Appendix C - Sealant Replacement Locations.pdf
PDF 501 KB Posted
- Attached to
- Y1JZ--NCOTA 3B Completion Project
- Solicitation number
- 36C10F25B0002
About this file
This document is an appendix (Appendix C) detailing joint sealant replacement locations for the National Cemetery of the Alleghenies (NCOTA) 3B Completion Project. The file contains detailed schematic drawings highlighting specific areas requiring joint sealant replacement across Columbarium B and Columbarium D, with red lines indicating current joint sealant deficiencies. The schematics meticulously map out joint sealant needs for multiple walls (B-1 through B-18 and D-1 through D-17), including various wall types such as single-sided veneer walls, double-sided veneer walls, piers, seatwalls, and overlook walls.
The drawings provide precise locations for sealant replacement, specifying that new joint sealant should be applied continuously from joint to joint or weep vent to weep vent. Additional details include joint sealant replacement requirements for columbarium caps and memorial wall plaza caps, with annotated sections showing specific segments needing treatment. The technical drawings serve as a comprehensive guide for contractors to understand the exact scope and locations of sealant replacement work required as part of the cemetery infrastructure improvement project.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Joint Sealant Replacement at Columbarium B & D
Red lines show areas of current joint sealant deficiency (ie sloppy, cut, separating, etc). New joint sealant should be applied continuous from joint to joint or weep vent to weep vent.
Columbarium B
Wall B-1
Wall B-2
Wall B-5
Wall B-6
Wall B-7
Wall B-9
Wall B-13
Wall B-16
Wall B-18
B- Single-sided Veneer Wall & Pier 1
B- Seatwall
B- Wall 11 & Pier 10
B- Pier 9 & Double-sided Veneer Wall (Back)
Pier return between cap & veneer stone
Includes side of pier
Columbarium D
Wall D-1
Wall D-2
Wall D-3
Wall D-5
Wall D-6
Wall D-7
Wall D-9
Wall D-10
Wall D-12
Wall D-13
Wall D-16
Wall D-17
D- Overlook Wall
D- Double Sided Veneer Wall (front) & Pier 32
D- Seatwall
Inside face between cap & veneer
D- Single Sided Veneer Wall & Pier 24
Joint Sealant Replacement at Columbarium Caps
Columbarium D Caps
Memorial Wall Plaza Caps
File details come from the government source that posted it. Updated .