36C10F22R0045 0006.docx

DOCX document 19 KB Posted

Attached to
Y1DA--LTSCI VA Dallas 549-820B Long Term Spinal Cord Injury
Solicitation number
36C10F22R0045
Issued by

About this file

This amendment modifies a solicitation for a long term spinal cord injury project at the Department of Veterans Affairs Dallas facility. The solicitation seeks proposals for construction management services for the 549-820B project, with an expected period of performance from 2023 to 2024. The amendment provides corrections to the requirements for proposal submissions, including updating the documentation of bonding capacity to reference 2023 and 2024 rather than 2021 and 2022. It also modifies the evaluation criteria by changing the definition of recency from projects completed within the past seven years of 2021 to within the past seven years of 2022, and updating the provision for projects nearing completion from 2022 to 2023.

View the file

Other files

File Type Posted
Part II of II RFI Response.pdf PDF
01 45 00 chart.pdf PDF
36C10F22R0045 0013.docx DOCX document
RE trailer plan REV.pdf PDF
sign IN-01.33.pdf PDF
RE Field Office REV.pdf PDF
ADD-02 SPECs.pdf PDF
ADD-02 DWGs.pdf PDF
36C10F22R0045 0012.docx DOCX document
LTSCI ADDDENDUM 01drawings RV.pdf PDF
36C10F22R0045 0011.docx DOCX document
Bldg 74 ACM Survey Report.pdf PDF
36C10F22R0045 0010.docx DOCX document
36C10F22R0045 0009.docx DOCX document
36C10F22R0045 0008.docx DOCX document
83-GL-101 VA-Attachment RFI.pdf PDF
36C10F22R0045 0007.docx DOCX document
36C10F22R0045 0005.docx DOCX document
1 17 RESIDENT ENGINEER FIeld Office.pdf PDF
LTSCI Pre-proposal visit Sign In Sheets.pdf PDF
1 17 RESIDENT ENGINEER RE FIeld Office.pdf PDF
36C10F22R0045 0004.docx DOCX document
36C10F22R0045 0003.docx DOCX document
36C10F22R0045 0002.docx DOCX document
36C10F22R0045 0001.docx DOCX document
23 b Mechl DWGs 2of12sp.pdf PDF
01_a Civil DWGs 1of4 tt1.pdf PDF
01_d Civil DWGs 4of4 oc.pdf PDF
23 d Mechl DWGs 4of12sp.pdf PDF
04 IRRIGATION DWGs 1of1.pdf PDF
22 a Plmbg DWGs 1of8 tt.pdf PDF
27_a TELECOM DWGs 1of1sp.pdf PDF
26_g Elecl DWGs 7of7g.pdf PDF
20_GENERAL Vol 3 DWGs tt.pdf PDF
LTSCI ProjMan VOL 01 part 1of2 div00-div08 tt1.pdf PDF
26_d Elecl DWGs 4of7sp.pdf PDF
09_f Archl DWGs 6of12sp.pdf PDF
08.0 a Structl DWGs 1of4 tt1.pdf PDF
LTSCI ProjMan VOL 01 part 2of2 div09-div14 tt.pdf PDF
83 LTSCI MES part 1of6.pdf PDF
09_l Archl DWGs 12of12sp.pdf PDF
23 f Mechl DWGs 6of12sp.pdf PDF
VA LTSCI Bid Pack B Suppl Info part 2of2 g.pdf PDF
09_j Archl DWGs 10of12sp.pdf PDF
09_h Archl DWGs 8of12sp.pdf PDF
22 f Plmbg DWGs 6of8 tt.pdf PDF
26_b Elecl DWGs 2of7 tt.pdf PDF
26_f Elecl DWGs 6of7 tt.pdf PDF
22 c Plmbg DWGs 3of8 tt1.pdf PDF
23 c Mechl DWGs 3of12sp.pdf PDF
Show 40 more

Latest 50 of 117 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 549-820B 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (003C4D) 1425 Tri-State Pkwy., Ste 140 Gurnee

IL

60031 101F Same as Block 6

To all Offerors/Bidders

36C10F22R0045 05-15-2023

X

X Amendment 0006 is to provide correction to the requirements for proposal submission, and to provide a note to Offerors in reference to 0004 and 0005 amendments attachment duplicated in transmission to SAM.GOV.

See page 2 continuation Item 14 Description

Continuation – Item 14 Description:

Amendment 0006 is to correct items related to the requirements for proposal submissions, and to provide a note to Offerors in reference to 0004 and 0005 amendments. Document for attachment “1 17 Resident Engineer’s (RE) Field Office” was transmitted twice in the beforementioned amendments. Both are the same in the information that’s being provided. SAM.GOV did not recognize the attachment for transmission in amendment 0004 therefore it was transmitted again in 0005.

On or around page 13, Section C1. 3.3) Tab 3- “Offeror shall provide documentation of the offeror’s total aggregate bonding capacity, the amount currently in use to bond other contracts and the remaining amount., current available bonding capacity and expected available capacity in 2021 and 2022.”

Change from “2021 and 2022” to “2023 and 2024”

On or around beginning mid pg. 16.

Factor 1: Construction Management and Experience

a. Subfactor 1A: Corporate Project Experience

(ii) Basis of Evaluation:

Recency description is changed.

From:

** Recency – ** Recency - projects completed within the past 7 years (projects totally completed 7 years previous to 2021 (projects completed or nearing completion at least 85% for 2022 will be accepted).

To:

** Recency – ** Recency - projects completed within the past 7 years (projects totally completed 7 years previous to 2022 (projects completed or nearing completion at least 85% for 2023 will be accepted).

LTSCI 549-840B-Amendment 0006