Appendix G - Electrical MR ref dwg.pdf

PDF 4 MB Posted

Attached to
Y1JZ--NCOTA 3B Completion Project
Solicitation number
36C10F25B0002
Issued by

About this file

This document is an electrical power and lighting floor plan drawing for the National Cemetery of the Alleghenies Phase III Development Package, prepared by Gordon and dated May 25, 2018. The drawing (E-102) provides detailed technical schematics for the maintenance building, including a power floor plan, lighting ceiling plan, and mezzanine underside plan. The document is part of the construction documents for the U.S. Department of Veterans Affairs, specifically for the project located in Washington County, Pennsylvania. The drawing includes multiple technical views, photographs of the existing electrical infrastructure, and annotations indicating specific electrical markups and design elements. Appendix G, noted on the document, references electrical markups with a VA final inspection purchase date of February 6, 2024.

View the file

Other files

File Type Posted
36C10F25B0002 0008.docx DOCX document
Updated Wage Determination PA20250104.pdf PDF
BMP Chapter 6-7-3.pdf PDF
36C10F25B0002 0007.docx DOCX document
Store Front Shop Drawing.pdf PDF
Pages from 10 14 00.1.R2 Exterior Signage.pdf PDF
Joint Sealant- Product Data and Color Chart.pdf PDF
36C10F25B0002 0006.docx DOCX document
SI-009 R02 Directional Signage - 8.20.2020.pdf PDF
RFI SUBMISSION LOG 8 04 - FINAL.pdf PDF
36C10F25B0002 0005.docx DOCX document
04 40 10 01R1 Stone Caps AE rvw AN.pdf PDF
04 40 10 08 Revd Stone Caps at Ossuary AE rvw NET.pdf PDF
Submittal 05 52 00-1.1 Handrails.pdf PDF
05 52 00.4 New handrail sections with slip joints.pdf PDF
05 52 00-03 SS Handrail PD - AE rvw AN.pdf PDF
36C10F25B0002 0003.docx DOCX document
S06 - Pre-Proposal Conference slides NCOTA 3B.pdf PDF
Appendix O - NCOTA PH3B Areas for Joint Sealant.pdf PDF
Appendix N1 - INFILTRATION BERM.pdf PDF
Appendix N - Section 14 Grid Markers.pdf PDF
Appendix L - Section 11 Grid Markers.pdf PDF
Appendix K - Section 9 Grid Markers.pdf PDF
Appendix D1 - Columbarium Niche Foundation Finish and Vertical Joints.pdf PDF
Appendix B6 - MC Cable.pdf PDF
Appendix B3 - Video Surveillance Cable.pdf PDF
Appendix A1 - TEMPORARY SHELTER RELOCATION.pdf PDF
Appendix M - Section 12 Grid Markers.pdf PDF
Appendix H - Cracked Mortar- Columbarium D.pdf PDF
Appendix D - Contract B- Caps to be Replaced Revised.pdf PDF
Appendix C - Sealant Replacement Locations.pdf PDF
Appendix B7 - Fire Detection and alarm Cable.pdf PDF
Appendix B5 - Pre-Product Data.pdf PDF
Appendix B1 - Video Surv. Product info.pdf PDF
Appendix A - FWS and Storm Structures.pdf PDF
Appendix T - NCOTA Phase 3B Development - Specifications Set 2.pdf PDF
Appendix Q - NCOTA Phase 3B Development - Package A Excerpts.pdf PDF
Appendix B - Existing columbarium concrete sidewalk replacement.pdf PDF
Appendix S - NCOTA Phase 3B Development - Specifications Set 1.pdf PDF
Appendix R - NCOTA Phase 3B Development - Package B Excerpts.pdf PDF
Appendix P - Sealant Technical Data Sheet.pdf PDF
Appendix J - Sect C8-C10 Grid Markers.pdf PDF
Appendix I - Niche Touch-up Locations.pdf PDF
Appendix F - Cracked Mortar- Columbarium B.pdf PDF
Appendix E - Contract B- Sidewalk Sections to Be Replaced Revised.pdf PDF
Appendix B8 - Fire Detection and Alarm Submittal RE Response.pdf PDF
Appendix B4 - Pre-Product Data.pdf PDF
Appendix B2 - Video Surv. Product info.pdf PDF
36C10F25B0002_1.docx DOCX document
wage determination PA20250104.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

MAINTENANCE

BUILDING

MEZZANINE

W-D

MAINTENANCE

BUILDING

MEZZANINE

ADMINISTRATION

BUILDING

A

B

W-A

W-CW-B

654321

654321

MG ATR

E-102

ELECTRICAL - POWER & LIGHTING

MAINT BLDG - FLOOR PLAN

1/4" = 1'-0"1 POWER FLOOR PLAN

1/4" = 1'-0"2 LIGHTING CEILING PLAN

1/4" = 1'-0"3 MEZZANINE UNDERSIDE PLAN

INTERSTATE 79

M O R G A N

R D

E

KEY MAP

(NOT TO SCALE)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

WASHINGTON COUNTY, PENNSYLVANIA

MAY 25, 2018

Gordon 148 S. Queen Street, Suite 201

Martinsburg, WV 25401 Phone: 304-725-8456 www.gordon.us.com

PROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

925PC2006BID DOCUMENTSThe LA Group

(518) 587-8100

Kovach Design Solutions LLC.

(717) 491-1806

Davidson Brown, Inc.

(757) 369-8403 rvi

(512) 480-0032

Miller-Remick LLC.

(856) 429-4000

Modjeski and Masters, Inc.

(717) 790-9565

The Onyx Group

(703) 548-6699

ECS Mid Atlantic LLC.

(412) 260-1470

GIS, Inc.

(205) 941-0442 code issue:

working clearance vacojohnsj5 Text Box

Appendix G Electrical Markups:

ES101, E-101, E-102. E-103, E-501, E-601

(MR PL Reference dwg) VA Final Inspection Punchlist - Feb 05, 2024

NCOTA - 925CM2006

File details come from the government source that posted it. Updated .