This is an access guide for ProductivityNOW eLearning that provides step-by-step instructions for granting external contractors access to complete Autodesk Build Construction management required training. The guide outlines the process beginning with contract award, requiring contractors to request access in writing to the Contracting Officer's Representative (COR) no later than 14 days after contract award. Contractors must provide staff names and email addresses. The COR then grants access with a mandatory expiration date set to 12 calendar days and assigns Autodesk training courses to the requested staff members. The system permits a maximum of 52 external users for the entire VISN (Veterans Integrated Service Network), and access to ProductivityNOW is separate from access to Autodesk Build.

The guide includes detailed procedural instructions for both granting external access and assigning training. For access, users log into ProductivityNOW, navigate to the VISN 2 Contractors Group, go to Members, and select "Invite External Members," where they fill in the staff member's name and email, mark the membership expiration checkbox, set the expiration date, and send the invitation. An automated email is then sent to the external person with platform access and login instructions. For training assignment, the COR accesses the VISN 2 Contractors Group, goes to Assets, selects "Assign Learning," checks the option to assign a due date, selects the appropriate training courses (such as Autodesk Build Fundamentals or VISN 2 Build Implementation User Training), specifies the due date, selects the member names, and saves the assignment. The member is then notified and the assigned trainings appear on their main course page. Upon completion, contractors must submit training completion certificates or competency memos to the COR.

View the file

Other files

File Type Posted
36C24226R0034 0005.docx DOCX document
36C24226R0034 0004.docx DOCX document
Amendment 00004 RFI Answers.docx DOCX document
S02 Mechanical Print Chiller Plant Drawing.pdf PDF
36C24226R0034 0003.docx DOCX document
S02 Mech_CD Drawing.pdf PDF
Amendment 00003 RFI Answers.docx DOCX document
S02 Elec CD Drawing.pdf PDF
S02 Architectural Drawing.pdf PDF
36C24226R0034 0002.docx DOCX document
VA Privacy Training Document.pdf PDF
36C24226R0034 0001.pdf PDF
S02 Participation Goals for Minorities and Females 2.1.pdf PDF
013200 Construction Documentation Design Build HVAC Bldgs. 4 and 5.1.docx DOCX document
WD NY20250003 Mod 17 12122025.1.pdf PDF
36C24226R0034_1.1.docx DOCX document
S02 52.225-2 BUY AMERICAN CERTIFICATE 2.1.docx DOCX document
S02 LIMITATION ON SUBCONTRACTING 2.1.docx DOCX document
S02 INSTRUCTIONS TO BIDDERS REGARDING TAX EXEMPTION IN NY 2.1.docx DOCX document
S02 Privacy Training for Personnel without Access to VA Computer 1.1.pdf PDF
SCA Wagw No 2015 4187 Rev 34 12032025.1.pdf PDF
01 35 26 Safety Requirements Design Build HVAC Bldgs. 4 and 5.1.docx DOCX document
01 00 00 General Requirements Design Build HVAC Bldgs. 4 and 5.1.docx DOCX document
S02 FAR DEVIATION FEB 2025 NOTICE 2.1.docx DOCX document
S02 LIQUIDATED DAMAGES FORMULATION MEMO 2.1.docx DOCX document
S02 SAFETY AND ENVIRONMENTAL RECORD 2.1.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Product ivit yNOW eLea rn ing

Acces s Guide

Purpose: This guide is to provide step by step instructions on how to grant access to external contractors to complete Autodesk Build Construction management required training.

Process:

Contract has been awarded (Design or Construction) Contractor(s) request access to ProductivityNow NLT 14 days from contract award, and provide the following staff information to the COR:

Name Email

COR to grand access to the requested staff and ensure an expiration date is set to 12 calendar days.

COR to assign Autodesk training courses to the requested staff.

COR shall inform the contractor that access invite had been sent.

Contractor’s staff to acknowledge / accept access invite and start the training Contractor Shall submit Autodesk Build training completion certificates or competency memo to

COR.

Notes:

• Contractor MUST request access in writing through the COR.

• COR MUST establish access expiration date (ProductivityNOW License agreement and contract permit 52 external users for the entire VISN)

• Access to ProductivityNOW is separate from access to Autodesk Build.

Granting External Access Step by Step Instructions

1) Login to your ProductivityNOW account

2) Go to VISN 2 Contractors Group

3) Go to Members

4) Go to Invite External Members

5) Fill in the invited staff info, mark Membership Expires, set Expiration Date, and hit send.

6) An invitation email will be sent to the external person with a link to the platform and login instructions.

Assign Training Step by Step Instructions

1) Login to your ProductivityNOW account

2) Go to VISN 2 Contractors Group

3) Go to Assets, then Assign Learning

4) Select Learning, check Assign a due date, and set due date

5) Select member name(s) and click save

6) The member will be notified that training courses has been assigned.

7) Assigned trainings will be on member’s main page

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9

File details come from the government source that posted it. Updated .