AEONRG LLC.pdf
PDF 250 KB Posted
- Attached to
- C1NB--Cooling Tower Replacement Project 595-11-135 Federal contract opportunity
- Solicitation number
- 36C24420R0014
About this file
This document contains details of a federal contract opportunity for cooling tower replacement services. The Lebanon VA Medical Center is seeking a design-build contractor team through a two-phase solicitation to complete designs from a previous 2012 project and perform construction for replacement of a cooling tower. The project is estimated to cost between $2-5 million and will be a 455-day period of performance once awarded. Only SDVOSB firms will be eligible to participate in phase one and the winning proposal will be selected based on best value. The solicitation is anticipated to be released on February 21, 2020 under NAICS code 238220 with a $15 million size standard. The Department of Veterans Affairs VISN 4 will administer the contract.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECORD OF ATTENDANCE
Solicitation/Contract No. 36C24420R0014 DATE: 5/12/20 TIME: 1PM
Project Title: Cooling Tower Replacement Project 595-11-135
TYPE OF MEETING
Training ( ) Bid Opening Negotiation Conference Pre-Performance Conference Pre-proposal/Pre-bid site visit Business Strategy Panel Pre-proposal/Pre-bid conference Pre-Final Inspection Progress Meeting Final Inspection Source Selection Evaluation Meeting Other:
NAME ORGANIZATION PHONE NUMBER EMAIL
ADDRESS
Jeffrey Zbezinski RPO East NCO4 Contracting Officer
878-271-6636 Jeffrey Zbezinski
Brandy Mickelson Lebanon VA COR 717-272-6621 x5078
Brandy.Mickelson@va.gov
Bill Belknap AEONRG LLC 610-517-0242 billbelknap@aeonrg.com Bob Metka Wheeling
Mechanical 610-689-4760 robertmetka@wheelingmecha nical.com David Bacci H.F. Lenz 412-371-9101 dbacci@hflenz.com
REMARKS:
Contracting Officer not present, the engineering walk-through/tour confirmed discussions did not make changes to the requirement or the specifications; this can only done by a written amendment to solicitation.
mailto:Brandy.Mickelson@va.gov mailto:billbelknap@aeonrg.com mailto:robertmetka@wheelingmechanical.com mailto:robertmetka@wheelingmechanical.com
| 2020-05-22T13:09:22-0400 | |
| Jeffrey Zbezinski 551812 |
File details come from the government source that posted it. Updated .