23 h Mechl DWGs 8of12sp.pdf
PDF 11 MB Posted
- Solicitation number
- 36C10F22R0045
About this file
This document provides details on a federal solicitation and related technical drawings. Solicitation number 36C10F22R0045 from the Department of Veterans Affairs Office of Construction and Facilities Management is seeking proposals for the Y1DA--LTSCI VA Dallas 549-820B Long Term Spinal Cord Injury opportunity. The opportunity involves providing long term spinal cord injury care services at facility 549-820B. The related technical drawings file 23 h Mechl DWGs 8of12sp.pdf contains diagrams and specifications but no other descriptive information. The solicitation appears to be open with no stated deadline, pricing, or award date provided in the available information.
View the file
Other files
Show 40 more
Latest 50 of 117 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
UP
UP
UP
UP
UP
UP
DN
UP
DN
DN
SP
SP
SP
SP
SP
SP
SP
D.5
1 4
E
F
F
I.6
I.6
I
I
H.6
H.6
H
H
8.3
CC.6
CC.6
CC
CC
BB.6
BB.6
12.3
L
L
L.6
L.6
M
M
7.1
P.2
P.2
Q
Q
Q.6
Q.6
R
R
8.8
V
V
V.6
V.6
W
W
11.4
A.8 A.8
B.8 B.8 J
J
G.8
G.8
6.3
7.6 7.2
BB
BB
DD
DD
M.6
M.6
N
N
N.2
N.2
6.5
R.6
R.6
P1
P1
S.2
S.2
9.4
10.1
W.6
W.6
X
X
X.2
X.2
11.8
12.5
AA
AA
G.2
G.2 Z.8
N.8
N.8
K.2
K.2
S.8
S.8
X.8
X.8
G
G
O
S.9
S.9
Y
Z
F.3 F.3
6.2
12.2
16.2
E.3
1.81.5
A.9 A.9
1.9
6.4 6.6
12.4
12.6
7.9
8.6
10.9
11.5
E.2
8.5
SHEET NOTES
D A
T E
S
A M
P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \b k in m a n \D o c u m e n ts
\3 b M
E -S
C I- R -C
E N
T R A L b k in m a n R K W
J .r v t
/2
/2
:1 :4
P
M
C:\Users\bkinman\Documents\309070b3ME-SCI-R18-CENTRAL_bkinmanR4KWJ.rvt
83-MP-1B1
CONSTRUCTION
VA-LTSCI-D
AB
549-820B
SH
MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 OVERALL
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR , CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/16" = 1'-0"F6 MECHANICAL PIPING - OVERALL PLAN - LEVEL B1 0' 16' 32'8' 64'
NORTH
PLAN
BF
C
D
G
A
H
E
1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,
ABBREVIATIONS AND GENERAL NOTES.
2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN
ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING
DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,
OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF
TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE CONTRACT.
3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED
ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE
PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY
THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH
THE GENERAL CONTRACTOR.
4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT
EQUIPMENT CONNECTIONS.
5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.
6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.
7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES
UNLESS NOTED OTHERWISE.
9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF
10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.
11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.
12 REFER TO SHEET 83-M-616 FOR THE STEAM/CONDENSATE RISER
DIAGRAM.
UP
E
D
B.8 B.8
F.3
F.3
E.3
1.51.9
E.2
D.6
83-FCU-05
83-TU-4-16
83-TU-4-18
83-TU-4-20
83-TU-4-31
83-FCU-02
83-FCU-03
83-CRC-01
83-TU-4-2583-TU-4-24
83-TU-4-22
83-TU-4-21
83-TU-4-32
83-TU-4-28
83-TU-4-30
83-TU-4-29
83-TU-4-27
83-TU-4-17
83-TU-4-15
83-TU-4-19
83-TU-4-26
83-TU-4-23
83-FCU-04
83-FCU-22C
83-FCU-22A
83-FCU-22D
83-FCU-22B
4" 4"
2"
2"
1 1/2"
1 1/2"
2"
2"
3"
3"
3"
3"
2"
3"
1 1/2"
1 1/2"
1 1/2" 1 1/2"
1 1/4"
1 1/4"
2"
3"
3"
2"
2"
2"
1 1/2" 2"
2"
1 1/2"
1 1/4" 1 1/4"
1 1/4" 1 1/4"
1"
CHS
CHR
CHS
CHR
C H
R
C H
S
CHR
CHS
C H
S
C H
R
C H
R
C H
S
CHS
CHR
C H
S
C H
R
C H
R
2"
2"
3"
2"
C H
S
HWS
HWR
H W
R H
W S
H W
R
HWS
HWR CHR
CHS
HWR
HWS
H W
SH
W
R
H W
S H
W R
HWR
HWS
HWS
HWR
HWR
HWS
H W
S
H W
R
2"
1 1/2"
1 1/2" 1"
1 1/2"1 1/2"
1 1/4" 1 1/4"
2"
3/4"
1" 1"
3"
2 1/2"2 1/2"
3"
3"
1"
1"
1 1/4"
1 1/4"
1"
1"
1"
1"
1"
1"
1"
1"
3"
3"
3" 3"
2"
1 1/2"
1 1/2"
2"
2"
1"
1"
1"
1"
CHS
CHRHWR
HWS
1 1/2"
1 1/2"
2"
2"
1 1/4"
2 1/2"
2 1/2"
H W
R H
W R
H W
S H
W S
2 1/2"
1 1/4"
3"
1 1/4"
HWS
2"
HWR
1"
H W
S
2"
D
D
D
D
D
D
D
1 1/4"
1"
1" 1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
D
D
D
1 1/4" CONDENSATE
DOWN TO B2
D
1 1/4"
1 1/4"
D
3"
3"3"
1 1/4"
1" D
1"
1" CONDENSATE DRAIN
FROM 83-FCU-18A ON
LEVEL 1 DOWN TO
LEVEL B2.
MATCHLINE
SEE /F6 83-MP-1B1F
M A
T C
H
LI
N E
S E
E
F
-M
P -1
B 1B
MATCHLINE
SEE
/F6 83-MP-1B1C
PROVIDE 3-WAY
VALVE.
ISOLATION VALVES IN BRANCH
LINES SERVING MULTIPLE
TERMINALS (TYPICAL)
ISOLATION VALVES IN BRANCH
LINES SERVING MULTIPLE
TERMINALS (TYPICAL)
2"
ISOLATION VALVES IN BRANCH
LINES SERVING MULTIPLE
TERMINALS (TYPICAL)
2 1/2"
D7
83-M-305
S
LO
P E
D O
W N
STAFF TLT
B1F009
ELEC
B1A014
TELE COMM
B1A016
EXAM ROOM
B1F023
FEMALE
PUBLIC
TOILETS
B1F045
MALE PUBLIC
TOILETS
B1F044
CLEAN
UTILITY
B1F022
SOILED
UTILITY
B1F024
PUBLIC
LOBBY
B1A002
RECEPTION
B1F003
CLINIC
SEATING
B1F002
SERVICE
ELEVATOR
LOBBY
B1A012
EXIT STAIR
(1)
B1A007
INFORMATION
DESK
B1A006
PATIENT
TOILET
B1F007
VESTIBULE
B1A001
PUBLIC
ELEVATOR
CAB (P1)
B1A009B
SERVICE
ELEVATOR
CAB (S3)
B1A010B
RESIDENT
ELEVATOR
CAB (P6)
1B001B
PUBLIC
CORRIDOR
B1A005
CHECK-IN
ALCOVE
B1F001
RESIDENT
CORRIDOR
B1B004
SERVICE
CORRIDOR
B1A011
SERVICE
CORRIDOR
B1F046
CLINIC
CORRIDOR
B1F006A
CLINIC
CORRIDOR
B1F006
RESIDENT
CORRIDOR
B1A017
WORKROOM
B1F013
NEURO EXAM
CONSULT
B1F008
STAFF
LOUNGE
B1F025
SECURITY
B1A015
W|M ALCOVE
B1F005
AREAWAY
EXHAUST
N|A
PUBLIC
ELEVATOR
LOBBY
B1A008
CHECK-OUT
ALCOVE
B1F004
RESIDENT
ELEVATOR
CAB (P5)
1B001A
SERVICE
ELEVATOR
CAB (S4)
B1A010A
PUBLIC
ELEVATOR
CAB (P2)
B1A009A
SEATING
B1A003 SEATING
B1A004
RESIDENT
CORRIDOR
B1A017
RESIDENT
CORRIDOR
B1A017
RESIDENT
CORRIDOR
B1B004
RESIDENT
CORRIDOR
B1B004
FUTURE
EXPANSION
B1A013
SHEET NOTES
D A
A M
P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W
V A -L
T S C
IF
-D \3
B M
E -S
C I- R -b k in m a n .R
V T
/3
/2
:5
:0
A
M
W:\VA-LTSCIF-D\309070B3ME-SCI-R18-bkinman.RVT
83-MP-1B1A
CONSTRUCTION
VA-LTSCI-D
AB
549-820B
SH
MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA A
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR , CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA A 0' 16' 32'8' 64'
NORTH
PLAN
BF
C
D
G
A
H
E
1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,
ABBREVIATIONS AND GENERAL NOTES.
2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN
ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING
DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,
OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF
TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE CONTRACT.
3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED
ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE
PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY
THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH
THE GENERAL CONTRACTOR.
4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT
EQUIPMENT CONNECTIONS.
5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.
6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.
7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES
UNLESS NOTED OTHERWISE.
9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF
10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.
11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.
DN
E
F
D
16.2
83-FCU-05
83-FCU-12A
83-FCU-12B
83-FCU-13A
83-CRC-02
83-FCU-06
83-FCU-08
83-FCU-07
83-CRC-03
83-UH-04
4" 4"
1 1/4"
1 1/4"
2" 1 1/4"
1 1/4"
2"
2"
2 1/2"
2 1/2"
4"
4"
2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"1 1/2"
1 1/2"
2"
2"
1 1/4"
1 1/2"
1"
1"
1"
1"
1 1/2"
1 1/4"
1 1/2" 1 1/2"
2" 2"
1 1/2"
1 1/2"
CHS
CHR
C H
S
C H
R
C H
S
C H
R
CHS CHR
CHS CHR
C H S
C H R
C H S C
H R
C H S
C H R
C H S
C H R
CHS
CHR
HWS
HWR
HWR
HWS
H W
SH
W
R
1 1/4"
1 1/4"
2"
1 1/4"
2"
1 1/4"
2"
2"
1"
1"
1 1/2"
1 1/2"
4" 4"
2" 2"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
2"
2"
1"
1"
H W
R H W
S
H W
R H W
S
HW
R
HW
S
H W
R
H W
S
H W
R H W
S
H W
R H W
S
83-FCU-26
83-FCU-23B
83-UH-11
83-FCU-23A
2"
83-FCU-30
83-FCU-09
C H
R
PLUGGED 2" BALL
VALVES FOR FUTURE
MDF RM. CRC UNIT
D
D
1"
4"
4"
2"
6"
6"
1" 1"
D
D
D
D
D
D
D
1 1/4"
1 1/4"
D
D
C H
S
1 1/4" CONDENSATE
DOWN TO B2
2" CONDENSATE
DOWN TO B2
1"
1 1/4"
2"
1 1/4"
CONDENSATE / 2"
CHS/R
DOWN TO B2
1 1/4" CONDENSATE, 2" CHS/R,
1 1/4" HWS/R DOWN TO LEVEL B2
D
D
D
D
D
H W
SH
W
R
C H R
C H S
D
1"
1"
1"
1 1/4"
1 1/4"
1 1/4"
D
1"
1"
1"
H W
SH
W
S
D C H S
C H R
1"
1"
1"
1" D
1" D
D
CHR
CHS
2"
2"
83-FCU-31
1"1"1"
CHR
CHR
D
F1
83-M-303
M A
T C
H
LI
N E
S E
E
F
-M
P -1
B 1A
MATCHLIN
E
SEE
F6
83-M P-1B1E
MATCHLIN
E
SEE
F6
-M
P-1 B1C
ISOLATION VALVES IN BRANCH
LINES SERVING MULTIPLE
TERMINALS (TYPICAL)
ISOLATION VALVES IN BRANCH
LINES SERVING MULTIPLE
TERMINALS (TYPICAL)
RESIDENT
ELEVATOR
CAB (P6)
1B001B
RESIDENT
CORRIDOR
B1B004
RESIDENT
ELEVATOR
CAB (P5)
1B001A
RESIDENT
CORRIDOR
B1B002
ELEC
B1B010
TELE COMM
B1B006
EXIT STAIR
(7)
B1B011
EXIT STAIR
(6)
B1C101
ELECTRICAL
GENERATOR
B1B013
NORMAL
POWER
SWITCHGEAR
B1B012
EMERGENCY
POWER
SWITCHGEAR
B1B014
ELEC
CLOSET
B1C103
SCREENED
PATIO
B1C102
SECURITY
B1B007
ELEC
CLOSET
B1B003
FIRE PUMP
ROOM
B1B015
MDF
B1B016
MECH CHASE
N|A
SUB POD C1
B1C104
SUB POD E0
B1E105
ELEC
CLOSET
B1B003
RESIDENT
ELEVATOR
LOBBY
B1B001
ELEC
CLOSET
B1B003
RESIDENT
CORRIDOR
B1B004
SUB POD E0
B1E105
RESIDENT
CORRIDOR
B1B004
FUTURE
EXPANSION
B1B009
SUB POD E0
B1E105
SHEET NOTES
KEY NOTES
DESCRIPTIONNUMBER
D A
A M
P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W
V A -L
T S C
IF
-D \3
B M
E -S
C I- R -b k in m a n .R
V T
/3
/2
:5
:3
A
M
W:\VA-LTSCIF-D\309070B3ME-SCI-R18-bkinman.RVT
83-MP-1B1B
CONSTRUCTION
VA-LTSCI-D
AB
549-820B
SH
MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA B
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR , CENTRAL REGION
06 MAY 2021
BID PACKAGE B
SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA B 0' 16' 32'8' 64'
NORTH
PLAN
BF
C
D
G
A
H
E
1 MECHANICAL CONTRACTOR TO INSTALL GENERATOR ENGINE MUFFLER
AND INTERCONNECTING PIPE. MUFFLER BY ELECTRICAL CONTRACTOR.
COORDINATE INSTALLATION REQUIREMENTS WITH ENGINE
MANUFACTURER.
1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,
ABBREVIATIONS AND GENERAL NOTES.
2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN
ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING
DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,
OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF
TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE CONTRACT.
3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED
ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE
PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY
THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH
THE GENERAL CONTRACTOR.
4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT
EQUIPMENT CONNECTIONS.
5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.
6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.
7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES
UNLESS NOTED OTHERWISE.
9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF
10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.
11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.
DD.6
DD.6
J.6 J.6
I.6 I.6
I I
H.6 H.6
H H
8.3
8.3
CC.6
CC.6
CC
CC
BB.6
BB.6
12.3
12.3
J J
G.8 G.8
6.3
6.3
7.6
7.6
7.2
7.2
13.2
13.2
13.6
13.6
BB
BB
DD
DD
G.2 G.2
Z.8
Z.8
Z.2
Z.2
14.3
14.3
G G
Z
Z
6.2
6.2
12.2
12.2
6.4
6.4
6.6
6.6
12.4
12.4
12.6
12.6
83-FCU-05
83-FCU-13A
83-FCU-13B
83-FCU-14A
83-FCU-14B
83-FCU-22C
83-FCU-22A
2"
3" 1 1/2"
1 1/4"
1 1/4"
1 1/4"
2"
2"
2 1/2"
2 1/2"
1 1/4"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
2"
2"
1 1/2"
1 1/2"
CHS CHR
CHS
CHR
C H
S
C H
R
C H
S
C H
R
C H
R C
H S
C H
R
1 1/2"
1 1/2"
1 1/2"
1 1/2"
3"
2"
C H
S
HWS
HWR
H W
R H W
S
2"
2"
1"
1"
1 1/4"
1 1/4"
2"
1 1/4"
2"
1 1/4"
2"
2"
1"
1"
H W
R H W
S
H W
R
H W
S
H W
R
H W
S
CHS
CHR
HWR
HWS
1 1/2"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1"
D
D
1 1/4"
D
D
D
1 1/4"
D
D
D
D
1 1/4"
1"
1"
HW
SHW
S D
CHS
CHR
1"D
M A
TC
H
LI
N
E S
E E
F6
-M
P -1
B 1A
MATCHLINE
SEE /F6 83-MP-1B1A
MATCHLINE
SEE
F6
83-MP-1B1B
PROVIDE 3-WAY
VALVE.
PROVIDE 3-WAY
VALVE.
ISOLATION VALVES IN BRANCH
LINES SERVING MULTIPLE
TERMINALS (TYPICAL)
RESIDENT
CORRIDOR
B1B002
SUB POD C0
B1C005
EXIT STAIR
(6)
B1C101
ELEC
CLOSET
B1C103
SCREENED
PATIO
B1C102
SUB POD C1
B1C104
EXIT STAIR
(2)
B1C001
ELEC
CLOSET
B1C004
SCREENED
PATIO
B1C002
FUTURE
EXPANSION
B1B009
SHEET NOTES
D A
A M
P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W
V A -L
T S C
IF
-D \3
B M
E -S
C I- R -b k in m a n .R
V T
/3
/2
:0
:2
P
M
W:\VA-LTSCIF-D\309070B3ME-SCI-R18-bkinman.RVT
83-MP-1B1C
CONSTRUCTION
VA-LTSCI-D
AB
549-820B
SH
MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA C
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR , CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16' 32'8' 64'
NORTH
PLAN
BF
C
D
G
A
H
E
SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA C
1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,
ABBREVIATIONS AND GENERAL NOTES.
2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN
ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING
DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,
OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF
TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE CONTRACT.
3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED
ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE
PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY
THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH
THE GENERAL CONTRACTOR.
4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT
EQUIPMENT CONNECTIONS.
5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.
6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.
7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES
UNLESS NOTED OTHERWISE.
9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF
10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.
11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.
L L
L.6 L.6
MM
7.1
7.1
P.2
P.2
Q
Q
Q.6
Q.6
R
R
8.8
8.8
M.6M.6
NN
N.2N.2
5.2
5.2
5.8
5.8
6.5
6.5
R.6
R.6
P1
P1
S.2
S.2
9.4
9.4
10.1
10.1
N.8N.8
K.2 K.2
S.8
S.8
OO
P
P
S.9
S.9
4.9
4.9
5.3
5.3
7.9
7.9
8.6
8.6
8.5
8.5
83-FCU-12A
83-FCU-10A
83-FCU-10B
83-FCU-11A
83-FCU-11B
83-FCU-04
83-FCU-22D
83-FCU-22B
4"
2" 2"
1 1/2"
1 1/2"
2"
2"
3" 3"
2" 3"
3"
2"
2"
2"
1 1/2"
2"
2" 1 1/2"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/2"
1 1/2"
1 1/2"
2"
2"
C H
S
C H
R
CHR
CHS
CHR
C H
R
C H
S
CHR
CHS
C H
S
C H
R
C H
R
C H
S
CHS
CHR
1 1/2"
1 1/2"
1 1/2"
1 1/2"
2"
2"
1 1/2"
1 1/2"
2"
2"
1 1/2"
1 1/2"
C H
S C
H R
C H
S C
H R
H W
SH
W
R
H W
S H
W R
HWR
H W
R H
W S
2"
2"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
H W
R H
W S
H W
R H
W S
D
D
1"
1 1/4"
1 1/4"
D
D
D
D
H W
S
H W
R
C H
R C
H S
1 1/4" 1 1/4"
1 1/4"
1"
1"
3" 3"
1 1/4"
2"
2"
M A
T C
H
LI
N E
S E
E
F
-M
P -1
B 1B
MATCHLINE
SEE /F6 83-MP-1B1A
MATCHLINE
SEE
/F6 83-MP-1B1B
PROVIDE 3-WAY VALVE.
PROVIDE 3-WAY VALVE.
ISOLATION VALVES IN BRANCH
LINES SERVING MULTIPLE
TERMINALS (TYPICAL)
RESIDENT
CORRIDOR
B1A017
SUB POD D0
B1D005
RESIDENT
CORRIDOR
B1A017
SCREENED
PATIO
B1E004
RESIDENT
CORRIDOR
B1A017
SCREENED
PATIO
B1E004
SUB POD D1
B1D105
EXIT STAIR
(3)
B1D001
EXIT STAIR
(4)
B1D101
EXIT STAIR
(5)
B1E001
ELEC
CLOSET
B1E002
ELEC
CLOSET
B1D102
ELEC
CLOSET
B1D002
SCREENED
PATIO
B1D004
SCREENED
PATIO
B1D104
SHEET NOTES
D A
A M
P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
C
U se rs \b k in m a n \D o c u m e n ts
\3 b M
E -S
C I- R -C
E N
T R A L b k in m a n R K W
J .r v t
/2
/2
:1 :1
P
M
C:\Users\bkinman\Documents\309070b3ME-SCI-R18-CENTRAL_bkinmanR4KWJ.rvt
83-MP-1B1D
CONSTRUCTION
VA-LTSCI-D
AB
549-820B
SH
MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA D
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR , CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16' 32'8' 64'
NORTH
PLAN
BF
C
D
G
A
H
E
SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA D
1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,
ABBREVIATIONS AND GENERAL NOTES.
2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN
ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING
DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,
OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF
TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE CONTRACT.
3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED
ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE
PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY
THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH
THE GENERAL CONTRACTOR.
4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT
EQUIPMENT CONNECTIONS.
5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.
6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.
7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES
UNLESS NOTED OTHERWISE.
9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF
10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.
11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.
U.2
U.2
V
V
V.6
V.6
W
W
11.4
11.4
W.6
W.6
X
X
X.2
X.2
11.8
11.8
12.5
12.5
13.1
13.1
X.8
X.8
U
U
Y
Y
10.9
10.9
11.5
11.5
83-FCU-12A
83-FCU-12B
2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
C H S
C H R
C H S C
H R
2" 2"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
H W
R H W
S
H W
R H W
S
D
D
1"
D
H W
SH
W
R
C H R
C H S
1"
1"
1"
MATCHLIN
E
SEE
F6
83-M P-1B
1B
PROVIDE 3-WAY
VALVE.
ISOLATION VALVES IN BRANCH
LINES SERVING MULTIPLE
TERMINALS (TYPICAL)
SCREENED
PATIO
B1E004
EXIT STAIR
(5)
B1E001
ELEC
CLOSET
B1E002
SUB POD E0
B1E105
SHEET NOTES
D A
A M
P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W
V A -L
T S C
IF
-D \3
B M
E -S
C I- R -b k in m a n .R
V T
/3
/2
:0
:3
P
M
W:\VA-LTSCIF-D\309070B3ME-SCI-R18-bkinman.RVT
83-MP-1B1E
CONSTRUCTION
VA-LTSCI-D
AB
549-820B
SH
MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA E
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR , CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16' 32'8' 64'
NORTH
PLAN
BF
C
D
G
A
H
E
SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA E
1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,
ABBREVIATIONS AND GENERAL NOTES.
2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN
ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING
DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,
OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF
TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE CONTRACT.
3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED
ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE
PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY
THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH
THE GENERAL CONTRACTOR.
4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT
EQUIPMENT CONNECTIONS.
5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.
6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.
7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES
UNLESS NOTED OTHERWISE.
9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF
10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.
11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.
DN
DN
A.8 A.8
B.8 B.8
AA
AA
A.9 A.9
83-TU-4-16
83-TU-4-18
83-TU-4-20
83-TU-4-2583-TU-4-24
83-TU-4-22
83-TU-4-21
83-TU-4-17
83-TU-4-15
83-TU-4-19
83-TU-4-26
83-TU-4-23
83-TU-5-03
83-TU-5-01
83-TU-5-07
83-TU-4-10
83-TU-4-14
83-TU-4-11
83-TU-4-09
83-TU-4-08
83-TU-5-05
83-TU-5-06
83-TU-5-02
83-TU-4-12
83-TU-4-05
83-TU-4-04
83-TU-4-03
83-TU-4-07
83-TU-5-04
83-TU-4-13
83-TU-4-06
2"
1 1/2"
1 1/2" 1"
1 1/2"1 1/2"
1 1/4" 1 1/4"
2"
3/4"
1" 1"
H W
R
H W
S H
W S
H W
SH
W
R
2"
1 1/4"
1 1/4"
1 1/2"
1"
1 1/2"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
3/4" 3/4"
3/4"
3/4"
2 1/2"
2 1/2"
1 1/4"
1 1/2" 1"
H W
R
1 1/2"
H W
R H
W R
H W
S H
W S
2 1/2"
HWS
2"
HWR
1"
2"
1 1/4"
MATCHLINE
SEE /F6 83-MP-1B1A
PROVIDE 3-WAY
VALVE.
PROVIDE 3-WAY
VALVE.
PROVIDE 3-WAY
VALVE.
2"
ISOLATION VALVES IN BRANCH
LINES SERVING MULTIPLE
TERMINALS (TYPICAL)
2 1/2"
STAFF TLT
B1F009
EXAM ROOM
B1F023
FEMALE
PUBLIC
TOILETS
B1F045
MALE PUBLIC
TOILETS
B1F044
CLEAN
UTILITY
B1F022
SOILED
UTILITY
B1F024
RECEPTION
B1F003
CLINIC
SEATING
B1F002
PATIENT
TOILET
B1F007
CHECK-IN
ALCOVE
B1F001
SERVICE
CORRIDOR
B1A011
SERVICE
CORRIDOR
B1F046
CLINIC
CORRIDOR
B1F006A
CLINIC
CORRIDOR
B1F006
WORKROOM
B1F013
NEURO EXAM
CONSULT
B1F008
STAFF
LOUNGE
B1F025
W|M ALCOVE
B1F005
AREAWAY
EXHAUST
N|A
CHECK-OUT
ALCOVE
B1F004
CLINIC
CORRIDOR
B1F010
PHYSICAL
EXAM ROOM
B1F021
EXAM ROOM
B1F011
PHYSICAL
EXAM ROOM
B1F018
EXAM ROOM
B1F014
EXAM ROOM
B1F016
NURSE
STATION
B1F012
SHARED
OFFICE
PHYSICIANS
B1F033
OFFICE
PSYCH
B1F032
OFFICE
CLINICIAN
B1F030
PATIENT
TOILET
B1F017
OFFICE CASE
MANAGER
B1F031
UROLOGY
EXAM ROOM
B1F019
HAC
B1F027
CLINIC
CORRIDOR
B1F015
SERVICE
CORRIDOR
B1F028
OFFICE
UROLOGY
B1F034
CLEAN
UTILITY
B1F038
INSTRUMENT
CLEANING
B1F043
STORAGE
B1F041
CYSTO
CONTROL
B1F042
CYSTO
B1F040
PATIENT
TOILET
B1F037
DRESSING
B1F036
AREAWAY
EXHAUST
N|A
ELEC
B1F026
SCRUB
ALCOVE
B1F039
HALLWAY
B1F029
CLINIC
CORRIDOR
B1F035
LEVEL B
ACCESS
CORRIDOR-E
B1G003
AREA WAY
N|ACYSTO
CONTROL
B1F042
CLINIC
CORRIDOR
B1F020
CYSTO
CONTROL
B1F042
SHEET NOTES
D A
A M
P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W
V A -L
T S C
IF
-D \3
B M
E -S
C I- R -b k in m a n .R
V T
/3
/2
:1
:3
P
M
W:\VA-LTSCIF-D\309070B3ME-SCI-R18-bkinman.RVT
83-MP-1B1F
CONSTRUCTION
VA-LTSCI-D
AB
549-820B
SH
MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA F
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR , CENTRAL REGION
06 MAY 2021
BID PACKAGE B
0' 16' 32'8' 64'
NORTH
PLAN
BF
C
D
G
A
H
E
SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA F
1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,
ABBREVIATIONS AND GENERAL NOTES.
2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN
ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING
DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,
OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF
TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE CONTRACT.
3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED
ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE
PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY
THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH
THE GENERAL CONTRACTOR.
4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT
EQUIPMENT CONNECTIONS.
5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.
6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.
7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES
UNLESS NOTED OTHERWISE.
9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF
10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.
11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.
| 83-MP-1B1 |
| 83-MP-1B1A |
| 83-MP-1B1B |
| 83-MP-1B1C |
| 83-MP-1B1D |
| 83-MP-1B1E |
| 83-MP-1B1F |
File details come from the government source that posted it. Updated .