This is a Construction Documentation specification section (01 32 00) for the VA-NYHHCS Design Build HVAC Buildings 4 and 5 project (Project No. 630-26-102), issued September 1, 2023. The specification establishes mandatory requirements for all construction contractors and A/E design firms awarded work at VISN 2 VA facilities to utilize the Autodesk Build Construction management platform, also known as Autodesk Construction Cloud (ACC), as the official project communication and collaboration system at no cost to the contractor.

The primary requirements include: contractors must request platform access within 14 days of contract award by submitting a written list of authorized staff members with their full names, company names, email addresses, and project roles; all granted staff must complete required ACC training through the ProductivityNOW eLearning portal within 12 calendar days of access being granted; contractors must submit training completion certificates to the Contracting Officer Representative within 2 business days; additional staff and subcontractors may be added at any time through the same process; and contractors must notify the COR of any staff changes within 2 business days. The ACC platform is designated for all official project correspondence and submissions including RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys. Correspondence conducted outside the platform will not serve as governing authority and any associated costs are the contractor's responsibility. No contract time extensions or cost increases will be provided for failure to comply with ACC platform requirements, and work cannot commence until all ACC platform requirements are satisfied.

View the file

Other files

File Type Posted
36C24226R0034 0005.docx DOCX document
36C24226R0034 0004.docx DOCX document
Amendment 00004 RFI Answers.docx DOCX document
S02 Architectural Drawing.pdf PDF
36C24226R0034 0003.docx DOCX document
S02 Mechanical Print Chiller Plant Drawing.pdf PDF
Amendment 00003 RFI Answers.docx DOCX document
S02 Mech_CD Drawing.pdf PDF
S02 Elec CD Drawing.pdf PDF
36C24226R0034 0002.docx DOCX document
36C24226R0034 0001.pdf PDF
VA Privacy Training Document.pdf PDF
01 35 26 Safety Requirements Design Build HVAC Bldgs. 4 and 5.1.docx DOCX document
S02 AUTODESK Contractors Access Instructions 1.1.pdf PDF
36C24226R0034_1.1.docx DOCX document
S02 SAFETY AND ENVIRONMENTAL RECORD 2.1.docx DOCX document
SCA Wagw No 2015 4187 Rev 34 12032025.1.pdf PDF
S02 52.225-2 BUY AMERICAN CERTIFICATE 2.1.docx DOCX document
S02 INSTRUCTIONS TO BIDDERS REGARDING TAX EXEMPTION IN NY 2.1.docx DOCX document
S02 LIMITATION ON SUBCONTRACTING 2.1.docx DOCX document
WD NY20250003 Mod 17 12122025.1.pdf PDF
S02 Participation Goals for Minorities and Females 2.1.pdf PDF
S02 Privacy Training for Personnel without Access to VA Computer 1.1.pdf PDF
01 00 00 General Requirements Design Build HVAC Bldgs. 4 and 5.1.docx DOCX document
S02 LIQUIDATED DAMAGES FORMULATION MEMO 2.1.docx DOCX document
S02 FAR DEVIATION FEB 2025 NOTICE 2.1.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA-NYHHCS Project No. 630-26-102 Project Title: Design Build HVAC Bldgs. 4 and 5 09-01-23

SECTION 01 32 00

CONSTRUCTION DOCUMENTATION

PART 1- GENERAL

1.1 DESCRIPTION:

A. Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform.

1.2 REQUIREMENTS:

A.Contractor shall accomplish and complete the following tasks upon award of contract:
1.Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR NLT 14 days from contract award.
2.Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.

3. The access request shall be in writing and include a list of staff. The list shall include the following information:

•Full Name
•Company Name
•Email Address
•Role/Position on the project (i.e., Project manager, site super)
4.Upon granting access, staff shall complete required ACC training through ProductivityNOW platform within 12 Calendar days.
5.Upon successful completion of training, contractor shall submit certificates of completion to COR NLT 2 Business days.
B.Access to ProductivityNOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period.
C.Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above.
D.The contractor shall only use the ACC platform for all contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor’s failure to utilize the ACC platform as the project’s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor’s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.
E.Contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertains to staff who was granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform.
F.Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.

‑ ‑ ‑ E N D ‑ ‑ ‑ 01 32 00 - 1