This document provides information for a federal contract opportunity to replace cooling towers at the Lebanon Veterans Affairs Medical Center in Pennsylvania. The Department of Veterans Affairs will conduct a two-phase design-build solicitation to select a prime contractor to partner with an architect/engineering firm for the design and construction of the cooling tower renovation project. Phase I proposals will be evaluated to determine which 100% Service Disabled Veteran Owned Small Business offerors will be selected to submit offers in Phase II. The solicitation is anticipated to have a value between $2-5 million and will be issued on or around February 21, 2020, with a 455 calendar day period of performance. Only SDVOSBs will be eligible to participate in Phase I, and the selection will made based on evaluation factors for technical approach, past performance, and price to determine the best value to the government.

36C24420R0014 EXHIBIT C - Subcontractor Information and Consent Form .docx

View the file

Other files for this federal contract opportunity

Other files attached to C1NB--Cooling Tower Replacement Project 595-11-135, newest first.
File Type Posted
EXHIBIT B - Past Performance Relevancy Questionnaire REV.docx DOCX document
36C24420R0014 A0004.pdf PDF
Qs and As A0004.pdf PDF
Full Set - Drawings Chiller.pdf PDF
36C24420R0014 A0004_1.docx DOCX document
36C24420R0014 A0003.pdf PDF
36C24420R0014 A0003_1.docx DOCX document
SAW Contracting Inc.pdf PDF
RLS Construction Group LLC.pdf PDF
District Veterans Contracting Inc.pdf PDF
AEONRG LLC.pdf PDF
36C24420R0014-A0002000.docx DOCX document
36C24420R0014-A0002001.pdf PDF
36C24420R0014-A0001001.docx DOCX document
36C24420R0014-A0001002.pdf PDF
36C24420R0014-018.docx DOCX document
36C24420R0014-017.docx DOCX document
36C24420R0014-015.pdf PDF
36C24420R0014-023.docx DOCX document
36C24420R0014-016.docx DOCX document
36C24420R0014-019.docx DOCX document
36C24420R0014-021.docx DOCX document
36C24420R0014-014.pdf PDF
36C24420R0014-013.pdf PDF
36C24420R0014-012.docx DOCX document
36C24420R0014-022.docx DOCX document
36C24420R0014-011.docx DOCX document
36C24420R0014-001.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit C – Subcontractor Information and Consent Form

(Phase I). Each major subcontractor and/or Teaming Partner must also complete an Exhibit C, “Subcontractor Information and Consent Form” to be considered. Offerors shall have major subcontractors identify on the Exhibit B two references, owners (if they were the Prime) or other Prime contractors they have worked for. References for subcontractors from the proposing offeror are not acceptable. See Exhibit “B” format for information to be provided. Written references for subcontractors may be included and are encouraged; however, subcontractors do not need to send out past performance questionnaires.

A. Multiple Subcontractors may be named for the same discipline but is limited to a maximum of three (3) subcontractors per discipline.

B. Provide information regarding the assessment of liquidated damages on any contracts within the last five years. (Frequency, circumstances, severity of problem, etc.)

C. Offerors are strongly encouraged to include with their proposals information on problems encountered on relevant projects and the specific corrective actions taken to remedy the problems.

D. Other Past Performance Considerations. Information provided, shall be limited to the period starting seven (7) years prior to the solicitation release date.

a. Effectiveness of value engineering (VEC) proposals you submitted on prior contracts. (Provide a brief description; impact on cost, schedule, efficiency or quality; contract number; name and phone number of customer benefiting from the VEC).

b. Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations.

c. Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).

Subcontractor and/or Teaming Partner Consent for the Release of Past Performance Information to the Prime Contractor and Reference Information:

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance relevancy we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms shall be submitted to the offering contractor for submission with the past performance volume.

(Name of Firm) is currently planning on participating as a (subcontractor and or a teaming partner) with (prime contractor or name of entity providing proposal) in responding to the Request for Proposal Number 36C24420R0014 Cooling Tower Replacement Project 595-11-135issued by the Department of Veterans Affairs Lebanon VA Medical Center1700 S Lincoln Ave Lebanon, PA 17042.

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process, we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.

(Signature) (Title of Individual with authority to sign for and legally bind the company

Address:

City/State/Zip Code: Date:

Reference List (required):

1. Contract No. And Title

Describe your role (Prime/Sub) and work Performed

Reference POC Name Phone Fax

Email address:

2. Contract No. And Title

Describe your role (Prime/Sub) and work Performed

Reference POC Name Phone Fax

Email address:

3. Contract No. And Title

Describe your role (Prime/Sub) and work Performed

Reference POC Name_ Phone Fax

Email address: