Appendix D1 - Columbarium Niche Foundation Finish and Vertical Joints.pdf

PDF 119 KB Posted

Attached to
Y1JZ--NCOTA 3B Completion Project
Solicitation number
36C10F25B0002
Issued by

About this file

This file is an appendix detailing the required finish and joint repair specifications for Columbarium B and D niche foundations at the National Cemetery of the Alleghenies. The document provides a comprehensive visual guide for repair work, highlighting areas requiring remediation, including blue-shaded sections indicating current discoloration, rust, chips, scratches, and uneven surfaces. The repair instructions specify that touched-up areas must match the adjacent color and finish of the niche foundation, with straight and even joints.

The technical specifications focus on two primary repair requirements: 1) Blue-shaded areas need restoration to match existing niche foundation color and finish, addressing current surface imperfections, and 2) Orange vertical lines indicating uneven joints must be corrected by removing existing joint sealant, creating straight and even edges, and reapplying sealant. The document details repair needs for multiple walls within Columbarium B (Walls B-1 through B-18) and Columbarium D (Walls D-2, D-4 through D-6, D-7, D-9, D-11, D-13 through D-18), providing a systematic approach to addressing surface and joint inconsistencies across these cemetery infrastructure elements.

View the file

Other files

File Type Posted
36C10F25B0002 0009.docx DOCX document
Updated Wage Determination PA20250104.pdf PDF
36C10F25B0002 0008.docx DOCX document
36C10F25B0002 0007.docx DOCX document
BMP Chapter 6-7-3.pdf PDF
RFI SUBMISSION LOG 8 04 - final 25 Aug 25.pdf PDF
Pages from 10 14 00.1.R2 Exterior Signage.pdf PDF
SI-009 R02 Directional Signage - 8.20.2020.pdf PDF
Store Front Shop Drawing.pdf PDF
RFI SUBMISSION LOG 8 04 - FINAL.pdf PDF
SI-002 SIGN POST Final 20200401.pdf PDF
SI-001 FWS DETAIL.pdf PDF
Joint Sealant- Product Data and Color Chart.pdf PDF
36C10F25B0002 0006.docx DOCX document
36C10F25B0002 0005.docx DOCX document
RFIs and Govt responses.pdf PDF
NCOTA 3B Temporary EandS measures left in place.pdf PDF
04 40 10 01R1 Stone Caps Submittal Revised RE Response 20200531.pdf PDF
04 40 10 01R1 Stone Caps AE rvw AN.pdf PDF
04 40 10 08 Revd Stone Caps at Ossuary AE rvw NET.pdf PDF
36C10F25B0002 0004.docx DOCX document
05 52 00-03 SS Handrail PD - AE rvw AN.pdf PDF
RFI Submission Log - 7.28.2025 - final.pdf PDF
36C10F25B0002 0003.docx DOCX document
05 52 00.4 New handrail sections with slip joints.pdf PDF
Submittal 05 52 00-1.1 Handrails.pdf PDF
40.1736-C-Infiltration-Letter.pdf PDF
36C10F25B0002 0002.docx DOCX document
Sign in sheet.pdf PDF
S06 - Pre-Proposal Conference slides NCOTA 3B.pdf PDF
36C10F25B0002 0001.docx DOCX document
Appendix B5 - Pre-Product Data.pdf PDF
Appendix D - Contract B- Caps to be Replaced Revised.pdf PDF
Appendix B7 - Fire Detection and alarm Cable.pdf PDF
Appendix B8 - Fire Detection and Alarm Submittal RE Response.pdf PDF
Appendix G - Electrical MR ref dwg.pdf PDF
Appendix B4 - Pre-Product Data.pdf PDF
Appendix N - Section 14 Grid Markers.pdf PDF
Appendix J - Sect C8-C10 Grid Markers.pdf PDF
Appendix M - Section 12 Grid Markers.pdf PDF
Appendix A - FWS and Storm Structures.pdf PDF
Appendix B2 - Video Surv. Product info.pdf PDF
Appendix I - Niche Touch-up Locations.pdf PDF
Appendix F - Cracked Mortar- Columbarium B.pdf PDF
Appendix B3 - Video Surveillance Cable.pdf PDF
Appendix L - Section 11 Grid Markers.pdf PDF
Appendix O - NCOTA PH3B Areas for Joint Sealant.pdf PDF
Appendix K - Section 9 Grid Markers.pdf PDF
Appendix B1 - Video Surv. Product info.pdf PDF
Appendix H - Cracked Mortar- Columbarium D.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Columbarium B & D Niche Foundation Finish & Vertical Joints

Blue shaded areas of current discoloration, rust, chips, scratches, uneven, excess joint sealant and/or partially painted surfaces. Areas touched up should match adjacent color and finish of the niche foundation, with straight and even joints.

Orange vertical lines are joints that are not straight and/or uneven. Remove joint sealant, create a straight and even edge, and reapply joint sealant. Adjacent concrete area should match niche foundation color and finish.

Columbarium B

Wall B-1

Wall B-2

Wall B-3

Wall B-4

Wall B-5

Wall B-6

Wall B-7

Wall B-10

Wall B-11

Wall B-12

Wall B-13

Wall B-14

Wall B-15

Wall B-16

Wall B-17

Wall B-18

Columbarium D

Wall D-2

Wall D-4

Wall D-5

Wall D-6

Wall D-7

Wall D-9

Wall D-11

Wall D-13

Wall D-14

Wall D-15

Wall D-16

Wall D-17

Wall D-18

File details come from the government source that posted it. Updated .