22 a Plmbg DWGs 1of8 tt.pdf
PDF 9 MB Posted
- Solicitation number
- 36C10F22R0045
About this file
This document package includes plumbing drawings and specifications for a federal construction project to renovate the Long Term Spinal Cord Injury Center located at the VA North Texas Health Care System campus in Dallas. The project involves upgrading plumbing systems across multiple levels of the facility below grade and at ground level. Key details include demolishing existing plumbing fixtures and piping in designated areas and installing new drainage, waste and vent systems to service sinks, floor drains, and other plumbing equipment. Medical gas systems for oxygen, vacuum, air and other medical gases will also be replaced or modified. Standard plumbing notes provide requirements for pipe materials, slopes, cleanouts, valves and other installation specifications. Plumbing symbols and legends define piping designations, equipment, and other diagrammatic elements.
View the file
Other files
Show 40 more
Latest 50 of 117 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AP ACCESS PANEL
APPROX APPROXIMATELY
AS AUTOMATIC SPRINKLER
ASW ADJUSTABLE SPEED DRIVES
ASW AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY HEATING, REFRIGERATION,
AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY MECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BFP REDUCED PRESSURE BACKFLOW PREVENTER
BG BELOW GRADE
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BV BALL VALVE
CFH CUBIC FEET PER HOUR
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
CWW CLEAR WATER WASTE
D DEMOLISH
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWR DOMESTIC WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EL ELEVATION
EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM
EOI EMERGENCY OXYGEN INLET
EPA ENVIRONMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
E EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FL FLOW LINE
FLR FLOOR
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWCP HOT WATER CIRCULATING PUMP
INV INVERT
INWC INCHES, WATER COLUMN
IPC INTERNATIONAL PLUMBING CODE
IW INDIRECT WASTE
KW KILOWATT
KWHR KILOWATT-HOUR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MCA MINIMUM CIRCUIT AMPACITY
MED MEDICAL
MH MANHOLE
MOCP MAXIMUM OVERCURRENT PROTECTION
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NFH NON-FREEZE HYDRANT
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON-POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
RD ROOF DRAIN
RO REVERSE OSMOSIS WATER
RPM REVOLUTIONS PER MINUTE
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SWMH STORM DRAIN MANHOLE
SP SUMP PUMP
SQFT SQUARE FEET
SS STAINLESS STEEL
SSD SUB-SOIL DRAINAGE
SSPD SANITARY SUMP PUMPED DISCHARGE
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TYP TYPICAL
V VENT
VB VACUUM BREAKER
VP VACUUM PUMP
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WM WATER METER
YCO YARD CLEANOUT
YH YARD HYDRANT
ZVB ZONE VALVE BOX
ABBREVIATIONS
(ALL ABBREVIATIONS MAY NOT APPEAR ON DRAWINGS)
SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
(ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS)(ALL DESIGNATIONS MAY NOT APPEAR ON DRAWINGS.)
SYMBOL DESCRIPTION
SECTION
RISER SYMBOL
EQUIPMENT DESIGNATION
NOTE BY SYMBOL
GENERAL VALVES
COMBINATION AUTOMATIC
FLOW CONTROL AND
SHUT-OFF VALVE
PRESSURE REGULATING
VALVE
PRESSURE RELIEF VALVE
MANUAL AIR VENT
TEST PLUG
(PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
BALL VALVE
GATE VALVE
GLOBE VALVE
CHECK VALVE
BUTTERFLY VALVE
ANGLED GLOBE VALVE
MODULATING CONTROL
VALVE
TWO POSITION CONTROL
VALVE
THREE-WAY MODULATING
CONTROL VALVE
THREE-WAY TWO POSITION
CONTROL VALVELIMIT OF DEMOLITION
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PRESSURE GAGE
THERMOMETER
STRAINER
FLOW ELEMENT
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
PIPE UP
PIPE DOWN
45 DEGREE ELBOW
90 DEGREE ELBOW
FLOOR DRAIN
HOSE BIBB
AV
FE
(ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS.)
DOMESTIC HOT WATER
DOMESTIC COLD WATER
MEDICAL OXYGEN
MEDICAL VACUUM
MEDICAL AIR
DOMESTIC HOT WATER RETURN
INDIRECT DRAIND
SANITARY SEWERSS
FUEL OIL DISCHARGE
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
SANITARY VENT
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
DRAWING NUMBER WHERE SHOWN
SECTION NUMBER
DRAWING SYMBOLS PIPING SYMBOLS
83-PX-XXX
X
PLUMBING SYMBOLS, LEGENDS AND NOTES
PLUMBING PIPING DESIGNATIONS
83-PX-XXX
26-P 3
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
BUILDING NO. WHERE EQUIPMENT IS LOCATED
DCW
DHW
DHWR
MA
MV
O
V
STORM WATER, BELOW GRADE
STORM WATERSW
SW
SOFTENED COLD WATERSCW
SWS
SWR SOLAR HOT WATER RETURN
SOLAR HOT WATER SUPPLY
FOD
FOS
FOV
FOR
OVERFLOW ROOF DRAINOD
CLEAR WASTE WATERCWW
NON-POTABLE WATERNPW
SUB-SOIL DRAINAGESSD
GENERAL DEMOLITION PLUMBING NOTES:
GENERAL PLUMBING NOTES:
1. THE EXISTING DESIGN DRAWINGS SHOW ORIGINAL DESIGN INTENT. THESE ARE NOT
AS-BUILT DRAWINGS. THE DEMOLITION CONTRACTOR SHALL FIELD VERIFY EXACT
AS-BUILT CONDITIONS PRIOR TO SUBMITTING A FORMAL BID. VARIANCES TO THE
DRAWINGS ARE THE RESPONSIBILITY OF THE BIDDING CONTRACTOR.
2. ASBESTOS ABATEMENT AND LEAD PAINT REMOVAL SHALL BE COMPLETED PRIOR TO
ANY OTHER PHASES OF DEMOLITION.
3. REMOVE ALL PLUMBING SYSTEMS, DEVICES, FIXTURES, PIPING AND HANGERS
WITHIN HATCHED AREA OF WORK, UNLESS NOTED OTHERWISE.
4. REFER TO SPECIFICATION DIVISIONS 01 AND 02 FOR DEMOLITION REQUIREMENTS /
PROCEDURES.
5. CONTRACTOR SHALL VISIT THE PROJECT SITE WITH THE OWNER'S REPRESENTATIVE
TO IDENTIFY AND MARK ALL ITEMS SCHEDULED FOR DEMOLITION THAT THE OWNER
WANTS TO RETAIN. DELIVER MARKED ITEMS TO THE OWNER'S STORAGE WITHIN
THE PROJECT SITE AS DIRECTED BY THE PROJECT MANAGER / CO TR.
6. ALL DEMOLITION ITEMS NOT IDENTIFIED BY THE OWNER'S REPRESENTATIVE TO BE
RETAINED SHALL BECOME THE PROPERTY OF THE CONTRACTOR. THESE ITEMS
SHALL BE REMOVED FROM THE SITE. HAZARDOUS MATERIALS SHALL BE DISPOSED
OF IN ACCORDANCE WITH SPECIFICATION DIVISIONS 01 AND 02.
7. WHERE CEILINGS OR WALLS ARE SCHEDULED FOR DEMOLITION ON THE
ARCHITECTURAL DRAWINGS, DISCONNECT AND REMOVE ALL DEVICES, PLUMBING
FIXTURES AND GRILLES ASSOCIATED WITH THOSE WALLS AND CEILINGS.
8. REMOVE ALL HANGING WIRE CLIPS, ALL-THREAD, UNISTRUT AND WIRES ABOVE
CEILING TO LEAVE STRUCTURE CLEAN, TYPICAL.
9. ALL EXISTING MATERIAL REMOVED SHALL NOT BE REUSED IN ANY NEW SYSTEM,
EXCEPT WHERE INDICATED AS BEING RELOCATED.
10. DEMOLITION OF ALL PIPING SHALL BE TAKEN BACK TO AN ACTIVE BRANCH, NO
DEAD-ENDS ARE PERMITTED.
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS INDICATED ON THE
DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
2. CONTRACT DRAWINGS FOR PLUMBING WORK ARE DIAGRAMMATIC AND ARE
INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
3. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH ARCHITECTURAL,
STRUCTURAL, CIVIL, MECHANICAL, ELECTRICAL WORK, ETC., SHOWN ON OTHER
CONTRACT DOCUMENTS.
4. WHEN TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED,
THE PRODUCT OF ONE MANUFACTURER SHALL BE USED.
5. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS
SHOWN IN DETAILS FOR PIPING AND EQUIPMENT (UNLESS OTHERWISE NOTED)
SHALL BE FURNISHED AND INSTALLED BY THE PLUMBING CONTRACTOR.
6. LOCATION AND SIZE OF ALL FLOOR, WALL AND ROOF OPENINGS SHALL BE
COORDINATED WITH ALL OTHER TRADES.
7. PLUMBING CONTRACTOR IS TO PROVIDE FIRE STOPS AT ALL FLOOR PENETRATIONS
PER SPECIFICATIONS.
8. COORDINATED ROUTING OF PLUMBING PIPING WITH STRUCTURE, DUCTWORK,
EQUIPMENT, ETC. OFFSETS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
OWNER.
9. SLOPE ALL DRAINAGE PIPING 3" AND SMALLER AT 1/4" PER FOOT AND ALL DRAINAGE
PIPING 4" AND LARGER AT 1/8" PER FOOT.
10. UNLESS OTHERWISE NOTED, ALL WATER PIPING SHALL BE NO LESS THAN 3/4".
11. UNLESS OTHERWISE NOTED, ALL PLUMBING PIPING IS OVERHEAD, TIGHT TO
UNDERSIDE OF STRUCTURE WITH SPACE FOR REQUIRED INSULATION.
12. INSTALL PIPING SO THAT VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND
OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE, PROVIDE ACCESS
PANELS AS NECESSARY.
13. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
14. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING SYSTEM BRANCHES IN
WHICH BRANCH PIPING SERVES TWO OR MORE FIXTURES.
15. UNIONS AND / OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN
BYPASSES AND IN LONG PIPING RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY
FOR ALTERATION AND REPAIRS.
16. PROVIDE ALL PLUMBING FIXTURES WITH ACCESSIBLE STOPS.
17. PROVIDE CLEANOUTS IN SANITARY AND STORM DRAINAGE SYSTEMS AT ENDS OF
RUNS, CHANGES IN DIRECTION, NEAR THE BASE OF STACKS, EVERY 75 FEET IN
HORIZONTAL RUNS AND ELSEWHERE AS INDICATED ON THE DRAWINGS.
18. WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A PIPE CHASE, THE
SIZE SHOWN FOR THE PIPE DROPS SHALL BE USED TO THE LAST FIXTURE SERVED.
19. NO PLUMBING LINE (DOMESTIC COLD WATER, DOMESTIC HOT WATER, SANITARY
SEWER, SANITARY VENT, STORM SEWER, ETC.) SHALL BE RUN OVER ELECTRICAL,
LOW VOLTAGE, TELECOM OR COMPUTER ROOMS.
D A
T E
ST
A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
FULLY SPRINKLERED
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:0 :3
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
83-PP-001
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING - LEGENDS, ABBREVIATIONS, AND GENERAL
NOTES
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
CONDENSATE PIPE SIZING
PIPE SIZE TONS
3/4"
1"
1 1/4"
1 1/2"
2"
1 TO 10
10 TO 40
40 TO 90
90 TO 125
125 TO 250
APPLICABLE CODES
2009 IPC INTERNATIONAL PLUMBING CODE
VA DESIGN MANUALS
VA MASTER SPECIFICATIONS
2009 NFPA NATIONAL FIRE CODES
2006 VA PLUMBING DESIGN MANUAL FOR DOMICILARY FACILITIES
2008 SPINAL CORD INJURY/DISORDERS CENTER DESIGN GUIDE
2004 ABA ARCHITECTURAL BARRIERS ACT AND PG 18-13
(TYPICAL ALL SHEETS)
DWG 1 OF 88
UP
DN
UP
UP
DN
DN
DN
DN
UP
UP
UP
DN
UP
DN
UP
DN
DNDN
DN
ROUTE NEW 1 1/2" MEDICAL
OXYGEN PIPE THROUGH NEW
TUNNEL.
EXISTING TUNNEL.
35,000 GALLON MISSION CRITICAL SANITARY
SEWER RETENTION TANK BELOW GRADE.
REFER TO CIVIL DWG 83-C-604 DETAIL 1.
12,000 GALLON
FOR EMERGENCY GENERATOR
3/4" DCW TO HOSE BIBB FOR WATER FEATURE -
TYPICAL FOR PODS B, C, D, & E.
POD 'A'
POD'B'
POD'C'
POD 'D'
POD 'E'
NEW TUNNEL.
REFER TO 83-PP-406 DETAIL ON SHEET.
EXISTING MANHOLE TO BE
RECONFIGURED. REFER TO CIVIL
FOR REQUIREMENTS.
1 1/2" O2
(E)2-1/2" O2
(E)2-1/2" O2 VALVE
(E)2-1/2" O2 CAP
TO BUILDING 2J
(E)2-1/2" O2
(E)2-1/2" O2 VALVE AND
CAP FOR FUTURE
CONNECT NEW OXYGEN PIPE TO
EXISTING PIPE AT EXISTING VALVE
LOCATION. INCLUDE NEW VALVE TO BE
AVAILABLE FOR FUTURE CONNECTION.
REFER TO RISER DIAGRAM FOR
ADDITIONAL INFORMATION.
ROUTE NEW 1 1/2" MEDICAL OXYGEN PIPE
THROUGH EXISTING TUNNEL
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
FULLY SPRINKLERED
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W
V A -L
T S C
IF
-D \3
B P -S
C I- R -j th e v ri n .R
V T
/1
/2
:5 :1
P
M
W:\VA-LTSCIF-D\309070B3P-SCI-R18-jthevrin.RVT
83-PS-100
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING - SITE PLAN
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1" = 50'-0"1 PLUMBING - SITE PLAN
25 50 1000-25
DWG 2 OF 88
A.8
AA
A.9
1.6
FIELD VERIFY EXISTING PLUMBING AND ETC TO BE
REMOVED, REPLACED, REROUTED AND/OR MODIFIED
FOR REPURPOSING OF SPACE FOR THIS PROJECT IN
THIS AREA OF EXISTING BASEMENT AND CRAWL SPACE.
FD(D)
4" S
A N
(E
4" S
A N
(E
4"SAN(D)
4"SAN(D)
2"SAN(D)
2"SAN(D)
4" S
A N
(D
2"SAN(D)
2"SAN(D)
2"SAN(D)
2"SAN(D)
4"SAN(D)
2"SAN(E)
4"SAN(E)
4"SAN(E)4"SAN(E)
4" S
A N
(E
3"SAN(E)
4"SAN(E)
4" S
A N
(D
8"SW(D)
4"SAN(D)
2"SAN(D)
2"SAN(D)
N.I.C.
8" SW(E)
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN (NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:5 :0
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
74-PD-1B1g
CONSTRUCTION
VA-LTSCIF-D
JG
549-820B
DG
PLUMBING - DEMOLITION PLAN - LEVEL B1 AREA G
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
BF
C
D
G
A
H
E
SCALE: 1/8" = 1'-0"F4 PLUMBING - DEMOLITION PLAN - LEVEL B1 AREA G
DWG 3 OF 88
A.8
AA
A.9
1.6 2.3
REMOVE EXISTING ROOF
DRAIN AND ASSOCIATED
PIPING AS SHOWN
REMOVE EXISTING ROOF DRAIN AND
ASSOCIATED PIPING AS SHOWN
REMOVE EXISTING ROOF DRAIN AND
ASSOCIATED PIPING AS SHOWN
EXISTING ROOF DRAINS AND
ASSOCIATED PIPING TO REMAIN.
EXISTING STORM DRAIN PIPING TO
REMAIN ABOVE CEILING
EXISTING STORM DRAIN PIPING TO
REMAIN ABOVE CEILING
EXISTING SANITARY VENT PIPING
TO REMAIN ABOVE CEILING
REMOVE ALL EXISTING PLUMBING FIXTURES, VENTS
THRU ROOF, MEDICAL GAS OUTLETS AND ASSOCIATED
PIPING SYSTEMS AS SHOWN. REFER TO BUILDING 83
CONTRACT DOCUMENTS FOR SCOPE OF NEW WORK
IN THIS AREA AND MAKE CONNECTIONS AS REQUIRED.
S W
(D
O D
(D
S W
(D )O D
(D
SAN(D)
V (D
V
(D
D C
W (D
D C
W (D
DCW(D)
DHW(D)
DCW(D)
O 2(
E
M A
(E
M V
(E
O2(E) MA(E)
MV(E)
O D
(D
S W
(D
OD(E)
SW(E)
SW(E)
OD(E)
SW(E)
V(E)
V(E)
3" VTR
EXISTING SANITARY VENT PIPING
TO REMAIN ABOVE CEILING
EXISTING SANITARY SEWER
PIPING TO REMAIN BELOW FLOOR
EXISTING ZONE VALVE BOX
TO REMAIN
EXISTING MEDICAL GAS PIPING
TO REMAIN ABOVE CEILING
REFER TO EXISTING DRAWINGS
FOR CONTINUATION
REFER TO EXISTING DRAWINGS
FOR CONTINUATION
3" VTR
3" VTR
3" VTR
3" VTR
V(D) S W
(D
SAN(D)
NOTE: SAW CUT FLOOR AS REQUIRED TO
REMOVE PIPING BELOW FLOOR. PATCH
REPAIR FLOOR TO MATCH EXISTING.
NOTE:
DEMOLITION OF DOMESTIC COLD WATER
AND DOMESTIC HOT WATER BACK TO
ACTIVE BRANCHES. CAP AS REQUIRED. NO
DEAD END LEGS PERMITED.
N.I.C.
2" V(D)
O2(E)
MA(E)
MV(E)
DHW(D)
O2(E)
MA(E)
MV(E)
MV(E)
MA(E)
O2(E)
2" V(D)
1/2"DCW(D)
1/2"DHW(D)
3/4"DHW(D)
1 1/2"DCW(D)
OD(E)
FD (D)
FD (D)
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN (NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:5 :1
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
74-PD-101g
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING - DEMOLITION PLAN - LEVEL 01 AREA G
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F4 PLUMBING - DEMOLITION PLAN - LEVEL 01 AREA G
0' 16'4' 8' 32'
NORTH
PLAN
BF
C
D
G
A
H
DWG 4 OF 88
8" SANITARY SEWER
SERVICE CONNECTION,
INV EL = 511.0'
(1114 DFU)
8"SW UP
CO
E
D
B.8
5.2
5.2
F.3
E.3
1.81.51.9
4.9 5.3
5.3
E.2
D.6
1.6 2.3
E.1
6" SSD
83-ESP-2
S S
D S
S D
4" FD-J
MATCHLINE
SEE /F4 83-PL-1B2f
M
AT
C H
LI
N
E
SE
E
F 4
8 3 -P
L - 1 B
2b
83-PP-306
83-PP-403
6" SSD
6" SSD
6" S
SD
6" SSD
S S
D
10" SW
S A
N
12" SW
6" SAN
4" SAN
2" SAN
" S
A N
6" SAN
4" SAN
3" SAN
4" SAN
6" SSD
6" SSD6
S W
6" SSD
6"SSD
6"SSD
6"SSD
6"SSD
6" S
S D
CO TERMINATE
ABOVE MUD SLAB
CO TERMINATE
ABOVE MUD SLAB
ELEVATOR SUMP PUMPS
82-ESP-1 AND 82-ESP-2.
3"SAN UP.
4"SAN UP
2"V UP
6"SAN
12"SW
4"SAN UP
2"SAN UP
4"SAN
3"SAN
6" S
S D
6"SSD
6"SSD
6"SSD
6"SSD
6"SSD
6"SSD
(E
S S
(E
3 6
S W
COORDINATE CONNECTION
WITH CIVIL SHEET 83-C-603
4" FD-J
6"SSD
2" SAN UP
4" SAN UP
2"SAN UP
4" S
S P
D
3"SAN
6"SSD
DOUBLE GCO
4"SSPD 4"SSPD
6" SAN UP TO FCO
10" SW UP TO FCO
6" SSD UP TO FCO
6" SSD UP TO FCO
4" SSD UP
4" SSD UP
6" SW UP
4" SSD UP
6" SSD
4" SAN
4" SAN UP
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:5 :4
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
83-PL-1B2a
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING WASTE, DRAIN AND VENT PIPING - FLOOR
PLAN - LEVEL B2 AREA A
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F4
PLUMBING WASTE, DRAIN and VENT PIPING SYSTEMS - FLOOR
PLAN - LEVEL B2 AREA A
BF
C
D
G
A
H
E
0' 16'4' 8' 32'
NORTH
PLAN
DWG 5 OF 88
UP
DN
DN
UP
83-PP-404
TWO 12" STORM DRAIN
SERVICE CONNECTION,
INV EL = 512.40'
(90,875 SF / 3771 GPM)
REFER TO CIVIL UTILITY DRAWINGS
FOR COORDINATION.
8"SW UP
E
E
DD.6
DD.6
F
D
12.3
P.2
U.2
V
13.6 DD
DD
10.1
10.1
14.3
P
U
DD.8
16.2
D.5
D.5
12.4
12.6
17.1
D.8
D.9
E.4
E.5
E.6
E.8
F.1
D.4
16.6
4" SAN
P
DN
6" SSD
6" SSD
S S
DCO -TERMINATE
ABOVE MUD-SLAB
CO -TERMINATE
ABOVE MUD-SLAB
CO -TERMINATE
ABOVE MUD-SLAB
4" FD-J
83-PP-403
83-PP-404
83-PP-404
83-PP-403
83-PP-201
18"
SW
"S
W
12"SW
12"SW
2"SAN
"S
W
12"SW
6"
SAN
6"SAN
6"SAN
6"
SAN
3"SAN
4"S A
N
6"
SAN
6"SSD
6"SSD
6"S
SD
4" FD-J
3"GV
4" FD-J
4"SSD
6"SSD
4" FD-J 4" FD-J
6"SSD
6"
SSD
4"SAN
2"SAN
4"SSPD
CO
ELEVATOR SUMP PUMPS 82-ESP-3.
COORDINATE WITH GENERAL CONTRACTOR
FOR SLEEVE INSTALLATION WHICH IS NOT
PERPENDICULAR TO BUILDING STRUCTURE.
4"SAN
4"S A
N
4"SAN
CO
CO
CO
CO
CO
4"FD-J
CO
12"SW
M
AT
C H
LI
N
E
SE
E
F4
-P
L- 1B
2a
2" SAN UP
83-PP-303
83-PP-301
6"SSD
6"S S
D
6"S S
D
4"SSPD
4"SSPD
4"
SSPD
4"
SSPD
4"
SSPD
4"
SSPD
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:5 :4
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
83-PL-1B2b
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING WASTE, DRAIN AND VENT PIPING - FLOOR
PLAN - LEVEL B2 AREA B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F4
PLUMBING WASTE, DRAIN and VENT PIPING SYSTEMS - FLOOR
PLAN - LEVEL B2 AREA B
BF
C
D
G
A
H
E
0' 16'4' 8' 32'
NORTH
PLAN
1 QAQC 12 NOV 21
DWG 6 OF 88
UP TO FD
2" SAN UP
CO
CO
D
A.8
B.8
AA
A.9
1.6
S S
D S
S D
4" FD-J
4" FD-J
4" FD-J
4" FD-J
4" FD-J
4" SAN
S S
D
S S
D
6" SSD
4" SSD
10" SW
6"SSD
6" S
S D
6"SSD
4" S
S D
4"SAN
2"SAN
6" S
S D
4" S
A N
4" S
A N
4"SSD
4"SSD
4" S
A N
4"SAN
3"SAN
2"SAN
2"SAN
2"SAN 4"SAN
4"SAN
2"SAN
4"SAN
2" S
A N
2"SAN
2"SAN
6" S
A N
2"SAN
3"SAN
3"SAN
4"SAN
6" S
A N
2"SAN
2"SAN
2"SAN
4"SAN
2"SAN
6"SSD
2"SAN
CO TERMINATE
ABOVE MUD SLAB
CO TERMINATE
ABOVE MUD SLAB
CO TERMINATE
ABOVE MUD SLAB
2"SAN
2"SAN
"S
W
6" S
S D
4" S
S D
6" S
S D
4" S
S D
6" S
S D
4"SSD
6" S
S D6"
S S
D
PROVIDE CLEANOUT AT TOP
OF MUD SLAB FOR 6"CWW
6" S
A N
4"CWW
CONTRACTOR TO CONNECT NEW SSD LINE
TO EXISTING DRAINAGE PIPING. VERIFY
SIZE AND LOCATION. NOTIFY BUILDING
OWNER OF ISSUES.
UP TO FD
4"SAN
2" SAN UP
2"SAN
4"SAN
4"SSD
2"SAN
2"SAN
2"SAN
83-PP-301
83-PP-302
83-PP-302
83-PP-302
83-PP-302
83-PP-302
83-PP-302
83-PP-301
83-PP-301
83-PP-301
83-PP-302
83-PP-301
83-PP-301
83-PP-302
83-PP-301
83-PP-301
83-PP-301
83-PP-302
83-PP-301
83-PP-302
83-PP-301
83-PP-301
MATCHLINE
SEE /F4 83-PL-1B2a
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:5 :4
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
83-PL-1B2f
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING WASTE, DRAIN AND VENT PIPING - FLOOR
PLAN - LEVEL B2 AREA F
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F4
PLUMBING WASTE, DRAIN and VENT PIPING SYSTEMS - FLOOR
PLAN - LEVEL B2 AREA F
BF
C
D
G
A
H
E
0' 16'4' 8' 32'
NORTH
DWG 7 OF 88
NOTE:
REFER TO RISER DIAGRAMS FOR
ROUGH-IN OF FUTURE PLUMBING
ON THIS LEVEL.
1 4
E
D
F.3
E.3
1.81.51.9
E.2
D.6
1.6
D.2
MATCHLINE
SEE
/F6 83-PL-1B1f
MATCHLINE
SEE /F4 83-PL-1B1d
MATCHLINE
SEE /F6 83-PL-1B1f
8"OD
83-PP-403
83-PP-404
2"SAN
6" SW
2"V
6"S W
2"SAN UP
CLEANOUT
4"SAN UP
2"V UP
4"SAN
4"SAN DOWN
CLEANOUT
2"SAN UP
4"SAN
4"SAN UP
2"V UP
3"SAN UP
2"V UP
8"SW
8"OD
3" FD-F
8"OD NOZZLE
83-PP-302
83-PP-301
83-PP-302
83-PP-302
83-PP-303
2" SW UP
M
AT
C H
LI
N
E
SE
E
F4
-P
L- 1B
1b
6" SW DN
2" SAN UP
2" SAN UP
2" SAN UP
3" SAN UP
3" SAN DN
PL3
PL4
PL4
PL4
PL5
PL6
PL4
6" OD UP
2" V
4" V
KEYED NOTES
DESCRIPTIONNUMBER
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:5 :1
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
83-PL-1B1a
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING WASTE, DRAIN AND VENT PIPING - FLOOR
PLAN - LEVEL B1 AREA A
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
SCALE: 1/8" = 1'-0"F4
PLUMBING WASTE, DRAIN and VENT PIPING - FLOOR PLAN -
LEVEL B1 AREA A
BF
C
D
G
A
H
E
PL3 4"SAN FROM LEVEL ABOVE. PROVIDE
ROUGH IN FOR FUTURE FLUSHING RIM
SINK BASED ON LAYOUT OF LEVEL
ABOVE.
PL4 2"SAN FROM LEVEL ABOVE. PROVIDE
ROUGH IN FOR FUTURE SINK BASED ON
LAYOUT OF LEVEL ABOVE.
PL5 4"SAN FROM LEVEL ABOVE. PROVIDE
ROUGH IN FOR FUTURE SINK BASED ON
LAYOUT OF LEVEL ABOVE.
PL6 2"V FROM LEVEL ABOVE CAPPED AT 14'-0"
AFF FOR FUTURE CONNECTION.
DWG 8 OF 88
DN1
83-PP-404
NOTE:
REFER TO RISER DIAGRAMS FOR
ROUGH-IN OF FUTURE PLUMBING
ON THIS LEVEL.
E
F
D
14 15
P
U
U
16.2
MATCHLIN
E
SEE
M
AT
C H
LI
N
E
SE
E
F4
-P
L- 1B
1a
8"OD
8"OD
V
S A
N
4"SAN
83-PP-403
83-PP-403
6" O
D
4" O
D
4"FD'B'
3"SAN
2"SA
N
4"SA
N
4"SAN
4"SAN
CO
CO
2"SAN UP
4"SAN UP
4"SAN UP
4"SAN DOWN
2"V UP
3"V
2"SAN UP, 4"SAN DOWN
4"SAN UP
2"SAN UP(WET VENT)
2" V
2"V
2" V
4"FD'B'
83-PP-301
83-PP-303
83-PP-301
83-PP-303
83-PP-303
83-PP-303
83-PP-303
83-PP-303UP
8"OD NOZZLE
83-HRC-9
3" SW UP
PL4
PL7
PL4
PL8
PL4
PL4
3" SAN UP
3" SAN UP
2" V UP
3" SAN DN
2" SAN DN
2" SAN UP/DN 2" SAN UP
2" V UP
2" SAN UP/DN
2" SAN UP
3" SAN UP
2" V UP
8" SW UP/DN
3" SAN
4" SW UP
4" SAN UP
4" SW DN
4" SAN UP/DN
8" V UP/DN
4" V UP/DN
2" V
2" SSD UP
3" SAN UP
2" V UP
4" SAN DN
2" SSD UP
2" V DN
4" SW UP
4" OD UP
6" SW DN
4" OD UP
4" SW UP
4" SW DN
4" SW UP
KEYED NOTES
DESCRIPTIONNUMBER
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:5 :2
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
83-PL-1B1b
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING WASTE, DRAIN AND VENT PIPING - FLOOR
PLAN - LEVEL B1 AREA B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F4
PLUMBING WASTE, DRAIN and VENT PIPING - FLOOR PLAN -
LEVEL B1 AREA B
BF
C
D
G
A
H
E
0' 16'4' 8' 32'
NORTH
PLAN
PL4 2"SAN FROM LEVEL ABOVE. PROVIDE
ROUGH IN FOR FUTURE SINK BASED ON
LAYOUT OF LEVEL ABOVE.
PL6 2"V FROM LEVEL ABOVE CAPPED AT 14'-0"
AFF FOR FUTURE CONNECTION.
PL7 3"V FROM LEVEL ABOVE CAPPED AT 14'-0"
AFF FOR FUTURE CONNECTION.
PL8 PROVIDE ROUGH IN FOR FUTURE SINK
AND WASHER BOX BASED ON LAYOUT OF
LEVEL ABOVE.
DWG 9 OF 88
ELEC CLOSET
B1C103
SCREENED
PATIO
B1C102
EXIT STAIR (6)
B1C101
ELEC CLOSET
B1C004
EXIT STAIR (2)
B1C001
SCREENED
PATIO
B1C002
RESIDENT
CORRIDOR
B1B002
DD.6
DD.6
J.6
I.6
I
H.6
H
8.3
12.3
J
G.8
13.6
13.6
DD
G.2
Z.2
14.3
G
J.8
Z
6.2
12.2
12.4
12.6
MATCHLINE
SEE /F6 83-PL-1B1a
M A
T C
H
LI
N E
S E
E
F
-P
L- 1B
1a
MATCHLINE
SEE
F6 83-PL-1B1b
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
W
V A -L
T S C
IF
-D \3
B P -S
C I- R -j th e v ri n .R
V T
/1
/2
:3 :1
P
M
W:\VA-LTSCIF-D\309070B3P-SCI-R18-jthevrin.RVT
83-PL-1B1c
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING WASTE, DRAIN AND VENT PIPING - FLOOR
PLAN - LEVEL B1 AREA C
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F6
PLUMBING WASTE, DRAIN and VENT PIPING - FLOOR PLAN -
LEVEL B1 AREA C
BF
C
D
G
A
H
E
BF
C
D
G
A
H
E
0' 16'4' 8' 32'
NORTH
PLAN
POD'A' IS OPPOSITE HAND TO POD 'C'. REFER TO POD 'C' FOR
PLUMBING IN THIS AREA. ALL PLUMBING PIPING AND/OR
NOTES SHOWN ON THIS POD IS DIFFERENT FROM POD 'C'AND
SHOULD BE INCORPORATED INTO THIS POD AS SHOWN.
POD 'A'
POD 'B' IS OPPOSITE HAND - REFER TO POD 'C' FOR
PLUMBING IN THIS AREA. ALL PLUMBING PIPING AND/OR
NOTES SHOWN ON THIS POD IS DIFFERENT FROM POD 'C'AND
SHOULD BE INCORPORATED INTO THIS POD AS SHOWN.
POD 'B'
DWG 10 OF 88
MATCHLINE
SEE /F4 83-PL-1B1b
L
L.6
M
7.1
P.2
Q
Q.6
R
V
M.6
N
N.2
5.2 5.8
6.5
R.6
P1
S.2
9.4
10.1
11.8
N.8
K.2
S.8
O
P
S.9
4.9
5.3
7.9
8.6
8.5
K
MATCHLINE
SEE /F4 83-PL-1B1a
3"V
6"OD
S A
N
2" SAN
2" SAN
4" FCO
2" SAN
S A
N
S A
N
4" SAN
4" SAN
2" SAN
2" SAN
S A
N
4" SAN
2" SAN
4" SAN4" SAN
2" SAN 2" SAN
2" SAN
2" SAN
4" FCO
4" SAN
2" SAN
2" SAN
4" FCO
4" SAN
4" FCO
2" SAN
4" FCO
4" FCO
2" SAN
2" SAN
2" SAN
2" SAN
2" SAN
4" SAN
S W
4"SAN MAIN ROUTED
BELOW LEVEL B1
SANITARY SEWER.
CLEANOUT
CLEANOUT
2"SAN
2" S
A N
2"SAN
CLEANOUT
2"S A
N
2" SAN THAT IS BE INSTALLED
IN ALL PODS TO BE USED AS
A REFERENCE OF WHERE TO
TIE IN FOR THE SINK.
ROUTE 2" SAN OVER
TO CORRESPONDING
SINK ON 83-PL-101d.
6" SSD UP TO GCO 6" SSD UP TO GCO
38-PP-304
83-PP-304
83-PP-3043
83-PP-304
83-PP-304
83-PP-304
83-PP-304
6" OD UP
6" OD UP
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:5 :2
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
83-PL-1B1d
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING WASTE, DRAIN AND VENT PIPING - FLOOR
PLAN - LEVEL B1 AREA D
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F4
PLUMBING WASTE, DRAIN and VENT PIPING - FLOOR PLAN -
LEVEL B1 AREA D
BF
C
D
G
A
H
E
0' 16'4' 8' 32'
NORTH
PLAN
POD'C' SIMILAR - REFER TO POD 'C' FOR PLUMBING IN THIS
AREA. ALL PLUMBING PIPING AND/OR NOTES SHOWN ON THIS
POD IS DIFFERENT FROM POD 'C'AND SHOULD BE
INCORPORATED INTO THIS POD AS SHOWN.
POD 'D'
PLUMBING SHOWN IN POD 'C' IS SIMILAR IN ALL OTHER PODS.
ALL PLUMBING PIPING AND/OR NOTES SHOWN IN OTHER
PODS THAT IS DIFFERENT THAN WHAT IS SHOWN HERE WILL
BE IDENTIFIED IN EACH RESPECTIVE POD. OTHERWISE ALL
OTHER PODS TO BE CONSIDERED SAME AS POD 'C'.
POD 'C'
1 QAQC 12 NOV 21
DWG 11 OF 88
ELEC CLOSET
B1E002
EXIT STAIR (5)
B1E001
SCREENED
PATIO
B1E004
F
U.2
V
11.8
U
MATCHLIN
E
SEE
F6
83-P L-1
B1b
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
W
V A -L
T S C
IF
-D \3
B P -S
C I- R -j th e v ri n .R
V T
/1
/2
:3 :3
P
M
W:\VA-LTSCIF-D\309070B3P-SCI-R18-jthevrin.RVT
83-PL-1B1e
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING WASTE, DRAIN AND VENT PIPING - FLOOR
PLAN - LEVEL B1 AREA E
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F6
PLUMBING WASTE, DRAIN and VENT PIPING - FLOOR PLAN -
LEVEL B1 AREA E
BF
C
D
G
A
H
E
BF
C
D
G
A
H
E
0' 16'4' 8' 32'
NORTH
PLAN
POD 'E' IS SIMILAR TO POD 'C' - REFER TO POD 'C' FOR
PLUMBING IN THIS AREA. ALL PLUMBING PIPING AND/OR
NOTES SHOWN ON THIS POD IS DIFFERENT FROM POD 'C'AND
SHOULD BE INCORPORATED INTO THIS POD AS SHOWN.
POD 'E'
DWG 12 OF 88
DN
P-528
P-418
P-101
P-101
P-418P-528
P-528
P-528
P-528
P-101
P-418
P-528 P-524
P-528
P-528
P-528
P-502
P-528
4"FD-L
2"SAN DN
P-505
RE: P83/8
P-524
D
A.8
B.8
AA
A.9
1.6
2.3
P-418
P-418
MATCHLINE
SEE /F4 83-PL-1B1a
M
AT
CH
LI
NE
SE
E
F4
-P L-
1B 1g
S W
(E
8"SW FROM LEVEL 01, COORDINATE WITH LEVEL 01
STRUCTURE AND DUCTWORK IN THIS AREA - HOLD
AS TIGHT AS POSSIBLE TO COLUMN
83-PP-203
C3P
83/4
2" FD-C
4" FD-J
4" FCO
4" FCO
WCO
8"OD NOZZLE8"OD
10"OD
2" V
V
WCO
V
2" V
2" V
V
V
3" V
V
2" V
2" V
V
V
V
2" V
8" SW
S S
D
2" HUB DRAIN FOR SCOPE WASHER.
REFER TO EQUIPMENT CUT SHEETS
FOR CONNECTION INFORMATION.
10"OD NOZZLE
10"OD NOZZLE
SCRUB SINK FURNISHED BY OTHERS,
CONTRACTOR TO PROVIDE ROUGH IN
CONNECTIONS AND FINAL INSTALATION.
REFER TO EQUIPMENT CUT SHEET FOR
CONNECTION AND SUPPORT INFORMATION
PROVIDE 2" HUB DRAIN BELOW
SINK FOR EQUIPMENT DRAIN.
83-PP-301
83-PP-302
83-PP-302
83-PP-301
83-PP-301
83-PP-301
83-PP-301
83-PP-302
83-PP-301
83-PP-301
83-PP-301
83-PP-301
83-PP-302
83-PP-301
P-101
10"OD
4" SSD DN
3" V
2" V
2" V
4" V
2" V
4" V
4" V
KEYED NOTES
DESCRIPTIONNUMBER
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:5 :3
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
83-PL-1B1f
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING WASTE, DRAIN AND VENT PIPING - FLOOR
PLAN - LEVEL B1 AREA F
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F6
PLUMBING WASTE, DRAIN and VENT PIPING - FLOOR PLAN -
LEVEL B1 AREA F
BF
C
D
G
A
H
E
BF
C
D
G
A
H
E
0' 16'4' 8' 32'
NORTH
DWG 13 OF 88
DN
DN
CONNECT 4"SAN TO EXISTING
BELOW FLOOR, FIELD VERIFY EXACT
LOCATION PRIOR TO
CONSTRUCTION
A.8
AA
A.9
1.6
M
AT
CH
LI
NE
SE
E
F6
-P L-
1B 1f
S A
N (E
8" SW
4" SAN
2" SAN
2" SAN
4" SAN
2" SAN
4" SAN(E)
4" SAN(E)
2" SAN(E)
S A
N (E
3" SAN(E)
4" SAN(E)
4" SAN 2" SAN
CONNECT 4"SAN TO EXISTING
BELOW FLOOR, FIELD VERIFY EXACT
LOCATION PRIOR TO
CONSTRUCTION
4" SAN
4" SAN
WCO
EXISTING GRATE INLET TO REMAIN. REMOVE
DIRT AND DEBRIS, CLEAN OUT, REPAIR AND
RESTORE TO FULL FUNCTIONALITY.
83-PP-304
83-PP-304
83-PP-304
83-PP-304
N.I.C.
D A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and
Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \j ru v a lc a b a \D o c u m e n ts
\3 b P -S
C I- R -C
E N
T R A L jr u v a lc a b a N
P C R .r v t
/1
/2
:5 :3
P
M
C:\Users\jruvalcaba\Documents\309070b3P-SCI-R18-CENTRAL_jruvalcabaNP8CR.rvt
83-PL-1B1g
CONSTRUCTION
VA-LTSCIF-D
RCM
549-820B
EGH
PLUMBING WASTE, DRAIN AND VENT PIPING - FLOOR
PLAN - LEVEL B1 AREA G
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F4
PLUMBING WASTE, DRAIN and VENT PIPING - FLOOR PLAN -
LEVEL B1 AREA G
BF
C
D
G
A
H
E
0' 16'4' 8' 32'
NORTH
DWG 14 OF 88
| 83-PP-001 |
| 83-PS-100 |
| 74-PD-1B1g |
| 74-PD-101g |
| 83-PL-1B2a |
| 83-PL-1B2b |
| 83-PL-1B2f |
| 83-PL-1B1a |
| 83-PL-1B1b |
| 83-PL-1B1c |
| 83-PL-1B1d |
| 83-PL-1B1e |
| 83-PL-1B1f |
| 83-PL-1B1g |
File details come from the government source that posted it. Updated .