36C10F25B0002 0008.docx

DOCX document 53 KB Posted

Attached to
Y1JZ--NCOTA 3B Completion Project
Solicitation number
36C10F25B0002
Issued by

About this file

This document is an Amendment (0008) to a federal solicitation for the National Cemetery of the Alleghenies Phase 3B Development Completion Project. The Department of Veterans Affairs Office of Construction and Facilities Management is seeking a firm fixed-price contract exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to perform construction work at the National Cemetery of the Alleghenies in Washington County, Pennsylvania. The project will correct previously identified punch list items and is valued between $2,000,000 and $5,000,000, with an approximate project duration of 365 calendar days from the Notice to Proceed.

The amendment updates solicitation clauses in accordance with Executive Order 14275 and the Revolutionary FAR Overhaul, removes outdated provisions, adds updated FAR clauses, and provides a new Davis-Bacon Wage Determination. The solicitation is being conducted as a Sealed Bid under FAR Part 14, with a bid opening date of September 4, 2025, at 10:00 AM EST. Bidders must be registered in SAM.gov, verified as SDVOSBs, and meet specific requirements including safety documentation, representations, and certifications. The project falls under NAICS code 236220 with a size standard of $45 Million and serves an estimated veteran population of 258,300 in the greater Pittsburgh metropolitan area.

View the file

Other files

File Type Posted
Updated Wage Determination PA20250104.pdf PDF
BMP Chapter 6-7-3.pdf PDF
36C10F25B0002 0007.docx DOCX document
SI-009 R02 Directional Signage - 8.20.2020.pdf PDF
RFI SUBMISSION LOG 8 04 - FINAL.pdf PDF
Store Front Shop Drawing.pdf PDF
Pages from 10 14 00.1.R2 Exterior Signage.pdf PDF
Joint Sealant- Product Data and Color Chart.pdf PDF
36C10F25B0002 0006.docx DOCX document
04 40 10 01R1 Stone Caps AE rvw AN.pdf PDF
04 40 10 08 Revd Stone Caps at Ossuary AE rvw NET.pdf PDF
36C10F25B0002 0005.docx DOCX document
05 52 00-03 SS Handrail PD - AE rvw AN.pdf PDF
36C10F25B0002 0003.docx DOCX document
Submittal 05 52 00-1.1 Handrails.pdf PDF
05 52 00.4 New handrail sections with slip joints.pdf PDF
S06 - Pre-Proposal Conference slides NCOTA 3B.pdf PDF
Appendix T - NCOTA Phase 3B Development - Specifications Set 2.pdf PDF
Appendix Q - NCOTA Phase 3B Development - Package A Excerpts.pdf PDF
Appendix B - Existing columbarium concrete sidewalk replacement.pdf PDF
Appendix M - Section 12 Grid Markers.pdf PDF
Appendix H - Cracked Mortar- Columbarium D.pdf PDF
Appendix D - Contract B- Caps to be Replaced Revised.pdf PDF
Appendix C - Sealant Replacement Locations.pdf PDF
Appendix B7 - Fire Detection and alarm Cable.pdf PDF
Appendix B5 - Pre-Product Data.pdf PDF
Appendix B1 - Video Surv. Product info.pdf PDF
Appendix A - FWS and Storm Structures.pdf PDF
Appendix O - NCOTA PH3B Areas for Joint Sealant.pdf PDF
Appendix N1 - INFILTRATION BERM.pdf PDF
Appendix N - Section 14 Grid Markers.pdf PDF
Appendix L - Section 11 Grid Markers.pdf PDF
Appendix K - Section 9 Grid Markers.pdf PDF
Appendix D1 - Columbarium Niche Foundation Finish and Vertical Joints.pdf PDF
Appendix B6 - MC Cable.pdf PDF
Appendix B3 - Video Surveillance Cable.pdf PDF
Appendix A1 - TEMPORARY SHELTER RELOCATION.pdf PDF
Appendix S - NCOTA Phase 3B Development - Specifications Set 1.pdf PDF
Appendix R - NCOTA Phase 3B Development - Package B Excerpts.pdf PDF
Appendix P - Sealant Technical Data Sheet.pdf PDF
Appendix J - Sect C8-C10 Grid Markers.pdf PDF
Appendix I - Niche Touch-up Locations.pdf PDF
Appendix G - Electrical MR ref dwg.pdf PDF
Appendix F - Cracked Mortar- Columbarium B.pdf PDF
Appendix E - Contract B- Sidewalk Sections to Be Replaced Revised.pdf PDF
Appendix B8 - Fire Detection and Alarm Submittal RE Response.pdf PDF
Appendix B4 - Pre-Product Data.pdf PDF
Appendix B2 - Video Surv. Product info.pdf PDF
36C10F25B0002_1.docx DOCX document
wage determination PA20250104.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-26-2025 925-008B 003C4B Department of Veterans Affairs Office of Construction and Facilities Management 425 I Street NW Washington DC 20001 101F Department of Veterans Affairs Office of Construction and Facilities Management 425 I Street NW Washington DC 20001 To all Offerors/Bidders

36C10F25B0002 07-07-2025

X X X N/A x The purpose of this amendment is to update the solicitation's clauses in accordance with E xecutive O rder 14275 and the Revolutionary FAR Overhaul (RFO). This amendment also provides an updated Wage Determination and additional changes to the solicitation as per all current regulatory guidance, deviations and directives.

See continuation page for more detailed information.

Attachments referenced within are provided with this amendment.

The bid opening due date remains the same at 09/04/2025 at 10:00AM EST.

Victoria Wayne Contracting Officer The Department of Veterans Affairs (VA,) Office of Construction and Facilities Management (CFM,) located at 425 I ST NW Washington, D.C. 20001, is issuing this solicitation for the National Cemetery of the Alleghenies Phase 3B Development Completion Project. This solicitation is 100% set aside for Service-Disabled Veteran Owned Small Businesses under Solicitation Number 36C10F25B0002.

The National Cemetery of the Alleghenies serves Veterans of the greater Pittsburgh metropolitan area, northwestern West Virginia, and southeastern Ohio for burial service to an estimated Veteran population of approximately 258,300. The purpose of this project is to enable the existing national cemetery to continue to provide burial services for eligible veterans in Washington County, Pennsylvania who have been served by this national cemetery since it opened in August 2005. This proposed phase of the development will correct previously Identified Punch List corrections plans and specifications prepared by the A/E of record.

Per VAAR 836.204– Disclosure of the magnitude of construction projects, the estimated magnitude for this project is between $2,000,000 and $5,000,000. The North American Industry Classification System (NAICS) of 236220 (Commercial and Institutional Building Construction) with the size standard of $45 Million.

CFM is conducting this acquisition as a Sealed Bid and award will be made in accordance with FAR Part 14, Sealed Bidding. This project will result in one firm fixed price contract. The approximate project duration will be 365 calendar days from the Notice to Proceed.

Bids received from concerns that are not Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns shall not be considered. SDVOSBs must be verified for ownership and control and listed on Veteran Small Business Certification website (sba.gov) prior to the due date for proposals and pending award. (See VAAR Clause 852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside.)

Bidders must be registered at the SAM.gov website for this solicitation. In order to receive e-mail notification of amendments, bidders must register at https://secure.login.gov/?request_id=98e1f875-8f0d-4fac-a0fa-34cfb3df818b . Amendments to this solicitation will not be mailed but will be posted at the sam.gov website. Offerors are responsible for obtaining the solicitation from Contract Opportunities and must acknowledge all amendments to the solicitation.

The Contracting Officer and point of contact for this solicitation is Victoria Wayne, E-mail Victoria.wayne@va.gov. Telephone requests will NOT be accepted. In the subject line of any e-mail sent, identify: The National Cemetery of the Alleghenies Phase 3B Development Completion Project 36C10F25B0002.

Continuation Page for Amendment 0008:

A. The purpose of this amendment is to:

1. Remove FAR clauses no longer in use as per the Revolutionary FAR Overhaul (RFO) and Executive Order (EO) 14275.

2. Add Full text FAR clauses that have been updated as a result to the EO and RFO

3. Update the Instruction to Bidders in accordance with the EO and RFO

4. Add FAR deviations SAM notice paragraph (i.e., “NOTE:” SECTION BELOW).

5. Provide updated Davis Bacon Wage Determination

B. Details:

· In accordance with executive order 14275, the following provisions/clauses are removed:

· 52.236-26 PRECONSTRUCTION CONFERENCE

· 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

· See the attached document titled “FAR Overhaul Clauses - Full text” for clauses that have been updated as a result of the EO 14275 (provided in full text for transparency).

· See the attached updated Instructions to Bidders section 2.8. Please note that the requirement for FAR 52.204-24 under section 2.8 paragraph “g.” is removed.

· See attached updated Wage Determination number PA20250104.

C. NOTE:

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications— Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

UPDATED

2.8 BID SUBMISSION:

A. GENERAL:

Mail in / Hand Carry Submission:

(a) Bidders may submit their bids by the deadline via mail or hand carry to:

National Cemetery of the Alleghenies Administration Building - Conference Room 318 1158 Morgan Road Bridgeville, PA 15017 ATTN: Victoria Wayne, Contracting Officer, CFM

(b) Bids must be in sealed envelopes and labeled to read:

“CFM -FOUO-SEALED BID PACKAGE–36C10F25B0002 NCOTA 3B Development– SEALED BID DOCUMENTS – COMPANY NAME”

(c) Bids that are to be hand delivered will only be accepted starting one (1) hour prior to the bid opening time stated in Block 13.a. (or as amended) on the SF 1442. Bidders have until the designated bid opening time to hand in their bids.

(d) Mail-in bid packages must be delivered/received on station prior to the designated bid opening time. It is the responsibility of the bidder to ensure timely delivery of their bid package. Please allow for shipping times and possible delays if utilizing public or private mail services.

(e) Failure to provide a properly completed and signed original offer could result in the bid being determined non-responsive and rejected. EMAILED, FAXED, OR DELIVERY BY ANY OTHER ELECTRONIC MEANS IS NOT AUTHORIZED AND WILL BE REJECTED.

B. BID PACKAGE CONTENTS:

(a) Standard Form (SF) 1442 Solicitation, Offer and Award:

Bidders must complete & sign the “OFFER” section of the SF 1442. Please include your company’s Unique Entity Identifier number associate with SAM.gov in Block 14. Electronic submissions may be electronic signature or signed and scanned “wet signature”.

(b) Acknowledgement of All Amendments:

Bidders must acknowledge all amendments by either 1.) Completing block 19 of the SF 1442, or 2.) Returning the signed amendment form(s) with the submission.

(c) Price Schedule:

Bidders must include the total lump sum price (for all work) in Block 17 on the SF 1442.

(d) Bid Guarantee:

Bidders must furnish a bid guarantee (see FAR 52.228-1). The bid guarantee must be provided on Standard Form 24.

(e) Safety:

The Bidder shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture and for the entity itself. EMR shall not be submitted for subcontractors.)

1. Occupational Safety and Health Administration (OSHA) and Environmental Protection Agency (EPA) Violation(s):

Bidders shall provide Summary of Work-Related Injuries and Illnesses, affirming that the Bidder has no more than three serious, or one repeat, or one willful Occupational Safety and Health Administration (OSHA) and Environmental Protection Agency (EPA) violation(s) in the past 3 years.

1. Experience Modification Rate (EMR):

Bidders shall provide documentation (letter from insurance carrier) to show that the bidder has an Experience Modification Rate (EMR) of equal to or less than 1.0. If a Bidder’s EMR is above 1.0, Bidder must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and Puerto Rico shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

If the NCCI cannot issue an EMR because the Bidder lacks insurance history, Bidder shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that it has assigned Bidder a Unity Rating of 1.0.

This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

(f) Representations & Certifications:

The offeror must provide their Representations and Certifications or their response to FAR 52.204-8 (2) (i) or (ii) Annual Representations and Certifications.

(g) Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment:

Offeror must provide their response to FAR 52.204-24 (d) Representation.

(h) Information Regarding Responsibility Matters:

Offeror must provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.

(i) Violation of Arms Controls Treaties or Agreements:

Offeror must provide their response to FAR 52.209-13 (b) (1) or (2) Violation of Arms Controls Treaties or Agreements.

(j) Tax on Certain Foreign Procurements:

Offeror must provide their response to FAR 52.229-11 (d)

(k) Post Award Small Business Program Representations:

Offeror must provide their response to FAR 52.219-28 (h), if applicable.

(l) Limitations on Subcontracting:

In accordance with VAAR 852.219-75, offeror must complete VA Notice of Limitations on Subcontracting-Certificate of Compliance for Construction and return with their bid submission. Completed form will become part of the official award documentation. Failure to submit the signed certification with the offeror’s bid will deem the bid non-responsive.

(m) Notice to SDVOSB Joint Venture/Mentor Protegee:

Any offeror submitting a bid as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture (1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402 and (2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s bid will deem the bid non-responsive.

C. BID OPENING:

Public Bid Opening:

(a) Bids will be publicly opened and read aloud in person at the following location:

National Cemetery of the Alleghenies Administration Building - Conference Room 318 1158 Morgan Road Bridgeville, PA 15017

(b) Bids will be recorded on a Bid Abstract (SF 1409) and made available upon request.

A.1 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

(a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of

(1) Latent physical conditions or subsurface conditions at the site which differ materially from those indicated in this contract; or

(2) Unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.

(b) (1) The Contracting Officer will investigate the site conditions promptly after receiving such a notice.

(2) If the conditions materially so differ and cause an increase or decrease in the Contractor's cost of, or the time required for, performing any part of the work under this contract an equitable adjustment must be made under this clause.

(c) No request for an equitable adjustment to the contract under this clause will be allowed, unless the Contractor has given the written notice required.

(d) No request for an equitable adjustment to the contract for differing site conditions will be allowed if made after final payment under this contract.

(End of clause)

A.2 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (DATE)

(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including—

(1) Conditions bearing upon transportation, disposal, handling, and storage of materials;

(2) The availability of labor, water, electric power, and roads;

(3) Uncertainties of weather, river stages, tides, or similar physical conditions at the site;

(4) The conformation and conditions of the ground; and

(5) The character of equipment and facilities needed preliminary to and during work performance.

(b) The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.

(c) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

(End of clause)

A.3 52.236-5 MATERIAL AND WORKMANSHIP (DATE)

(a) (1) Equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract.

(2) References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition.

(3) The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.

(b) The Contractor shall obtain the Contracting Officer's approval of the machinery, mechanical, and other equipment to be incorporated into the work.

(1) When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment.

(2) When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer's approval of the material or articles which the Contractor contemplates incorporating into the work.

(i) When requesting approval, the Contractor shall provide appropriate and required information concerning the material or articles.

(ii) When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval are installed or used at the risk of subsequent rejection.

(c) Work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

(End of clause)

A.4 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (DATE)

During performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on site a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

(End of clause)

A.5 52.236-7 PERMITS AND RESPONSIBILITIES (DATE)

(a) The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work.

(b) The Contractor shall be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence.

(c) The Contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

(End of clause)

A.6 52.236-8 OTHER CONTRACTS (DATE)

(a) The Government may award other contracts for work at or near the site of the work under this contract. The Contractor shall cooperate and coordinate with—

(1) Other contractors; and

(2) Government employees.

(b) The Contractor shall adapt scheduling and performance of the work under this contract to accommodate the performance of other contractors. The Contractor’s scheduling and performance shall not delay or interfere with the performance of work by other contractors or Government employees.

(End of clause) A.7 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (DATE)

(a) The Contractor shall preserve and protect structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed, and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so. If any limbs or branches of trees are broken during contract performance, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

(b) The Contractor shall protect from damage and, in the event of damage resulting from non-compliance with this contract or failure to exercise reasonable care in performing the work, shall promptly repair existing improvements and utilities at or near the work site, on adjacent property of a third party, and on or near transportation paths and routes. The Contractor shall repair any damage, including those that are the property of a third party.

(c) If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(End of clause)

A.8 52.236-10 OPERATIONS AND STORAGE AREAS (DATE)

(a) The Contractor shall confine all activities and operations on site to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

(b) Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

(1) Temporary buildings (e.g., storage sheds, shops, offices) and utilities—

(i) May be erected by the Contractor only with the approval of the Contracting Officer; and

(ii) Shall only be built with labor and materials furnished by the Contractor without additional expense to the Government.

(2) The temporary buildings and utilities are the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work.

(3) The temporary buildings and utilities may be abandoned and need not be removed, with written consent of the Contracting Officer.

(c) The Contractor shall, as prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation.

(End of clause)

A.9 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (DATE)

(a) The Government has the right to take possession of or use any completed or partially completed part of the work.

(1) Before taking possession of or using any work, the Contracting Officer will furnish the Contractor a list of items of work remaining to be performed or corrected on those portions of the work that the Government intends to take possession of or use.

(2) Failure of the Contracting Officer to list any item of work shall not relieve the Contractor of responsibility for complying with the terms of the contract.

(3) The Government's possession or use shall not be deemed an acceptance of any work under the contract.

(b) (1) While the Government has such possession or use, the Contractor is relieved of the responsibility for the loss of or damage to the work resulting from the Government’s possession or use, notwithstanding the terms of the clause in this contract entitled “Permits and Responsibilities”.

(2) If prior possession or use by the Government delays the progress of the work or causes additional expense to the Contractor, an equitable adjustment shall be made in the contract price or the time of completion, and the contract shall be modified in writing accordingly.

(End of clause)

A.10 52.236-12 CLEANING UP (DATE)

(a) The Contractor shall keep the work area, including storage areas, in a clean, neat, orderly condition, and free from accumulations of waste materials.

(b) Before completing the work, the Contractor shall remove from the site any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government.

(End of clause)

A.11 52.236-13 ACCIDENT PREVENTION (DATE)

(a) The Contractor shall provide and maintain work environments and procedures that—

(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;

(2) Avoid interruptions of Government operations and delays in project completion dates; and

(3) Control costs in the performance of this contract.

(b) In addition, for contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—

(1) Provide appropriate safety barricades, signs, and signal lights;

(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910 ; and

(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.

(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.

(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

(1) If the Contracting Officer becomes aware of any noncompliance with these requirements or any condition that poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer will notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action.

(2) This notice, when delivered to the Contractor or the Contractor's representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required.

(3) After receiving the notice, the Contractor shall immediately take corrective action.

(4) If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken.

(5) The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop-work order issued under this clause.

(e) The Contractor shall insert the substance of this clause, including this paragraph (e), in subcontracts.

(End of clause)

A.12 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (DATE)

(a) The Government will make all reasonably required utilities available to the Contractor from existing outlets and supplies, as specified in the contract.

(b) Unless otherwise provided in the contract, the Contractor shall pay for all utility costs.

(c) The Contractor, at its expense and in a workmanlike manner, shall install and maintain all necessary temporary connections, distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges.

(d) Before final acceptance by the Government, the Contractor shall remove the temporary connections, distribution lines, meters, and associated paraphernalia.

(End of clause)

A.13 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (DATE)

(a)(1) Within five days after the work commences on the contract or another period of time determined by the Contracting Officer, the Contractor shall prepare and submit to the Contracting Officer for approval a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the work (including acquiring materials, plant, and equipment).

(2) The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period.

(3) If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall continually update the actual progress in the schedule and shall submit it to the Contracting Officer by the means prescribed in the contract for transmittals or as directed by the Contracting Officer.

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

(1) If the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to recover lost time and execute in accordance with the approved schedule, without additional cost to the Government.

(2) Such steps may include increasing the number of shifts, overtime operations, days of work, and/or the amount of construction plant.

(3) The Contractor shall submit, for approval, supplementary schedule(s) that demonstrate how the lost time will be recovered.

(d) If the Contractor does not recover the lost time, the Contracting Officer may determine that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

(End of clause)

A.14 52.236-17 LAYOUT OF WORK (DATE)

The Contractor shall lay out its work from Government established base lines and bench marks indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at its own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through its negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(a) The Contractor shall lay out its work from Government-established base lines and benchmarks provided on the drawings.

(b) The Contractor shall be responsible for all measurements in connection with the layout.

(c) The Contractor shall furnish, at its own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required for the layout.

(d) The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer.

(e)(1) The Contractor shall be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

(2) If such marks are destroyed by the Contractor, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(End of clause)

A.15 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (DATE)

(a) The Contractor shall keep at the site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto.

(b) Anything mentioned in the specifications and not shown on the drawings or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both.

(1) In case of difference between drawings and specifications, the specifications shall govern.

(2) In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing.

(3) Any adjustment by the Contractor without such a determination shall be at its own risk and expense.

(c) The Contracting Officer will furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.

(d) (1) Words, such as, “directed”, “required”, “ordered”, “designated”, “prescribed”, or words of like import when used, in the specifications or on the drawings are intended to mean the “direction”, “requirement”, “order”, “designation”, or “prescription”, of the Contracting Officer.

(2) Words, such as, “approved”, “acceptable”, “satisfactory”, or words of like import shall mean “approved by”, or ‘acceptable to”, or “satisfactory to” the Contracting Officer, unless otherwise expressly stated.

(e) Where “as shown”, “as indicated”, “as detailed”, or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word “provided” as used herein shall be understood to mean “provide complete in place”, that is “furnished and installed”.

(f) Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail (1) the proposed fabrication and assembly of structural elements and (2) the installation (i.e., form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

(g) (1) If this contract requires shop drawings, the Contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review.

(2) Shop drawings submitted to the Contracting Officer without evidence of the Contractor's approval may be returned for resubmission.

(h) The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government's reasons therefor.

(1) Any work done before such approval shall be at the Contractor's risk.

(2) Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with paragraph (i) of this clause.

(i) (1) If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission.

(2) If the Contracting Officer approves any such variation, the Contracting Officer will issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.

(j) The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer and one set will be returned to the Contractor.

(End of clause)

A.16 52.243-4 CHANGES (DEVIATION DATE)

As prescribed in 43.305(d), insert the following clause. Agency procedures may vary the 30-day period.

CHANGES (DEVIATION DATE)

(a) (1) At any time, the Contracting Officer may issue a written order, identified as a change order, to make changes in the work within the scope of the contract, including changes—

(i) In the specifications (including drawings and designs);

(ii) In the method or manner of performance of the work;

(iii) In the Government-furnished property or services; or

(iv) Directing acceleration in the performance of the work.

(2) If there are any sureties, the Contracting Officer does not need to notify them of a written order.

(b) Any other written or oral order (which, as used in this paragraph (b), includes direction, instruction, interpretation, or determination) from the Contracting Officer that causes a change shall be treated as a change order under this clause; provided, that the Contractor gives the Contracting Officer written notice stating—

(1) The date, circumstances, and source of the order; and

(2) That the Contractor regards the order as a change order.

(c) Except as provided in this clause, no order, statement, or conduct of the Contracting Officer shall be treated as a change under this clause or entitle the Contractor to an equitable adjustment.

(d) If any change under this clause causes an increase or decrease in the Contractor's cost of, or the time required for, the performance of any part of the work under this contract, whether or not changed by any such order, the Contracting Officer shall make an equitable adjustment and modify the contract in writing. However, except for an adjustment based on defective specifications, no adjustment for any change under paragraph (b) of this clause shall be made for any costs incurred more than 20 days before the Contractor gives written notice as required. In the case of defective specifications for which the Government is responsible, the equitable adjustment shall include any increased cost reasonably incurred by the Contractor in attempting to comply with the defective specifications.

(e) (1) The Contractor must assert its right to an adjustment under this clause, by submitting to the Contracting Officer a written statement describing the general nature and amount of proposal within 30 days, unless this period is extended by the Government, after—

(i) Receipt of a written change order under paragraph (a) of this clause; or

(ii) The furnishing of a written notice under paragraph (b) of this clause.

(2) The statement of proposal for adjustment may be included in the notice under paragraph (b) of this clause.

(f) No proposal by the Contractor for an equitable adjustment shall be allowed if asserted after final payment under this contract.

(End of clause)

A.17 52.252-5 Authorized Deviations in Provisions.

Authorized Deviations in Provisions (Nov 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any VA Acquisition Regulation (VAAR) (48 CFR Chapter 8) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision) A.18 52.211-12 Liquidated Damages – Construction (SEPT 2000) Liquidated Damages-Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of ____________ [Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause) A.19 52.223-10 Waste Reduction Program (MAY 2024)(DEVIATION FEB 2025) Waste Reduction Program (May 2024)

(a) Definitions. As used in this clause- Recycling means the series of activities, including collection, separation, and processing, by which products or other materials are recovered from the solid waste stream for use in the form of raw materials in the manufacture of products other than fuel for producing heat or power by combustion.

Waste prevention means any change in the design, manufacturing, purchase, or use of materials or products (including packaging) to reduce their amount or toxicity before they are discarded. Waste prevention also refers to the reuse of products or materials.

Waste reduction means preventing or decreasing the amount of waste being generated through waste prevention, recycling, or purchasing recycled and environmentally preferable products.

(b) Consistent with the requirements of section 207 of Executive Order 14057, the Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by this contract. The Contractor’s programs shall comply with applicable Federal, State, and local requirements, specifically including Section 6002 of the Resource Conservation and Recovery Act ( 42 U.S.C.6962, etseq.) and implementing regulations (40 CFR Part 247).

(End of clause) A.20 52.223-20 Aerosols (MAY 2024) Aerosols (May 2024)

(a) Definitions. As used in this clause– Global warming potential means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide’s global warming potential is defined as 1.0.

High global warming potential hydrofluorocarbons means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables of alternatives available at ( https://www.epa.gov/snap/) Hydrofluorocarbons means compounds that only contain hydrogen, fluorine, and carbon.

(b) Unless otherwise specified in the contract, the Contractor shall reduce its use, release, or emissions of high global warming potential hydrofluorocarbons, when feasible, from aerosol propellants or solvents under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as–

(1) In-use emission rates, energy efficiency;

(2) Safety, such as flammability or toxicity;

(3) Ability to meet technical performance requirements; and

(4) Commercial availability at a reasonable cost.

(c) The Contractor shall refer to EPA's SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables available at https://www.epa.gov/snap/.

(End of clause)

See attached document: Updated Wage Determination PA20250104.