26_b Elecl DWGs 2of7 tt.pdf
PDF 17 MB Posted
- Solicitation number
- 36C10F22R0045
About this file
This document provides details on a federal solicitation and related technical drawings. The solicitation number is 36C10F22R0045 for the project "Y1DA--LTSCI VA Dallas 549-820B Long Term Spinal Cord Injury" issued by the Department of Veterans Affairs Office of Construction and Facilities Management. The opportunity type is a solicitation for LONG TERM SPINAL CORD INJURY services at location 549-820B. The file contains technical drawings for the project but no other information on response dates, pricing, or terms.
View the file
Other files
Show 40 more
Latest 50 of 117 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERNET CAFE
1B042
EXAM |
TREATMENT
ROOM
1A020
STORAGE
LITTER
1B027
STORAGE
LITTER
1B008
CLEAN UTILITY
ROOM
1B021
EMS SUPPLY
STORAGE
1A021
SUPPLY CLOSET
1B029
NURSE STATION
1B034
CHARTING,
DICTATION
AREA
1B031
SECURITY
1B011
RESIDENT
CORRIDOR
1B009
STORAGE
TRANSFER
EQUIP.
1B006
STORAGE
PATIENT
1B004
STORAGE
PATIENT
1B023
STORAGE
SOILED LINEN
1B045
SOILED UTILITY
ROOM
1B046
PATIENT
BATHROOM
1D103
PATIENT
LAUNDRY
1B005
ONE-BED
PATIENT ROOM
1D102
STORAGE
TRANSFER
EQUIP.
1B025
PATIENT
BATHROOM
1E010
PATIENT
BATHROOM
1E005
ONE-BED
PATIENT ROOM
1E007
ONE-BED
PATIENT ROOM
1E009
PATIENT
BATHROOM
1E003
PATIENT
LAUNDRY
1B024
ONE-BED
PATIENT ROOM
1E004
ONE-BED
PATIENT ROOM
1E002
ONE-BED
PATIENT ROOM
1C104
ONE-BED
PATIENT ROOM
1C102
PATIENT
BATHROOM
1C103
PATIENT
BATHROOM
1C108
PATIENT
BATHROOM
1C105
RESIDENT
CORRIDOR
1E001
MULTIPURPOSE
1A023
RESIDENT
DINNING |
SERVING
1B020
SERVICE
CORRIDOR
1B030
MEDITATION
1B043
RES (4)
1B040
MEDICATION
ROOM
1B032
STORAGE MED.
EQUIP.
1A022
VISITOR
LOUNGE
1B007
STAFF LOUNGE
1B015
PATIENT TOILET
1B016
RES (1)
1B036
STORAGE
CLEAN LINEN
1B028
HALLWAY
1B019
VISITOR
LOUNGE
1B026
STORAGE
1B044
STORAGE MED.
EQUIP.
1B022
STAFF LOCKER
1B014
NOURISHMENT
KITCHEN
1E025
SOILED UTILITY
ROOM
1A019
ELEC
1B048
RESIDENT
CORRIDOR
1B035
RES (2)
1B037
OFFICE NURSE
SUPERVISOR
1B013
DAY ROOM |
LOUNGE
1C122
RESIDENT
CORRIDOR
1B002
TELE COMM
1B012
DAY ROOM |
LOUNGE
1E023
ELEC CLOSET
1B010
SERVICE
CORRIDOR
STRETCHER|WHEELCHAIR
ALCOVE
1C101A
BATHROOM
1C114
DN
UP
DN
UP
ELEC
1C118
EXIT STAIR
1C117
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
A
F6
POWER FLOOR PLAN - LEVEL 01 AREA B
MA
TC
HL
INE
RE
F F
6 /
-EP
-10
1a
MATCHLINE
REF F6 / 8
3-EP-101
e
MATCHLINE
REF F6 / 8
3-EP-101
e
MATCHLINE
REF F6 / 83-EP-101d
E
F
D
16.2
D.5
17.1
17.1
16.6
16.6
F.1
E.6
E.4
D.7
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E P d w g p m
83-EP-101b
POWER FLOOR PLAN - LEVEL 01 AREA B
WH DR
C
L
E
N
U
T
I
L
I
T
Y
R
O
O
M
B
S
U
P
P
Y
O
S
E
T
B
N
U
R
S
E
A
T
I
O
N
B
C
H
A
R
T
I
N
G
D
I
C
T
A
T
I
O
N A
R
E
A
B
S
T
O
R
A
G
E
S
O
I
L
D
I
N
E
N
B
S
O
I
L
D
I
L
I
T
Y
R
O
O
M
B
R
E
S
I
D
E
N
T
C
O
R
R
I
D
O
R
C
P
A
T
I E
N
T
B
A
T
H
R
O
O
M
C
O
N
E
B
E
D
P
A
T
I
E
R
O
O
M
C
O
N
E
B
E
D
P
A
T
I
E
O
M
C
O
N
E
B
E
D
P
A
T
I
E
O
M
C
O
N
E
B
E
D
P
A
T
I
E
O
M
C
P
A
T
I
E
N
T
B
A
T
H
R
O
O
M
C
P
A
T
I E
N
T
B
A
T
H
R
O
O
M
C
P
A
T
I
E
N
T
B
A
T
H
R
O
O
M
C
R
E
S
I
D
E
N
T
C
O
R
R
I
D
O
R
C
P
A
T
I E
N
T
B
A
T
H
R
O
O
M
C
O
N
E
B
E
D
P
A
T
I
E
O
M
C
O
N
E
B
E
D
P
A
T
I
E
O
M
C
O
N
E
B
E
D
P
A
T
I
E
O
M
C
O
N
E
B
E
D
P
A
T
I
E
O
M
C
P
A
T
I E
N
T
B
A
T
H
R
O
O
M
C
P
A
T
I
E
N
T
B
A
T
H
R
O
O
M
C
P
A
T
I
E
N
T
B
A
T
H
R
O
O
M
C
R
E
S
I
D
E
N
T
C
O
R
R
I
D
O
R
C
R
E
S
I
D
E
N
T
D
I
N
N
I
G
E
R
V
I
N
G
B
S
E
R
V
I
C
E
C
O
R
R
I
D
O
R
B
R
B
M
E
D
I
C
A
T
I
O
N
R
O
O
M
B
T
W
O
B
E
D
P
A
T
I
E
O
M
C
P
A
T
I E
N
T
B
A
T
H
R
O
O
M
C
P
A
T
I E
N
T
B
A
T
H
R
O
O
M
C
S
T
O
R
A
G
E
C
L
E
N
E
N
B
S
T
O
R
A
G
E
B
T
W
O
B
E
D
P
A
T
I
E
O
M
C
P
A
T
I
E
N
T
B
A
T
H
R
O
O
M
C
R
E
S
I
D
E
N
T
C
O
R
R
I
D
O
R
B
D
M
O
U
N
G
E
C
D
O
U
N
G
E
C
R
E
S
I
D
E
N
T
C
O
R
R
I
D
O
R
B
S
E
R
V
I
C
E
C
O
R
R
I
D
O
R
A
S
T
R
E
T
C
H
E
R
W
H
E
E
L
C
H
A
I
R
A
L
C
O
V
E1
C
A
N
O
U
R
I
S
H
M
E
N
T
K
I
T
C
H
E
N
C
P
A
T
I E
N
T
B
A
T
H
R
O
O
M
C
U
P
D
N
U
P
D
N
E
L
E
C
C
E
L
E
C
C
E
X
A
I
R1
C
E
X
A
I
R1
C
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
POWER FLOOR PLAN - LEVEL 01 AREA C
MATCHLINE
REF F6 / 83-EP-101a
MATCHLINE
REF F6 / 83-EP-101a
MATCHLINE
REF F6 / 83-EP-101b
MATCHLINE
REF F6 / 83-EP-101b
DD.6
DD.6
J.6 J.6
I.6 I.6
I I
H.6 H.6
H H
8.3
CC.6
CC.6
CC
CC
BB.6
BB.6
12.3
J J
G.8 G.8
6.3 7 7.67.2
13.2 13.6
BB
BB
DD
DD
G.2 G.2
Z.8
Z.8
Z.2
Z.2
14.3
G G
J.8 J.8
Z
Z
DD.8
DD.8
6.2
12.2
6.6
12.6
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E P d w g p m
83-EP-101c
POWER FLOOR PLAN - LEVEL 01 AREA C
WH DR
D8
OVEN AND RANGE WIRING DIAGRAM
T
T
E
R
B
S
T
O
R
A
G
E T
R
A
N
S
F
E
R
E
Q
U
I P
B
S
T
O
R
A
G
E
P
A
T
I E
N
T
B
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
O
N
E
B
E
D
P
A
T
I E
O
M
D
O
N
E
B
E
D
P
A
T
I E
O
M
D
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
P
A
T
I E
N
T L
A
U
N
D
R
Y
B
O
N
E
B
E
D
P
A
T
I E
O
M1
D
O
N
E
B
E
D
P
A
T
I E
O
M1
D
O
N
E
B
E
D
P
A
T
I E
O
M1
D
O
N
E
B
E
D
P
A
T
I E
O
M1
D
P
A
T
I E
N
T L
A
U
N
D
R
Y
A
S
T
O
R
A
G
E P
A
T
I E
N
T
A
S
T
O
R
A
G
E
L
I T
T
E
R
A
O
N
E
B
E
D
P
A
T
I E
O
M
D
O
N
E
B
E
D
P
A
T
I E
O
M1
D
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
O
N
E
B
E
D
P
A
T
I E
O
M
D
O
N
E
B
E
D
P
A
T
I E
O
M1
D
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
O
N
E
B
E
D
P
A
T
I E
O
M
D
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
O
N
E
B
E
D
P
A
T
I E
O
M1
D
P
A
T
I E
N
TB
A
T
H
R
O
O
M
D
R
E
S
I D
E
N
T C
O
R
R
I D
O
R
D
R
E
S
I D
E
N
T C
O
R
R
I D
O
R
D
R
E
S
I D
E
N
T C
O
R
R
I D
O
R
D
M
U
L
T
I P
U
R
P
O
S
E
A
S
T
O
R
A
G
E T
R
A
N
S
F
E
R
E
Q
U
I P
A
O
F
F
I C
E
A
C
T
I V
I T
I E
SC
O
O
R
D
A
R
E
S
I D
E
N
T C
O
R
R
I D
O
R
D
S
T
O
R
A
D
E
Q
U
I P
A
S
T
O
R
A
D
E
Q
U
I P
A
M
U
L
T
I P
U
R
P
O
S
E
S
T
O
R
A
G
E
A
V
I S
I T
O
R
L
O
U
N
G
E
A
R
E
S
I D
E
N
T C
O
R
R
I D
O
R
D
A
O
F
F
I
R
S
E
S
U
P
E
R
V
I S
O
R
A
D
O
U
N
G
E
D
N
O
U
R
I S
H
M
E
N
T
K
I T
C
H
E
N
D
R
E
S
I D
E
N
T C
O
R
R
I D
O
R
D
O
F
F
I
C
I A
L
W
O
R
K
A
O
F
F
I
R
S
E
S
U
P
E
R
V
I S
O
R
B
D
O
U
N
G
E
D
N
O
U
R
I S
H
M
E
N
T
K
I T
C
H
E
N
D
N
U
R
A
T
I O
N
D
E
D
I C
A
T
E
D
V
E
W
N
G
D
S
T
R
E
T
C
H
H
E
E
L
C
H
A
I R
A
L
C
O
V
E
D
A
S
T
R
E
T
C
H
H
E
E
L
C
H
A
I R
A
L
C
O
V
E
D
U
P
U
P
D
N
D
N
E
L
E
C
D
E
L
E
C
D
E
X
A
I R
D
E
X
A
I R
D
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
POWER FLOOR PLAN - LEVEL 01 AREA D
REF F6 / 83-EP-101a
MATCHLINE
REF F6 / 83-EP-101b
MATCHLINE
REF F6 / 83-EP-101b
MATCHLINE
REF F6 / 83-EP-101a
L L
L.6 L.6
MM
7.1
P.2
P.2
Q
Q
Q.6
Q.6
R
R
8.8
M.6M.6
NN
N.2N.2
5.2 5.8
R.6
R.6
P1
P1
S.2
S.2
8.4
9.4
10.1
N.8N.8
K.2 K.2
K K
OO
P
P
S.9
S.9
6.5
S.8
S.8
4.9 5.3
7.9 8.6
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E P d w g p m
83-EP-101d
POWER FLOOR PLAN - LEVEL 01 AREA D
WH DR
STORAGE
TRANSFER
EQUIP.
1B025
PATIENT
BATHROOM
1E013
PATIENT
BATHROOM
1E010
PATIENT
BATHROOM
1E005
ONE-BED
PATIENT ROOM
1E007
ONE-BED
PATIENT ROOM
1E009
PATIENT
BATHROOM
1E003
PATIENT
LAUNDRY
1B024
ONE-BED
PATIENT ROOM
1E012
ONE-BED
PATIENT ROOM
1E016
ONE-BED
PATIENT ROOM
1E004
ONE-BED
PATIENT ROOM
1E002
RESIDENT
CORRIDOR
1E001
RESIDENT
CORRIDOR
1E015
PATIENT
BATHROOM
1E018
RES (1)
1B036
VISITOR
LOUNGE
1B026
NOURISHMENT
KITCHEN
1E025
RES (2)
1B037
DAY ROOM |
LOUNGE
1E023
UP
DN
ELEC
1E020
EXIT STAIR
1E019
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
POWER FLOOR PLAN - LEVEL 01 AREA E
REF F6 / 8
3-EP-101
b
MATCHLINE
REF F6 / 8
3-EP-101
b
U.2
U.2
V
V
V.6
V.6
W
W
11.4
W.6
W.6
X
X
X.2
X.2
11.8
13.1
X.8
X.8
Y
12.5
10.9
11.5
U
Y
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E P d w g p m
83-EP-101e
POWER FLOOR PLAN - LEVEL 01 AREA E
WH DR
F3
OFFICE
VSO
1F011
WORKROOM
1F009
OFFICE
VSO
1F013
OFFICE
VSO
1F012
FEMALE
PUBLIC
TOILETS
1F006
MALE
PUBLIC
TOILETS
1F007
ENTRY
VESTIBULE
(1) 1F001
INFORMATION
DESK
1F002
MECH
CHASE
N|A
CONFERENCE
ROOM
1F018
BATHROOM
1G008
BEDROOM
1G007
WASHER
| DRYER
1G006
KITCHENETTE
1G005
LIVING |
DINING
1G004
RESPIRATORY
STORAGE
1G002
OFFICE
RESPIRATORY
THERAPIST
1G003
RESPIRATORY
WORKROOM
1G001
CONSULTATION
ROOM
1F008
PUBLIC
CORRIDOR
1A002
SECURITY
EQUIPMENT
STORAGE
1F017
ELEC
CLOSET
1F016
OFFICE
PHARMACY
1G011
CONSULTATION
1G010
DISPENSING
WINDOWS
1G009
ENTRANCE
1F003
HALLWAY
1G000
SECT
1F010
PVA
OFFICE
SUITE
1F014
PVA
SEATING
1F015
HALLWAY
1G004A
1F019
STORAGE
1F020
EXIT
STAIR (9)
/SEE
MATCHLINE
RE
FMA
TC
HL
INE
RE
FMA
TC
HL
INE
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
POWER FLOOR PLAN - LEVEL 01 AREA F
A.8
B.8
A.9
AA
1.6
D.2 x10.5 x11.1 xK xJ.5 xJ xH xG xF.4 xL
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E P f d w g p m
83-EP-101f
POWER FLOOR PLAN - LEVEL 01 AREA F -
WH DR
MATCHLINE
REF F6 / 83-EP-101a
MATCHLINE
REF F6 / 83-EP-101a
B1A009A
PUBLIC ELEVATOR CAB (P2)
B1A010A
SERVICE ELEVATOR CAB (S4)
1B001A
RESIDENT ELEVATOR CAB (P5)
2A012
HAC
2A007
SECURITY
2A031
OFFICE CORRIDOR
2A032
PUBLIC CONNECTOR
2A030
OFFICE CORRIDOR
1B001B
RESIDENT ELEVATOR CAB (P6)
B1A010B
SERVICE ELEVATOR CAB (S3)B1A009B
PUBLIC ELEVATOR CAB (P1)
2A003
EXIT STAIR (1)
2A002
PUBLIC LOBBY
2B001
RESIDENT ELEVATOR LOBBY
2A013
STAFF TLTN|A
MECH CHASE
N|A
MECH CHASE
2A004
SERVICE ELEVATOR LOBBY
2A001
PUBLIC ELEVATOR LOBBY
2F007
MALE PUBLIC TOILETS
2F006
FEMALE PUBLIC TOILETS
2A008
NURSE ADMINISTRATOR
2A028
SHARED OFFICE, QA CARE COOR
2F009
OFFICE HOME CARE COORD.
2A009
TELE COMM
2A005
ELEC
2A027
CONFERENCE CLASSROOM
2A029
SECRETARY | WAITING
2A011
NURSE ADMINISTRATOR
2A010
NURSE ADMINISTRATOR
2A020
CHIEF OF SERVICE
2A021
MED DIRECTOR
2A023
NURSE EDUCATOR
2A017
OFFICE PHYSICIAN
2A018
OFFICE PHYSICIAN
2A016
OFFICE PHYSICIAN
2A024
OFFICE ASST AO
2A015
OFFICE MDS COORDINATOR
2A025
OFFICE AO
2A006
MED. REC. | QA
2A022
CLERICAL CUBICLE
2A019
CLERICAL CUBICLE
2A026
CONFERENCE CLASSROOM
2F005
STORAGE SCI HOME CARE
2A014
STAFF LOUNGE
BELOW
TO
OPEN
UP
DN
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
POWER FLOOR PLAN - LEVEL 02 AREA A
REF F6 / 83-EP-102f
MATCHLINE
REF F6 / 83-EP-102f
MA
TC
HL
INE
RE
F F
6 /
-EP
-10
2g
MA
TC
HL
INE
RE
F F
6 /
-EP
-10
2b
MA
TC
HL
INE
RE
F F 6 /
-EP
-10 2b
E
F
D
B.8 B.8
F.3 F.3
E.3
1.81.51.9
E.2
D.6
1.6
1.6
D.2 D.2
2.3
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E P d w g p m
83-EP-102a
POWER FLOOR PLAN - LEVEL 02 AREA A
WH DR
2B005
ON CALL TLT
N|A
MECH CHASE
1B001A
RESIDENT ELEVATOR CAB (P5)
2B004
ELEC CLOSET
2B003
SECURITY
2A031
OFFICE CORRIDOR
2B002
RESIDENT CORRIDOR
2B024
CORRIDOR
2B023
CORRIDOR
1B001B
RESIDENT ELEVATOR CAB (P6)
2B025
PUBLIC CONNECTOR
2B001
RESIDENT ELEVATOR LOBBY
2B010
PT/OT INTERVIEW ROOM
2B026
EXIT STAIR (7)
N|A
MECH CHASE
2B006
TELE COMM.
2B018
ELEC
2B007
ON CALL
2A017
OFFICE PHYSICIAN
2A018
OFFICE PHYSICIAN
2B017
PATIENT TOILET
2B019
STORAGE EQUIPMENT
2B022
KINESIOLOGY THERAPY
PHYSICAL THERAPY |
2B021
OCCUPATIONAL THERAPY
2B014
THERAPIST (6)
2B008
THERAPIST (1)
2B012
THERAPIST (4)
2B009
THERAPIST (2)
2B011
THERAPIST (3)
2B013
THERAPIST (5)
2B015
THERAPIST (7)
2B016
THERAPIST (8)
2B020
ACTIVITIES OF DAILY LIVING
DN
UP 2B028
BRIDGE TO GARAGE
2B026
EXIT STAIR (7)
DN
UP
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
POWER FLOOR PLAN - LEVEL 02 AREA B
TC
HL
INE
RE
F F
6 /
-EP
-10
2a
MATCHLINE
REF F6 / 8
3-EP-102
e
MATCHLINE
REF F6 / 8
3-EP-102
e
MATCHLINE
REF F6 / 83-EP-102d
E
F
D
16.2
D.5
17.1
17.1
16.6
16.6
F.1
E.6
E.4
D.7
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E P d w g p m
83-EP-102b
POWER FLOOR PLAN - LEVEL 02 AREA B
WH DR
POWER FLOOR PLAN - GARAGE CONNECTOR
OPEN
TO
BELOW
OPEN
TO
BELOW
1 3
A.8 A.8
B.8 B.8
INTERVIEW
RM.
2F004
OFFICE
HOME
CARE
COORD.
2F014
OFFICE
HOME
CARE
COORD.
2F013
OFFICE
HOME
CARE
COORD.
2F012
OFFICE
HOME
CARE
COORD.
2F011
OFFICE
TELEHEALTH
2F015
STORAGE
SCI
HOME
CARE
2F005
OFFICE
HOME
CARE
COORD.
2F009
OFFICE
HOME
CARE
COORD.
2F010
OFFICE
HOME
CARE
COORD.
2F016
OFFICE
PHYSICIAN
2F017
FEMALE
PUBLIC
TOILETS
2F006
MALE
PUBLIC
TOILETS
2F007
MECH
CHASE
N|A
PUBLIC
LOBBY
2A002
OFFICE
CORRIDOR
2F008
ELEC
2F003
A.9 A.9
AA
AA
D.2
MATCHLINE
SEE
MA
TC
HL
INE
RE
F
MA
TC
HL
INE
RE
F x10.5 x10 x11.1 x11.1 xK
J.11 xJ.5 xJ xH xG xF.4 xLL xLL.8 xL
C
1F020
EXIT
STAIR (9)
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
POWER FLOOR PLAN - LEVEL 02 AREA F
A.8
B.8
A.9
AA
1.6
D.2 x10.5 x11.1 xK xJ.5 xJ xH xG xF.4 xL
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E P f d w g p m
83-EP-102f
POWER FLOOR PLAN - LEVEL 02 AREA F
WH DR
MATCHLINE
REF F6 / 83-EP-102a
MATCHLINE
REF F6 / 83-EP-102a
MA
TC
HL
INE
RE
F F
6 /
-EP
-10
2g
MA
TC
HL
INE
RE
F F
6 /
-EP
-10
2g
4 J.6
J.6 I.6
I.6
I
I
H.6
H.6
H
H
8.3
BB.6
7.1 P.2
A.8 A.8
B.8 B.8 J
J
G.8
6.3
7.6
7.2
5.2
G.2
K.2
K.2
G
J.8
J.8
P
F.3 F.2
E.3
A.9 A.9
1.9
1.5
1.8
E.2
AA
6.2
6.4
6.6
4.9 5.3 x11.1 xJ.5 xJ.5
L
D.6
2.3
K
K xLL.8 xJ xH xL
1.6 xKK xLL
2.5
E.25
D.2
C C
B.5 B.5
PIPE BASEMENT
N|A
AREAWAY EXHAUST
N|A
AREA WAY
N|A
EXIT STAIR (1) B2 VESTIBULE
B2B007
83-EF-01
83-TU-4-01
83-TU-4-02
F1
MECHANICAL POWER FLOOR PLAN - LEVEL B2 AREA A
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
A
MA
TC
HL
INE
RE
F F
6 /
-EM
-1B
2b
MA
TC
HL
INE
RE
F F 6 /
-EM
-1B 2b
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E M
B d w g p m
83-EM-1B2a
MECHANICAL POWER FLOOR PLAN - LEVEL B2 AREA A
UP
DN
DD.6
DD.6
J.6
CC.6
CC
BB.6
12.3
P.2
Q
U.2
U.2
V
V
V.6
V.6
W
J
13.2
BB
DD
DD
W.6
W.6
X
X.2
13.1
Z.8
X.8
J.8
P
U
U
DD.8
16.2
16.2
12.2
12.4
11.5
11.5
E.4
E.5
E.6
F.1
D.9
D.8
16.6
16.6
17.1
MECHANICAL PUMP ROOM
B2B002
EXIT STAIR (7)
B2B001
ACCESS TO TUNNEL
B2B004
AREA WAY
N|A
EXIT STAIR (7) VESTIBULE
B2B003
EQUIPMENT ROOM
B2B005
EQUIPMENT ROOM
B2B006
AREA WAY
N|A
UP
UP
83-FCU-01
83-FCU-27
83-FCU-28
83-BP-1
83-CHP-01
83-CHP-02
83-EF-02
83-EF-03
83-CP-01
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
F1
MECHANICAL POWER FLOOR PLAN - LEVEL B2 AREA B
TC
HL
INE
RE
F F
6 /
-EM
-1B
2a
MA
TC
HL
INE
RE
F F 6 /
-EM
-1B 2a
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E M
B d w g a m
83-EM-1B2b
MECHANICAL POWER FLOOR PLAN - LEVEL B2 AREA B
B1A004
SEATINGB1A003
SEATING
B1A009A
PUBLIC ELEVATOR CAB (P2)
B1A010A
SERVICE ELEVATOR CAB (S4)
1B001A
RESIDENT ELEVATOR CAB (P5)
B1F004
CHECK-OUT ALCOVE
B1A008
PUBLIC ELEVATOR LOBBY
N|A
AREAWAY EXHAUST
B1F005
W|M ALCOVE
B1A015
SECURITY
B1F025
STAFF LOUNGE
B1F008
NEURO EXAM CONSULT
B1F013
WORKROOM
B1A013
FUTURE EXPANSION
B1A017
RESIDENT CORRIDOR
B1F020
CLINIC CORRIDOR
B1F006
CLINIC CORRIDOR
B1F006A
CLINIC CORRIDOR
B1F046
SERVICE CORRIDOR
B1A011
SERVICE CORRIDOR
B1B004
RESIDENT CORRIDOR
B1F001
CHECK-IN ALCOVE
B1A005
PUBLIC CORRIDOR
1B001B
RESIDENT ELEVATOR CAB (P6)
B1A010B
SERVICE ELEVATOR CAB (S3)B1A009B
PUBLIC ELEVATOR CAB (P1)
B1A001
VESTIBULE
B1F007
PATIENT TOILET
B1A006
INFORMATION DESK
B1A007
EXIT STAIR (1)
B1A012
SERVICE ELEVATOR LOBBY
B1B001
RESIDENT ELEVATOR LOBBY
B1F002
CLINIC SEATING
B1F003
RECEPTION
B1A002
PUBLIC LOBBY
B1F024
SOILED UTILITY
B1F022
CLEAN UTILITY
B1F044
MALE PUBLIC TOILETS
B1F045
FEMALE PUBLIC TOILETS
B1F023
EXAM ROOM 7
B1A016
TELE COMM
B1A014
ELEC
B1F009
STAFF TLT
UP
83-FCU-10A
83-FCU-05
83-TU-4-16
83-TU-4-18
83-TU-4-20
83-TU-4-31
83-FCU-02
83-FCU-03
83-CRC-01
83-FCU-06
83-FCU-04
83-TU-4-25
83-TU-4-24
83-TU-4-22
83-TU-4-21
83-TU-4-32
83-TU-4-28
83-TU-4-30
83-TU-4-29
83-TU-4-27
83-TU-4-17
83-TU-4-15
83-TU-4-19
83-TU-4-26
83-TU-4-23
83-FCU-22B
83-FCU-22D
83-FCU-22C
83-FCU-22A
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
MECHANICAL POWER FLOOR PLAN - LEVEL B1 AREA A
REF F6 / 83-EM-1B1f
MATCHLINE
REF F6 / 83-EM-1B1f
MA
TC
HL
INE
RE
F F
6 /
-EM
-1B
1g
MA
TC
HL
INE
RE
F F
6 /
-EM
-1B
1b
MA
TC
HL
INE
RE
F F 6 /
-EM
-1B 1b
E
F
D
B.8 B.8
F.3 F.3
E.3
1.81.51.9
E.2
D.6
1.6
1.6
D.2 D.2
2.3
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E M
B d w g p m
83-EM-1B1a
MECHANICAL POWER FLOOR PLAN - LEVEL B1 AREA A
B1E105
SUB POD E0
B1C104
SUB POD C1
N|A
MECH CHASE
1B001A
RESIDENT ELEVATOR CAB (P5)
B1B016
MDF
B1B015
FIRE PUMP ROOM
B1B003
ELEC CLOSET
B1B007
SECURITY
B1E004
SCREENED PATIO
B1C102
SCREENED PATIO
B1B009
FUTURE EXPANSIONB1B002
RESIDENT CORRIDOR
B1A017
RESIDENT CORRIDOR
B1B004
RESIDENT CORRIDOR
1B001B
RESIDENT ELEVATOR CAB (P6)
B1C103
ELEC CLOSET
B1B014
EMERGENCY POWER SWITCHGEAR
B1B012
NORMAL POWER SWITCHGEAR
B1B013
ELECTRICAL GENERATOR
B1C101
EXIT STAIR (6)
B1B011
EXIT STAIR (7)
B1B001
RESIDENT ELEVATOR LOBBY
B1B006
TELE COMM
B1B010
ELEC
DN
UP
UP
83-FCU-12A
83-FCU-12B
83-FCU-13A
83-FCU-13B
83-FCU-05
83-CRC-02
83-FCU-06
83-FCU-08
83-FCU-04
83-FCU-07
83-CRC-03
83-UH-04
83-FCU-26
83-FCU-22C
83-FCU-23A
83-FCU-23B
83-FCU-09
83-FCU-30
83-FCU-31
83-UH-11
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
MECHANICAL POWER FLOOR PLAN - LEVEL B1 AREA B
TC
HL
INE
RE
F F
6 /
-EM
-1B
1a
MATCHLINE
REF F6 / 8
3-EM-1B1e
MATCHLINE
REF F6 / 8
3-EM-1B1e
MATCHLINE
REF F6 / 83-EM-1B1d
E
F
D
16.2
D.5
17.1
17.1
16.6
16.6
F.1
E.6
E.4
D.7
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E M
B d w g p m
83-EM-1B1b
MECHANICAL POWER FLOOR PLAN - LEVEL B1 AREA B
B1C005
SUB POD C0
B1C104
SUB POD C1
B1B003
ELEC CLOSET
B1C102
SCREENED PATIO
B1C002
SCREENED PATIO
B1B009
FUTURE EXPANSION
B1B002
RESIDENT CORRIDOR
B1C103
ELEC CLOSET
B1C004
ELEC CLOSET
B1C101
EXIT STAIR (6)
B1C001
EXIT STAIR (2)
U
P
U
P
F
C
U
A
F
C
U
B
F
C
U
A
F
C
U
B
F
C
U
F
C
U
F
C
U
U
H
U
H
F
C
U
C
F
C
U
A
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions Date
ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
KEY PLAN(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
CONSTRUCTION FULLY SPRINKLERED
VA-LTSCIF-D
549-820B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16'4' 8' 32'
NORTH
PLAN
F
G
E
B
D
C
MECHANICAL POWER FLOOR PLAN - LEVEL B1 AREA C
REF F6 / 83-EM-1B1a
MATCHLINE
REF F6 / 83-EM-1B1a
MATCHLINE
REF F6 / 83-EM-1B1b
MATCHLINE
REF F6 / 83-EM-1B1b
DD.6
DD.6
J.6 J.6
I.6 I.6
I I
H.6 H.6
H H
8.3
CC.6
CC.6
CC
CC
BB.6
BB.6
12.3
J J
G.8 G.8
6.3 7 7.67.2
13.2 13.6
BB
BB
DD
DD
G.2 G.2
Z.8
Z.8
Z.2
Z.2
14.3
G G
J.8 J.8
Z
Z
DD.8
DD.8
6.2
12.2
6.6
12.6
F I L E
N
A M
E
D A
T E
S T
A M
P :9
E M
B d w g a m
83-EM-1B1c
MECHANICAL POWER FLOOR PLAN - LEVEL B1 AREA C
| 83-EP-101b |
| 83-EP-101c |
| 83-EP-101d |
| 83-EP-101e |
| 83-EP-101f |
| 83-EP-102a |
| 83-EP-102b |
| 83-EP-102f |
| 83-EM-1B2a |
| 83-EM-1B2b |
| 83-EM-1B1a |
| 83-EM-1B1b |
| 83-EM-1B1c |
File details come from the government source that posted it. Updated .