36C24420R0014-018.docx
DOCX document Posted
- Attached to
- C1NB--Cooling Tower Replacement Project 595-11-135 Federal contract opportunity
- Solicitation number
- 36C24420R0014
About this file
This document contains a technical proposal template for a design-build project to replace cooling towers at the Lebanon Veterans Affairs Medical Center. Key details include:
The project involves selecting a prime contractor to partner with an engineering firm to complete design and construction. Firms must be 100% Service-Disabled Veteran Owned Small Businesses. The technical proposal requests information on experience, personnel, quality control, safety programs, and schedules. Proposals are limited to 40 double-sided pages and are due by February 21, 2020. The construction period is 455 calendar days with an anticipated budget between $2-5 million. Evaluation will be based on technical capability, past performance, and price.
36C24420R0014 EXHIBIT A - Technical proposal data.docx
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A – TECHNICAL PROPOSAL DATA
Offerors are strongly encouraged to review the evaluation information located in the solicitation as they complete their Exhibit A (Phase I AND Phase II).
Each question should be covered in sufficient detail to clearly address all required information. Answer questions in order presented. There is an overall technical proposal page limit; 40 double-sided pages, 12 pt. Times New Roman font single spaced); use as much space as necessary to provide answers. It is advisable to state the question then give the answer. This will aid in the evaluation.
In the event you reference another document or part of the proposal you must be clear as to where the information can be found to answer the particular question(s). Such statements as see Company profile or see Safety Plan are not acceptable. You must indicate on what page of the proposal the answer can be found in the referenced document. Failure to do so may make your proposal non-compliant.
The Project Management data is obtained for the purpose of evaluating technical capability. The offeror is required to provide required information to show experience and capability to manage multiple disciplined projects.
1. TECHNICAL CAPABILITY:
A. TECHNICAL EXPERIENCE (Project and Personnel Experience)
1. Describe your experience and capability in managing construction projects for the dollar level, and disciplines needed to accomplish this project. (Explain why you are a good candidate for receiving an award?)
2. This contract requires short notice site visits/proposal meetings, normally within 2 calendar days, but can be as short as 2 hours (120 minutes). How will you ensure compliance with these requirements?
3. Explain in detail how you will perform the minimum percentage required (25% GC) with your own resources. (See Exhibit D for what can/cannot be included.) Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, Cooling tower installation, may be afforded additional consideration in the evaluation. You should address your general self-performance capability here as well as demonstrate it in the calculations on the Exhibit D.
B. CAPABILITY (Technical Personnel Experience)
1. Provide as an attachment an Organizational Chart listing company personnel that be actively involved with this project and their roles. (Titles)
2. Provide names, duties and levels of responsibility of key personnel to include the Project Manager, Site Superintendent(s), Quality Control Manager, Safety Manager and Infection Control Manager.
Indicate to whom the Quality Control, Safety and Infection Control Managers report. (Lines of authority)
3. Provide a list of the in-house trades that you employ. Provide the number (not names) of these employees and if they are full-time, part- time etc.
4. If applicable, describe the support and interface with your home office or corporate headquarters for such aspects as financial, management and technical support.
5. Discuss the education, training and experience in managing construction projects of the key personnel listed in B2 above (a resume may be submitted if it provides this information).
6. Provide list of major subcontractors and their trades that you intend to use on these projects.
7. Tell us if you have worked together in the past (Contract/project numbers). If yes, on what kind of jobs?
8. Discuss your scheduling capabilities. Include such things as programs and staff to do scheduling. Submit a schedule for this project.
C. QUALITY CONTROL:
1. Discuss how quality issues will be dealt with on this construction project. Include in the discussion as a minimum, meetings, inspections, submittal reviews, correction of non-compliant work and how you intend to ensure non-reoccurrence and reporting of quality problems to Government officials. (Note: A full Quality Control Plan is required with the proposal. Also, provide on this form the page numbers where the required information (list of minimum information above) can be found. If you fail to follow these instructions, your proposal may not be adequately evaluated).
2. Provide the names of testing laboratories to be used and the procedures for test data reporting.
3. Discuss your procedures for contract closeout (Punch list, as built drawings, etc.); updated record drawings that would be included.
4. Discuss your Safety Program in general, and provide as a minimum, details on training, documentation, and your plan to ensure adherence to OSHA Standards. (Note: A full Safety Plan will be required if you are awarded a contract and is NOT required with the proposal. If you do provide a plan, indicate if it is a draft for this contract, a sample from another project or a corporate plan. Also, provide on this form the page numbers where the required information (listed above) can be found. If you fail to follow these instructions, your proposal may not be adequately evaluated.)
5: Discuss the steps you took to promote safety during construction during the past five (5) years.
6. Provide a certification that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If the number exceeds the criteria listed, explain why?
7. Offerors shall submit their current EMR rating. EMR rating should be less than or equal to 1.0. If the number exceeds the criteria listed, explain why?
Attachments to your exhibit A:
1. Organization Chart (required);
2. Resumes (required);
3. Schedule (required)
4. Quality Control Plan (Quality Control Manager - Phase I and Quality Assurance/Quality Control Plan – Phase II).
5. Safety Plan (required Phase I - be sure to follow guidance in Scope of Work and instructions, conditions and other statements to bidders/offeror’s) Page 1 of Page 1 of