36C24420R0014-019.docx
DOCX document Posted
- Attached to
- C1NB--Cooling Tower Replacement Project 595-11-135 Federal contract opportunity
- Solicitation number
- 36C24420R0014
About this file
This document outlines requirements for a federal design-build contract opportunity. The Lebanon Veterans Affairs Medical Center is soliciting proposals for the design and construction of a Cooling Tower Replacement Project. The selected contractor will partner with an engineering firm to complete remaining design work and construct a new cooling tower system. The project budget is between $2-5 million. Only Service-Disabled Veteran-Owned Small Businesses may respond to the initial Phase I solicitation. Phase II proposals will be evaluated based on best value. The period of performance is 455 calendar days from notice to proceed. The solicitation will be issued on February 21, 2020 under North American Industry Classification System code 238220 with a small business size standard of $15 million.
36C24420R0014 EXHIBIT B - Past Performance Relevancy Questionnaire.docx
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1: Prepare no more than three (3) Part 1 forms: (Phase I).
Provide the following information requested in this format for each of the projects/contracts being described. Projects may be on going and cannot have been completed any later than seven (7) years prior to the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. no more than (3) pages per project.
A. Offeror (Your) Name (Company/Division):
B. Project/Contract Title:
C. Contract Specifics:
1. Description of Effort as Prime or _Subcontractor
2. Contract Number
3. Original Contract $ Value Current/Final Contract $ Value
4. If amounts in 3 above are different, provide a brief description of the reason:
5. Completion Date:
1. Original Date:
2. Current Schedule: _____________________
3. Estimate/Final Completion Date:
4. Primary cause for Contract Modifications
D. Provide detailed description of the work performed under the contract and describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)
In addition, address the following
1. Describe the specific elements of the work performed by your firm.
2. Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on this project. Should you intend to use these same subcontractors, please list their company names and described their principal areas of work that they will perform.
3. Address any technical areas about this project you consider uniquely relevant to this solicitation.
E. Point of Contact for Owner/Government agency Contracting Officer and or inspector (COR / COTR); include a current phone number and email address for each.
EXHIBIT B PERFORMANCE RELEVANCY QUESTIONNAIRE
End of Part 1- Questionnaire Requirements – Prepare and send Exhibit C Package to the reference(s) for each of the no more than three Construction Projects, or Specialty Trade if applicable provided in Exhibit A, Part 1. See below for Exhibit A, Part Page 1 of Page 1 of
Part 2, Additional offeror information required.
A. Name subcontractors and/or Teaming Partners to be utilized on this contract. Multiple subcontractors may be named for the same discipline but are limited to a maximum of three (3) subcontractors per discipline. As a minimum, provide the name(s) of subcontractors to be utilized in the following areas:
(Specialty Trades will address their specific trade for any major subcontractor or Teaming partner – list below is not all inclusive or may not apply)
a. Specialty Trades:
i. Existing Conditions
ii. Concrete
iii. Masonry
iv. Metals
v. Wood, Plastics and Composites
vi. Thermal and Moisture Protection
vii. Openings
viii. Finishes
ix. Specialties
x. Equipment
xi. Furnishings
xii. Conveying Equipment
xiii. Fire Suppression
xiv. Plumbing
xv. Heating, Ventilating and Air Conditioning
xvi. Electrical
xvii. Electrical Safety and Security
xviii. Earthworks
xix. Exterior Improvements
xx. Utilities
{MUST BE PROJECT SPECIFIC}
Page 1 of Page 1 of
File details come from the government source that posted it. Updated .