This document is an amendment to a federal solicitation providing revised drawings, specifications, and responses to requests for information. The solicitation is for the construction of a long term spinal cord injury facility at the VA Dallas Medical Center project number 549-820B. The amendment provides part two of the response to offeror questions, replaces several drawings related to fire protection, plumbing, and lighting fixtures, adds one new dry pipe sprinkler system specification, and replaces or revises several specifications covering hollow metal doors and frames, gypsum board, painting and coatings, and plumbing fixtures. All changes are clearly marked in underlined bold text. The Department of Veterans Affairs Office of Construction and Facilities Management is the issuing agency. The response due date is not extended by this amendment.
View the file
Other files
Show 40 more
Latest 50 of 117 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 549-820B 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (0034CD) 1425 Tri-State Pkwy., Ste. 140 Gurnee IL 60031 101F Same as block 6
To all Offerors/Bidders
36C10F22R0045 06-02-2023
X X
X Amendment 0013 provides Part II of II Response to RFIs to all Offerors, provides revised drawings and specifications.
See continuation page 2 and all attachments.
Continuation- Item 14 Description Amendment 0013 provides part II of II Response to RFIs to all Offerors, provide revised drawings IAW file attached “ADD-02 DWGs.pdf”, add new specification section included in file attached “ADD-02 SPECS.pdf., revision to specification sections included in file attached “ADD-02 SPECS.pdf”, and provides attachments in support of RFI responses.
Please see attachments as follows:
· Part II RFI Response.pdf LTSCI attachments in support of RFI responses
· 01 45 00 chart.pdf
· RE trailer plan REV.pdf
· RE Field Office REV.pdf (replaces previous version of 1.17 Dallas RESIDENT ENGINEER Field Office via 0004 & 005 amendments)
· Sign IN-01.33.pdf
ADD-02 DWGS.pdf- the below revised drawings will replace all previous versions of the same.
Revised drawings included in Addendum 02
· 83-FX-B1 FIRE PROTECTION FLOOR PLAN – LEVEL B1 (replace previous drawing)
· 83-FX-102 FIRE PROTECTION FLOOR PLAN – 2ND LEVEL (replace previous drawing)
· 83-PP-1B1b PLUMBING SYSTEMS FLOOR PLAN – LEVEL B1 AREA B (replace previous drawing)
· 83-PL-202 PLUMBING WASTE DRAIN AND VENT – ISOMETRICS (replace previous drawing)
· 83-PP-201 PLUMBING – ENLARGED PLANS (replace previous drawing)
· 83-PP-402 PLUMBING DETAILS (replace previous drawing)
· 83-PP-403 PLUMBING DETAILS (replace previous drawing)
· 83-PP-404 PLUMBING DETAILS (replace previous drawing)
· 83-PP-501 PLUMBING SCHEDULES (replace previous drawing)
· 83-E-002 LIGHTING FIXTURES SCHEDULE (replace previous drawing)
ADD-02 SPECS.pdf- the below 21 13 16 DRY-PIPE SPRINKLER SYSTEMS is now included in the project manual NEW specification section included in Addendum 02
· 21 13 16 DRY-PIPE SPRINKLER SYSTEMS (new section added) ADD-02 SPECS.pdf – the below revised specifications will replace all previous versions of the same spec section, changes made in the revised specifications are underlined and bold.
REVISED specification sections included in Addendum 02
· 00 00 01 TABLE OF CONTENTS
· 08 11 13 HOLLOW METAL DOORS AND FRAMES
· 09 29 00 GYPSUM BOARD
· 09 91 00 PAINTING & COATING
· 22 40 00 PLUMBING FIXTURES
See attached document: Part II of II RFI Response.
See attached document: 01 45 00 chart.
See attached document: RE trailer plan REV.
See attached document: RE Field Office REV.
See attached document: sign IN-01.33.
See attached document: ADD-02 DWGs.
See attached document: ADD-02 SPECs.
LTSCI 549-820B
File details come from the government source that posted it. Updated .