23 h Mechl DWGs 8of12sp.pdf

PDF 11 MB Posted

Attached to
Y1DA--LTSCI VA Dallas 549-820B Long Term Spinal Cord Injury
Solicitation number
36C10F22R0045
Issued by

About this file

This document provides details on a federal solicitation and related technical drawings. Solicitation number 36C10F22R0045 from the Department of Veterans Affairs Office of Construction and Facilities Management is seeking proposals for the Y1DA--LTSCI VA Dallas 549-820B Long Term Spinal Cord Injury opportunity. The opportunity involves providing long term spinal cord injury care services at facility 549-820B. The related technical drawings file 23 h Mechl DWGs 8of12sp.pdf contains diagrams and specifications but no other descriptive information. The solicitation appears to be open with no stated deadline, pricing, or award date provided in the available information.

View the file

Other files

File Type Posted
Part II of II RFI Response.pdf PDF
01 45 00 chart.pdf PDF
36C10F22R0045 0013.docx DOCX document
RE trailer plan REV.pdf PDF
sign IN-01.33.pdf PDF
RE Field Office REV.pdf PDF
ADD-02 SPECs.pdf PDF
ADD-02 DWGs.pdf PDF
36C10F22R0045 0012.docx DOCX document
LTSCI ADDDENDUM 01drawings RV.pdf PDF
36C10F22R0045 0011.docx DOCX document
Bldg 74 ACM Survey Report.pdf PDF
36C10F22R0045 0010.docx DOCX document
36C10F22R0045 0009.docx DOCX document
36C10F22R0045 0008.docx DOCX document
83-GL-101 VA-Attachment RFI.pdf PDF
36C10F22R0045 0007.docx DOCX document
36C10F22R0045 0006.docx DOCX document
36C10F22R0045 0005.docx DOCX document
1 17 RESIDENT ENGINEER FIeld Office.pdf PDF
LTSCI Pre-proposal visit Sign In Sheets.pdf PDF
1 17 RESIDENT ENGINEER RE FIeld Office.pdf PDF
36C10F22R0045 0004.docx DOCX document
36C10F22R0045 0003.docx DOCX document
36C10F22R0045 0002.docx DOCX document
36C10F22R0045 0001.docx DOCX document
23 b Mechl DWGs 2of12sp.pdf PDF
01_a Civil DWGs 1of4 tt1.pdf PDF
01_d Civil DWGs 4of4 oc.pdf PDF
23 d Mechl DWGs 4of12sp.pdf PDF
04 IRRIGATION DWGs 1of1.pdf PDF
22 a Plmbg DWGs 1of8 tt.pdf PDF
27_a TELECOM DWGs 1of1sp.pdf PDF
26_g Elecl DWGs 7of7g.pdf PDF
20_GENERAL Vol 3 DWGs tt.pdf PDF
LTSCI ProjMan VOL 01 part 1of2 div00-div08 tt1.pdf PDF
26_d Elecl DWGs 4of7sp.pdf PDF
09_f Archl DWGs 6of12sp.pdf PDF
08.0 a Structl DWGs 1of4 tt1.pdf PDF
LTSCI ProjMan VOL 01 part 2of2 div09-div14 tt.pdf PDF
83 LTSCI MES part 1of6.pdf PDF
09_l Archl DWGs 12of12sp.pdf PDF
23 f Mechl DWGs 6of12sp.pdf PDF
VA LTSCI Bid Pack B Suppl Info part 2of2 g.pdf PDF
09_j Archl DWGs 10of12sp.pdf PDF
09_h Archl DWGs 8of12sp.pdf PDF
22 f Plmbg DWGs 6of8 tt.pdf PDF
26_b Elecl DWGs 2of7 tt.pdf PDF
26_f Elecl DWGs 6of7 tt.pdf PDF
22 c Plmbg DWGs 3of8 tt1.pdf PDF
Show 40 more

Latest 50 of 117 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

UP

UP

UP

UP

UP

UP

DN

UP

DN

DN

SP

SP

SP

SP

SP

SP

SP

D.5

1 4

E

F

F

I.6

I.6

I

I

H.6

H.6

H

H

8.3

CC.6

CC.6

CC

CC

BB.6

BB.6

12.3

L

L

L.6

L.6

M

M

7.1

P.2

P.2

Q

Q

Q.6

Q.6

R

R

8.8

V

V

V.6

V.6

W

W

11.4

A.8 A.8

B.8 B.8 J

J

G.8

G.8

6.3

7.6 7.2

BB

BB

DD

DD

M.6

M.6

N

N

N.2

N.2

6.5

R.6

R.6

P1

P1

S.2

S.2

9.4

10.1

W.6

W.6

X

X

X.2

X.2

11.8

12.5

AA

AA

G.2

G.2 Z.8

N.8

N.8

K.2

K.2

S.8

S.8

X.8

X.8

G

G

O

S.9

S.9

Y

Z

F.3 F.3

6.2

12.2

16.2

E.3

1.81.5

A.9 A.9

1.9

6.4 6.6

12.4

12.6

7.9

8.6

10.9

11.5

E.2

8.5

SHEET NOTES

D A

T E

S

A M

P

Drawing Title

Approved Project Director:

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

PSP 309070 Revisions Date

ARCHITECT/ENGINEERS: Office of

Construction and Facilities

Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FILE NAME

Project Abbreviation

F

E

D

C

B

A

F

IL

E N

A M

E

KEY PLAN

FULLY SPRINKLERED

(NOT TO SCALE)

Page Southerland Page, LLP.

1800 Main Street Suite 123

Dallas, TX 75201 pagethink.com

TEL

FAX

ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING

Austin / Dallas / Denver / Houston / Washington DC /

International Affiliate Offices

214 522 3900

214 522 4380

DWG

C

U se rs \b k in m a n \D o c u m e n ts

\3 b M

E -S

C I- R -C

E N

T R A L b k in m a n R K W

J .r v t

/2

/2

:1 :4

P

M

C:\Users\bkinman\Documents\309070b3ME-SCI-R18-CENTRAL_bkinmanR4KWJ.rvt

83-MP-1B1

CONSTRUCTION

VA-LTSCI-D

AB

549-820B

SH

MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 OVERALL

LONG TERM SPINAL CORD INJURY

VA NORTH TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES

MANAGEMENT DIRECTOR , CENTRAL REGION

06 MAY 2021

BID PACKAGE B

SCALE: 1/16" = 1'-0"F6 MECHANICAL PIPING - OVERALL PLAN - LEVEL B1 0' 16' 32'8' 64'

NORTH

PLAN

BF

C

D

G

A

H

E

1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,

ABBREVIATIONS AND GENERAL NOTES.

2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN

ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING

DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,

OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF

TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE CONTRACT.

3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED

ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE

PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY

THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL

COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH

THE GENERAL CONTRACTOR.

4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT

EQUIPMENT CONNECTIONS.

5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION

WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.

6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.

7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES

UNLESS NOTED OTHERWISE.

9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF

10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.

11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.

12 REFER TO SHEET 83-M-616 FOR THE STEAM/CONDENSATE RISER

DIAGRAM.

UP

E

D

B.8 B.8

F.3

F.3

E.3

1.51.9

E.2

D.6

83-FCU-05

83-TU-4-16

83-TU-4-18

83-TU-4-20

83-TU-4-31

83-FCU-02

83-FCU-03

83-CRC-01

83-TU-4-2583-TU-4-24

83-TU-4-22

83-TU-4-21

83-TU-4-32

83-TU-4-28

83-TU-4-30

83-TU-4-29

83-TU-4-27

83-TU-4-17

83-TU-4-15

83-TU-4-19

83-TU-4-26

83-TU-4-23

83-FCU-04

83-FCU-22C

83-FCU-22A

83-FCU-22D

83-FCU-22B

4" 4"

2"

2"

1 1/2"

1 1/2"

2"

2"

3"

3"

3"

3"

2"

3"

1 1/2"

1 1/2"

1 1/2" 1 1/2"

1 1/4"

1 1/4"

2"

3"

3"

2"

2"

2"

1 1/2" 2"

2"

1 1/2"

1 1/4" 1 1/4"

1 1/4" 1 1/4"

1"

CHS

CHR

CHS

CHR

C H

R

C H

S

CHR

CHS

C H

S

C H

R

C H

R

C H

S

CHS

CHR

C H

S

C H

R

C H

R

2"

2"

3"

2"

C H

S

HWS

HWR

H W

R H

W S

H W

R

HWS

HWR CHR

CHS

HWR

HWS

H W

SH

W

R

H W

S H

W R

HWR

HWS

HWS

HWR

HWR

HWS

H W

S

H W

R

2"

1 1/2"

1 1/2" 1"

1 1/2"1 1/2"

1 1/4" 1 1/4"

2"

3/4"

1" 1"

3"

2 1/2"2 1/2"

3"

3"

1"

1"

1 1/4"

1 1/4"

1"

1"

1"

1"

1"

1"

1"

1"

3"

3"

3" 3"

2"

1 1/2"

1 1/2"

2"

2"

1"

1"

1"

1"

CHS

CHRHWR

HWS

1 1/2"

1 1/2"

2"

2"

1 1/4"

2 1/2"

2 1/2"

H W

R H

W R

H W

S H

W S

2 1/2"

1 1/4"

3"

1 1/4"

HWS

2"

HWR

1"

H W

S

2"

D

D

D

D

D

D

D

1 1/4"

1"

1" 1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

D

D

D

1 1/4" CONDENSATE

DOWN TO B2

D

1 1/4"

1 1/4"

D

3"

3"3"

1 1/4"

1" D

1"

1" CONDENSATE DRAIN

FROM 83-FCU-18A ON

LEVEL 1 DOWN TO

LEVEL B2.

MATCHLINE

SEE /F6 83-MP-1B1F

M A

T C

H

LI

N E

S E

E

F

-M

P -1

B 1B

MATCHLINE

SEE

/F6 83-MP-1B1C

PROVIDE 3-WAY

VALVE.

ISOLATION VALVES IN BRANCH

LINES SERVING MULTIPLE

TERMINALS (TYPICAL)

ISOLATION VALVES IN BRANCH

LINES SERVING MULTIPLE

TERMINALS (TYPICAL)

2"

ISOLATION VALVES IN BRANCH

LINES SERVING MULTIPLE

TERMINALS (TYPICAL)

2 1/2"

D7

83-M-305

S

LO

P E

D O

W N

STAFF TLT

B1F009

ELEC

B1A014

TELE COMM

B1A016

EXAM ROOM

B1F023

FEMALE

PUBLIC

TOILETS

B1F045

MALE PUBLIC

TOILETS

B1F044

CLEAN

UTILITY

B1F022

SOILED

UTILITY

B1F024

PUBLIC

LOBBY

B1A002

RECEPTION

B1F003

CLINIC

SEATING

B1F002

SERVICE

ELEVATOR

LOBBY

B1A012

EXIT STAIR

(1)

B1A007

INFORMATION

DESK

B1A006

PATIENT

TOILET

B1F007

VESTIBULE

B1A001

PUBLIC

ELEVATOR

CAB (P1)

B1A009B

SERVICE

ELEVATOR

CAB (S3)

B1A010B

RESIDENT

ELEVATOR

CAB (P6)

1B001B

PUBLIC

CORRIDOR

B1A005

CHECK-IN

ALCOVE

B1F001

RESIDENT

CORRIDOR

B1B004

SERVICE

CORRIDOR

B1A011

SERVICE

CORRIDOR

B1F046

CLINIC

CORRIDOR

B1F006A

CLINIC

CORRIDOR

B1F006

RESIDENT

CORRIDOR

B1A017

WORKROOM

B1F013

NEURO EXAM

CONSULT

B1F008

STAFF

LOUNGE

B1F025

SECURITY

B1A015

W|M ALCOVE

B1F005

AREAWAY

EXHAUST

N|A

PUBLIC

ELEVATOR

LOBBY

B1A008

CHECK-OUT

ALCOVE

B1F004

RESIDENT

ELEVATOR

CAB (P5)

1B001A

SERVICE

ELEVATOR

CAB (S4)

B1A010A

PUBLIC

ELEVATOR

CAB (P2)

B1A009A

SEATING

B1A003 SEATING

B1A004

RESIDENT

CORRIDOR

B1A017

RESIDENT

CORRIDOR

B1A017

RESIDENT

CORRIDOR

B1B004

RESIDENT

CORRIDOR

B1B004

FUTURE

EXPANSION

B1A013

SHEET NOTES

D A

A M

P

Drawing Title

Approved Project Director:

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

PSP 309070 Revisions Date

ARCHITECT/ENGINEERS: Office of

Construction and Facilities

Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FILE NAME

Project Abbreviation

F

E

D

C

B

A

F

IL

E N

A M

E

KEY PLAN

FULLY SPRINKLERED

(NOT TO SCALE)

Page Southerland Page, LLP.

1800 Main Street Suite 123

Dallas, TX 75201 pagethink.com

TEL

FAX

ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING

Austin / Dallas / Denver / Houston / Washington DC /

International Affiliate Offices

214 522 3900

214 522 4380

DWG

W

V A -L

T S C

IF

-D \3

B M

E -S

C I- R -b k in m a n .R

V T

/3

/2

:5

:0

A

M

W:\VA-LTSCIF-D\309070B3ME-SCI-R18-bkinman.RVT

83-MP-1B1A

CONSTRUCTION

VA-LTSCI-D

AB

549-820B

SH

MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA A

LONG TERM SPINAL CORD INJURY

VA NORTH TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES

MANAGEMENT DIRECTOR , CENTRAL REGION

06 MAY 2021

BID PACKAGE B

SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA A 0' 16' 32'8' 64'

NORTH

PLAN

BF

C

D

G

A

H

E

1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,

ABBREVIATIONS AND GENERAL NOTES.

2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN

ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING

DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,

OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF

TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE CONTRACT.

3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED

ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE

PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY

THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL

COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH

THE GENERAL CONTRACTOR.

4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT

EQUIPMENT CONNECTIONS.

5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION

WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.

6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.

7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES

UNLESS NOTED OTHERWISE.

9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF

10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.

11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.

DN

E

F

D

16.2

83-FCU-05

83-FCU-12A

83-FCU-12B

83-FCU-13A

83-CRC-02

83-FCU-06

83-FCU-08

83-FCU-07

83-CRC-03

83-UH-04

4" 4"

1 1/4"

1 1/4"

2" 1 1/4"

1 1/4"

2"

2"

2 1/2"

2 1/2"

4"

4"

2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"1 1/2"

1 1/2"

2"

2"

1 1/4"

1 1/2"

1"

1"

1"

1"

1 1/2"

1 1/4"

1 1/2" 1 1/2"

2" 2"

1 1/2"

1 1/2"

CHS

CHR

C H

S

C H

R

C H

S

C H

R

CHS CHR

CHS CHR

C H S

C H R

C H S C

H R

C H S

C H R

C H S

C H R

CHS

CHR

HWS

HWR

HWR

HWS

H W

SH

W

R

1 1/4"

1 1/4"

2"

1 1/4"

2"

1 1/4"

2"

2"

1"

1"

1 1/2"

1 1/2"

4" 4"

2" 2"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

2"

2"

1"

1"

H W

R H W

S

H W

R H W

S

HW

R

HW

S

H W

R

H W

S

H W

R H W

S

H W

R H W

S

83-FCU-26

83-FCU-23B

83-UH-11

83-FCU-23A

2"

83-FCU-30

83-FCU-09

C H

R

PLUGGED 2" BALL

VALVES FOR FUTURE

MDF RM. CRC UNIT

D

D

1"

4"

4"

2"

6"

6"

1" 1"

D

D

D

D

D

D

D

1 1/4"

1 1/4"

D

D

C H

S

1 1/4" CONDENSATE

DOWN TO B2

2" CONDENSATE

DOWN TO B2

1"

1 1/4"

2"

1 1/4"

CONDENSATE / 2"

CHS/R

DOWN TO B2

1 1/4" CONDENSATE, 2" CHS/R,

1 1/4" HWS/R DOWN TO LEVEL B2

D

D

D

D

D

H W

SH

W

R

C H R

C H S

D

1"

1"

1"

1 1/4"

1 1/4"

1 1/4"

D

1"

1"

1"

H W

SH

W

S

D C H S

C H R

1"

1"

1"

1" D

1" D

D

CHR

CHS

2"

2"

83-FCU-31

1"1"1"

CHR

CHR

D

F1

83-M-303

M A

T C

H

LI

N E

S E

E

F

-M

P -1

B 1A

MATCHLIN

E

SEE

F6

83-M P-1B1E

MATCHLIN

E

SEE

F6

-M

P-1 B1C

ISOLATION VALVES IN BRANCH

LINES SERVING MULTIPLE

TERMINALS (TYPICAL)

ISOLATION VALVES IN BRANCH

LINES SERVING MULTIPLE

TERMINALS (TYPICAL)

RESIDENT

ELEVATOR

CAB (P6)

1B001B

RESIDENT

CORRIDOR

B1B004

RESIDENT

ELEVATOR

CAB (P5)

1B001A

RESIDENT

CORRIDOR

B1B002

ELEC

B1B010

TELE COMM

B1B006

EXIT STAIR

(7)

B1B011

EXIT STAIR

(6)

B1C101

ELECTRICAL

GENERATOR

B1B013

NORMAL

POWER

SWITCHGEAR

B1B012

EMERGENCY

POWER

SWITCHGEAR

B1B014

ELEC

CLOSET

B1C103

SCREENED

PATIO

B1C102

SECURITY

B1B007

ELEC

CLOSET

B1B003

FIRE PUMP

ROOM

B1B015

MDF

B1B016

MECH CHASE

N|A

SUB POD C1

B1C104

SUB POD E0

B1E105

ELEC

CLOSET

B1B003

RESIDENT

ELEVATOR

LOBBY

B1B001

ELEC

CLOSET

B1B003

RESIDENT

CORRIDOR

B1B004

SUB POD E0

B1E105

RESIDENT

CORRIDOR

B1B004

FUTURE

EXPANSION

B1B009

SUB POD E0

B1E105

SHEET NOTES

KEY NOTES

DESCRIPTIONNUMBER

D A

A M

P

Drawing Title

Approved Project Director:

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

PSP 309070 Revisions Date

ARCHITECT/ENGINEERS: Office of

Construction and Facilities

Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FILE NAME

Project Abbreviation

F

E

D

C

B

A

F

IL

E N

A M

E

KEY PLAN

FULLY SPRINKLERED

(NOT TO SCALE)

Page Southerland Page, LLP.

1800 Main Street Suite 123

Dallas, TX 75201 pagethink.com

TEL

FAX

ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING

Austin / Dallas / Denver / Houston / Washington DC /

International Affiliate Offices

214 522 3900

214 522 4380

DWG

W

V A -L

T S C

IF

-D \3

B M

E -S

C I- R -b k in m a n .R

V T

/3

/2

:5

:3

A

M

W:\VA-LTSCIF-D\309070B3ME-SCI-R18-bkinman.RVT

83-MP-1B1B

CONSTRUCTION

VA-LTSCI-D

AB

549-820B

SH

MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA B

LONG TERM SPINAL CORD INJURY

VA NORTH TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES

MANAGEMENT DIRECTOR , CENTRAL REGION

06 MAY 2021

BID PACKAGE B

SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA B 0' 16' 32'8' 64'

NORTH

PLAN

BF

C

D

G

A

H

E

1 MECHANICAL CONTRACTOR TO INSTALL GENERATOR ENGINE MUFFLER

AND INTERCONNECTING PIPE. MUFFLER BY ELECTRICAL CONTRACTOR.

COORDINATE INSTALLATION REQUIREMENTS WITH ENGINE

MANUFACTURER.

1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,

ABBREVIATIONS AND GENERAL NOTES.

2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN

ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING

DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,

OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF

TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE CONTRACT.

3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED

ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE

PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY

THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL

COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH

THE GENERAL CONTRACTOR.

4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT

EQUIPMENT CONNECTIONS.

5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION

WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.

6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.

7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES

UNLESS NOTED OTHERWISE.

9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF

10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.

11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.

DD.6

DD.6

J.6 J.6

I.6 I.6

I I

H.6 H.6

H H

8.3

8.3

CC.6

CC.6

CC

CC

BB.6

BB.6

12.3

12.3

J J

G.8 G.8

6.3

6.3

7.6

7.6

7.2

7.2

13.2

13.2

13.6

13.6

BB

BB

DD

DD

G.2 G.2

Z.8

Z.8

Z.2

Z.2

14.3

14.3

G G

Z

Z

6.2

6.2

12.2

12.2

6.4

6.4

6.6

6.6

12.4

12.4

12.6

12.6

83-FCU-05

83-FCU-13A

83-FCU-13B

83-FCU-14A

83-FCU-14B

83-FCU-22C

83-FCU-22A

2"

3" 1 1/2"

1 1/4"

1 1/4"

1 1/4"

2"

2"

2 1/2"

2 1/2"

1 1/4"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

2"

2"

1 1/2"

1 1/2"

CHS CHR

CHS

CHR

C H

S

C H

R

C H

S

C H

R

C H

R C

H S

C H

R

1 1/2"

1 1/2"

1 1/2"

1 1/2"

3"

2"

C H

S

HWS

HWR

H W

R H W

S

2"

2"

1"

1"

1 1/4"

1 1/4"

2"

1 1/4"

2"

1 1/4"

2"

2"

1"

1"

H W

R H W

S

H W

R

H W

S

H W

R

H W

S

CHS

CHR

HWR

HWS

1 1/2"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1"

D

D

1 1/4"

D

D

D

1 1/4"

D

D

D

D

1 1/4"

1"

1"

HW

SHW

S D

CHS

CHR

1"D

M A

TC

H

LI

N

E S

E E

F6

-M

P -1

B 1A

MATCHLINE

SEE /F6 83-MP-1B1A

MATCHLINE

SEE

F6

83-MP-1B1B

PROVIDE 3-WAY

VALVE.

PROVIDE 3-WAY

VALVE.

ISOLATION VALVES IN BRANCH

LINES SERVING MULTIPLE

TERMINALS (TYPICAL)

RESIDENT

CORRIDOR

B1B002

SUB POD C0

B1C005

EXIT STAIR

(6)

B1C101

ELEC

CLOSET

B1C103

SCREENED

PATIO

B1C102

SUB POD C1

B1C104

EXIT STAIR

(2)

B1C001

ELEC

CLOSET

B1C004

SCREENED

PATIO

B1C002

FUTURE

EXPANSION

B1B009

SHEET NOTES

D A

A M

P

Drawing Title

Approved Project Director:

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

PSP 309070 Revisions Date

ARCHITECT/ENGINEERS: Office of

Construction and Facilities

Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FILE NAME

Project Abbreviation

F

E

D

C

B

A

F

IL

E N

A M

E

KEY PLAN

FULLY SPRINKLERED

(NOT TO SCALE)

Page Southerland Page, LLP.

1800 Main Street Suite 123

Dallas, TX 75201 pagethink.com

TEL

FAX

ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING

Austin / Dallas / Denver / Houston / Washington DC /

International Affiliate Offices

214 522 3900

214 522 4380

DWG

W

V A -L

T S C

IF

-D \3

B M

E -S

C I- R -b k in m a n .R

V T

/3

/2

:0

:2

P

M

W:\VA-LTSCIF-D\309070B3ME-SCI-R18-bkinman.RVT

83-MP-1B1C

CONSTRUCTION

VA-LTSCI-D

AB

549-820B

SH

MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA C

LONG TERM SPINAL CORD INJURY

VA NORTH TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES

MANAGEMENT DIRECTOR , CENTRAL REGION

06 MAY 2021

BID PACKAGE B

0' 16' 32'8' 64'

NORTH

PLAN

BF

C

D

G

A

H

E

SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA C

1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,

ABBREVIATIONS AND GENERAL NOTES.

2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN

ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING

DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,

OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF

TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE CONTRACT.

3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED

ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE

PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY

THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL

COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH

THE GENERAL CONTRACTOR.

4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT

EQUIPMENT CONNECTIONS.

5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION

WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.

6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.

7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES

UNLESS NOTED OTHERWISE.

9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF

10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.

11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.

L L

L.6 L.6

MM

7.1

7.1

P.2

P.2

Q

Q

Q.6

Q.6

R

R

8.8

8.8

M.6M.6

NN

N.2N.2

5.2

5.2

5.8

5.8

6.5

6.5

R.6

R.6

P1

P1

S.2

S.2

9.4

9.4

10.1

10.1

N.8N.8

K.2 K.2

S.8

S.8

OO

P

P

S.9

S.9

4.9

4.9

5.3

5.3

7.9

7.9

8.6

8.6

8.5

8.5

83-FCU-12A

83-FCU-10A

83-FCU-10B

83-FCU-11A

83-FCU-11B

83-FCU-04

83-FCU-22D

83-FCU-22B

4"

2" 2"

1 1/2"

1 1/2"

2"

2"

3" 3"

2" 3"

3"

2"

2"

2"

1 1/2"

2"

2" 1 1/2"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/2"

1 1/2"

1 1/2"

2"

2"

C H

S

C H

R

CHR

CHS

CHR

C H

R

C H

S

CHR

CHS

C H

S

C H

R

C H

R

C H

S

CHS

CHR

1 1/2"

1 1/2"

1 1/2"

1 1/2"

2"

2"

1 1/2"

1 1/2"

2"

2"

1 1/2"

1 1/2"

C H

S C

H R

C H

S C

H R

H W

SH

W

R

H W

S H

W R

HWR

H W

R H

W S

2"

2"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

H W

R H

W S

H W

R H

W S

D

D

1"

1 1/4"

1 1/4"

D

D

D

D

H W

S

H W

R

C H

R C

H S

1 1/4" 1 1/4"

1 1/4"

1"

1"

3" 3"

1 1/4"

2"

2"

M A

T C

H

LI

N E

S E

E

F

-M

P -1

B 1B

MATCHLINE

SEE /F6 83-MP-1B1A

MATCHLINE

SEE

/F6 83-MP-1B1B

PROVIDE 3-WAY VALVE.

PROVIDE 3-WAY VALVE.

ISOLATION VALVES IN BRANCH

LINES SERVING MULTIPLE

TERMINALS (TYPICAL)

RESIDENT

CORRIDOR

B1A017

SUB POD D0

B1D005

RESIDENT

CORRIDOR

B1A017

SCREENED

PATIO

B1E004

RESIDENT

CORRIDOR

B1A017

SCREENED

PATIO

B1E004

SUB POD D1

B1D105

EXIT STAIR

(3)

B1D001

EXIT STAIR

(4)

B1D101

EXIT STAIR

(5)

B1E001

ELEC

CLOSET

B1E002

ELEC

CLOSET

B1D102

ELEC

CLOSET

B1D002

SCREENED

PATIO

B1D004

SCREENED

PATIO

B1D104

SHEET NOTES

D A

A M

P

Drawing Title

Approved Project Director:

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

PSP 309070 Revisions Date

ARCHITECT/ENGINEERS: Office of

Construction and Facilities

Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FILE NAME

Project Abbreviation

F

E

D

C

B

A

F

IL

E N

A M

E

KEY PLAN

FULLY SPRINKLERED

(NOT TO SCALE)

Page Southerland Page, LLP.

1800 Main Street Suite 123

Dallas, TX 75201 pagethink.com

TEL

FAX

ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING

Austin / Dallas / Denver / Houston / Washington DC /

International Affiliate Offices

214 522 3900

214 522 4380

DWG

C

U se rs \b k in m a n \D o c u m e n ts

\3 b M

E -S

C I- R -C

E N

T R A L b k in m a n R K W

J .r v t

/2

/2

:1 :1

P

M

C:\Users\bkinman\Documents\309070b3ME-SCI-R18-CENTRAL_bkinmanR4KWJ.rvt

83-MP-1B1D

CONSTRUCTION

VA-LTSCI-D

AB

549-820B

SH

MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA D

LONG TERM SPINAL CORD INJURY

VA NORTH TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES

MANAGEMENT DIRECTOR , CENTRAL REGION

06 MAY 2021

BID PACKAGE B

0' 16' 32'8' 64'

NORTH

PLAN

BF

C

D

G

A

H

E

SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA D

1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,

ABBREVIATIONS AND GENERAL NOTES.

2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN

ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING

DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,

OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF

TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE CONTRACT.

3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED

ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE

PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY

THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL

COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH

THE GENERAL CONTRACTOR.

4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT

EQUIPMENT CONNECTIONS.

5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION

WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.

6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.

7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES

UNLESS NOTED OTHERWISE.

9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF

10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.

11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.

U.2

U.2

V

V

V.6

V.6

W

W

11.4

11.4

W.6

W.6

X

X

X.2

X.2

11.8

11.8

12.5

12.5

13.1

13.1

X.8

X.8

U

U

Y

Y

10.9

10.9

11.5

11.5

83-FCU-12A

83-FCU-12B

2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

C H S

C H R

C H S C

H R

2" 2"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

H W

R H W

S

H W

R H W

S

D

D

1"

D

H W

SH

W

R

C H R

C H S

1"

1"

1"

MATCHLIN

E

SEE

F6

83-M P-1B

1B

PROVIDE 3-WAY

VALVE.

ISOLATION VALVES IN BRANCH

LINES SERVING MULTIPLE

TERMINALS (TYPICAL)

SCREENED

PATIO

B1E004

EXIT STAIR

(5)

B1E001

ELEC

CLOSET

B1E002

SUB POD E0

B1E105

SHEET NOTES

D A

A M

P

Drawing Title

Approved Project Director:

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

PSP 309070 Revisions Date

ARCHITECT/ENGINEERS: Office of

Construction and Facilities

Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FILE NAME

Project Abbreviation

F

E

D

C

B

A

F

IL

E N

A M

E

KEY PLAN

FULLY SPRINKLERED

(NOT TO SCALE)

Page Southerland Page, LLP.

1800 Main Street Suite 123

Dallas, TX 75201 pagethink.com

TEL

FAX

ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING

Austin / Dallas / Denver / Houston / Washington DC /

International Affiliate Offices

214 522 3900

214 522 4380

DWG

W

V A -L

T S C

IF

-D \3

B M

E -S

C I- R -b k in m a n .R

V T

/3

/2

:0

:3

P

M

W:\VA-LTSCIF-D\309070B3ME-SCI-R18-bkinman.RVT

83-MP-1B1E

CONSTRUCTION

VA-LTSCI-D

AB

549-820B

SH

MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA E

LONG TERM SPINAL CORD INJURY

VA NORTH TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES

MANAGEMENT DIRECTOR , CENTRAL REGION

06 MAY 2021

BID PACKAGE B

0' 16' 32'8' 64'

NORTH

PLAN

BF

C

D

G

A

H

E

SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA E

1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,

ABBREVIATIONS AND GENERAL NOTES.

2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN

ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING

DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,

OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF

TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE CONTRACT.

3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED

ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE

PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY

THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL

COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH

THE GENERAL CONTRACTOR.

4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT

EQUIPMENT CONNECTIONS.

5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION

WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.

6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.

7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES

UNLESS NOTED OTHERWISE.

9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF

10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.

11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.

DN

DN

A.8 A.8

B.8 B.8

AA

AA

A.9 A.9

83-TU-4-16

83-TU-4-18

83-TU-4-20

83-TU-4-2583-TU-4-24

83-TU-4-22

83-TU-4-21

83-TU-4-17

83-TU-4-15

83-TU-4-19

83-TU-4-26

83-TU-4-23

83-TU-5-03

83-TU-5-01

83-TU-5-07

83-TU-4-10

83-TU-4-14

83-TU-4-11

83-TU-4-09

83-TU-4-08

83-TU-5-05

83-TU-5-06

83-TU-5-02

83-TU-4-12

83-TU-4-05

83-TU-4-04

83-TU-4-03

83-TU-4-07

83-TU-5-04

83-TU-4-13

83-TU-4-06

2"

1 1/2"

1 1/2" 1"

1 1/2"1 1/2"

1 1/4" 1 1/4"

2"

3/4"

1" 1"

H W

R

H W

S H

W S

H W

SH

W

R

2"

1 1/4"

1 1/4"

1 1/2"

1"

1 1/2"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

3/4" 3/4"

3/4"

3/4"

2 1/2"

2 1/2"

1 1/4"

1 1/2" 1"

H W

R

1 1/2"

H W

R H

W R

H W

S H

W S

2 1/2"

HWS

2"

HWR

1"

2"

1 1/4"

MATCHLINE

SEE /F6 83-MP-1B1A

PROVIDE 3-WAY

VALVE.

PROVIDE 3-WAY

VALVE.

PROVIDE 3-WAY

VALVE.

2"

ISOLATION VALVES IN BRANCH

LINES SERVING MULTIPLE

TERMINALS (TYPICAL)

2 1/2"

STAFF TLT

B1F009

EXAM ROOM

B1F023

FEMALE

PUBLIC

TOILETS

B1F045

MALE PUBLIC

TOILETS

B1F044

CLEAN

UTILITY

B1F022

SOILED

UTILITY

B1F024

RECEPTION

B1F003

CLINIC

SEATING

B1F002

PATIENT

TOILET

B1F007

CHECK-IN

ALCOVE

B1F001

SERVICE

CORRIDOR

B1A011

SERVICE

CORRIDOR

B1F046

CLINIC

CORRIDOR

B1F006A

CLINIC

CORRIDOR

B1F006

WORKROOM

B1F013

NEURO EXAM

CONSULT

B1F008

STAFF

LOUNGE

B1F025

W|M ALCOVE

B1F005

AREAWAY

EXHAUST

N|A

CHECK-OUT

ALCOVE

B1F004

CLINIC

CORRIDOR

B1F010

PHYSICAL

EXAM ROOM

B1F021

EXAM ROOM

B1F011

PHYSICAL

EXAM ROOM

B1F018

EXAM ROOM

B1F014

EXAM ROOM

B1F016

NURSE

STATION

B1F012

SHARED

OFFICE

PHYSICIANS

B1F033

OFFICE

PSYCH

B1F032

OFFICE

CLINICIAN

B1F030

PATIENT

TOILET

B1F017

OFFICE CASE

MANAGER

B1F031

UROLOGY

EXAM ROOM

B1F019

HAC

B1F027

CLINIC

CORRIDOR

B1F015

SERVICE

CORRIDOR

B1F028

OFFICE

UROLOGY

B1F034

CLEAN

UTILITY

B1F038

INSTRUMENT

CLEANING

B1F043

STORAGE

B1F041

CYSTO

CONTROL

B1F042

CYSTO

B1F040

PATIENT

TOILET

B1F037

DRESSING

B1F036

AREAWAY

EXHAUST

N|A

ELEC

B1F026

SCRUB

ALCOVE

B1F039

HALLWAY

B1F029

CLINIC

CORRIDOR

B1F035

LEVEL B

ACCESS

CORRIDOR-E

B1G003

AREA WAY

N|ACYSTO

CONTROL

B1F042

CLINIC

CORRIDOR

B1F020

CYSTO

CONTROL

B1F042

SHEET NOTES

D A

A M

P

Drawing Title

Approved Project Director:

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

PSP 309070 Revisions Date

ARCHITECT/ENGINEERS: Office of

Construction and Facilities

Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FILE NAME

Project Abbreviation

F

E

D

C

B

A

F

IL

E N

A M

E

KEY PLAN

FULLY SPRINKLERED

(NOT TO SCALE)

Page Southerland Page, LLP.

1800 Main Street Suite 123

Dallas, TX 75201 pagethink.com

TEL

FAX

ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING

Austin / Dallas / Denver / Houston / Washington DC /

International Affiliate Offices

214 522 3900

214 522 4380

DWG

W

V A -L

T S C

IF

-D \3

B M

E -S

C I- R -b k in m a n .R

V T

/3

/2

:1

:3

P

M

W:\VA-LTSCIF-D\309070B3ME-SCI-R18-bkinman.RVT

83-MP-1B1F

CONSTRUCTION

VA-LTSCI-D

AB

549-820B

SH

MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA F

LONG TERM SPINAL CORD INJURY

VA NORTH TEXAS HEALTH CARE SYSTEM

4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES

MANAGEMENT DIRECTOR , CENTRAL REGION

06 MAY 2021

BID PACKAGE B

0' 16' 32'8' 64'

NORTH

PLAN

BF

C

D

G

A

H

E

SCALE: 1/8" = 1'-0"F6 MECHANICAL PIPING - FLOOR PLAN - LEVEL B1 AREA F

1. REFER TO DRAWING 83-M-001 FOR HVAC PIPING LEGENDS,

ABBREVIATIONS AND GENERAL NOTES.

2. COORDINATE WORK ON THIS SHEET WITH ALL TRADES. WORK SHOWN

ON THIS SHEET IS INTENDED TO PROVIDE THE OVERALL ENGINEERING

DESIGN CONCEPT AND DOES NOT PROVIDE FOR RELOCATIONS,

OFFSETS, ETC., THAT ARE REQUIRED BY THE COORDINATION OF

TRADES. THESE SHALL BE PROVIDED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE CONTRACT.

3. ALL MECHANICAL EQUIPMENT REQUIRING ACCESS THAT IS LOCATED

ABOVE GYP. BOARD OR OTHERWISE INACCESSIBLE CEILING SHALL BE

PROVIDED WITH A CEILING ACCESS PANEL SUPPLIED AND INSTALLED BY

THE GENERAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL

COORDINATE THE EXACT LOCATION OF THESE ACCESS PANELS WITH

THE GENERAL CONTRACTOR.

4. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING AND AT

EQUIPMENT CONNECTIONS.

5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION

WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.

6. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY SPECIFICATIONS.

7. ALL PIPE RUN-OUTS TO INDIVIDUAL VAV TERMINAL UNITS SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

8. ALL VAV TERMINAL UNITS SHALL HAVE TWO-WAY CONTROL VALVES

UNLESS NOTED OTHERWISE.

9. ALL LOW PRESSURE RETURN (LPR) TO BE SLOPED TO 1/8"/LF

10 REFER TO SHEET 83-M-614 FOR THE CHILLED WATER RISER DIAGRAM.

11 REFER TO SHEET 83-M-615 FOR THE HEATING WATER RISER DIAGRAM.

83-MP-1B1
83-MP-1B1A
83-MP-1B1B
83-MP-1B1C
83-MP-1B1D
83-MP-1B1E
83-MP-1B1F

File details come from the government source that posted it. Updated .