Appendix B7 - Fire Detection and alarm Cable.pdf

PDF 268 KB Posted

Attached to
Y1JZ--NCOTA 3B Completion Project
Solicitation number
36C10F25B0002
Issued by

About this file

This document is a submittal for fire alarm control cable for the National Cemetery of the Alleghenies Phase 3 Development project. The submittal, numbered 28 46 00-3.0, was prepared by Vantage Corporation for C&C Contractors, LLC and submitted to the Department of Veterans Affairs on February 4, 2021. The submittal covers fire alarm control cable specifications, including details such as low smoke PVC insulated solid bare copper conductors with an overall red low smoke PVC jacket, twisted with an aluminum tape and drain wire. The cable is intended for applications including fire protection, alarm systems, monitoring/detection circuits, and other related electrical safety systems, with specifications covering conductor type, insulation, voltage rating, and color coding.

The technical specification sheet provides comprehensive details on cable configurations, including unshielded and shielded FFLP (Fire, Fluorinated Propylene) cable types across different American Wire Gauge (AWG) sizes, conductor strand configurations, and physical characteristics. The cable is UL listed, cUL listed, RoHS compliant, and meets various NEC articles. Available in 1,000-foot reels and boxes, the cable supports multiple conductor configurations from 12 to 18 AWG, with specific part numbers for different strand and conductor counts. The product is manufactured by Advanced Digital Cable (ADC) and is designed for use in critical safety and signaling applications within federal construction projects.

View the file

Other files

File Type Posted
Updated Wage Determination PA20250104.pdf PDF
36C10F25B0002 0008.docx DOCX document
BMP Chapter 6-7-3.pdf PDF
36C10F25B0002 0007.docx DOCX document
Store Front Shop Drawing.pdf PDF
Pages from 10 14 00.1.R2 Exterior Signage.pdf PDF
Joint Sealant- Product Data and Color Chart.pdf PDF
36C10F25B0002 0006.docx DOCX document
SI-009 R02 Directional Signage - 8.20.2020.pdf PDF
RFI SUBMISSION LOG 8 04 - FINAL.pdf PDF
04 40 10 01R1 Stone Caps AE rvw AN.pdf PDF
04 40 10 08 Revd Stone Caps at Ossuary AE rvw NET.pdf PDF
36C10F25B0002 0005.docx DOCX document
Submittal 05 52 00-1.1 Handrails.pdf PDF
05 52 00.4 New handrail sections with slip joints.pdf PDF
05 52 00-03 SS Handrail PD - AE rvw AN.pdf PDF
36C10F25B0002 0003.docx DOCX document
S06 - Pre-Proposal Conference slides NCOTA 3B.pdf PDF
Appendix O - NCOTA PH3B Areas for Joint Sealant.pdf PDF
Appendix N1 - INFILTRATION BERM.pdf PDF
Appendix N - Section 14 Grid Markers.pdf PDF
Appendix L - Section 11 Grid Markers.pdf PDF
Appendix K - Section 9 Grid Markers.pdf PDF
Appendix D1 - Columbarium Niche Foundation Finish and Vertical Joints.pdf PDF
Appendix B6 - MC Cable.pdf PDF
Appendix B3 - Video Surveillance Cable.pdf PDF
Appendix A1 - TEMPORARY SHELTER RELOCATION.pdf PDF
Appendix T - NCOTA Phase 3B Development - Specifications Set 2.pdf PDF
Appendix Q - NCOTA Phase 3B Development - Package A Excerpts.pdf PDF
Appendix B - Existing columbarium concrete sidewalk replacement.pdf PDF
Appendix M - Section 12 Grid Markers.pdf PDF
Appendix H - Cracked Mortar- Columbarium D.pdf PDF
Appendix D - Contract B- Caps to be Replaced Revised.pdf PDF
Appendix C - Sealant Replacement Locations.pdf PDF
Appendix B5 - Pre-Product Data.pdf PDF
Appendix B1 - Video Surv. Product info.pdf PDF
Appendix A - FWS and Storm Structures.pdf PDF
Appendix S - NCOTA Phase 3B Development - Specifications Set 1.pdf PDF
Appendix R - NCOTA Phase 3B Development - Package B Excerpts.pdf PDF
Appendix P - Sealant Technical Data Sheet.pdf PDF
Appendix J - Sect C8-C10 Grid Markers.pdf PDF
Appendix I - Niche Touch-up Locations.pdf PDF
Appendix G - Electrical MR ref dwg.pdf PDF
Appendix F - Cracked Mortar- Columbarium B.pdf PDF
Appendix E - Contract B- Sidewalk Sections to Be Replaced Revised.pdf PDF
Appendix B8 - Fire Detection and Alarm Submittal RE Response.pdf PDF
Appendix B4 - Pre-Product Data.pdf PDF
Appendix B2 - Video Surv. Product info.pdf PDF
36C10F25B0002_1.docx DOCX document
wage determination PA20250104.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C&C Contractors 209 Lyons Street Notasulga, Alabama 36866 Phone: (334) 257-4307

Project: 1901 - 1901 Alleghenies Major 2018 1158 Morgan Rd

Bridgeville, Pennsylvania 15017

Distribution Summary Distributed on 02/24/2021 by Brandon Johnson (C&C Contractors, LLC)

To: Leanne Pomponio (Vantage Corp ), Bill Kendall (Vantage Corp ) Message: Bill. See attached APPROVED submittal.

Additional Attachments: 28 46 00-03 Fire Detection and Alarm- Fire Alarm Cable- Submittal.pdf

NAME RESPONSE ATTACHMENTS COMMENT

Joyce Johnson (Department of Veteran Affairs)

Approved No Exception Taken

28 46 0-03 Fire Detection and Alarm- Fire Alarm Cable REVISION: 0 SUBMITTAL MANAGER: Brandon Johnson (C&C Contractors, LLC)

STATUS: Closed DATE CREATED: 02/4/2021 ISSUE DATE: 02/4/2021 SPEC SECTION: 28 46 00 - Fire Detection and Alarm

RESPONSIBLE

CONTRACTOR:

Vantage Corp RECEIVED FROM: Bill Kendall

RECEIVED DATE: SUBMIT BY: 02/4/2021

FINAL DUE DATE: 03/4/2021 LOCATION:

COST CODE:

TYPE: Product Information

APPROVERS: Joyce Johnson (Department of Veteran Affairs), Brandon Johnson (C&C Contractors, LLC)

BALL IN COURT:

DISTRIBUTION:

Ashraf Wahba (NCA), Robert Meyer (C&C Contractors, LLC), Kimberly Giles (NCA), Jason Gerhart (Gordon), Carlton Fuqua (C&C Contractors, LLC), Peter Fuller (C&C Contractors, LLC), Paul Crowe (Vali Cooper International, LLC)

DESCRIPTION:

SUBMITTAL TRANSMITTAL

DEPARTMENT OF VETERANS AFFAIRS PROJECT: National Cemetery of the Alleghenies- Phase 3 Development

CONTRACT NO: 36C10F19C0002

Obligation No. 925CM20006

Contractor: C & C Contractors, LLC Supplier: Vantage Electric

Item No.

Specification Section No.:

28 46 00 Registered Submittal No.:

Paragraph No. Description of Item (Size, Type, Name, Manufacturer, Use, etc.)

No. of Copies Submitted

1.4 Submittals- Fire Detection and Alarm- Fire Alarm

Cable

1 2.2. Wire- Fire Alarm Control Cable 3

C&C Contractors Page 1 of 2 Printed On: 02/25/2021 09:35 AM

Submittal #28 46 00-3.0

28 46 00 - Fire Detection and Alarm https://storage.procore.com/v4/d/us-east-1/pro-core.com/prostore/20210204163904_production_2671741011.pdf?sig=aa8c50f9bbf02c053da4a88b3174fcb6658e08d1e34ad2c198cdcf69cf0baaad

SUBMITTAL WORKFLOW

NAME SENT DATE DUE DATE RETURNED

DATE RESPONSE ATTACHMENTS COMMENTS

General Information Attachments

28 46 00-03 Fire Detection and Alarm- Fire Alarm Cable- Submittal.pdf

Joyce Johnson 02/04/2021 02/18/2021 02/24/2021 Approved No Exception Taken

Brandon Johnson 02/24/2021 03/04/2021 02/24/2021 Approved

BY DATE COPIES TO

C&C Contractors Page 2 of 2 Printed On: 02/25/2021 09:35 AM

Submittal #28 46 00-3.0

28 46 00 - Fire Detection and Alarm https://app.procore.com/743331/project/submittal_logs/document_downloader?attachment_id=2671741011&item_id=27913953&item_type=SubmittalLog&project_id=743331&source=coversheet https://app.procore.com/743331/project/submittal_logs/document_downloader?attachment_id=2671741011&item_id=27913953&item_type=SubmittalLog&project_id=743331&source=coversheet https://app.procore.com/743331/project/submittal_logs/document_downloader?attachment_id=2671741011&item_id=27913953&item_type=SubmittalLog&project_id=743331&source=coversheet

SUBMITTAL TRANSMITTAL

SN: 28 46 00-03

Sheet: 1 of 03

DEPARTMENT OF

VETERANS AFFAIRS

PROJECT: National Cemetery of the Alleghenies- Phase 3 Development

CONTRACT NO: 36C10F19C0002

Obligation No. 925CM20006

Pkg.

No.

x

Date:

February 4, 2021

Contractor: C & C Contractors, LLC Supplier: Vantage Electric VA ACTION

Ite m

N o.

Specification Section No.:

28 46 00 Registered Submittal No.:

Pa ra gr ap h

Description of Item (Size, Type, Name, Manufacturer, Use, etc.) N o.

o f C op ie s Su bm itt ed o f

C op ie s

R et ur ne d

Ap pr ov

Ap pr w ith ot at io ns

D is ap pr

R es ub m it

1.4 Submittals- Fire Detection and Alarm- Fire Alarm Cable

1 2.2. Wire- Fire Alarm Control Cable 3 Contractor Signature:

Brandon Johnson

Recommended By:

Title, Date: Project Manager February 4, 2021

Title: Date:

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements per the General Provisions (FAR 52.236-21) A/E/Sub:

Review Comments:

Action By:

Date:

Contracting Officer’s Representative

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omissions.

SUBMITTAL LOG DATES: From contractor (_________), To reviewer (_________), From reviewer (_________), To contractor (_________), DSC-1(CS) Rev.

Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim 11/95

File details come from the government source that posted it. Updated .