area. |
3.2 CLEANUP:
On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Resident Engineer. Cleanup shall include off the Medical Center property disposal of all items and materials not required to remain property of the Government as well as all debris and rubbish resulting from demolition operations.
E N D 02 41 00 - 1