This is a solicitation for a construction project to build long term spinal cord injury facilities at the VA Medical Center in Dallas, Texas. The solicitation was issued by the Department of Veterans Affairs Office of Construction and Facilities Management. The project involves construction of new buildings and renovations to existing facilities to provide long term care for veterans with spinal cord injuries. Services required include construction of patient wards, therapy areas, administrative offices, and support facilities. The anticipated award date is in 2023 with construction expected to be completed by 2026. Pricing will be fixed-price with payment milestones tied to project completion stages.
View the file
Other files
Show 40 more
Latest 50 of 117 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID PACKAGE B - ADDENDUM 02 LTSCI PROJECTS
DATE: 31 MAY 2023 VANTHCS, DALLAS, TX
PROJECT 549-820B
00 00 01 - 1
LONG TERM SPINAL CORD INJURY
AND ASSOCIATED PROJECTS
VA NORTH TEXAS HEALTH CARE SYSTEM
TABLE OF CONTENTS
Section 00 00 01
VOLUME 1
DIVISION 00 - SPECIAL SECTIONS ISSUE
00 00 00 Cover Page 05-06-21 00 00 01 Table of Contents 05-31-23 00 00 10 Soil Investigation Data 05-06-21 00 01 07 Professional Seals 05-06-21 00 01 15 List of Drawing Sheets 05-06-21
DIVISION 01 - GENERAL REQUIREMENTS
01 32 16.13 Network Analysis Schedules 05-06-21 01 33 23 Submittal Procedures 05-06-21 01 35 26 Safety Requirements 05-06-21 01 42 19 References 05-06-21 01 45 00 Quality Control 05-06-21 01 45 29 Testing Laboratory Services 05-06-21 01 57 19 Temporary Environmental Controls 05-06-21 01 61 16 Volatile Organic Compound VOC Content Restrictions 05-06-21 01 61 16.01 Accessory Material VOC Content Certification form 05-06-21 01 70 10 Alteration Project Procedures 05-06-21 01 73 00 Execution 05-06-21 01 74 19 Construction Waste Management 05-06-21 01 81 11 Sustainable Design Requirements 05-31-23 01 91 00 General Commissioning Requirements 05-06-21
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 05-06-21 02 41 19 Selective Demolition 05-06-21
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 05-06-21 03 35 11 Concrete Floor Finishing 05-06-21 03 45 00 Precast Architectural Concrete 05-06-21 03 45 10 Blast Resistant Precast 05-06-21
DIVISION 04 – MASONRY
04 05 13 Masonry Mortar 05-06-21 04 05 16 Masonry Grouting 05-06-21 04 20 00 Unit Masonry 05-06-21
00 00 01 - 2
04 42 00 Exterior Stone Cladding 05-06-21 04 43 00 Stone Masonry 05-06-21 04 72 00 Cast Stone Masonry 05-06-21
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 05-06-21 05 12 13 Architecturally Exposed Structural Steel Framing 05-06-21 05 15 00 Steel Cable Vehicle Barrier 05-06-21 05 16 00 Unitized Metal Framing Systems 05-06-21 05 31 00 Steel Decking 05-06-21 05 36 00 Composite Metal Decking 05-06-21 05 40 00 Cold-Formed Metal Framing 05 40 10 Blast Requirements for Cold Formed Metal Framing 05-06-21 05 50 00 Metal Fabrications 05-06-21 05 51 00 Metal Stairs 05-06-21 05 73 00 Decorative Metal Railings 05-06-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 05-06-21 06 20 00 Finish Carpentry 05-06-21 06 41 00 Architectural Wood Casework 05-06-21 06 42 16 Wood-Veneer Paneling 05-06-21 06 60 00 Plastic Glazing 05-06-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50 Roofing Repair 05-06-21 07 08 00 Facility Exterior Closure Commissioning 05-06-21 07 13 52 Modified Bituminous Sheet Waterproofing 05-06-21 07 14 13 Fluid-Applied Waterproofing 05-06-21 07 16 19 Metal Oxide Waterproofing 05-06-21 07 21 13 Thermal Insulation 05-06-21 07 21 29 Sprayed Insulation 05-06-21 07 22 00 Roof and Deck Insulation 05-06-21 07 27 26 Fluid Applied Membrane Air Barriers 05-06-21 07 42 15 Blast Requirements for Metal Wall Panel System 05-06-21 07 42 35 Phenolic Wall Panels 05-06-21 07 42 43 Composite Wall Panels 05-06-21 07 52 16 SBS Mod Bit Roofing, Hot-Applied 05-06-21 07 60 00 Flashing and Sheet Metal 05-06-21 07 71 00 Roof Specialties 05-06-21 07 81 00 Applied Fireproofing 05-06-21 07 84 00 Firestopping 05-06-21 07 92 00 Joint Sealants 05-06-21 07 95 13 Expansion Joint Cover Assemblies 05-06-21
00 00 01 - 3
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 05-31-23 08 11 16 Aluminum Door Frames 05-06-21 08 14 00 Interior Wood Doors 05-06-21 08 17 10 Integrated Door Assemblies 05-06-21 08 31 13 Access Doors and Frames 05-06-21 08 33 00 Coiling Doors 05-06-21 08 38 19 Vertical Lift Doors 05-06-21 08 41 13 Aluminum-Framed Entrances and Storefronts 05-06-21 08 42 29 Sliding Automatic Entrances - Blast Resistant 05-06-21 08 42 30 Sliding Automatic Entrances 05-06-21 08 42 43 Automatic Sliding Interior Doors 05-06-21 08 44 13 Glazed Aluminum Curtain Walls 05-06-21 08 44 15 Blast Resistant Glazing 05-06-21 08 56 59 Service and Teller Window Units 05-06-21 08 71 00 Door Hardware 05-06-21 08 71 13 Automatic Door Operators 05-06-21 08 80 00 Glazing 05-06-21 08 84 00 Plastic Glazing 05-06-21 08 87 17 Glazing Films 05-06-21 08 90 00 Louvers and Vents 05-06-21 08 90 10 Blast Resistant Louvers 05-06-21
DIVISION 09 - FINISHES
09 06 00 Schedule for Finishes 05-06-21 09 22 16 Non-Structural Metal Framing 05-06-21 09 24 00 Portland Cement Plastering 05-06-21 09 29 00 Gypsum Board 05-31-23 09 30 13 Porcelain and Ceramic Tiling 05-06-21 09 51 00 Acoustical Ceilings 05-06-21 09 54 26 Linear Wood Ceilings 05-06-21 09 62 29 Cork Flooring 05-06-21 09 65 13 Resilient Base and Accessories 05-06-21 09 65 16 Resilient Sheet Flooring 05-06-21 09 65 19 Resilient Tile Flooring 05-06-21 09 66 23.16 Epoxy-Resin Terrazzo Flooring (RES-5) 05-06-21 09 68 00 Carpeting 05-06-21 09 72 16 Vinyl-Coated Fabric Wall Coverings 05-06-21 09 84 33 Sound-Absorbing Wall Units 05-06-21 09 91 00 Painting & Coating 05-31-23
DIVISION 10 – SPECIALTIES
10 11 13 Markerboards 05-06-21 10 11 23 Tackboards 05-06-21 10 14 00 Signage 05-06-21 10 14 00.01 Signage Schedule 05-06-21 10 14 00.02 Signage-VA SIGNS 05-06-21 10 21 13 Toilet Compartments 05-06-21
00 00 01 - 4
10 21 23 Cubicle Curtain Tracks 05-06-21 10 22 26.33 Folding Panel Partitions 05-06-21 10 26 00 Wall and Door Protection 05-06-21 10 28 00 Toilet, Bath, and Laundry Accessories 05-06-21 10 31 00 Manufactured Fireplaces 05-06-21 10 44 13 Fire Extinguisher Cabinets 05-06-21 10 51 10 Plastic Laminate Lockers 05-06-21 10 71 00 Exterior Protection 05-06-21 10 82 13 Exterior Grills and Screens 05-06-21
DIVISION 11 – EQUIPMENT
11 12 00 Parking Control Equipment 05-06-21 11 24 10 Window Washing Equipment Anchorage 05-06-21 11 73 00 Ceiling Mounted Patient Lift System 05-06-21
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 05-06-21 12 24 63 Banquette Seating 05-06-21 12 36 00 Countertops 05-06-21 12 44 16 Shower Curtains 05-06-21 12 48 13 Entrance Floor Mats and Frames 05-06-21 12 93 13 Bicycle Racks 05-06-21
DIVISION 13 – SPECIAL CONSTRUCTION
13 42 53 Modular Building Systems – Outpatient Clinic 05-06-21 13 49 00 Radiation Protection 05-06-21
DIVISION 14 – CONVEYING EQUIPMENT
14 08 00 Commissioning of Elevators and Materials Handling 05-06-21 14 21 00 Electric Traction Elevators 05-06-21 14 92 00 Pneumatic Tube System 05-06-21
VOLUME 2
DIVISION 21 – FIRE SUPPRESSION
21 05 11 Common Work Results for Fire Suppression 05-06-21 21 05 12 Motor Requirements for Fire Suppression Equipment 05-06-21 21 08 00 Commissioning of Fire Suppression Systems 05-06-21 21 10 00 Water Based Fire Suppression Systems 05-06-21 21 12 00 Fire Suppression Standpipes 05-06-21 21 13 13 Wet Pipe Sprinkler Systems 05-06-21 21 13 16 Dry Pipe Sprinkler Systems 05-31-23
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 05-06-21 22 05 12 General Motor Requirements for Plumbing Equipment 05-06-21
00 00 01 - 5
22 05 19 Meters and Gages for Plumbing Piping 05-06-21 22 05 23 General Duty Valves for Plumbing Piping 05-06-21 22 05 33 Heat Tracing for Plumbing Piping 05-06-21 22 08 00 Commissioning of Plumbing Systems 05-06-21 22 11 00 Facility Water Distribution 05-06-21 22 11 23 Domestic Water Pumps 05-06-21 22 12 16 Potable Water Storage 05-06-21 22 13 00 Facility Sanitary and Vent Piping 05-06-21 22 13 33 Packaged Submersible Sewerage Pump Units 05-06-21 22 14 00 Facility Storm Drainage 05-06-21 22 14 36 Packaged Submersible Drainage Pump Units 05-06-21 22 14 36.11 Packaged Submersible Drain Pump Units 05-06-21 22 33 00 Electric Domestic Water Heaters 05-06-21 22 40 00 Plumbing Fixtures 05-31-23 22 62 00 Vacuum Systems for Healthcare Facilities 05-06-21 22 63 00 Gas Systems for Healthcare Facilities
DIVISION 23 – MECHANICAL
23 05 11 Common Work Results for HVAC and Steam Generation 05-06-21
23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment
05-06-21
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
05-06-21
23 05 93 Testing, Adjusting, and Balancing for HVAC 05-06-21 23 07 11 HVAC, Plumbing and Boiler Plant Insulation 05-06-21 23 08 00 Commissioning of HVAC Systems 05-06-21 23 09 23 Direct-Digital Control System for HVAC 05-06-21 23 10 00 Facility Fuel Systems 05-06-21 23 21 13 Hydronic Piping 05-06-21 23 21 23 Hydronic Pumps 05-06-21 23 22 13 Steam and Condensate Heating Piping 05-06-21 23 22 23 Steam Condensate Pumps 05-06-21 23 23 00 Refrigerant Piping 05-06-21 23 25 00 HVAC Water Treatment 05-06-21 23 31 00 HVAC Ducts and Casing 05-06-21 23 33 00 Air Duct Accessories 05-06-21 23 34 00 HVAC Fans 05-06-21 23 36 00 Air Terminal Units 05-06-21 23 37 00 Air Outlets and Inlets 05-06-21 23 40 00 HVAC Air Cleaning Devices 05-06-21 23 72 00 Air to Air Energy Recovery Equipment 05-06-21 23 73 00 Indoor Air Handling Units 05-06-21 23 81 23 Computer Room Air Conditioners 05-06-21 23 82 00 Convection Heating and Cooling Units 05-06-21 23 82 16 Air Coils 05-06-21
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 05-06-21 26 05 12 Minor Electrical Demolition for Remodeling 05-06-21 26 05 13 Medium Voltage Cables 05-06-21
26 05 21 Low Voltage Electrical Power Conductors and Cables (600V And Below)
05-06-21
26 05 26 Grounding and Bonding for Electrical Systems 05-06-21 26 05 33 Raceway and Boxes for Electrical Systems 05-06-21
00 00 01 - 6
26 05 41 Underground Electrical Construction 05-06-21 26 05 53 Electrical Identification 05-06-21 26 05 71 Electrical System Protective Device Study 05-06-21 26 08 00 Commissioning of Electrical Systems 05-06-21 26 09 13 Power Monitoring Systems 05-06-21 26 09 23 Lighting Controls 05-06-21 26 11 16 Secondary Unit Substations 05-06-21
26 12 19 Pad Mounted, Liquid Filled, Medium Voltage Transformers
05-06-21
26 18 41 Load Interrupter Switches 05-06-21 26 22 00 Low Voltage Transformers 05-06-21 26 23 00 Low Voltage Switchgear 05-06-21 26 24 13 Switchboards 05-06-21 26 24 16 Panelboards 05-06-21 26 27 26 Wiring Devices 05-06-21 26 27 27 Equipment Wiring Systems 05-06-21 26 27 28 Electrical Connections for Equipment 05-06-21 26 29 11 Motor Starters 05-06-21 26 29 21 Disconnect Switches 05-06-21 26 32 13 Engine Generators 05-06-21 26 36 23 Automatic Transfer Switches 05-06-21 26 41 00 Facility Lightning Protection 05-06-21 26 43 13 Transient Voltage Surge Suppression 05-06-21 26 51 00 Interior Lighting 05-06-21 26 56 00 Exterior Lighting 05-06-21
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 05-06-21 27 05 26 Grounding and Bonding for Communications Systems 05-06-21 27 05 28 Pathways for Communications Systems 05-06-21 27 08 00 Commissioning of Communications Systems 05-06-21 27 11 00 Communication Equipment Room Fittings 05-06-21 27 13 00 Communications Backbone Cabling 05-06-21 27 15 00 Communications Horizontal Cabling 05-06-21 27 41 13 AudioVideo Infrastructure 05-06-21 27 41 70 Community Access Television 05-06-21 27 52 23 Nurse Call and Code Blue Systems 05-06-21
27 53 19 Distributed Radio Antenna (within Building) Equipment and System (DAS)
05-06-21
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 00 00 Electronic Security 05-06-21 28 05 00 Security Racks & Enclosures
28 05 11 Requirements for Electronic Safety and Security Installations
05-06-21
28 05 13 Conductors and Cables for Electronic Safety and Security
05-06-21
28 05 26 Grounding and Bonding for Electronic Safety and Security
05-06-21
28 05 33 Raceways and Boxes for Electronic Safety and Security
05-06-21
28 08 00 Commissioning of Electronic Safety and Security Systems
05-06-21
28 10 00 Physical Access Control 05-06-21
00 00 01 - 7
28 23 00 Video Surveillance 05-06-21 28 26 00 Emergency Intercommunications and Duress 05-06-21 28 31 00 Fire Detection and Alarm 05-06-21
DIVISION 31 – EARTHWORK
31 20 00 Earth Moving 05-06-21 31 23 19 Dewatering 05-06-21 31 25 00 Erosion and Sedimentation Controls 05-06-21 31 31 16 Termite Control 05-06-21 31 32 13.19 Lime Treated Base Courses 05-06-21 31 63 26 Drilled Caissons 05-06-21
DIVISION 32 – EXTERIOR IMPROVEMENT
32 05 23 Cement and Concrete for Exterior Improvements 05-06-21 32 11 25 Turf Surfaced Roadways 05-06-21 32 14 13 Precast Concrete Unit Paving 05-06-21 32 17 23 Pavement Markings 05-06-21 32 18 23 Exterior Athletic Surfacing 05-06-21 32 84 00 Planting Irrigation 05-06-21 32 90 00 Planting 05-06-21 32 95 00 Exterior Planting Support Structures 05-06-21
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 05-06-21 33 30 00 Sanitary Sewerage Utilities 05-06-21 33 40 00 Storm Drainage Utilities 05-06-21 33 46 13 Foundation Drainage 05-06-21 33 47 13 Tank Liners 05-06-21
- - - E N D - - -
DATE: 31 MAY 23 VANTHCS, DALLAS, TX
PROJECT 549-820B
01 81 11 - 1
SECTION 01 81 11
SUSTAINABLE DESIGN REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section describes general requirements and procedures to comply with the Guiding Principles for Leadership in High Performance and
Sustainable Buildings Memorandum of Understanding incorporated in the
Executive Orders 13423 and 13514; Energy Policy Act of 2005 (EPA 2005) and the Energy Independence and Security Act of 2007 (EISA 2007).
1.2 OBJECTIVES
A. To obtain acceptable Indoor Air Quality (IAQ) for the completed project and minimize the environmental impacts of the construction and operation, the Contractor during the construction phase of this project shall implement the following procedures:
1. Select products that minimize consumption of non-renewable resources, consume reduced amounts of energy and minimize amounts of pollution to produce, and employ recycled and/or recyclable materials. It is the intent of this project to conform with EPA’s
Five Guiding Principles on environmentally preferable purchasing.
The five principles are:
a. Include environmental considerations as part of the normal purchasing process.
b. Emphasize pollution prevention early in the purchasing process.
c. Examine multiple environmental attributes throughout a product’s or service’s life cycle.
d. Compare relevant environmental impacts when selecting products and services.
e. Collect and base purchasing decisions on accurate and meaningful information about environmental performance.
2. Control sources for potential IAQ pollutants by controlled selection of materials and processes used in project construction in order to attain superior IAQ.
3. Products and processes that achieve the above objectives to the extent currently possible and practical have been selected and included in these Construction Documents. The Contractor is responsible to maintain and support these objectives in developing
PROJECT 549-820B
01 81 11 - 2 means and methods for performing the work of this Contract and in proposing product substitutions and/or changes to specified processes.
4. Use building practices that ensure construction debris and particulates do mot contaminate or enter duct work prior to system startup and turn over.
1.3 RELATED DOCUMENTS
A. Section 01 74 19 - CONSTRUCTION WASTE MANAGEMENT
B. Section 01 91 00 - GENERAL COMMISSIONING REQUIREMENTS
C. Section 01 61 16 - VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
1.4 REFERENCE STANDARDS
A. ANSI/BIFMA X7.1 - 2011(R2016) FES Standard
B. ANSI/SMACNA 008-2008 - IAQ Guidelines for Occupied Buildings Under Construction.
B. ASHRAE 90.1-2019 - Energy Standard for Buildings Except Low-Rise Residential Buildings
1.5 DEFINITIONS
A. Agrifiber Products: Composite panel products derived from agricultural fiber
B. Biobased Product: As defined in the 2002 Farm Bill, a product determined by the Secretary to be a commercial or industrial product
(other than food or feed) that is composed, in whole or in significant part, of biological products or renewable domestic agricultural materials (including plant, animal, and marine materials) or forestry materials
C. Biobased Content: The weight of the biobased material divided by the total weight of the product and expressed as a percentage by weight
D. Certificates of Chain-of-Custody: Certificates signed by manufacturers certifying that wood used to make products has been tracked through its extraction and fabrication to ensure that is was obtained from forests certified by a specified certification program
E. Composite Wood: A product consisting of wood fiber or other plant particles bonded together by a resin or binder
F. Construction and Demolition Waste: Includes solid wastes, such as building materials, packaging, rubbish, debris, and rubble resulting from construction, remodeling, repair and demolition operations. A
PROJECT 549-820B
01 81 11 - 3 construction waste management plan is to be provided by the Contractor as defined in Section 01 74 19.
G. Third Party Certification: Certification of levels of environmental achievement by nationally recognized sustainability rating system.
H. Light Pollution: Light that extends beyond its source such that the additional light is wasted in an unwanted area or in an area where it inhibits view of the night sky
I. Recycled Content Materials: Products that contain pre-consumer or post-consumer materials as all or part of their feedstock
J. Post-Consumer Recycled Content: The percentage by weight of constituent materials that have been recovered or otherwise diverted from the solid-waste stream after consumer use
K. Pre-Consumer Recycled Content: Materials that have been recovered or otherwise diverted from the solid-waste stream during the manufacturing process. Pre-consumer content must be material that would not have otherwise entered the waste stream as per Section 5 of the FTC Act, Part 260 “Guidelines for the Use of Environmental Marketing Claims”:
www.ftc.gov/bcp/grnrule/guides980427
L. Regional Materials: Materials that are extracted, harvested, recovered, and manufactured within a radius of 250 miles (400 km) from the Project site
M. Salvaged or Reused Materials: Materials extracted from existing buildings in order to be reused in other buildings without being manufactured
N. Sealant: Any material that fills and seals gaps between other materials
O. Type 1 Finishes: Materials and finishes which have a potential for short-term levels of off gassing from chemicals inherent in their manufacturing process, or which are applied in a form requiring vehicles or carriers for spreading which release a high level of particulate matter in the process of installation and/or curing.
P. Type 2 Finishes: “Fuzzy" materials and finishes which are woven, fibrous, or porous in nature and tend to adsorb chemicals offgas
Q. Volatile Organic Compounds (VOCs): Any compound of carbon, excluding carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or carbonates, and ammonium carbonate, which participates in atmospheric photochemical reactions. Compounds that have negligible photochemical reactivity, listed in EPA 40 CFR 51.100(s), are also excluded from this regulatory definition.
PROJECT 549-820B
01 81 11 - 4
1.6 SUBMITTALS
A. Sustainable Design Submittals:
1. Alternative Transportation: Provide manufacturer’s cut sheets for all bike racks installed on site, including the total number of bicycle storage slots provided. Also, provide manufacturer’s cut sheets for any alternative-fuel refueling stations installed on site, including fueling capacity information for an 8-hour period.
2. Heat Island Effect:
a. Site Paving: Provide manufacturer’s cut sheets for all impervious paving materials, highlighting the Solar Reflectance Index (SRI) of the material. Also, provide cut sheets for all pervious paving materials.
b. Roofing Materials: Submittals for roofing materials must include manufacturer’s cut sheets or product data highlighting the Solar
Reflectance Index (SRI) of the material.
3. Exterior Lighting Fixtures: Submittals must include cut sheets with manufacturer’s data on initial fixture lumens above 90° from nadir for all exterior lighting fixtures, and, for parking lot lighting, verification that the fixtures are classified by the IESNA as “full cutoff” (FCO); OR provide documentation that exterior luminaires are
IDA-Approved as Dark-Sky Friendly by the International Dark Sky
Association (IDA) Fixture Seal of Approval Program.
4. Irrigation Systems: Provide manufacturer’s cut sheets for all permanent landscape irrigation system components and for any rainwater harvesting system components, such as cisterns.
5. Water Conserving Fixtures: Submittals must include manufacturer’s cut sheets for all water-consuming plumbing fixtures and fittings
(toilets, urinals, faucets, showerheads, etc.) highlighting maximum flow rates and/or flush rates. Include cut sheets for any automatic faucet-control devices.
6. Process Water Use: Provide manufacturer’s cut sheets for all water-consuming commercial equipment (clothes washers, dishwashers, ice machines, etc.), highlighting water consumption performance. Include manufacturer’s cut sheets or product data for any cooling towers, highlighting water consumption estimates, water use reduction measures, and corrosion inhibitors.
7. Elimination of CFCs AND HCFCs: Provide manufacturer’s cut sheets for all cooling equipment with manufacturer’s product data, highlighting
PROJECT 549-820B
01 81 11 - 5 refrigerants; provide manufacturer’s cut sheets for all fire-suppression equipment, highlighting fire-suppression agents; provide manufacturer’s cut-sheets for all polystyrene insulation (XPS) and closed-cell spray foam polyurethane insulation, highlighting the blowing agent(s).
8. Appliances and Equipment: Provide copies of manufacturer’s product data for all Energy Star eligible equipment and appliances, including office equipment, computers and printers, electronics, and commercial food service equipment (excluding HVAC and lighting components), verifying compliance with EPA’s Energy Star program.
9. On-Site Renewable Energy Systems: Provide cut sheets and manufacturer’s product data for all on-site renewable energy generating components and equipment, including documentation of output capacity.
10. Measurement and Verification Systems: Provide cut sheets and manufacturer’s product data for all controls systems, highlighting electrical metering and trending capability components.
11. Salvaged or Reused Materials: Provide documentation that lists each salvaged or reused material, the source or vendor of the material, the purchase price, and the replacement cost if greater than the purchase price.
12. Recycled Content: Submittals for all materials with recycled content
(excluding MEP systems equipment and components) must include the following documentation: Manufacturer’s product data, product literature, or a letter from the manufacturer verifying the percentage of post-consumer and pre-consumer recycled content (by weight) of each material or product
a. An electronic spreadsheet that tabulates the Project’s total materials cost and combined recycled content value (defined as the sum of the post-consumer recycled content value plus one-half of the pre-consumer recycled content value) expressed as a percentage of total materials cost. This spreadsheet shall be submitted every month with the Contractor’s Certificate and
Application for Payment. It should indicate, on an ongoing basis, line items for each material, including cost, pre-consumer recycled content, post-consumer recycled content, and combined recycled content value.
PROJECT 549-820B
01 81 11 - 6
13. Regional Materials: Submittals for all products or materials expected to contribute to the regional calculation (excluding MEP systems equipment and components) must include the following documentation:
a. Cost of each material or product, excluding cost of labor and equipment for installation
b. Location of product manufacture and distance from point of manufacture to the Project Site.
c. Location of point of extraction, harvest, or recovery for each raw material in each product and distance from the point of extraction, harvest, or recovery to the Project Site
d. Manufacturer’s product data, product literature, or a letter from the manufacturer verifying the location and distance from the
Project Site to the point of manufacture for each regional material
e. Manufacturer’s product data, product literature, or a letter from the manufacturer verifying the location and distance from the
Project Site to the point of extraction, harvest, or recovery for each regional material or product, including, at a minimum, gravel and fill, planting materials, concrete, masonry, and GWB
f. An electronic spreadsheet that tabulates the Project’s total materials cost and regional materials value, expressed as a percentage of total materials cost. This spreadsheet shall be submitted every month with the Contractor’s Certificate and
Application for Payment. It should indicate on an ongoing basis, line items for each material, including cost, location of manufacture, distance from manufacturing plant to the Project
Site, location of raw material extraction, and distance from extraction point to the Project Site.
14. Biobased Products:
a. Rapidly Renewable Products: Submittals must include written documentation from the manufacturer declaring that rapidly renewable materials are made from plants harvested within a ten-year or shorter cycle and must indicate the percentage (by weight) of these rapidly renewable components contained in the candidate products, along with the costs of each of these materials, excluding labor and delivery costs.
PROJECT 549-820B
01 81 11 - 7
b. Certified Wood: Submittals for all wood-based materials must include a statement indicating the cost of each product containing FSC Certified wood, exclusive of labor and delivery costs, and third party verification of certification from one of the following:
1) Documentation from the supplier verifying that 100% of the wood-based content originates from SFI third-party certified forest lands, identifying the company or companies that performed the SFI third-party certification for both the forest land management and the certified product content.
15. Outdoor Air Delivery Monitoring: Provide manufacturer’s cut sheets highlighting the installed carbon dioxide monitoring system components and sequence of controls shop drawing documentation, including CO2 differential set-points and alarm capabilities.
16. Interior Adhesives and Sealants: Submittals for all field-applied adhesives and sealants, which have a potential impact on indoor air, must include manufacturer’s SDSs or other Product Data highlighting
VOC content.
a. Provide manufacturers’ documentation verifying all adhesives used to apply laminates, whether shop-applied or field-applied, contain no urea-formaldehyde.
17. Interior Paints and Coatings: Submittals for all field-applied paints and coatings, which have a potential impact on indoor air, must include manufacturer’s SDSs or other Product Data highlighting
VOC content
18. Exterior Paints and Coatings: Submittals for all field-applied paints and coatings, which have a potential impact on ambient air quality, must include manufacturer’s SDSs or other manufacturer’s
Product Data highlighting VOC content.
19. Floorcoverings:
a. Carpet Systems: Submittals for all carpet must include the following:
1) A copy of an assessment from the Building for Environmental and Economic Sustainability (BEES) software model, either
Version 3.0 or 4.0, with parameters of the model set as described by this specification section.
PROJECT 549-820B
01 81 11 - 8
2) Manufacturer’s product data verifying that all carpet systems meet or exceed the testing and product requirements of the
Carpet and Rug Institute Green Label Plus program.
b. Engineered Wood Flooring: Submittals for all engineered wood flooring must include manufacturer’s product data verifying certification under either the Greenguard or FloorScore indoor emissions testing program.
20. Composite Wood and Agrifiber Binders: Submittals for all composite wood and agrifiber products (including but not limited to particleboard, wheatboard, strawboard, agriboard products, engineered wood components, solid-core wood doors, OSB, MDF, and plywood products) must include manufacturer’s product data verifying that these products contain no urea-formaldehyde resins.
21. Systems Furniture and Seating: Provide manufacturer’s product data verifying that all systems furniture and seating products meet the requirements of one of the following:
a. Greenguard certification
b. SCS Indoor Advantage certification
c. SCS Indoor Advantage Gold certification
d. BIFMA Standard X7.1- 2011(R2016), as tested to BIFMA method M7.1 and as verified by an independent laboratory
d. Calculated indoor air concentration limits for furniture systems and seating determined by the U.S. EPA’s Environmental Technology
Verification Large Chamber Test Protocol for Measuring Emissions of VOCs and Aldehydes (September 1999) testing protocol as conducted in an independent air quality testing laboratory
22. Entryway Systems: Provide manufacturer’s cut sheets for all walk-off systems installed to capture particulates, including permanently installed grates, grilles, slotted systems, direct glue-down walk-off mats, and non-permanent roll-out mats.
23. Air Filtration: Provide manufacturer’s cut sheets and product data highlighting the following:
a. Minimum Efficiency Reporting Value (MERV) for filtration media in all air handling units (AHUs) per ASHRAE HVAC Design Manual for
Hospitals and Clinics.
b. Minimum Efficiency Reporting Value (MERV) for filtration media installed at return air grilles during construction if
PROJECT 549-820B
01 81 11 - 9 permanently installed AHUs are used during construction. See above for requirements
24. Mercury in Lighting: Provide manufacturer’s cut sheets or product data for all fluorescent or HID lamps highlighting mercury content.
25. Lighting Controls: Provide manufacturer’s cut sheets and shop drawing documentation highlighting all lighting controls systems components.
26. Thermal Comfort Controls: Provide manufacturer’s cut sheets and shop drawing documentation highlighting all thermal comfort-control systems components.
27. Blended Cement: It is the intent of this specification to reduce CO2 emissions and other environmentally detrimental effects resulting from the production of portland cement by requiring that all concrete mixes, in aggregate, utilize blended cement mixes to displace portland cement as specified in Section 03 30 00, CONCRETE typically included in conventional construction. Provide the following submittals:
a. Copies of concrete design mixes for all installed concrete
b. Copies of typical regional baseline concrete design mixes for all compressive strengths used on the Project
c. Quantities in cubic yards of each installed concrete mix
28. Gypsum Wall Board: Provide manufacturer’s cut sheets or product data verifying that all gypsum wallboard products are moisture and mold-resistant.
29. Fiberglass Insulation: Provide manufacturer’s cut sheets or product data verifying that fiberglass batt insulation contains no urea-formaldehyde.
30. Duct Acoustical Insulation: Provide manufacturer’s cut sheets or product data verifying that mechanical sound insulation materials in air distribution ducts consists of an impervious, non-porous coatings that prevent dust from accumulating in the insulating materials.
31. Green Housekeeping: Provide documentation that all cleaning products and janitorial paper products meet the VOC limits and content requirements of this specification section.
B. Project Materials Cost Data: Provide a spreadsheet in an electronic file indicating the total cost for the Project and the total cost of building materials used for the Project, as follows:
PROJECT 549-820B
01 81 11 - 10
1. Not more than 60 days after the Preconstruction Meeting, the General
Contractor shall provide to the Owner and Architect a preliminary schedule of materials costs for all materials used for the Project organized by specification section. Exclude labor costs and all mechanical, electrical, and plumbing (MEP) systems materials and labor costs. Include the following:
a. Identify each reused or salvaged material, its cost, and its replacement value.
b. Identify each recycled-content material, its post-consumer and pre-consumer recycled content as a percentage the product’s weight, its cost, its combined recycled content value (defined as the sum of the post-consumer recycled content value plus one-half of the pre-consumer recycled content value), and the total combined recycled content value for all materials as a percentage of total materials costs.
c. Identify each regional material, its cost, its manufacturing location, the distance of this location from the Project site, the source location for each raw material component of the material, the distance of these extraction locations from the
Project site, and the total value of regional materials as a percentage of total materials costs.
d. Identify each biobased material, its source, its cost, and the total value of biobased materials as a percentage of total materials costs. Also provide the total value of rapidly renewable materials (materials made from plants that are harvested in less than a 10-year cycle) as a percentage of total materials costs.
e. Identify each wood-based material, its cost, the total wood-based materials cost, each FSC Certified wood material, its cost, and the total value of Certified wood as a percentage of total wood-based materials costs.
2. Provide final versions of the above spreadsheets to the Owner and
Architect not more than 14 days after Substantial Completion.
C. Construction Waste Management: See Section 01 74 19 - CONSTRUCTION
WASTE MANAGEMENT for submittal requirements.
D. Construction Indoor Air Quality (IAQ) Management: Submittals must include the following:
PROJECT 549-820B
01 81 11 - 11
1. Not more than 30 days after the Preconstruction Meeting, prepare and submit for the Architect and Owner’s approval, an electronic copy of the draft Construction IAQ Management Plan in an electronic file including, but not limited to, descriptions of the following:
2. Instruction procedures for meeting or exceeding the minimum requirements of the Sheet Metal and Air Conditioning National
Contractors Association ANSI/SMACNA 008-2008, Chapter 3(SMACNA) IAQ
Guidelines for Occupied Buildings Under Construction, 2008, including procedures for HVAC Protection, Source Control, Pathway
Interruption, Housekeeping, and Scheduling
a. Instruction procedures for protecting absorptive materials stored on-site or installed from moisture damage
b. Schedule of submission to Architect of photographs of on-site construction IAQ management measures such as protection of ducts and on-site stored oil installed absorptive materials
c. Instruction procedures if air handlers must be used during construction, including a description of filtration media to be used at each return air grille
d. Instruction procedure for replacing all air-filtration media immediately prior to occupancy after completion of construction, including a description of filtration media to be used at each air handling or air supply unit
3. Not more than 30 days following receipt of the approved draft
CIAQMP, submit an electronic copy of the approved CIAQMP in an electronic file, along with the following:
a. Manufacturer’s cut sheets and product data highlighting the
Minimum Efficiency Reporting Value (MERV) for all filtration media to be installed at return air grilles during construction if permanently installed AHUs are used during construction.
b. Manufacturer’s cut sheets and product data highlighting the
Minimum Efficiency Reporting Value (MERV) for filtration media in all air handling units (AHUs).
4. Not more than 14 days after Substantial Completion provide the following:
a. Documentation verifying required replacement of air filtration media in all air handling units (AHUs) after the completion of construction and prior to occupancy and, if applicable, required installation of filtration during construction.
PROJECT 549-820B
01 81 11 - 12
b. Minimum of 18 Construction photographs: Six photographs taken on three different occasions during construction of the ANSI/SMACNA
008-2008, Chapter 3SMACNA approaches employed, along with a brief description of each approach, documenting implementation of the
IAQ management measures, such as protection of ducts and on-site stored or installed absorptive materials.
c. A copy of the report from testing and inspecting agency documenting the results of IAQ testing, demonstrating conformance with IAQ testing procedures and requirements.
E. Commissioning: See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for submittal requirements.
F. Sustainable Design Progress Reports: Concurrent with each Application for Payment, submit reports for the following:
1. Construction Waste Management: Waste reduction progress reports and logs complying with the requirements of Section 01 74 19 -
CONSTRUCTION WASTE MANAGEMENT.
2. Construction IAQ Management: See details below under Section 3.2
Construction Indoor Air Quality Management for Construction IAQ management progress report requirements.
1.7 QUALITY ASSURANCE
A. Preconstruction Meeting: After award of Contract and prior to the commencement of the Work, schedule and conduct meeting with Owner, Architect, and all Subcontractors to discuss the Construction Waste
Management Plan, the required Construction Indoor Air Quality (IAQ)
Management Plan, and all other Sustainable Design Requirements. The purpose of this meeting is to develop a mutual understanding of the
Project’s Sustainable Design Requirements and coordination of the
Contractor’s management of these requirements with the Contracting
Officer and the Construction Quality Manager.
B. Construction Job Conferences: The status of compliance with the
Sustainable Design Requirements of these specifications will be an agenda item at all regular job meetings conducted during the course of work at the site.
PROJECT 549-820B
01 81 11 - 13
PART 2 - PRODUCTS
2.1 PRODUCT ENVIRONMENTAL REQUIREMENTS
A. Site Clearing: Topsoil shall be provided by the Contractor from on-site material which has been stockpiled for reuse. Off-site borrow should only be used when on-site sources are exhausted. Chip and/or compost on site all vegetated material identified for removal.
B. Do not burn rubbish, organic matter, etc. or any material on the site.
Dispose of, offsite, legally and in accordance with Specification
Section 01 74 19.
C. Roofing Materials: All roofing systems must comply with the following requirements:
1. Low-Sloped roofing less than or equal to 2:12 slope must have an SRI of at least 78.
2. Roofing Materials: Light-colored, reflective, and high-emissivity roofing helps to reduce localized heat build-up from roof surfaces that contribute to the urban heat island effect.
D. Exterior Lighting Fixtures:
1. All exterior luminaries must emit 0% of the total initial designed fixture lumens at an angle above 90° from nadir and/or meet the requirements of the Dark Sky certification program.
2. Exterior lighting cannot exceed 80% of the lighting power densities defined by ASHRAE/IESNA Standard 90.1-2019, Exterior Lighting
Section, without amendments.
3. No lighting of building facades or landscape features is permitted.
E. Herbicides and Pest Control: Herbicides shall not be permitted, and pest control measures shall utilize EPA-registered biopesticides only.
F. Irrigation Systems: Any permanent landscape irrigation systems must be supplied by collected rain water, gray water, and condensate water as much as possible. The use of any potable water is to be kept to as near zero as possible and still keep the plant material healthy and green. Drip type emitters are to be used in all planting beds. Spray and/or rotor type heads are to be used in grass areas where appropriate. Overspray onto road surfaces, walls, buildings, etc. is to be minimized to conserve water. Automatic controllers using ET (evapotranspiration) and weather monitors are to be used to operate the irrigation system and to conserve water.
G. Water-Conserving Fixtures: Plumbing fixtures and fittings shall use in aggregate at least 40% less water than the water use baseline calculated for the building after meeting the Energy Policy Act of 1992
PROJECT 549-820B
01 81 11 - 14 fixture performance requirements. Flow and flush rates shall not exceed the following:
1. Toilets: no more than 1.3 gallons per flush, otherwise be dual flush
1.6/0.8 gallons per flush, and have documented bowl evacuation capability per MaP testing of at least 400 grams
2. Urinals: Water sense rated with no more than 0.125 gallons per flush or use where considered appropriate.
3. Lavatory Faucets: 0.5 gpm with automatic faucet controls
4. Kitchen Sink Lavatories: 2.2 gpm
5. Showerheads: no more than 1.5gpm
H. Process Water Use: Employ strategies that in aggregate result in 20% less water use than the process water use baseline for the building after meeting the commercial equipment and HVAC performance requirements as listed in the Table below. For equipment not addressed by EPACT 2005 or the list below, additional equipment performance requirements may be proposed provided documentation supporting the proposed benchmark or industry standard is submitted.
1. Clothes Washer: 7.5 gallons/cubic foot/cycle
2. Dishwasher with Racks: 1.0 gallons/rack
3. Ice Machine: 20 gallons/100 pounds ice for machines making over 175 pounds of ice per day; 30 gallons/100 pounds ice for machines making less than 175 ice per day. Avoid water-cooled machines.
4. Food Steamer: 2 gallons/hour. Use only boilerless steamers.
5. Pre-Rinse Spray Valves: 1.4 gallons/minute
6. Kitchen Pot-Washing Sinks: 2.2 gallons/minute
7. Cooling Towers: 2.3 gallons/ton-hr. water loss
I. Elimination of CFCs AND HCFCs:
1. Ozone Protection: Base building cooling equipment shall contain no refrigerants other than the following: HCFC-123, HFC-134a, HFC-
245fa, HFC-407c, or HFC 410a.
2. Fire suppression systems may not contain ozone-depleting substances.
3. Extruded polystyrene insulation (XPS) and closed-cell spray foam polyurethane insulation shall not be manufactured with hydrochlorofluorocarbon (HCFC) blowing agents.
J. Appliances and Equipment: All Energy Star eligible equipment and appliances, including office equipment, computers and printers, electronics, and commercial food service equipment (excluding HVAC and lighting components), shall be qualified by EPA’s Energy Star program.
PROJECT 549-820B
01 81 11 - 15
K. HVAC Distribution Efficiency:
1. All duct systems shall be constructed of galvanized sheet metal, aluminum, or stainless steel as deemed appropriate based on the application requirements. No fiberglass duct board shall be permitted.
2. All medium- and high-pressure ductwork systems shall be pressure-tested in accordance with the current SMACNA standards.
3. All ductwork shall be externally insulated. No interior duct liner shall be permitted.
4. Where possible, all air terminal connections shall be hard-connected with sheet metal ductwork. If flexible ductwork is used, no flexible duct extension shall be more than six feet in length.
5. All HVAC equipment shall be isolated from the ductwork system with flexible duct connectors to minimize the transmittance of vibration.
6. All supply and return air branch ducts shall include the appropriate style of volume damper. Air terminal devices such as grilles, registers, and diffusers shall be balanced at duct branch dampers, not at terminal face.
L. Measurement and Verification: Install controls and monitoring devices as required by MEP divisions order to comply with International
Performance Measurement & Verification Protocol (IPMVP), Volume III:
Concepts and Options for Determining Energy Savings in New
Construction, April 2003, Option D.
1. The IPMVP provides guidance on situation-appropriate application of measurement and verification strategies.
M. Salvaged or Reused materials: There shall be no substitutions for specified salvaged and reused materials and products.
1. Salvaged materials: Use of salvaged materials reduces impacts of disposal and manufacturing of replacements.
N. Recycled Content of Materials:
1. Provide building materials with recycled content such that post-consumer recycled content value plus half the pre-consumer recycled content value constitutes a minimum of 30% of the cost of materials used for the Project, exclusive of all MEP equipment, labor, and delivery costs. The Contractor shall make all attempts to maximize the procurement of materials with recycled content.
a. e post-consumer recycled content value of a material shall be determined by dividing the weight of post-consumer recycled
PROJECT 549-820B
01 81 11 - 16 content by the total weight of the material and multiplying by the cost of the material.
b. Do not include mechanical and electrical components in the calculations.
c. Do not include labor and delivery costs in the calculations.
d. Recycled content of materials shall be defined according to the
Federal Trade Commission’s “Guide for the Use of Environmental
Marketing Claims,” 16 CFR 260.7 (e).
e. Utilize all on-site existing paving materials that are scheduled for demolition as granulated fill, and include the cost of this material had it been purchased in the calculations for recycled content value.
f. The materials in the following list must contain the minimum recycled content indicated:
Category Minimum Recycled Content
Compost/mulch 100% post-consumer
Asphaltic Concrete Paving 25% post-consumer
Cast-in-Place Concrete 6% pre-consumer
CMU: Gray Block 20% pre-consumer
Steel Reinforcing Bars 90% combined
Structural Steel Shapes 90% combined
Steel Joists 75% combined
Steel Deck 75% combined
Steel Fabrications 60% combined
Steel Studs 30% combined
Steel Roofing 30% post-consumer
Aluminum Fabrications 35% combined
Rigid Insulation 20% pre-consumer
Batt insulation 30% combined
PROJECT 549-820B
01 81 11 - 17
PART 3 - EXECUTION - NOT USED
3.1 NOT USED
3.2 FIELD QUALITY CONTROL - Construction Indoor Air Quality Management:
1. During construction, meet or exceed recommended control measures of
ANSI/SMACNA 008-2008, Chapter 3.
2. Protect stored on-site and installed absorptive materials from moisture damage.
3. If permanently installed air handlers are used during construction, filtration media with a minimum efficiency reporting value (MERV) of
8 must be used at each return air grille, as determined by ASHRAE
Standard 52.2-1999 (with errata but without addenda). Replace all filtration media immediately prior to occupancy.
4. Perform building flush-out as follows:
After construction ends, prior to occupancy and with interior finishes installed, perform a building flush-out by supplying a total volume of 14000
cu. ft. of outdoor air per sq. ft. of floor area while maintaining an internal temperature of at least 60 degrees Fahrenheit and a relative humidity no higher than 60 percent.
OR
If occupancy is desired prior to flush-out completion, the space may be occupied following delivery of a minimum of 3500 cu. ft. of outdoor air per sq. ft. of floor area to the space. Once a space is occupied, it must be ventilated at a minimum rate of 0.30 cfm per sq. ft. of outside air or design minimum outside air rate determined until a total of 14000 cu. ft./sq. ft. of outside air has been delivered to the space.
During each day of flush-out period, ventilation must begin a minimum of three hours prior to occupancy and continue during occupancy.
08 11 13 - 1
SECTION 08 11 13
HOLLOW METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies steel doors, steel frames and related components.
B. Terms relating to steel doors and frames as defined in ANSI A123.1 and as specified.
1.2 RELATED WORK
A. Frames fabricated of structural steel: 05 50 00 - METAL
FABRICATIONS.
B. Aluminum frames entrance work: 08 41 13 - ALUMINUM-FRAMED
ENTRANCES AND STOREFRONTS.
C. Overhead doors including loading docks: 08 33 00 - COILING DOORS
AND GRILLES.
D. Door Hardware: 08 71 00 - DOOR HARDWARE.
E. Glazing and ballistic rated glazing: 08 80 00 - GLAZING.
F. Blast resistant Glazing (Mission Critical and Life Safety): 08 44 15.
G. Deal trays of a Forced Entry/Ballistic Resistant rating: 08 56
59 - SERVICE AND TELLER WINDOW UNITS.
H. Card readers and biometric devices: 11 10 00 – PHYSICAL ACCESS
CONTROL.
1.3 TESTING
A. An independent testing laboratory shall perform testing.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23 - SUBMITTAL PROCEDURES.
B. Manufacturers Literature and Data:
1. Fire rated doors and frames, showing conformance with NFPA 80 and
08 11 13 - 2
Underwriters Laboratory, Inc., or Intertek Testing Services or
Factory Mutual fire rating requirements and temperature rise rating for stairwell doors. Submit proof of temperature rating.
2. Sound rated doors, including test report from Testing Laboratory.
1.5 SHIPMENT
A. Prior to shipment label each door and frame to show location, size, door swing and other pertinent information.
B. Fasten temporary steel spreaders across the bottom of each door frame.
1.6 STORAGE AND HANDLING
A. Store doors and frames at the site under cover.
B. Protect from rust and damage during storage and erection until completion.
1.7 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.
C. Door and Hardware Institute (DHI):
A115 Series.............Steel Door and Frame Preparation for Hardware, Series A115.1 through A115.17 (Dates Vary)
D. Steel Door Institute (SDI):
113.................. Thermal Transmittance of Steel Door and Frame
Assemblies
128................ Acoustical Performance for Steel Door and Frame
Assemblies
A250.8............... Standard Steel Doors and Frames
E. American Society for Testing and Materials (ASTM):
A1008................ Steel, sheet, Cold-Rolled, Carbon, Structural, High Strength Low Alloy and High Strength
Low Alloy with Improved Formability
E90.................. Laboratory Measurement of Airborne Sound
Transmission Loss of Building Partitions
08 11 13 - 3
F. The National Association Architectural Metal Manufactures
(NAAMM): Metal Finishes Manual (Current Edition)
G. National Fire Protection Association (NFPA):
80-09...................Fire Doors and Fire Windows
H. Underwriters…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .