This document is a supplemental information drawing (Sheet SI-006) for the National Cemetery of the Alleghenies Phase III Development, Package "A" located in Washington County, Pennsylvania. The detailed site plan shows a complex drainage and infrastructure layout including specific engineering elements such as a rip-rap outlet apron, 4" valve, 4" PVC solid pipe, stabilized overflow weir (width 45', elevation 1119.00), 4" perforated HDPE underdrain, and an infiltration berm with top elevation at 1120.00 and bottom elevation at 1117.00. The project is associated with the broader Y1JZ--NCOTA 3B Completion Project (Solicitation Number: 36C10F25B0002), which involves infrastructure improvements at the national cemetery.

The drawing includes topographical contour lines, detailed site grading information, and a legend with technical specifications. The plan was created by Gordon engineering firm, with the CADD file labeled SI-006.DWG and dated 6-20, referencing an original plan sealed on 5-25-18. The document notes that construction sequence details can be found on Sheet GC001, and the project involves precise site development work with specific elevation and infrastructure requirements for the National Cemetery of the Alleghenies.

View the file

Other files

File Type Posted
36C10F25B0002 0008.docx DOCX document
Updated Wage Determination PA20250104.pdf PDF
BMP Chapter 6-7-3.pdf PDF
36C10F25B0002 0007.docx DOCX document
Store Front Shop Drawing.pdf PDF
Pages from 10 14 00.1.R2 Exterior Signage.pdf PDF
Joint Sealant- Product Data and Color Chart.pdf PDF
36C10F25B0002 0006.docx DOCX document
SI-009 R02 Directional Signage - 8.20.2020.pdf PDF
RFI SUBMISSION LOG 8 04 - FINAL.pdf PDF
36C10F25B0002 0005.docx DOCX document
04 40 10 01R1 Stone Caps AE rvw AN.pdf PDF
04 40 10 08 Revd Stone Caps at Ossuary AE rvw NET.pdf PDF
Submittal 05 52 00-1.1 Handrails.pdf PDF
05 52 00.4 New handrail sections with slip joints.pdf PDF
05 52 00-03 SS Handrail PD - AE rvw AN.pdf PDF
36C10F25B0002 0003.docx DOCX document
S06 - Pre-Proposal Conference slides NCOTA 3B.pdf PDF
Appendix O - NCOTA PH3B Areas for Joint Sealant.pdf PDF
Appendix N - Section 14 Grid Markers.pdf PDF
Appendix L - Section 11 Grid Markers.pdf PDF
Appendix K - Section 9 Grid Markers.pdf PDF
Appendix D1 - Columbarium Niche Foundation Finish and Vertical Joints.pdf PDF
Appendix B6 - MC Cable.pdf PDF
Appendix B3 - Video Surveillance Cable.pdf PDF
Appendix A1 - TEMPORARY SHELTER RELOCATION.pdf PDF
Appendix M - Section 12 Grid Markers.pdf PDF
Appendix H - Cracked Mortar- Columbarium D.pdf PDF
Appendix D - Contract B- Caps to be Replaced Revised.pdf PDF
Appendix C - Sealant Replacement Locations.pdf PDF
Appendix B7 - Fire Detection and alarm Cable.pdf PDF
Appendix B5 - Pre-Product Data.pdf PDF
Appendix B1 - Video Surv. Product info.pdf PDF
Appendix A - FWS and Storm Structures.pdf PDF
Appendix T - NCOTA Phase 3B Development - Specifications Set 2.pdf PDF
Appendix Q - NCOTA Phase 3B Development - Package A Excerpts.pdf PDF
Appendix B - Existing columbarium concrete sidewalk replacement.pdf PDF
Appendix S - NCOTA Phase 3B Development - Specifications Set 1.pdf PDF
Appendix R - NCOTA Phase 3B Development - Package B Excerpts.pdf PDF
Appendix P - Sealant Technical Data Sheet.pdf PDF
Appendix J - Sect C8-C10 Grid Markers.pdf PDF
Appendix I - Niche Touch-up Locations.pdf PDF
Appendix G - Electrical MR ref dwg.pdf PDF
Appendix F - Cracked Mortar- Columbarium B.pdf PDF
Appendix E - Contract B- Sidewalk Sections to Be Replaced Revised.pdf PDF
Appendix B8 - Fire Detection and Alarm Submittal RE Response.pdf PDF
Appendix B4 - Pre-Product Data.pdf PDF
Appendix B2 - Video Surv. Product info.pdf PDF
36C10F25B0002_1.docx DOCX document
wage determination PA20250104.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POINT #'S 5000 - 5005

(PROVIDED BY STEFANIK

CONTRACTING ON 3/3/20)

RIP-RAP

OUTLET

APRON

4" VALVE

4" PVC SOLID PIPE

STABILIZED OVERFLOW WEIR

WIDTH = 45'

ELEV = 1119.00

4" PERFORATED

HDPE UNDERDRAIN

INFILTRATION BERM

TOP OF BERM = 1120.00

BOTTOM OF BERM = 1117.00

LEGEND:

Gordon

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

PROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

OF

SHEET:

CADD:

DATE:

DRAWN:

JOB:

SI-006.DWG

3265-0301

5-6-20

BJS

1 1

SCALE: 1" = 20'SUPPLEMENTAL INFORMATION 006

NATIONAL CEMETERY OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

WASHINGTON COUNTY, PA

PROJECT NUMBER: 925PC2006

ORIGINAL PLAN AFFECTED: CG102

ORIGINAL PLAN SEAL DATE: 5-25-18

NOTE: REFER TO SHEET GC001 FOR CONSTRUCTION SEQUENCE.