36C24420R0014-021.docx

DOCX document Posted

Attached to
C1NB--Cooling Tower Replacement Project 595-11-135 Federal contract opportunity
Solicitation number
36C24420R0014
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This document contains a calculation worksheet and related federal contract opportunity notice for a cooling tower replacement project. The Lebanon Veterans Affairs Medical Center will solicit proposals for a design-build contract with a 100% Service-Disabled Veteran-Owned Small Business prime contractor to complete designs and construction. Offerors must be SDVOSBs and provide at least 25% of contract costs from their own or other eligible SDVOSB personnel. The calculation worksheet outlines how to report self-performance and subcontracting percentages by specification division. The federal contract opportunity is a best value two-phase solicitation, with Phase I evaluating SDVOSB offerors for Phase II proposals. The project scope includes renovating Cooling Tower 595-11-135 per VA specifications within a $2-5 million budget. The contract will be awarded under NAICS code 238220 with a size standard of $15 million. Proposals are due in February 2020 and work must be completed within 455 calendar days of notice to proceed. The Department of Veterans Affairs Veterans Health Administration VISN 4 will administer the contract.

36C24420R0014 EXHIBIT D - Calculation of Self Performance.docx

View the file

Other files for this federal contract opportunity

Other files attached to C1NB--Cooling Tower Replacement Project 595-11-135, newest first.
File Type Posted
Full Set - Drawings Chiller.pdf PDF
36C24420R0014 A0004_1.docx DOCX document
Qs and As A0004.pdf PDF
EXHIBIT B - Past Performance Relevancy Questionnaire REV.docx DOCX document
36C24420R0014 A0004.pdf PDF
RLS Construction Group LLC.pdf PDF
District Veterans Contracting Inc.pdf PDF
AEONRG LLC.pdf PDF
36C24420R0014 A0003_1.docx DOCX document
SAW Contracting Inc.pdf PDF
36C24420R0014 A0003.pdf PDF
36C24420R0014-A0002000.docx DOCX document
36C24420R0014-A0002001.pdf PDF
36C24420R0014-A0001001.docx DOCX document
36C24420R0014-A0001002.pdf PDF
36C24420R0014-020.docx DOCX document
36C24420R0014-014.pdf PDF
36C24420R0014-013.pdf PDF
36C24420R0014-012.docx DOCX document
36C24420R0014-022.docx DOCX document
36C24420R0014-023.docx DOCX document
36C24420R0014-016.docx DOCX document
36C24420R0014-019.docx DOCX document
36C24420R0014-018.docx DOCX document
36C24420R0014-017.docx DOCX document
36C24420R0014-015.pdf PDF
36C24420R0014-011.docx DOCX document
36C24420R0014-001.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.1 - CALCULATION WORKSHEET FOR SELF-PERFORMED AND SUBCONTRACTED WORK

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK (Phase II).

Offerors for Plumbing, Heating, and Air-Conditioning Contractors (NAICS code 238220) must provide at least 25 percent (25% performance compliance for this specialty trade NAICS code) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division

SDVOSB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$

Sub Total (Personnel Costs, Material/Equipment Costs)

Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Page 1 of

Page 1 of Page 1 of

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $

1. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $_______________

1. Remainder is ‘Total amount of work to be self-performed this Contract ’: $_______________

1. Self-performed work = Line 3/Line 1 x 100 = ______________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)