S02 Architectural Drawing.pdf
PDF 576 KB Posted
- Solicitation number
- 36C24226R0034
About this file
This is an architectural drawing set for a federal construction project. The document presents contract documents for the "Replace Chillers Ph. II" project at the New York Harbor Healthcare System located at 423 E 23rd Street, New York, NY. The project is identified as VA PROJECT NUMBER 17-054 and Building Number 630-16-101, indicating involvement of the Department of Veterans Affairs.
The main bid item includes comprehensive chiller replacement work with associated mechanical, electrical, and architectural modifications. The project specifies four bid alternates: Alternate 1 excludes replacement of Chiller CH-3, requiring instead that it be maintained in working condition with disconnected and reconnected water lines; Alternate 2 replaces window cleaning and reinstallation instead of new window units; Alternate 3 adds epoxy floor coating application to the complete chiller room floor with high-traction finish; and Alternate 4 requires furnishing of a chiller manufacturer's premium 3-year factory service plan covering planned maintenance, emergency maintenance, and extended warranty. Additional requirements include installation of wall-mounted hearing protection dispensers (Honeywell Howard Leight model HL400-LL-INTRO) at every entrance to chiller spaces, provision of hearing conservation signage stating "CAUTION HEARING PROTECTION REQUIRED" at all chiller space entrances, and plastic sheeting for weather protection during demolition and window installation. The facility is noted as fully sprinklered, and the architectural plans include first floor layouts, elevations, and detailed specifications prepared by Apogee Consulting Group, P.A., the project manager and consultant.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H
C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
UP
UP
FF
A-101
15 18 19
HH
JJ
LL
21 22.5 24
EE
A-101
SCOPE OF WORK
02 03
02 03
02 03
ALT
ALT
ALT
02 03
FIRST FLOOR
26.67
ROOF LEVEL
52.67
15 18 19 21 22.5 24
V.I.F.
12'-0"
V.I.F.
12'-0"
V .I
.F
2-3/4” INSULATED TRANSLUCENT
FIBERGLASS SANDWICH PANEL
UNIT WALL SYSTEM.
A-101
20'-4 5/8" 19'-11 3/4"13'-7 3/4"
4'-1 3/8" 4'-1 5/8"
2-3/4” INSULATED
TRANSLUCENT
FIBERGLASS SANDWICH
PANEL UNIT WALL
SYSTEM.
V.I.F.
8'-4"
11 1/2"
A-101
A-101
A-101
12'-0"
2"
EQ.
2 1/2"
EQ.
2 1/2"
EQ.
2"
/2
/2
PANEL DIMENSION
ROUGH OPENING
FIRST FLOOR
26.67
ROOF LEVEL
52.67
18 19 21 22.5 24
20'-4 5/8" 19'-11 3/4"13'-7 3/4"
8'-4" 5'-2 3/4" 12'-0" 8'-3" 12'-0"
010101
EXISTING
WINDOW
SYSTEM
EXISTING
WINDOW
SYSTEM
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
/1 /2
:5
:3
P M
A-101
ARCHITECTURAL PLAN DETAILS AND
ELEVATIONS
1 1DMM HM
REPLACE CHILLERS PH. II
NEW YORK HARBOR HEALTHCARE
SYSTEM
423 E 23RD STREET, NEW YORK, NY 12/20/2019
CONTRACT DOCUMENTS
630-16-10117-054
Scale: 1/8" = 1'-0"
FIRST FLOOR PLAN 0 4 8 16
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
SOUTH ELEVATION - NEW WORK
Scale: 1/4" = 1'-0"
DETAIL
Scale: 1/8" = 1'-0"
DETAIL
Scale: 1/8" = 1'-0"
DETAIL
Scale: 1/8" = 1'-0"
DETAIL
Scale: 1/8" = 1'-0"
EXISTING - SOUTH ELEVATION
ALT
ALT
BID ALTERNATES:
# KEY NOTES:
01.
02.
03.
Scale: No Scale
SIGNAGE
A. MAIN BID ITEM I: WORK INCLUDES ALL WORK
INCLUDED ON CONTRACT DOCUMENTS.
B. BID ALTERNATE NO.1:
SHALL INCLUDE ALL WORK DESCRIBED IN
THE MAIN BID ITEM NO. 1, WITH THE
EXCEPTION OF WHERE CONTRACT
DOCUMENTS INDICATE REPLACEMENT OF
CHILLER CH-3. IF BID ALTERNATE NO. 1 IS
ACCEPTED BY THE VA, TREAT CHILLER CH-3
AS EXISTING TO REMAIN. DO NOT REPLACE
THIS CHILLER, AND MAINTAIN CH-3 IN
WORKING CONDITION. DISCONNECT CHILLED
WATER AND CONDENSER WATER LINES
FROM EXISTING DISTRIBUTION HEADERS
DURING DEMOLITION, AND CONNECT TO
VALVED CONNECTIONS AT NEW
DISTRIBUTION HEADERS INSTALLED DURING
CONSTRUCTION. MAKE CHILLER CH-3
OPERABLE BY ACTION OF THE BUILDING
AUTOMATION SYSTEM. LEAVE EXISTING
ELECTRICAL SERVICE TO CH-3 AS IS, AND
MAINTAIN IN WORKING CONDITION.
C. BID ALTERNATE NO. 2:
SHALL INCLUDE ALL WORK DESCRIBED IN
THE MAIN BID ITEM NO. 1, WITH THE
EXCEPTION OF WHERE CONTRACT
DOCUMENTS INDICATE WINDOW
REPLACEMENT WITH NEW UNITS. IF BID
ALTERNATE NO. 2 IS ACCEPTED BY THE VA,
TREAT THE EXISTING WINDOWS AS ITEMS TO
BE CLEANED AND REINSTALLED, INCLUDING
REPAIR OF DAMAGE TO WINDOWS INCURRED
DURING REMOVAL, STORAGE, AND
REINSTALLATION.
D. BID ALTERNATE NO. 3:
SHALL INCLUDE ALL WORK DESCRIBED IN
THE MAIN BID ITEM NO. 1, ALONG WITH THE
REQUIREMENT TO CLEAN AND PREPARE
COMPLETE CHILLER ROOM FLOOR FOR
APPLICATION OF EPOXY FLOOR COATING.
PROVIDE HIGH-TRACTION EPOXY FLOOR
FINISH FOR COMPLETE CHILLER ROOM
FLOOR. COR WILL SELECT COLOR. PAINT
EQUIPMENT HOUSEKEEPING PADS AS
INDICATED IN MAIN BID ITEM I.
E. BID ALTERNATE NO.4:
SHALL INCLUDE ALL WORK DESCRIBED IN
THE MAIN BID ITEM NO. 1, ALONG WITH THE
REQUIREMENT TO FURNISH CHILLER
MANUFACTURER’S PREMIUM 3-YEAR
FACTORY SERVICE PLAN TO COVER
PLANNED MAINTENANCE, EMERGENCY
MAINTENANCE, AND EXTENDED WARRANTY
FOR EACH CHILLER.
PROVIDE WALL MOUNTED HEARING
PROTECTION DISPENSERS EQUAL TO:
HONEYWELL HOWARD LEIGHT HL400-LL-INTRO
HL400 DISPENSER WITH 1 PREFILLED CANISTER
OF 400 PRS. LASER LITE EARPLUGS 32 DB
HONEYWELL INDUSTRIAL SAFETY 900 DOUGLAS
PIKE SMITHFIELD, RI 02917 UNITED STATES: TEL.
800.430.5490 TEL. FAX. 800.322.1330 HYPERLINK
"HTTP://WWW.HONEYWELL.COM"
WWW.HONEYWELL.COM
MOUNT 1 DISPENSER WITH 1 CANISTER PER
CASE AT EVERY ENTRANCE TO THE ROOM AND
AS NOTED ON KEYNOTE #2.
PROVIDE PLASTIC SHEETING AS REQUIRED FOR
WEATHER PROTECTION DURING THE
DEMOLITION AND INSTALLATION OF THE
WINDOW SYSTEMS.
PROVIDE HEARING CONSERVATION SIGNAGE AT
ALL ENTRANCES INTO THE CHILLER SPACES,
SIGNS SHALL STATE "CAUTION HEARING
PROTECTION REQUIRED" REFER TO 7/A-101.
A.
B.
C.
REMOVE WINDOWS AND REPLACE WITH
NEW WINDOWS.
PROVIDE PLASTIC WALL MOUNTED EARPLUG
DISPENSER CABINET.
PROVIDE 10" X 14" HEARING CONSERVATION
SIGNAGE ON WALL OUTSIDE CHILLER SPACE.
REFER TO DETAIL 7.
ALT
DocuSign Envelope ID: F59BCCEA-213D-434D-883A-29537521E0FC
12/19/2019
| Sheets |
| A-101 - ARCHITECTURAL PLAN DETAILS AND ELEVATIONS |
| G-002 - INFECTION CONTROL RISK ASSESSEMENT |
| 2019-12-20T05:48:05-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .