017900 Warranties_Single Prime.pdf

PDF 12 KB Posted

Attached to
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2
Solicitation number
36C24420R0075
Issued by

About this file

This document includes a warranty specification for a parking garage project and the corresponding federal contract solicitation. The parking garage project specification outlines administrative and procedural requirements for warranties on the project, including standard manufacturer warranties and any special warranties required by the contract. It addresses related damages and losses, reinstatement of warranties, replacement costs, and the owner's recourse. The federal contract solicitation is for construction of the parking garage project at the Wilkes-Barre VA Medical Center in Pennsylvania. The project scope includes all labor, materials, tools and equipment to construct a new 435-space parking structure. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and will use a tiered evaluation process including large businesses. Pricing is to be provided in whole dollars and the magnitude of the project is estimated between $10-20 million.

View the file

Other files

File Type Posted
Parking Garage Arch Dwgs Add 1.pdf PDF
A6.2 Signage.pdf PDF
015000TempFacilitiesControls.pdf PDF
VMAC_Sketch_SKE-1.pdf PDF
084113 Aluminum Storefront Systems.pdf PDF
057200 Ornamental Fence and Gates.pdf PDF
097753 Living Wall System.pdf PDF
019100 Gen Commis.docx DOCX document
013526 Safety Requirements.docx DOCX document
S02 36C24420R0075 Amend 2.pdf PDF
S02 Q_A Parking Structure Solicit.pdf PDF
S02 Pricing Sheet.pdf PDF
36C24420R0075_6.docx DOCX document
010000 General.docx DOCX document
024100 Demolition.docx DOCX document
150002002 - VAMC Wilkes-Barre Parking Structure FINAL Geotechnical Report 11-30-15.pdf PDF
095113 Acoustical Panel Ceilings.pdf PDF
014535 Special Inspections.docx DOCX document
017419 Const Waste Mgmt.doc DOC document
022113 Site Surveys.docx DOCX document
087100 Door Hardware.pdf PDF
107300 Exterior Canopy System.pdf PDF
015719 Temp Envir Cont.doc DOC document
013323 Shop dwgs Product Data.docx DOCX document
015816 Temp Int Signage.docx DOCX document
042000 Unit Masonry Assemblies.pdf PDF
074515 Composite Wall Panel.pdf PDF
014219 Reference Standards.docx DOCX document
014500 Quality Control.docx DOCX document
S02 Solicitation 36C24420R0075 AMD 0001.pdf PDF
EXHIBIT D -SampleTransmittalLetter Past Performance Evaluation Questionnaire.docx DOCX document
36C24420R0075_5.docx DOCX document
EXHIBIT E PastPerformanceQuestionnaire.docx DOCX document
36C24420R0075_4.docx DOCX document
P03 JA Tyco SimplexGrinnell.pdf PDF
P03 JA Yale Lock.pdf PDF
S04 Site Visit Sign-in.pdf PDF
P03 JA Johnson Controls.pdf PDF
075323 EPDM Single-Ply Membrane Roofing.pdf PDF
014500.docx DOCX document
071113 Bituminous Dampproofing.pdf PDF
034133 Precast Structural Pretensioned Concrete.pdf PDF
264313.pdf PDF
S02 Dwg S3-S5.pdf PDF
012700 Cutting and Patching_Single Prime.pdf PDF
061000 Rough Carpentry.pdf PDF
111200 Parking Control Equipment.pdf PDF
012800 Field Engineering_Single Prime.pdf PDF
210512.pdf PDF
233400.pdf PDF
Show 40 more

Latest 50 of 165 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARKING GARAGE PROJECT NUMBER 693-222

DEPARTMENT OF VETERANS AFFAIRS

WILKES-BARRE, PENNSYLVANIA

017900 - 1

SECTION 017900 - WARRANTIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for warranties required by the Contract Documents, including manufacturer’s standard warranties on products and special warranties.

1. Refer to the General Conditions of the Contract for Construction for terms of the Contractor's period for correction of the Work.

B. Related Sections: The following Sections contain requirements that relate to this Section:

1. Division 1 Section "Submittals" specifies procedures for submitting warranties.

2. Division 1 Section "Contract Closeout" specifies contract closeout procedures.

3. Divisions 2 through 33 Sections for specific requirements for warranties and special warranties on products and installations specified to be warranted.

4. Certifications and other commitments and agreements for continuing services to the Owner are specified elsewhere in the Contract Documents.

C. Disclaimers and Limitations: Manufacturer's disclaimers and limitations on product warranties do not relieve the Contractor of the warranty on the Work that incorporates the products. Manufacturer's disclaimers and limitations on product warranties do not relieve suppliers, manufacturers and subcontractors required to countersign special warranties with the Contractor.

1.3 DEFINITIONS

A. Standard product warranties are preprinted written warranties published by individual manufacturers for particular products and are specifically endorsed by the manufacturer to the Owner.

B. Special warranties are written warranties required by or incorporated in the Contract Documents, either to extend time limits provided by standard warranties or to provide greater rights for the Owner.

1.4 WARRANTY REQUIREMENTS

017900 - 2

A. Related Damages and Losses: When correcting failed or damaged warranted construction, remove and replace construction that has been damaged as a result of such failure or must be removed and replaced to provide access for correction of warranted construction.

B. Reinstatement of Warranty: When Work covered by a warranty has failed and been corrected by replacement or rebuilding, reinstate the warranty by written endorsement.

The reinstated warranty shall be equal to the original warranty with an equitable adjustment for depreciation.

C. Replacement Cost: Upon determination that Work covered by a warranty has failed, replace or rebuild the Work to an acceptable condition complying with the requirements of the Contract Documents. The Contractor is responsible for the cost of replacing or rebuilding defective Work regardless of whether the Owner has benefited from use of the Work through a portion of its anticipated useful service life.

D. Owner's Recourse: Expressed warranties made to the Owner are in addition to implied warranties and shall not limit the duties, obligations, rights, and remedies otherwise available under the law. Expressed warranty periods shall not be interpreted as limitations on the time in which the Owner can enforce such other duties, obligations, rights, or remedies.

1. Rejection of Warranties: The Owner reserves the right to reject warranties and to limit selection to products with warranties not in conflict with the requirements of the Contract Documents.

E. Where the Contract Documents require a special warranty or similar commitment on the Work or part of the Work, the Owner reserves the right to refuse to accept the Work until the Contractor presents evidence that entities required to countersign such commitments are willing to do so.

1.5 SUBMITTALS

A. Submit written warranties to the Architect prior to the date certified for Substantial Completion. If the Architect's Certificate of Substantial Completion designates a commencement date for warranties other than the date of Substantial Completion of the Work, or a designated portion of the Work, submit written warranties upon request of the Architect.

1. When a designated portion of the Work is completed and occupied or used by the Owner, by separate agreement with the Contractor during the construction period, submit properly executed warranties to the Architect within 15 days of completion of that designated portion of the Work.

B. When the Contract Documents require the Contractor, or the Contractor and a subcontractor, supplier or manufacturer to execute a special warranty, prepare a written document that contains appropriate terms and identification, ready for execution by the required parties. Submit a draft to the Owner, through the Architect, for approval prior to final execution.

017900 - 3

C. Form of Submittal: At Final Completion compile two (2) copies of each required warranty properly executed by the Contractor, or by the Contractor, subcontractor, supplier or manufacturer. Organize the warranty documents into an orderly sequence based on the table of contents of the Project Manual.

D. Bind warranties and bonds in heavy-duty, commercial-quality, durable 3-ring, vinyl-covered loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch paper.

1. Provide heavy paper dividers with celluloid covered tabs for each separate warranty. Mark the tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product, and the name, address, and telephone number of the installer.

2. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project title or name and the name of the Contractor.

3. When warranted construction requires operation and maintenance manuals, provide additional copies of each required warranty, as necessary, for inclusion in each required manual.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 017900