This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the National Cemetery of the Alleghanies (NCOTA) Phase 3B Development project. The amendment extends the Request for Information (RFI) due date from July 30, 2025, at 12:00 PM EST to August 4, 2025, at 3:00 PM EST, while maintaining the original proposal due date of August 19, 2025, at 10:00 AM EST. The solicitation is issued by the Department of Veterans Affairs Office of Construction and Facilities Management and will result in a firm fixed-price contract for the NCOTA 3B Completion project, following Federal Acquisition Regulation (FAR) Part 14 procedures for an Invitation for Bid (IFB).

View the file

Other files

File Type Posted
36C10F25B0002 0008.docx DOCX document
Updated Wage Determination PA20250104.pdf PDF
BMP Chapter 6-7-3.pdf PDF
36C10F25B0002 0007.docx DOCX document
Store Front Shop Drawing.pdf PDF
Pages from 10 14 00.1.R2 Exterior Signage.pdf PDF
Joint Sealant- Product Data and Color Chart.pdf PDF
36C10F25B0002 0006.docx DOCX document
SI-009 R02 Directional Signage - 8.20.2020.pdf PDF
RFI SUBMISSION LOG 8 04 - FINAL.pdf PDF
36C10F25B0002 0005.docx DOCX document
04 40 10 01R1 Stone Caps AE rvw AN.pdf PDF
04 40 10 08 Revd Stone Caps at Ossuary AE rvw NET.pdf PDF
Submittal 05 52 00-1.1 Handrails.pdf PDF
05 52 00.4 New handrail sections with slip joints.pdf PDF
05 52 00-03 SS Handrail PD - AE rvw AN.pdf PDF
36C10F25B0002 0003.docx DOCX document
S06 - Pre-Proposal Conference slides NCOTA 3B.pdf PDF
Appendix O - NCOTA PH3B Areas for Joint Sealant.pdf PDF
Appendix N1 - INFILTRATION BERM.pdf PDF
Appendix N - Section 14 Grid Markers.pdf PDF
Appendix L - Section 11 Grid Markers.pdf PDF
Appendix K - Section 9 Grid Markers.pdf PDF
Appendix D1 - Columbarium Niche Foundation Finish and Vertical Joints.pdf PDF
Appendix B6 - MC Cable.pdf PDF
Appendix B3 - Video Surveillance Cable.pdf PDF
Appendix A1 - TEMPORARY SHELTER RELOCATION.pdf PDF
Appendix M - Section 12 Grid Markers.pdf PDF
Appendix H - Cracked Mortar- Columbarium D.pdf PDF
Appendix D - Contract B- Caps to be Replaced Revised.pdf PDF
Appendix C - Sealant Replacement Locations.pdf PDF
Appendix B7 - Fire Detection and alarm Cable.pdf PDF
Appendix B5 - Pre-Product Data.pdf PDF
Appendix B1 - Video Surv. Product info.pdf PDF
Appendix A - FWS and Storm Structures.pdf PDF
Appendix T - NCOTA Phase 3B Development - Specifications Set 2.pdf PDF
Appendix Q - NCOTA Phase 3B Development - Package A Excerpts.pdf PDF
Appendix B - Existing columbarium concrete sidewalk replacement.pdf PDF
Appendix S - NCOTA Phase 3B Development - Specifications Set 1.pdf PDF
Appendix R - NCOTA Phase 3B Development - Package B Excerpts.pdf PDF
Appendix P - Sealant Technical Data Sheet.pdf PDF
Appendix J - Sect C8-C10 Grid Markers.pdf PDF
Appendix I - Niche Touch-up Locations.pdf PDF
Appendix G - Electrical MR ref dwg.pdf PDF
Appendix F - Cracked Mortar- Columbarium B.pdf PDF
Appendix E - Contract B- Sidewalk Sections to Be Replaced Revised.pdf PDF
Appendix B8 - Fire Detection and Alarm Submittal RE Response.pdf PDF
Appendix B4 - Pre-Product Data.pdf PDF
36C10F25B0002_1.docx DOCX document
wage determination PA20250104.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 07-31-2025 925-008B 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 425 I Street NW Washington

DC

20001 101F Department of Veterans Affairs Office of Construction and Facilities Management 425 I Street NW Washington

DC

20001 To all Offerors/Bidders

36C10F25B0002 07-07-2025

X X X x The purpose of this amendment is to extend the Request for Information (RFI) due date. The RFI due date is changed from July 30, 2025 by 12:00 PM EST to August 4, 2025 by 3:00PM EST.

The proposal due date and time remain the same at August 19, 2025 by 10:00 AM EST.

No further changes.

Victoria Wayne National Cemetery of the Alleghanies (NCOTA) Phase 3B Development