This document provides details on a federal solicitation and related architectural drawings. Solicitation number 36C10F22R0045 from the Department of Veterans Affairs Office of Construction and Facilities Management seeks proposals for the Y1DA--LTSCI VA Dallas 549-820B Long Term Spinal Cord Injury project. The opportunity type is listed as a solicitation. The description provided is for LONG TERM SPINAL CORD INJURY 549-820B. The related file is 09 b Archl DWGs 2of12g tt.pdf, which contains architectural drawings to support responses to the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 117 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
GENERAL DEMOLITION PLAN NOTES
1. GENERAL CONTRACTOR REQUIRED TO COORDINATE ALL DEMOLITION PROVISIONS
WITH THE INFORMATION PROVIDED BY ALL DISCIPLINES IN THIS SET OF CONTRACT
DOCUMENTS.
2. GENERAL CONTRACTOR REQUIRED TO COORDINATE DEMOLITION ACTIVITES FOR ALL
TRADES. GENERAL CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING ELEMENTS
AND EQUIPMENT TO CONTINUE IN SERVICE. CONSULT "GENERAL REQUIREMENTS" AND
"SOLICITATION" FOR ADDITIONAL INFORMATION REGARDING SUCH PROTECTION AND
MAINTENANCE, AND FOR SYSTEM SHUTDOWN SCHEDULING AND ETC. COORDINATE ALL
SUCH ACTIVITIES WITH VA RESIDENT ENGINEER.
3. THE MAJOR PORTION OF THE EXISTING BUILDING WILL REMAIN ACTIVE DURING ALL
CONSTRUCTION AND DEMOLITION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE
ALL SYSTEM SHUT DOWNS WITH THE VA RESIDENT ENGINEER. THE CONTRACTOR SHALL
ALSO COORDINATE WITH THE VA RESIDENT ENGINEER FOR SCHEDULE, DURATION, AND
AREAS AFFECTED, AND SHALL RECEIVE VA APPROVAL PRIOR TO SHUT DOWN
COMMENCEMENT AND AS PER VA GENERAL REQUIREMENTS.
4. CONTRACTOR SHALL PRESERVE AND PROTECT FROM DAMAGE ALL STRUCTURES,
IMPROVEMENTS AND UTILITIES ON OR ADJACENT TO THE WORK SITE WHICH ARE NOT
INDICATED OR IMPLIED WITHIN THE SCOPE OF THE DOCUMENTS TO BE REMOVED
AND/OR THEIR SERVICE DISCONTINUED.
5. THE EXISTING AREAS TO REMAIN SHALL BE PROTECTED. ALL DAMAGE RESULTING
FROM WORK IN THIS CONTRACT SHALL BE RETURNED TO ITS ORIGINAL STATE, UNLESS
NOTED OTHERWISE.
6. CONTRACTOR SHALL EXERCISE REASONABLE CARE AS EXCAVATION PROCEEDS TO
MINIMIZE AND LIMIT DAMAGE TO ANY EXISTING CONDUIT, PIPING AND UNDERGROUND
APPURTENANCES THAT MAY BE ENCOUNTERED.
7. NOTIFY RESIDENT ENGINEER AND ARCHITECT OF UNEXPECTED SUBSURFACE
CONDITIONS.
8. THE VA RESERVES THE RIGHT AND SHALL BE GIVEN THE OPPORTUNITY TO CLAIM
ITEMS NO LONGER NEEDED WHETHER OR NOT THOSE ITEMS WERE SPECIFICALLY
NOTED FOR REMOVAL, RELOCATION, OR RETURN TO THE VA. ALL OTHER MATERIALS TO
BE REMOVED SHALL BE DISPOSED OF IN ACCORDANCE WITH APPLICABLE VA
REQUIREMEMTS, APPLICABLE CODES AND LOCAL ORDINANCES. COORDINATE ALL SUCH
CLAIMED ITEMS AND THEIR DISPOSITION WITH VA RESIDENT ENGINEER.
9. BEFORE WORK PROCEEDS IN A PARTICULAR AREA, CONTRACTOR SHALL REVIEW
FIELD CONDITIONS AND CRITICAL DIMENSIONS WITHIN SUCH WORK AREA AND NOTIFY
VA RESIDENT ENGINEER AND ARCHITECT OF ANY DISCREPANCIES BETWEEN
CONSTRUCTION DOCUMENTS AND EXISTING CONDITIONS.
10. MAINTAIN AND PROTECT EXISTING UTILITIES TO REMAIN IN SERVICE. IDENTIFY AND
PROTECT AGAINST DAMAGE DURING DEMOLITION. THE CONTRACTOR IS TO REFERENCE
RELEVANT DOCUMENTS FROM ALL DISCIPLINES AND TO NOTIFY VA RESIDENT
ENGINEER, ARCHITECT AND ENGINEER OF RECORD IF ANY UTILITIES ARE UNCOVERED
DURING THE DEMOLITION PHASE THAT ARE NOT INDENTIFIED IN DOCUMENTS PROVIDED.
11. PROVIDE TEMPORARY WEATHER PROTECTION FOR DURATION OF INSTALLATION OF
NEW CONSTRUCTION SO AS TO ENSURE THAT NO WATER LEAKAGE OR DAMAGE
OCCURS TO THE STRUCTURE OR AT INTERIOR AREAS OF THE EXISTING BUILDING.
REMOVE TEMPORARY WEATHER PROTECTION AT COMPLETION OF WORK.
12. THIS DRAWING IS ISSUED FOR THE PURPOSE OF ASSISTING THE CONTRACTOR TO
UNDERSTAND THE PROJECT SCOPE. IT SHALL REMAIN THE CONTRACTORS'
RESPONSIBILITY TO VISIT THE JOBSITE AND FAMILIARIZE THEMSELVES WITH THE
EXISTING CONDITIONS.
13. EXISTING CONCRETE SLABS INTENDED TO REMAIN SHALL BE REPAIRED AND
FLOATED LEVEL WITH SURROUNDING SLABS AND PREPARED TO RECEIVE NEW FINISH.
WHERE NO ADDED FINISH MATERIAL IS SCHEDULED OR NOTED FOR THE SLAB, FINISH
SHALL BE TO MATCH EXISTING ADJACENT CONCRETE FINISH.
14. THE PREMISES IN WHICH WORK IS BEING PERFORMED SHALL BE KEPT CLEAN AT
ALL TIMES.
15. REFER TO ELECTRICAL DOCUMENTS FOR ELECTRICAL RELATED DEMOLITION
SCOPE.
16. REFER TO PLUMBING DOCUMENTS FOR PLUMBING RELATED DEMOLITION SCOPE.
17. REFER TO MECHANICAL DOCUMENTS FOR MECHANICAL RELATED DEMOLITION
SCOPE.
18. REFER TO CIVIL DOCUMENTS FOR SITE RELATED DEMOLITION SCOPE, INCLUDING
SITE UTILITIES.
19. AREAS AND OBJECTS IDENTIFIED AS "EXISTING TO REMAIN" , "NOT IN CONTRACT" ,
AND/OR "N.I.C." SHALL BE PROTECTED. ALL DAMAGE TO THESE AREAS RESULTING
FROM DEMOLITION ACTIVITIES WITHIN THIS CONTRACT SHALL BE RETURNED TO ITS
ORIGINAL STATE.
20. PROTECT EXISTING FIREPROOFING AND FIRE ASSEMBLIES AT LOCATIONS TO
REMAIN. DAMAGE DURING DEMOLITION ACTIVITIES SHALL BE REPAIRED TO CONFORM
TO ORIGINAL FIRE PROTECTION REQUIREMENTS, LABELS AND RATINGS.
21. DURING CONSTRUCTION AND RENOVATION ACTIVITES WITHIN THE BUILDING
MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION ZONE WHILE MAINTAINING
POSITIVE PRESSURE IN THE NON-CONSTRUCTION ZONE.
22. CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE DIRECTLY TO THE OUTSIDE.
DURING DEMOLITION AND NEW CONSTRUCTION ACTIVITIES TO MINIMIZE THE CHANCE
FOR AIR POLLUTION AND THE SPREAD OF MOLD ASPERGILLUS INTO THE HOSPITAL
VENTILATION SYSTEMS, AIR MONITORING IS REQUIRED AS INDICATED IN THE GENERAL
REQUIREMENTS AND CONSTRUCTION DOCUMENTS. ALL EXISTING RETURN AND SUPPLY
DUCTWORK IN THESE AREAS SHALL BE SECURELY CAPPED WITH SHEET METAL DURING
ALL CONSTRUCTION ACTIVITIES. THIS REQUIREMENT APPLIES TO ALL WORK AREAS.
23. COORDINATE WITH THE VA RESIDENT ENGINEER DEMOLITION WORK CAUSING
VIBRATION AND/OR NOISE DISRUPTIVE TO THE HOSPITAL FUNCTIONS AS DEEMED SUCH
BY THE VA CONTRACTING OFFICER AND/OR VA RESIDENT ENGINEER SHALL BE
SCHEDULED AFTER HOURS.
24. THE FACILITY SHALL BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS. REVIEW DAILY THE STATUS OF WEATHER TIGHT CONDITIONS AND TAKE
ACTIONS NECESSARY TO MAINTAIN CONTINUOUS WEATHER TIGHT CONDITIONS
TWENTY-FOUR HOURS A DAY FOR DURATION OF THE PROJECT.
25. RELOCATE ROOF DRAINS ALONG THE DEMOLITION LINE. RELOCATE AND RE-SLOPE
ROOF TO NEW DRAIN LOCATIONS.
26. REMOVE EXISTING CEILING AND CEILING SUPPORT SYSTEM WHERE NEW CEILINGS
ARE INDICATED, UNLESS OTHERWISE NOTED.
27. REMOVE EXISTING FINISHES AS REQUIRED PER FINISH MANUFACT- URER'S
PRINTED INSTRUCTIONS TO ACCOMMODATE INSTALLATION OF NEW FINISHES. SEE
FINISH SCHEDULE FOR NEW FINISHES.
28. CONTRACTOR SHALL PROVIDE FOR AND MAINTAIN SAFETY AND INFECTION
CONTROL REQUIREMENTS AS PER SPECIFICATION SECTION 01 35 26 SAFETY
REQUIREMENTS.
29. CONTRACTOR SHALL PROVIDE FOR AND MAINTAIN "CLASS III REQUIREMENTS" FOR
SEPARATION BETWEEN ALL CONSTRUCTION AREAS AND THE EXISTING FACILITY
(BUILDING 74 - ACUTE SCI) THROUGHOUT ALL CONSTRUCTION ACTIVITIES AND
THROUGHOUT ALL CONSTRUCTION PHASES AS PER SPECIFICATION SECTION 01 35 26
SAFETY REQUIREMENTS.
30. AT DOOR OPENINGS WITHIN TEMPORARY CONSTRUCTION PARTITIONS, INSTALL
CLASS C, 45 MINUTE FIRE/SMOKE RATED DOORS WITH SELF-CLOSING DEVICES.
31. CONTRACTOR SHALL MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER
GUAGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED AS PER SPECIFICATION SECTION 01 35 26 SAFETY
REQUIREMENTS.
DOCK
UNIT
SUB
STATION
EMERGANCY
GENERATOR
STORAGE
ELECTRIC
PUMP
ROOM
CRAWL
SPACE
STROAGE
WHEELCHAIR
CLINIC
WORKROOM
STORAGE
ROOM
ROOM
STAIR
ROOM
ELEVATOR
CORRIDOR
CORRIDOR
x10.5 x10.5 x10 x10 x9.3 x9.3 x9 x9 x29 x29 x28.1 x28.1 x28 x28 x11.1 x11.1 xK xK
J.11
J.11 xJ.5 xJ.5 xJ xJ xH xH xG xG xF.4 xF.4 x27 x27 xLL xLL xLL.8 xLL.8
EXISTING COLUMN
AND BOLLARDS
TO REMAIN
EXISTING
COLUMN AND
BOLLARDS
TO REMAIN
REMOVE MECHANICAL LOUVER
AND EXHAUST FANS .
REFER TO MECHANICAL DWGS
REMOVE DOOR AND
FRAME FOR NEW WORK.
PATCH WALL
TO MATCH WITH EXISTING
WALL AND FINISHES
REFER TO STRUCTURAL DWGS FOR
STRUCTURAL COLUMNS AND
FLOOR SLAB DEMOLITION
AT THIS AREA
REFER TO STRUCTURAL
FOR STRUCTURAL WALL,
COLUMNS AND FLOOR SLAB
DEMOLITION AT THIS AREA
REMOVE EXISTING STEEL
STAIR AND HANDRAIL
EXISTING TO REMAIN
REMOVE EXISTING COLUMN
REFER TO STRUCTURAL
REMOVE EXISTING WALL
SAWCUT EDGE-
REMOVE EXISTING SLAB
PER STRUCTURAL
SAWCUT EDGE -REMOVE EXISTING EXISTING TO REMAIN
REMOVE EXISTING COLUMN
REFER TO STRUCTURAL
REMOVE EXISTING COLUMN
REFER TO STRUCTURAL
EXISTING COLUMN TO REMAIN
EXISTING COLUMN TO REMAIN
EXISTING COLUMN TO REMAIN
EXISTING COLUMN TO REMAIN
FIELD VERIFY EXISTING PLUMBING, MECHANICAL,
ELECTRICAL AND ETC IN THIS AREA OF EXISTING
CRAWL SPACE TO BE REMOVED, REPLACED,
REROUTED AND/OR MODIFIED FOR REPRUPOSING OF
SPACE FOR THIS PROJECT. MODIFY CRAWL SPACE
GRADING AS NEEDED FOR NEW RAMPS, STAIRS AND
FLOORING CONFIGURATION.
REMOVE EXISTING TRENCH -
REFER CIVIL AND PLUMBING DWGS
REMOVE CONCRETE RETAINING WALL-
REFER CIVIL DWGS
EXISTING BLDG 74
TO BE REMOVED
EXISTING BLDG 74
TO BE RENOVATED
EXISTING BLDG 74
TO BE REMOVED
EXISTING BLDG 74
TO BE RENOVATED
xL xL
RECONNECT PERIMETER DRAIN TO NEW
SYSTEM
RELOCATE EXISTING OVERFLOW ROOF DRAIN DISCHARGE
REMOVE AREA DRAINS IN DEMO AREA
AND RECONNECT EXISTING SYSTEM
TO MAINTAIN FULL FUNCTION
MAINTAIN CLEARANCE OF ALL GENERATOR
LOUVERS AND EXHAUST FOR FULL
OPERATION
PROTECT EXISTING WALL AND RETAINING WALL SYSTEM
EXISTING TRENCH DRAIN TO BE DEMOLISHED
REF CIVIL FOR
CURB AND PAVING
REMOVAL
REMOVE EXISTING
CMU WALL UP TO
DOOR JAMB STRIKE
SIDE
1"
12' - 4 1/4"
REMOVE STORAGE CONTAINER
COORDINATE WITH OWNER FOR
RELOCATION.
EXISTING TRENCH DRAIN
TO REMAIN
TIE INTO NEW DRAIN SYSTEM
B1
74-AD-201
F3
74-AD-201
F6
74-AD-201
F1
74-AD-201
74-AD-201
D1
REMOVE PORTION OF
EXISTING PT SYSTEM WITHIN
CRAWL SPACE FOR
CONNECTION AND TRANSITION
WITH NEW BUILDING 83 PT
SYSTEM. SCHEDULE WORK TO
MINIMIZE DOWNTIME TO
EXISTING PT SYSTEM. (REFER
SPECIFICATIOJ 14 92 00.
REFER DRAWING 83-AC-1B1g.)
COORDINATE FINAL SYSTEM IN
BUILDING 74 FROM CRAWL
SPACE THROUGH BUILDING
CEILING WITH EXISTING
CONDITIONS FOR PT
CONNECTION TO BUILDING 83
(RESTORE EXISTING FINISHES
AND PATCH TO MATCH
EXISTING FINISH AS
REQUIRED.)
REFER TO STRUCTURAL DRAWINGS IN THIS AREA
FOR REINFOREMENT OF EXISTING GIRDERS
(ABOVE) AT UNDERSIDE OF SLAB AT LEVEL 1
REFER TO STRUCTURAL DRAWINGS IN
THIS AREA FOR REINFOREMENT OF
EXISTING GIRDERS (ABOVE) AT
UNDERSIDE OF SLAB AT LEVEL 1
PROVIDE SURVEY TO VERIFY EXISTING GRADE
ELEVATION FOR FLOOR SURFACE AT THESE SPOT
LOCATIONS AT EXISTING BASEMENT CORRIDOR AND
DOCK BEFORE ANY WORK PROCEEDS. NOTIFY RESIDENT
ENGINEER, ARCHITECT, AND EOR OF SURVEY RESULTS. PROVIDE ONE HOUR FIRE RATED CONSTRUCTION
BARRIER FROM FLOOR SLAB TO UNDERSIDE OF
CORRIDOR CEILING. AT DOOR LOCATIONS
PROVIDE 45 MINUTE RATED DOOR AND
HARDWARE. REFER DEMOLITION RCP FOR
ADDITIONAL INFORMATION.
PROVIDE SIGN ON THIS SIDE OF RATED
DOOR INDICATING "EXIT"
PROVIDE SIGN ON THIS SIDE OF RATED
DOOR INDICATING "NOT AN EXIT -
AUTHORIZED PERSONNEL ONLY"
PROVIDE ONE HOUR FIRE RATED
CONSTRUCTION BARRIER FROM FLOOR
SLAB TO UNDERSIDE OF CORRIDOR
CEILING. AT DOOR LOCATIONSPROVIDE 45
MINUTE RATED DOOR AND HARDWARE.
REFER DEMOLITION RCP FOR ADDITIONAL
INFORMATION.
PROVIDE SIGN ON THIS
SIDE OF RATED DOOR
INDICATING "EXIT"
PROVIDE SIGN ON THIS SIDE OF
RATED DOOR INDICATING "NOT AN
EXIT - AUTHORIZED PERSONNEL ONLY"
PROVIDE ONE HOUR FIRE RATED
CONSTRUCTION BARRIER FROM FLOOR
SLAB TO UNDERSIDE OF CONCRETE DECK
ABOVE. AT DOOR LOCATIONS PROVIDE 45
MINUTE RATED DOOR AND HARDWARE.
REFER DEMOLTION RCP FOR ADDITIONAL
INFORMATION.
PROVIDE SIGN ON THIS SIDE OF RATED
DOOR INDICATING "CONSTRUCTION
ZONE - DO NOT ENTER - AUTHORIZED
PERSONNEL ONLY"
REMOVE EXISTING
SIGN AND SAVE FOR
RE-INSTALLATION
CONSTRUCTION
SEPARATION(CONTRACTOR TO
COORDINATE WITH CENTER
AREA OF DEMOLITION
DEMOLITION PLAN LEGEND
EXISTING CONSTRUCTION TO BE
DEMOLISHED
EXISTING CONSTRUCTION
TO REMAIN
D A
T E
S
A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W b A -S
C I_
In te ri o r-
-C
E N
T R A L tb o n d .r v t
/2
/2
:2
:3
P
M
W:\309070b3A-SCI_Interior-2018-CENTRAL_tbond4749.rvt
74-AD-1B1g
CONSTRUCTION
VA-LTSCIF-D
TEAM
549-820B
TAB
ARCHITECTURAL - DEMOLITION FLOOR PLAN - BUILDING
74 - LEVEL B1 - AREA G
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
FULLY SPRINKLEREDBID PACKAGE B
SCALE: 1/8" = 1'-0"F6 DEMOLITION FLOOR PLAN - BUILDING 74 - LEVEL B1 - AREA G
0' 16'4' 8' 32'
NORTH
PLAN
BF
C
D
G
A E
AT
T S
XETE FO
S A
M
LAB
1 0 9 0 0
R E G
IS
TE
RED ARCH
ITE
C T
A
I F
A
T T
AI
O N
I II
05/06/21
GRATE INLET
D G E
O F
O V E R H A N G
F H
MEN'S
1A-113
WOMEN'S
1A-115
Q.A.
OFFICE
1A-100A
DISPENSING
1A-100B
CONSULT
1A-100C
PHARMACY
1A-100
VAULT
1A-100F
OFFICE
1A-100E
STORAGE
1A-142A
STORAGE
1A-100H
I.V.A.D.
1A-100G
H.V.C.
1A-140
OFFICE
1B-106
OFFICE
1B-106A
CONFERENCE
RM.
1B-106B
DARK
RM.
1D-120B
LIGHT
RM.
1D-120A
DARK
RM.
1D-120
B
SCRUB
RM.
C1-13A
CHEF,
GU
1D-119
BEDROOM
1C-100
BATH
RM.
1C-104A
BATH
RM.
1C-100A
BEDROOM/
1C-104
BEDROOM/
1C-108
MALE
TOILET
1B-101
HYDRO
THERAPY
1B-204
VISITOR
WAITING
1B-220
EQUIP.
STORAGE
1B-224A
C. LINEN
1C-101
C.
UTILITY
1C-103
ELECTRICAL
1C-123
H.A.C.
1C-171
EQUIP.
STORAGE
1C-173
NOUR.
1C-127 EQUIP.
STORAGE
1C-125
VESTIBULE
1A-102B
WAITING
PVA
OFFICE
SECRETARY
1A-102
PVA
OFFICE
SERVICE
OFFICER
1A-102A
CONFERENCE
ROOM
1A-101
OUTPATIENT
COORD
1A-103
LIVING/DINING
1D-142
HALLWAY
1D-142G
UTILITY
ROOM
1D-142B
BATH
RM.
1D-142E
PHSY
EXAM
1D-140
CLOSET
1D-142F
CLOSET
1D-142D
BEDROOM
1D-142C
EXAM/TREAT
1D-134
EXAM/TREAT
1D-138
NURSE
STATION
C1-105A
KITCHEN
1D-142A
HAC
1D-136EXAM/TREAT
1D-133
EXAM/TREAT
1D-127
DRESSING
RM.
1D-117
TOILET
1D-107
S.
UTILITY
1D-105
PHSY
EXAM
1D-125 NEURO
EXAM
1D-191
OFFICE
1D-100
CLEAN
UTILITY
1D-103
FEMALE
TOILET
1B103
PHYSICAL
THERAPY
1B-208
CLEAN
UTILITY
1B-208D
SOILED
UTILITY
1B-108C
TOILET
1B-108B
STAIR
ELECTRICAL
1B-100
OCCUPATIONAL
THERAPY
1B-224
RECEPTION
1A-142
OFFICE
1A-142E
OFFICE
1A-142D
OFFICE
1A-142C
OFFICE
1A-142B
PSYCHOLOGY
INTERN
1B-102
STAFF
PHYSICIAN
1B-104
SOCIAL
WORK
1B-108
SOICAL
WORK
1B-110
PSYCHOLOGIST
1B-114
TELEPHONE
1B-116
MEDICATION
1C-133
S.
UTILITY
1C-167
TOILET
1C-129A CHASE
ROOM
1B-139
NURSE
STATION
SHOWER ROOM
1C-139
TUB RM
1C-139B
FEC
x10.5 x10.5 x10 x10 x9.3 x9.3 x9 x9 x29 x29 x28.1 x28.1 x28 x28 x11.1 x11.1 xK xK
J.11
J.11 xJ.5 xJ.5 xJ xJ xH xH xG xG xF.4 x27 x27 xLL xLL xLL.8 xLL.8
REMOVE CONCRETE RETAINING WALL-
REFER CIVIL DWGS
REFER TO STRUCTURAL DWGS FOR
STRUCTURAL COLUMNS AND
FLOOR SLAB DEMOLITION
AT THIS AREA
REFER TO STRUCTURAL DWGS
FOR STRUCTURAL
COLUMNS AND FLOOR SLAB
DEMOLITION AT THIS AREA
REMOVE WALLS, DOORS, CEILINGS,
MECHANICAL DIFFUSERS, DUCTWORK
CASEWORK, ELECTRICAL AND
PLUMBING FIXTURES, ROOF DRAINS,
PIPES, EQUIPMENTS, ETC. AND
PREPARE FOR NEW WORK
EXISTING BLDG 74
TO BE REMOVED
EXISTING BLDG 74
TO BE RENOVATED
EXISTING BLDG 74
TO BE REMOVED
EXISTING BLDG 74
TO BE RENOVATED
REMOVE ALL CANOPY COLUMNS
REMOVE CANOPY STRUCTURE ABOVE
REMOVE EXISTING WALLS, TYP.
REMOVE EXISTING DOORS AND FRAMES, TYP.
REMOVE PLUMBING FIXTURE, REFER TO PLUMBING DWGS, TYP.
xL xL
REFER TO STRUCTURAL
DWGS FOR ADDITIONAL
NEW KNEE BRACES ABOVE CEILING.
PROTECT EXISTING WALL AND RETAINING WALL SYSTEM
RELOCATE EXISTING OVERFLOW ROOF DRAIN DISCHARGE
REFER CIVIL DRAWINGS FOR DEMO THIS AREA
CONSTRUCT TEMPORARY 1 HOUR WALL
DURING DEMOLITION AND
CONSTRUCTION. - MAINTAIN 5'-0" CLEAR
PROVIDE ONE HOUR FIRE RATED
CONSTRUCTION BARRIER FROM FLOOR
SLAB TO UNDERSIDE OF CONCRETE
DECK ABOVE. AT DOOR LOCATIONS
PROVIDE 45 MINUTE RATED DOOR AND
HARDWARE.
2' - 0"
TEMPORARY EXIT
74-AD-201
D1
F3
74-AD-301
F6
74-AD-301
PROVIDE SURVEY TO VERIFY EXISTING GRADE
ELEVATION FOR FLOOR SURFACE AT THESE SPOT
LOCATIONS AT EXISTING BASEMENT CORRIDOR AND
DOCK BEFORE ANY WORK PROCEEDS. NOTIFY RESIDENT
ENGINEER, ARCHITECT, AND EOR OF SURVEY RESULTS.
PROVIDE SURVEY TO VERIFY EXISTING GRADE
ELEVATION FOR FLOOR SURFACE AT THESE SPOT
LOCATIONS AT LEVEL 01 BEFORE ANY WORK PROCEEDS.
NOTIFY RESIDENT ENGINEER, ARCHITECT, AND EOR OF
SURVEY RESULTS.
PROVIDE SURVEY TO VERIFY EXISTING GRADE
ELEVATION FOR FLOOR SURFACE AT THESE SPOT
LOCATIONS AT EXISTING LEVEL 01 BEFORE ANY WORK
PROCEEDS. NOTIFY RESIDENT ENGINEER, ARCHITECT,
AND EOR OF SURVEY RESULTS.
MIN CLR
5' - 0"
PROVIDE ONE HOUR FIRE RATED
CONSTRUCTION BARRIER FROM FLOOR SLAB
TO UNDERSIDE OF CONCRETE DECK ABOVE.
AT DOOR LOCATIONS PROVIDE 45 MINUTE
RATED DOOR AND HARDWARE.
PROVIDE SIGN ON THIS SIDE
OF RATED DOOR INDICATING
"EMERGENCY EXIT ONLY"
PROVIDE SIGN ON THIS SIDE OF RATED
DOOR INDICATING "CONSTRUCTION
ZONE - DO NOT ENTER - AUTHORIZED
PERSONNEL ONLY"
GENERAL DEMOLITION PLAN NOTES
1. GENERAL CONTRACTOR REQUIRED TO COORDINATE ALL DEMOLITION PROVISIONS
WITH THE INFORMATION PROVIDED BY ALL DISCIPLINES IN THIS SET OF CONTRACT
DOCUMENTS.
2. GENERAL CONTRACTOR REQUIRED TO COORDINATE DEMOLITION ACTIVITES FOR ALL
TRADES. GENERAL CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING ELEMENTS
AND EQUIPMENT TO CONTINUE IN SERVICE. CONSULT "GENERAL REQUIREMENTS" AND
"SOLICITATION" FOR ADDITIONAL INFORMATION REGARDING SUCH PROTECTION AND
MAINTENANCE, AND FOR SYSTEM SHUTDOWN SCHEDULING AND ETC. COORDINATE ALL
SUCH ACTIVITIES WITH VA RESIDENT ENGINEER.
3. THE MAJOR PORTION OF THE EXISTING BUILDING WILL REMAIN ACTIVE DURING ALL
CONSTRUCTION AND DEMOLITION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE
ALL SYSTEM SHUT DOWNS WITH THE VA RESIDENT ENGINEER. THE CONTRACTOR SHALL
ALSO COORDINATE WITH THE VA RESIDENT ENGINEER FOR SCHEDULE, DURATION, AND
AREAS AFFECTED, AND SHALL RECEIVE VA APPROVAL PRIOR TO SHUT DOWN
COMMENCEMENT AND AS PER VA GENERAL REQUIREMENTS.
4. CONTRACTOR SHALL PRESERVE AND PROTECT FROM DAMAGE ALL STRUCTURES,
IMPROVEMENTS AND UTILITIES ON OR ADJACENT TO THE WORK SITE WHICH ARE NOT
INDICATED OR IMPLIED WITHIN THE SCOPE OF THE DOCUMENTS TO BE REMOVED
AND/OR THEIR SERVICE DISCONTINUED.
5. THE EXISTING AREAS TO REMAIN SHALL BE PROTECTED. ALL DAMAGE RESULTING
FROM WORK IN THIS CONTRACT SHALL BE RETURNED TO ITS ORIGINAL STATE, UNLESS
NOTED OTHERWISE.
6. CONTRACTOR SHALL EXERCISE REASONABLE CARE AS EXCAVATION PROCEEDS TO
MINIMIZE AND LIMIT DAMAGE TO ANY EXISTING CONDUIT, PIPING AND UNDERGROUND
APPURTENANCES THAT MAY BE ENCOUNTERED.
7. NOTIFY RESIDENT ENGINEER AND ARCHITECT OF UNEXPECTED SUBSURFACE
CONDITIONS.
8. THE VA RESERVES THE RIGHT AND SHALL BE GIVEN THE OPPORTUNITY TO CLAIM
ITEMS NO LONGER NEEDED WHETHER OR NOT THOSE ITEMS WERE SPECIFICALLY
NOTED FOR REMOVAL, RELOCATION, OR RETURN TO THE VA. ALL OTHER MATERIALS TO
BE REMOVED SHALL BE DISPOSED OF IN ACCORDANCE WITH APPLICABLE VA
REQUIREMEMTS, APPLICABLE CODES AND LOCAL ORDINANCES. COORDINATE ALL SUCH
CLAIMED ITEMS AND THEIR DISPOSITION WITH VA RESIDENT ENGINEER.
9. BEFORE WORK PROCEEDS IN A PARTICULAR AREA, CONTRACTOR SHALL REVIEW
FIELD CONDITIONS AND CRITICAL DIMENSIONS WITHIN SUCH WORK AREA AND NOTIFY
VA RESIDENT ENGINEER AND ARCHITECT OF ANY DISCREPANCIES BETWEEN
CONSTRUCTION DOCUMENTS AND EXISTING CONDITIONS.
10. MAINTAIN AND PROTECT EXISTING UTILITIES TO REMAIN IN SERVICE. IDENTIFY AND
PROTECT AGAINST DAMAGE DURING DEMOLITION. THE CONTRACTOR IS TO REFERENCE
RELEVANT DOCUMENTS FROM ALL DISCIPLINES AND TO NOTIFY VA RESIDENT
ENGINEER, ARCHITECT AND ENGINEER OF RECORD IF ANY UTILITIES ARE UNCOVERED
DURING THE DEMOLITION PHASE THAT ARE NOT INDENTIFIED IN DOCUMENTS PROVIDED.
11. PROVIDE TEMPORARY WEATHER PROTECTION FOR DURATION OF INSTALLATION OF
NEW CONSTRUCTION SO AS TO ENSURE THAT NO WATER LEAKAGE OR DAMAGE
OCCURS TO THE STRUCTURE OR AT INTERIOR AREAS OF THE EXISTING BUILDING.
REMOVE TEMPORARY WEATHER PROTECTION AT COMPLETION OF WORK.
12. THIS DRAWING IS ISSUED FOR THE PURPOSE OF ASSISTING THE CONTRACTOR TO
UNDERSTAND THE PROJECT SCOPE. IT SHALL REMAIN THE CONTRACTORS'
RESPONSIBILITY TO VISIT THE JOBSITE AND FAMILIARIZE THEMSELVES WITH THE
EXISTING CONDITIONS.
13. EXISTING CONCRETE SLABS INTENDED TO REMAIN SHALL BE REPAIRED AND
FLOATED LEVEL WITH SURROUNDING SLABS AND PREPARED TO RECEIVE NEW FINISH.
WHERE NO ADDED FINISH MATERIAL IS SCHEDULED OR NOTED FOR THE SLAB, FINISH
SHALL BE TO MATCH EXISTING ADJACENT CONCRETE FINISH.
14. THE PREMISES IN WHICH WORK IS BEING PERFORMED SHALL BE KEPT CLEAN AT
ALL TIMES.
15. REFER TO ELECTRICAL DOCUMENTS FOR ELECTRICAL RELATED DEMOLITION
SCOPE.
16. REFER TO PLUMBING DOCUMENTS FOR PLUMBING RELATED DEMOLITION SCOPE.
17. REFER TO MECHANICAL DOCUMENTS FOR MECHANICAL RELATED DEMOLITION
SCOPE.
18. REFER TO CIVIL DOCUMENTS FOR SITE RELATED DEMOLITION SCOPE, INCLUDING
SITE UTILITIES.
19. AREAS AND OBJECTS IDENTIFIED AS "EXISTING TO REMAIN" , "NOT IN CONTRACT" ,
AND/OR "N.I.C." SHALL BE PROTECTED. ALL DAMAGE TO THESE AREAS RESULTING
FROM DEMOLITION ACTIVITIES WITHIN THIS CONTRACT SHALL BE RETURNED TO ITS
ORIGINAL STATE.
20. PROTECT EXISTING FIREPROOFING AND FIRE ASSEMBLIES AT LOCATIONS TO
REMAIN. DAMAGE DURING DEMOLITION ACTIVITIES SHALL BE REPAIRED TO CONFORM
TO ORIGINAL FIRE PROTECTION REQUIREMENTS, LABELS AND RATINGS.
21. DURING CONSTRUCTION AND RENOVATION ACTIVITES WITHIN THE BUILDING
MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION ZONE WHILE MAINTAINING
POSITIVE PRESSURE IN THE NON-CONSTRUCTION ZONE.
22. CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE DIRECTLY TO THE OUTSIDE.
DURING DEMOLITION AND NEW CONSTRUCTION ACTIVITIES TO MINIMIZE THE CHANCE
FOR AIR POLLUTION AND THE SPREAD OF MOLD ASPERGILLUS INTO THE HOSPITAL
VENTILATION SYSTEMS, AIR MONITORING IS REQUIRED AS INDICATED IN THE GENERAL
REQUIREMENTS AND CONSTRUCTION DOCUMENTS. ALL EXISTING RETURN AND SUPPLY
DUCTWORK IN THESE AREAS SHALL BE SECURELY CAPPED WITH SHEET METAL DURING
ALL CONSTRUCTION ACTIVITIES. THIS REQUIREMENT APPLIES TO ALL WORK AREAS.
23. COORDINATE WITH THE VA RESIDENT ENGINEER DEMOLITION WORK CAUSING
VIBRATION AND/OR NOISE DISRUPTIVE TO THE HOSPITAL FUNCTIONS AS DEEMED SUCH
BY THE VA CONTRACTING OFFICER AND/OR VA RESIDENT ENGINEER SHALL BE
SCHEDULED AFTER HOURS.
24. THE FACILITY SHALL BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS. REVIEW DAILY THE STATUS OF WEATHER TIGHT CONDITIONS AND TAKE
ACTIONS NECESSARY TO MAINTAIN CONTINUOUS WEATHER TIGHT CONDITIONS
TWENTY-FOUR HOURS A DAY FOR DURATION OF THE PROJECT.
25. RELOCATE ROOF DRAINS ALONG THE DEMOLITION LINE. RELOCATE AND RE-SLOPE
ROOF TO NEW DRAIN LOCATIONS.
26. REMOVE EXISTING CEILING AND CEILING SUPPORT SYSTEM WHERE NEW CEILINGS
ARE INDICATED, UNLESS OTHERWISE NOTED.
27. REMOVE EXISTING FINISHES AS REQUIRED PER FINISH MANUFACT- URER'S
PRINTED INSTRUCTIONS TO ACCOMMODATE INSTALLATION OF NEW FINISHES. SEE
FINISH SCHEDULE FOR NEW FINISHES.
28. CONTRACTOR SHALL PROVIDE FOR AND MAINTAIN SAFETY AND INFECTION
CONTROL REQUIREMENTS AS PER SPECIFICATION SECTION 01 35 26 SAFETY
REQUIREMENTS.
29. CONTRACTOR SHALL PROVIDE FOR AND MAINTAIN "CLASS III REQUIREMENTS" FOR
SEPARATION BETWEEN ALL CONSTRUCTION AREAS AND THE EXISTING FACILITY
(BUILDING 74 - ACUTE SCI) THROUGHOUT ALL CONSTRUCTION ACTIVITIES AND
THROUGHOUT ALL CONSTRUCTION PHASES AS PER SPECIFICATION SECTION 01 35 26
SAFETY REQUIREMENTS.
30. AT DOOR OPENINGS WITHIN TEMPORARY CONSTRUCTION PARTITIONS, INSTALL
CLASS C, 45 MINUTE FIRE/SMOKE RATED DOORS WITH SELF-CLOSING DEVICES.
31. CONTRACTOR SHALL MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER
GUAGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED AS PER SPECIFICATION SECTION 01 35 26 SAFETY
REQUIREMENTS.
CONSTRUCTION
SEPARATION(CONTRACTOR TO
COORDINATE WITH CENTER
AREA OF DEMOLITION
DEMOLITION PLAN LEGEND
EXISTING CONSTRUCTION TO BE
DEMOLISHED
EXISTING CONSTRUCTION
TO REMAIN
D A
A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W b A -S
C I_
In te ri o r-
-C
E N
T R A L tb o n d .r v t
/2
/2
:2
:2
P
M
W:\309070b3A-SCI_Interior-2018-CENTRAL_tbond4749.rvt
74-AD-101g
CONSTRUCTION
VA-LTSCIF-D
TEAM
549-820B
TAB
ARCHITECTURAL - DEMOLITION FLOOR PLAN - BUILDING
74 - LEVEL 1 - AREA G
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
FULLY SPRINKLEREDBID PACKAGE B
SCALE: 1/8" = 1'-0"F6 DEMOLITION FLOOR PLAN - BUILDING 74 - LEVEL 1 - AREA G
0' 16'4' 8' 32'
NORTH
PLAN
BF
C
D
G
A E
AT
T S
XETE FO
S A
M
LAB
1 0 9 0 0
R E G
IS
TE
RED ARCH
ITE
C T
A
I F
A
T T
AI
O N x10.5 x10.5 x10 x10 x9.3 x9.3 x9 x9 x29 x29 x28.1 x28.1 x28 x28 x11.1 x11.1 xK xK
J.11
J.11 xJ.5 xJ.5 xJ xJ xH xH xG xG xF.4 xF.4 x25 x25 x26 x26 x27 x27 xLL xLL.8
DEMOLISH THIS PORTION OF
BUILDING 74 REF STRUCT FOR EXTENT
DEMOLISH THIS PORTION
OF BUILDING 74
REMOVE EXISTING PORTION OF
BUILT-UP ROOFING MATERIALS AND
PREPARE FOR NEW WORK- NEW
ROOF SLOPE AND NEW ROOF DRAIN
LOCATIONS..
REMOVE EXISTING PORTION OF
BUILT-UP ROOFING MATERIALS AND
PREPARE FOR NEW WORK- NEW
ROOF SLOPE AND NEW ROOF DRAIN
LOCATIONS.
EXISTING ROOF DRAINS TO REMAIN.
EXISTING
MECHANICAL ROOM
BLDG 74
EXISTING ROOF -
BLDG 74
RELOCATE EXISTING ROOF DRAINS.
PREPARE SERVICES FOR RELOCATION,
REFER TO SHEET 83-A-102f-DX
EXISTING BLDG 74
TO BE REMOVED
EXISTING BLDG 74
TO BE RENOVATED
EXISTING BLDG 74
TO BE REMOVED
EXISTING BLDG 74
TO BE RENOVATED
REMOVE CANOPY
EXISTING ROOF DRAINS TO
REMAIN.
PREPARE SERVICES ADJACENT TO
ROOF DRAINS - PATCH AND REPAIR
AS REQUIRED. REFER TO SHEET
83-A-102f-DX
RELOCATE EXISTING ROOF DRAINS.
PREPARE SERVICES FOR RELOCATION,
REFER TO SHEET 83-A-102f-DX
RELOCATE EXISTING ROOF DRAINS.
PREPARE SERVICES FOR RELOCATION,
REFER TO SHEET 83-A-102f-DX
EXISTING EXHAUST FAN TO REMAIN.
PREPARE FOR NEW WORK AND INSTALL NEW FLASHING AS REQUIRED
EXISTING ROOF -
BLDG 74
EXISTING VENT TO REMAIN.
PREPARE FOR NEW WORK AND
INSTALL NEW FLASHING AS REQUIRED
EXISTING ROOF CURB TO REMAIN
EXISTING ROOF PARAPET TO REMAIN
EXISTING CONTROL JOINT -
ROOF CURB TO REMAIN
EXISTING GRAVITY HOOD ;
REFER TO MECHANICAL DWGS
EXISTING ROOF DRAINS TO REMAIN
PREPARE SERVICES ADJACENT TO ROOF DRAINS-
PATCH AND REPAIR AS REQUIRED
REFER TO SHEET 83-A-102f-DX
EXISTING ROOF PARAPET TO REMAIN
xL xL
REMOVE SECURITY CAMERA
(REFER TO CAMERA NOTE - BELOW)
74-AD-201
D3
EXISTING POOL BELOW
BLDG 74
74-AD-201
B3
EXISTING ROOF DRAINS.
NOTE: GC TO DISCONNECT AND REMOVE ALL EXISTING ROOF AREA AND EXTERIOR
BUILDING MOUNTED SECURITY CAMERAS IMPACTED BY CONSTRUCTION /
DEMOLITION WORK WITHIN THE SCOPE OF BUILDING DEMOLITION AREA AND/OR
WITHIN PORTIONS OF EXISTING ROOF AREAS TO BE RENOVATED. COORDINATE
SUCH ACTIVITIES WITH VA RESIDENT ENGINEER AND VA LOCAL STATION POLICE
SERVICES, INCLUDING WHETHER OR NOT ANY SUCH SECURITY CAMERAS ARE TO BE
REINSTALLED IN THESE AREAS. IF REQUESTED, GC TO REINSTALL UP TO ONE SUCH
EXISTING CAMERA AS PER VA RESIDENT ENGINEER DETERMINATION AND
PLACEMENT. ALL SUCH IMPACTED EXISTING CAMERAS THAT WILL NOT BE
REINSTALLED WILL BE TURNED OVER TO THE VA RESIDENT ENGINEER.
GENERAL DEMOLITION PLAN NOTES
1. GENERAL CONTRACTOR REQUIRED TO COORDINATE ALL DEMOLITION PROVISIONS
WITH THE INFORMATION PROVIDED BY ALL DISCIPLINES IN THIS SET OF CONTRACT
DOCUMENTS.
2. GENERAL CONTRACTOR REQUIRED TO COORDINATE DEMOLITION ACTIVITES FOR ALL
TRADES. GENERAL CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING ELEMENTS
AND EQUIPMENT TO CONTINUE IN SERVICE. CONSULT "GENERAL REQUIREMENTS" AND
"SOLICITATION" FOR ADDITIONAL INFORMATION REGARDING SUCH PROTECTION AND
MAINTENANCE, AND FOR SYSTEM SHUTDOWN SCHEDULING AND ETC. COORDINATE ALL
SUCH ACTIVITIES WITH VA RESIDENT ENGINEER.
3. THE MAJOR PORTION OF THE EXISTING BUILDING WILL REMAIN ACTIVE DURING ALL
CONSTRUCTION AND DEMOLITION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE
ALL SYSTEM SHUT DOWNS WITH THE VA RESIDENT ENGINEER. THE CONTRACTOR SHALL
ALSO COORDINATE WITH THE VA RESIDENT ENGINEER FOR SCHEDULE, DURATION, AND
AREAS AFFECTED, AND SHALL RECEIVE VA APPROVAL PRIOR TO SHUT DOWN
COMMENCEMENT AND AS PER VA GENERAL REQUIREMENTS.
4. CONTRACTOR SHALL PRESERVE AND PROTECT FROM DAMAGE ALL STRUCTURES,
IMPROVEMENTS AND UTILITIES ON OR ADJACENT TO THE WORK SITE WHICH ARE NOT
INDICATED OR IMPLIED WITHIN THE SCOPE OF THE DOCUMENTS TO BE REMOVED
AND/OR THEIR SERVICE DISCONTINUED.
5. THE EXISTING AREAS TO REMAIN SHALL BE PROTECTED. ALL DAMAGE RESULTING
FROM WORK IN THIS CONTRACT SHALL BE RETURNED TO ITS ORIGINAL STATE, UNLESS
NOTED OTHERWISE.
6. CONTRACTOR SHALL EXERCISE REASONABLE CARE AS EXCAVATION PROCEEDS TO
MINIMIZE AND LIMIT DAMAGE TO ANY EXISTING CONDUIT, PIPING AND UNDERGROUND
APPURTENANCES THAT MAY BE ENCOUNTERED.
7. NOTIFY RESIDENT ENGINEER AND ARCHITECT OF UNEXPECTED SUBSURFACE
CONDITIONS.
8. THE VA RESERVES THE RIGHT AND SHALL BE GIVEN THE OPPORTUNITY TO CLAIM
ITEMS NO LONGER NEEDED WHETHER OR NOT THOSE ITEMS WERE SPECIFICALLY
NOTED FOR REMOVAL, RELOCATION, OR RETURN TO THE VA. ALL OTHER MATERIALS TO
BE REMOVED SHALL BE DISPOSED OF IN ACCORDANCE WITH APPLICABLE VA
REQUIREMEMTS, APPLICABLE CODES AND LOCAL ORDINANCES. COORDINATE ALL SUCH
CLAIMED ITEMS AND THEIR DISPOSITION WITH VA RESIDENT ENGINEER.
9. BEFORE WORK PROCEEDS IN A PARTICULAR AREA, CONTRACTOR SHALL REVIEW
FIELD CONDITIONS AND CRITICAL DIMENSIONS WITHIN SUCH WORK AREA AND NOTIFY
VA RESIDENT ENGINEER AND ARCHITECT OF ANY DISCREPANCIES BETWEEN
CONSTRUCTION DOCUMENTS AND EXISTING CONDITIONS.
10. MAINTAIN AND PROTECT EXISTING UTILITIES TO REMAIN IN SERVICE. IDENTIFY AND
PROTECT AGAINST DAMAGE DURING DEMOLITION. THE CONTRACTOR IS TO REFERENCE
RELEVANT DOCUMENTS FROM ALL DISCIPLINES AND TO NOTIFY VA RESIDENT
ENGINEER, ARCHITECT AND ENGINEER OF RECORD IF ANY UTILITIES ARE UNCOVERED
DURING THE DEMOLITION PHASE THAT ARE NOT INDENTIFIED IN DOCUMENTS PROVIDED.
11. PROVIDE TEMPORARY WEATHER PROTECTION FOR DURATION OF INSTALLATION OF
NEW CONSTRUCTION SO AS TO ENSURE THAT NO WATER LEAKAGE OR DAMAGE
OCCURS TO THE STRUCTURE OR AT INTERIOR AREAS OF THE EXISTING BUILDING.
REMOVE TEMPORARY WEATHER PROTECTION AT COMPLETION OF WORK.
12. THIS DRAWING IS ISSUED FOR THE PURPOSE OF ASSISTING THE CONTRACTOR TO
UNDERSTAND THE PROJECT SCOPE. IT SHALL REMAIN THE CONTRACTORS'
RESPONSIBILITY TO VISIT THE JOBSITE AND FAMILIARIZE THEMSELVES WITH THE
EXISTING CONDITIONS.
13. EXISTING CONCRETE SLABS INTENDED TO REMAIN SHALL BE REPAIRED AND
FLOATED LEVEL WITH SURROUNDING SLABS AND PREPARED TO RECEIVE NEW FINISH.
WHERE NO ADDED FINISH MATERIAL IS SCHEDULED OR NOTED FOR THE SLAB, FINISH
SHALL BE TO MATCH EXISTING ADJACENT CONCRETE FINISH.
14. THE PREMISES IN WHICH WORK IS BEING PERFORMED SHALL BE KEPT CLEAN AT
ALL TIMES.
15. REFER TO ELECTRICAL DOCUMENTS FOR ELECTRICAL RELATED DEMOLITION
SCOPE.
16. REFER TO PLUMBING DOCUMENTS FOR PLUMBING RELATED DEMOLITION SCOPE.
17. REFER TO MECHANICAL DOCUMENTS FOR MECHANICAL RELATED DEMOLITION
SCOPE.
18. REFER TO CIVIL DOCUMENTS FOR SITE RELATED DEMOLITION SCOPE, INCLUDING
SITE UTILITIES.
19. AREAS AND OBJECTS IDENTIFIED AS "EXISTING TO REMAIN" , "NOT IN CONTRACT" ,
AND/OR "N.I.C." SHALL BE PROTECTED. ALL DAMAGE TO THESE AREAS RESULTING
FROM DEMOLITION ACTIVITIES WITHIN THIS CONTRACT SHALL BE RETURNED TO ITS
ORIGINAL STATE.
20. PROTECT EXISTING FIREPROOFING AND FIRE ASSEMBLIES AT LOCATIONS TO
REMAIN. DAMAGE DURING DEMOLITION ACTIVITIES SHALL BE REPAIRED TO CONFORM
TO ORIGINAL FIRE PROTECTION REQUIREMENTS, LABELS AND RATINGS.
21. DURING CONSTRUCTION AND RENOVATION ACTIVITES WITHIN THE BUILDING
MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION ZONE WHILE MAINTAINING
POSITIVE PRESSURE IN THE NON-CONSTRUCTION ZONE.
22. CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE DIRECTLY TO THE OUTSIDE.
DURING DEMOLITION AND NEW CONSTRUCTION ACTIVITIES TO MINIMIZE THE CHANCE
FOR AIR POLLUTION AND THE SPREAD OF MOLD ASPERGILLUS INTO THE HOSPITAL
VENTILATION SYSTEMS, AIR MONITORING IS REQUIRED AS INDICATED IN THE GENERAL
REQUIREMENTS AND CONSTRUCTION DOCUMENTS. ALL EXISTING RETURN AND SUPPLY
DUCTWORK IN THESE AREAS SHALL BE SECURELY CAPPED WITH SHEET METAL DURING
ALL CONSTRUCTION ACTIVITIES. THIS REQUIREMENT APPLIES TO ALL WORK AREAS.
23. COORDINATE WITH THE VA RESIDENT ENGINEER DEMOLITION WORK CAUSING
VIBRATION AND/OR NOISE DISRUPTIVE TO THE HOSPITAL FUNCTIONS AS DEEMED SUCH
BY THE VA CONTRACTING OFFICER AND/OR VA RESIDENT ENGINEER SHALL BE
SCHEDULED AFTER HOURS.
24. THE FACILITY SHALL BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS. REVIEW DAILY THE STATUS OF WEATHER TIGHT CONDITIONS AND TAKE
ACTIONS NECESSARY TO MAINTAIN CONTINUOUS WEATHER TIGHT CONDITIONS
TWENTY-FOUR HOURS A DAY FOR DURATION OF THE PROJECT.
25. RELOCATE ROOF DRAINS ALONG THE DEMOLITION LINE. RELOCATE AND RE-SLOPE
ROOF TO NEW DRAIN LOCATIONS.
26. REMOVE EXISTING CEILING AND CEILING SUPPORT SYSTEM WHERE NEW CEILINGS
ARE INDICATED, UNLESS OTHERWISE NOTED.
27. REMOVE EXISTING FINISHES AS REQUIRED PER FINISH MANUFACT- URER'S
PRINTED INSTRUCTIONS TO ACCOMMODATE INSTALLATION OF NEW FINISHES. SEE
FINISH SCHEDULE FOR NEW FINISHES.
28. CONTRACTOR SHALL PROVIDE FOR AND MAINTAIN SAFETY AND INFECTION
CONTROL REQUIREMENTS AS PER SPECIFICATION SECTION 01 35 26 SAFETY
REQUIREMENTS.
29. CONTRACTOR SHALL PROVIDE FOR AND MAINTAIN "CLASS III REQUIREMENTS" FOR
SEPARATION BETWEEN ALL CONSTRUCTION AREAS AND THE EXISTING FACILITY
(BUILDING 74 - ACUTE SCI) THROUGHOUT ALL CONSTRUCTION ACTIVITIES AND
THROUGHOUT ALL CONSTRUCTION PHASES AS PER SPECIFICATION SECTION 01 35 26
SAFETY REQUIREMENTS.
30. AT DOOR OPENINGS WITHIN TEMPORARY CONSTRUCTION PARTITIONS, INSTALL
CLASS C, 45 MINUTE FIRE/SMOKE RATED DOORS WITH SELF-CLOSING DEVICES.
31. CONTRACTOR SHALL MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER
GUAGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED AS PER SPECIFICATION SECTION 01 35 26 SAFETY
REQUIREMENTS.
CONSTRUCTION
SEPARATION(CONTRACTOR TO
COORDINATE WITH CENTER
AREA OF DEMOLITION
DEMOLITION PLAN LEGEND
EXISTING CONSTRUCTION TO BE
DEMOLISHED
EXISTING CONSTRUCTION
TO REMAIN
D A
A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W
V A
-L T S C
IF
-D \3 b A -S
C I_
In te ri o r-
-c si e rr a .r v t
/2
/2
:0
:4
A
M
W:\VA-LTSCIF-D\309070b3A-SCI_Interior-2018-csierra.rvt
74-AD-102g
CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTION
VA-LTSCIF-D
TEAM
549-820B
TAB
ARCHITECTURAL - DEMOLITION FLOOR PLAN - BUILDING
74 - ROOF PLAN - AREA G
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
FULLY SPRINKLEREDBID PACKAGE BBID PACKAGE BBID PACKAGE BBID PACKAGE B
SCALE: 1/8" = 1'-0"F6 DEMOLITION FLOOR PLAN - BUILDING 74 - ROOF PLAN - AREA G 0' 16'4' 8' 32'
NORTH
PLAN
BF
C
D
G
A E
AT
T S
XETE FO
S A
M
LAB
1 0 9 0 0
R E G
IS
TE
RED ARCH
ITE
C T
A
I
F
A
T T
AI
O N
D A
A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN (NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W b A -S
C I_
In te ri o r-
-C
E N
T R A L tb o n d .r v t
/2
/2
:3
:1
P
M
W:\309070b3A-SCI_Interior-2018-CENTRAL_tbond4749.rvt
74-AD-201
CONSTRUCTION
VA-LTSCIF-D
TEAM
549-820B
TAB
ARCHITECTURAL - EXISTING ELEVATIONS - BUILDING 74
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
FULLY SPRINKLEREDBID PACKAGE B
BF
C
D
G
A E
SCALE: 1" = 1'-0"F6 EXISTING ELEVATION - CRAWLSPACE NORTH
SCALE: 1" = 1'-0"F3 EXISTING ELEVATION - CRAWLSPACE SOUTH
SCALE: 1" = 1'-0"F1 EXISTING ELEVATION - DOCK CLOSEUP
SCALE: 1" = 1'-0"B1 EXISTING ELEVATION - DOCK CORRIDOR
SCALE: 1" = 1'-0"D1 EXISTING ELEVATION - DOCK
SCALE: 1" = 1'-0"D3 EXISTING ELEVATION - ROOF EAST
SCALE: 1" = 1'-0"B3 EXISTING ELEVATION - ROOF WEST
SCALE : N.T.S
SCALE : N.T.S
SCALE : N.T.S
SCALE : N.T.S
SCALE : N.T.S
SCALE : N.T.S
SCALE : N.T.S
AT
T S
XETE FO
S A
M
LAB
1 0 9 0 0
R E G
IS
TE
RED ARCH
ITE
C T
A
I F
A
T T
AI
O N
LEVELB1
519' - 3"
LEVEL01
535' - 3" x11.1
CRAWL SPACE
2' - 0"
EXISTING BUILDING 74 TO BE REMOVED
REFER TO AD AND SD SHEETS
EXISTING BUILDING 74 TO REMAIN
PREPARE FOR NEW WORK
EXISTING BUILDING 74 TO BE REMOVEDEXISTING BUILDING 74 TO REMAIN
PREPARE FOR NEW WORK REFER TO AD AND SD SHEETS
2' - 0"
CORRIDOROFFICE
EXISTING ROOF STRUCTURE TO REMAIN;
REFER TO STRUCTURAL
REMOVE ROOF MEMBRANE FOR NEW WORK
RELOCATE EXISTING ROOF DRAINS
REMOVE EXISTING INTERIOR WALLS, DOORS,
CEILINGS, MECHANICAL DIFFUSERS, DUCTWORK,
CASEWORK, ELECTRICAL AND PLUMBING FIXTURES,
ROOF DRAINS, PIPES, EQUIPMENTS, ETC.;
PREPARE FOR NEW WORK
EXISTING FLOOR STRUCTURE TO REMAIN;
REFER TO STRUCTURAL
REMOVE ROOF STRUCTURE;
REFER TO STRUCTURAL
REFER TO MEP SHEETS
FOR ELECTRICAL, PLUMBING AND
MECHANICAL DEMOLITION AND NEW WORK
REFER TO AD AND SD SHEETS FOR DEMOLITION AT THIS AREA
REMOVE FLOOR STRUCTURE;
REFER TO STRUCTURAL
EXISTING RIGID INSULATION TO REMAIN
LEVELB1
519' - 3"
LEVEL01
535' - 3" x11.1
2' - 0"
2' - 0"
EXISTING BUILDING 74 TO BE REMOVED
REFER TO AD AND SD SHEETS
EXISTING BUILDING 74 TO BE REMOVED
REFER TO AD AND SD SHEETS
STORAGE
LOADING DOCK
WAITING
DISPENSING
1A-100B
REMOVE ROOF STRUCTURE;
REFER TO STRUCTURAL
REMOVE ROOF MEMBRANE FOR NEW WORK
RELOCATE EXISTING ROOF DRAINS
EXISTING ROOF STRUCTURE TO REMAIN;
REFER TO STRUCTURAL
REFER TO MEP SHEETS
FOR ELECTRICAL, PLUMBING AND
MECHANICAL DEMOLITION AND NEW WORK
REMOVE EXISTING INTERIOR WALLS, DOORS,
CEILINGS, MECHANICAL DIFFUSERS, DUCTWORK,
CASEWORK, ELECTRICAL AND PLUMBING FIXTURES,
ROOF DRAINS, PIPES, EQUIPMENTS, ETC.;
PREPARE FOR NEW WORKEXISTING FLOOR STRUCTURE TO REMAIN;
REFER TO STRUCTURAL
EXISTING CEILING TO REMAIN
EXISTING CONCRETE SLAB TO REMAIN;
REFER TO STRUCTURAL
EXISTING CONCRETE LOADING DOCK STRUCTURE
TO REMAIN; REFER TO STRUCTURAL REMOVE CONCRETE SLAB;
REFER TO STRUCTURAL
REMOVE CONCRETE LOADING DOCK STRUCTURE; REFER TO STRUCTURAL
REFER TO STRUCTURAL
REMOVE EXISTING STEEL STAIR AND HANDRAIL
REMOVE EXTERIOR WALL STRUCTURE; REFER TO STRUCTURAL
EXCAVATE FOR NEW WORK
REMOVE EXISTING CEILING AND WALL
EXISTING BUILDING 74 TO REMAIN
PREPARE FOR NEW WORK
EXISTING RIGID INSULATION TO REMAIN
D A
ST
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W
R e v it
L o ca l\ b A
-S C I_
In te ri o r-
-C
E N
T R A L c ry st a lm cm .r v t
/1
/2
:4 :5
P
M
W:\@RevitLocal\309070b3A-SCI_Interior-2018-CENTRAL_crystalmcm.rvt
74-AD-301
CONSTRUCTION
VA-LTSCIF-D
TEAM
549-820B
TAB
ARCHITECTURAL - DEMOLITION WALL SECTIONS -
BUILDING 74
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
FULLY SPRINKLEREDBID PACKAGE B
0' 8'2' 4' 16'
SCALE: 1/4" = 1'-0"F3 WALL SECTION - DEMOLITION BUILDING 74
SCALE: 1/4" = 1'-0"F6 WALL SECTION - DEMOLITION BUILDING 74
A T
T S
XETE FO
S A
M
LAB
1 0 9 0 0
R E G
IS
TE
RED ARCH
ITE
C T
A
I F
A
T T
AI
O N
CRAWL
SPACE
PUMP ROOM
ELECTRIC
STORAGE
UNIT SUB
STATION
STORAGE
EMERGANCY
GENERATOR
ROOM
ELEVATOR
ROOM
CORRIDOR
CORRIDOR
STROAGE
WORKROOM
WHEELCHAIR
CLINIC
ROOM
STAIR
x10.5 x10.5 x10 x10 x9.3 x9.3 x9 x9 x29 x29 x28.1 x28.1 x28 x28 x11.1 x11.1 xK
J.11 xJ.5 xJ xH xG xF.4 x27 x27 xLL xLL xLL.8 xLL.8
EXISTING BLDG 74
TO BE REMOVED
EXISTING BLDG 74
TO BE RENOVATED
EXISTING BLDG 74
TO BE REMOVED
EXISTING BLDG 74
TO BE RENOVATED
REMOVE EXISTING
PLASTER CEILING
AND LIGHT FIXTURES
REMOVE EXISTING SUSPENDED
CEILING AND LIGHT FIXTURES
REFER TO MEP DWGS FOR
DEMOLITION WORK
AT THIS AREA
EXISTING CONCRETE STRUCTURE TO REMAIN
EXISTING EXPOSED CEILING
EXISTING EXPOSED CEILING
EXISTING CEILING
TO REMAIN
xL xL
EXISTING CEILING
TO REMAIN
PATCH AS REQUIRED
COORDINATE PLACEMENT AND INSTALL ONE HOUR FIRE RATED
CONSTRUCTION BARRIERS (FROM FLOOR SLAB TO UNDERSIDE OF
CONCRETE DECK ABOVE.) MINIMIZE DISRUPTION TO EXISTING
LIGHTING, CEILING AND HVAC SYSTEMS IN EXISTING AREAS TO
REMAIN. MAINTAIN OPERATION FOR LIGHTING AND HVAC PROVISIONS
THROUGHOUT CONSTRUCTION ACTIVITES IN EXISTING AREAS TO
REMAIN. RESTORE CEILING, LIGHTING AND HVAC SYSTEMS TO
ORIGINAL AND OPERATIONAL CONDITION WHEN TEMPORARY
CONSTRUCTION BARRIERS REMOVED AT THE COMPLETION OF
CONSTRUCTION (TYPICAL).
COORDINATE PLACEMENT AND INSTALL ONE HOUR FIRE
RATED CONSTRUCTION BARRIER (FROM FLOOR SLAB TO
UNDERSIDE OF CORRIDOR CEILING.) MINIMIZE DISRUPTION
TO EXISTING LIGHTING, CEILING AND HVAC SYSTEMS IN
EXISTING AREAS TO REMAIN. MAINTAIN OPERATION FOR
LIGHTING AND HVAC PROVISIONS THROUGHOUT
CONSTRUCTION ACTIVITES IN EXISTING AREAS TO REMAIN.
RESTORE CEILING, LIGHTING AND
HVAC SYSTEMS TO ORIGINAL AND OPERATIONAL
CONDITION WHEN TEMPORARY CONSTRUCTION BARRIERS
REMOVED AT THE COMPLETION OF CONSTRUCTION
(TYPICAL).
GENERAL DEMOLITION RCP NOTES
1. GENERAL CONTRACTOR REQUIRED TO COORDINATE ALL DEMOLITION
PROVISIONS WITH THE INFORMATION PROVIDED BY ALL DISCIPLINES IN THIS SET OF
CONTRACT DOCUMENTS.
2. GENERAL CONTRACTOR REQUIRED TO COORDINATE DEMOLITION ACTIVITES FOR
ALL TRADES. GENERAL CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING
ELEMENTS AND EQUIPMENT TO CONTINUE IN SERVICE. CONSULT "GENERAL
REQUIREMENTS" AND "SOLICITATION" FOR ADDITIONAL INFORMATION REGARDING
SUCH PROTECTION AND MAINTENANCE, AND FOR SYSTEM SHUTDOWN SCHEDULING
AND ETC. COORDINATE ALL SUCH ACTIVITIES WITH VA RESIDENT ENGINEER.
3. THE MAJOR PORTION OF THE EXISTING BUILDING WILL REMAIN ACTIVE DURING ALL
CONSTRUCTION AND DEMOLITION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE
ALL SYSTEM SHUT DOWNS WITH THE VA RESIDENT ENGINEER. THE CONTRACTOR
SHALL ALSO COORDINATE WITH THE VA RESIDENT ENGINEER FOR SCHEDULE,
DURATION, AND AREAS AFFECTED, AND SHALL RECEIVE VA APPROVAL PRIOR TO
SHUT DOWN COMMENCEMENT AND AS PER VA GENERAL REQUIREMENTS.
4. THE EXISTING AREAS TO REMAIN SHALL BE PROTECTED. ALL DAMAGE RESULTING
FROM WORK IN THIS CONTRACT SHALL BE RETURNED TO ITS ORIGINAL STATE,
UNLESS NOTED OTHERWISE.
5. THE VA RESERVES THE RIGHT AND SHALL BE GIVEN THE OPPORTUNITY TO CLAIM
ITEMS NO LONGER NEEDED WHETHER OR NOT THOSE ITEMS WERE SPECIFICALLY
NOTED FOR REMOVAL, RELOCATION, OR RETURN TO THE VA. ALL OTHER MATERIALS
TO BE REMOVED SHALL BE DISPOSED OF IN ACCORDANCE WITH APPLICABLE VA
REQUIREMEMTS, APPLICABLE CODES AND LOCAL ORDINANCES. COORDINATE ALL
SUCH CLAIMED ITEMS AND THEIR DISPOSITION WITH VA RESIDENT ENGINEER.
6. BEFORE WORK PROCEEDS IN A PARTICULAR AREA, CONTRACTOR SHALL REVIEW
FIELD CONDITIONS AND CRITICAL DIMENSIONS WITHIN SUCH WORK AREA AND NOTIFY
VA RESIDENT ENGINEER AND ARCHITECT OF ANY DISCREPANCIES BETWEEN
CONSTRUCTION DOCUMENTS AND EXISTING CONDITIONS.
7. PROVIDE TEMPORARY WEATHER PROTECTION FOR DURATION OF INSTALLATION
OF NEW CONSTRUCTION SO AS TO ENSURE THAT NO WATER LEAKAGE OR DAMAGE
OCCURS TO THE STRUCTURE OR AT INTERIOR AREAS OF THE EXISTING BUILDING.
REMOVE TEMPORARY WEATHER PROTECTION AT COMPLETION OF WORK.
8. THIS DRAWING IS ISSUED FOR THE PURPOSE OF ASSISTING THE CONTRACTOR TO
UNDERSTAND THE PROJECT SCOPE. IT SHALL REMAIN THE CONTRACTORS'
RESPONSIBILITY TO VISIT THE JOBSITE AND FAMILIARIZE THEMSELVES WITH THE
EXISTING CONDITIONS.
9. THE PREMISES IN WHICH WORK IS BEING PERFORMED SHALL BE KEPT CLEAN AT
ALL TIMES.
10. AREAS AND OBJECTS IDENTIFIED AS "EXISTING TO REMAIN" , "NOT IN
CONTRACT" , AND/OR "N.I.C." SHALL BE PROTECTED. ALL DAMAGE TO THESE AREAS
RESULTING FROM DEMOLITION ACTIVITIES WITHIN THIS CONTRACT SHALL BE
RETURNED TO ITS ORIGINAL STATE.
11. PROTECT EXISTING FIREPROOFING AND FIRE ASSEMBLIES AT LOCATIONS TO
REMAIN. DAMAGE DURING DEMOLITION ACTIVITIES SHALL BE REPAIRED TO CONFORM
TO ORIGINAL FIRE PROTECTION REQUIREMENTS, LABELS AND RATINGS.
12. DURING CONSTRUCTION AND RENOVATION ACTIVITES WITHIN THE BUILDING
MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION ZONE WHILE MAINTAINING
POSITIVE PRESSURE IN THE NON-CONSTRUCTION ZONE.
13. COORDINATE WITH THE VA RESIDENT ENGINEER DEMOLITION WORK CAUSING
VIBRATION AND/OR NOISE DISRUPTIVE TO THE HOSPITAL FUNCTIONS AS DEEMED
SUCH BY THE VA CONTRACTING OFFICER AND/OR VA RESIDENT ENGINEER SHALL BE
SCHEDULED AFTER HOURS.
14. REMOVE EXISTING CEILING AND CEILING SUPPORT SYSTEM WHERE NEW
CEILINGS ARE INDICATED, UNLESS OTHERWISE NOTED.
15. REMOVE EXISTING FINISHES AS REQUIRED PER FINISH MANUFACT- URER'S
PRINTED INSTRUCTIONS TO ACCOMMODATE INSTALLATION OF NEW FINISHES. SEE
FINISH SCHEDULE FOR NEW FINISHES.
16. CONTRACTOR SHALL PROVIDE FOR AND MAINTAIN SAFETY AND INFECTION
CONTROL REQUIREMENTS AS PER SPECIFICATION SECTION 01 35 26 SAFETY
REQUIREMENTS.
17. CONTRACTOR SHALL PROVIDE FOR AND MAINTAIN "CLASS III REQUIREMENTS"
FOR SEPARATION BETWEEN ALL CONSTRUCTION AREAS AND THE EXISTING FACILITY
(BUILDING 74 - ACUTE SCI) THROUGHOUT ALL CONSTRUCTION ACTIVITIES AND
THROUGHOUT ALL CONSTRUCTION PHASES AS PER SPECIFICATION SECTION 01 35 26
SAFETY REQUIREMENTS.
18. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
19. CONTRACTOR SHALL MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER
GUAGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED AS PER SPECIFICATION SECTION 01 35 26 SAFETY
REQUIREMENTS.
20. CONSTRUCTION DUST CONTROL ABATEMENT SHALL BE PROVIDED DURING
ABOVE CEILING WORK. CONSTRUCTION DUST CONTROL ABATEMENT SHALL NOT
INTERFERE WITH THE AIR FLOW AND BALANCE OF MECHANICAL SYSTEMS..
CONSTRUCTION
SEPARATION(CONTRACTOR TO
COORDINATE WITH CENTER
AREA OF DEMOLITION
DEMOLITION RCP LEGEND
EXISTING CONSTRUCTION
TO BE DEMOLISHED
EXISTING CONSTRUCTION
TO REMAIN
EXISTING SUSPENDED CEILING
TO BE DEMOLISHED
D A
A
M P
Drawing Title
Approved Project Director:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
PSP 309070 Revisions Date
ARCHITECT/ENGINEERS: Office of
Construction and Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FILE NAME
Project Abbreviation
F
E
D
C
B
A
F
IL
E N
A M
E
KEY PLAN
FULLY SPRINKLERED
(NOT TO SCALE)
Page Southerland Page, LLP.
1800 Main Street Suite 123
Dallas, TX 75201 pagethink.com
TEL
FAX
ARCHITECTURE / ENGINEERING / INTERIORS / CONSULTING
Austin / Dallas / Denver / Houston / Washington DC /
International Affiliate Offices
214 522 3900
214 522 4380
DWG
W b A -S
C I_
In te ri o r-
-C
E N
T R A L tb o n d .r v t
/2
/2
:4
:1
P
M
W:\309070b3A-SCI_Interior-2018-CENTRAL_tbond4749.rvt
74-ACD-1B1g
CONSTRUCTION
VA-LTSCIF-D
TEAM
549-820B
TAB
ARCHITECTURAL - DEMOLITION REFLECTED CEILING
PLAN -BUILDING 74 - LEVEL B1 - AREA G
LONG TERM SPINAL CORD INJURY
VA NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER RD. DALLAS, TX 75216OFFICE OF CONSTRUCTION AND FACILITIES
MANAGEMENT DIRECTOR, CENTRAL REGION
06 MAY 2021
FULLY SPRINKLEREDBID PACKAGE B
SCALE: 1/8" = 1'-0"F6 DEMOLITION REFLECTED CEILING PLAN - LEVEL B1 - AREA G 0' 16'4' 8' 32'
NORTH
PLAN
BF
C
D
G
A E
AT
T S
XETE FO
S A
M
LAB
1 0 9 0 0
R E G
IS
TE
RED ARCH
ITE
C T
A
I F
A
T T
AI
O N
MEN'S
1A-113
WOMEN'S
1A-115
Q.A.
OFFICE
1A-100A
DISPENSING
1A-100B
CONSULT
1A-100C
PHARMACY
1A-100
VAULT
1A-100F
OFFICE
1A-100E
STORAGE
1A-142A
STORAGE
1A-100H
I.V.A.D.
1A-100G
RECEPTION
1A-142
OFFICE
1A-142B
OFFICE
1A-142C
OFFICE
1A-142D
OFFICE
1A-142E
H.V.C.
1A-140
OFFICE
1B-106
OFFICE
1B-106A
CONFERENCE
RM.
1B-106B
DARK
RM.
1D-120B
LIGHT
RM.
1D-120A
DARK
RM.
1D-120
B
SCRUB
RM.
C1-13A
CHEF,
GU
1D-119
BEDROOM
1C-100
BATH
RM.
1C-104A
BATH
RM.
1C-100A
BEDROOM/
1C-104
BEDROOM/
1C-108
MALE
TOILET
1B-101
HYDRO
THERAPY
1B-204
VISITOR
WAITING
1B-220
EQUIP.
STORAGE
1B-224A
C. LINEN
1C-101
C.
UTILITY
1C-103
ELECTRICAL
1C-123
H.A.C.
1C-171
EQUIP.
STORAGE
1C-173
NOUR.
1C-127
EQUIP.
STORAGE
1C-125
ELECTRICAL
1B-100
DRESSING
RM.
1D-117
S.
UTILITY
1D-105
TOILET
1D-107
PSYCHOLOGY
INTERN
1B-102STAFF
PHYSICIAN
1B-104
SOCIAL
WORK
1B-108
SOICAL
WORK
1B-110
PSYCHOLOGIST
1B-114
CHIEF
1B-120B
TELEPHONE
1B-116
VESTIBULE
1A-102B
WAITING
PVA
OFFICE
SECRETARY
1A-102
PVA
OFFICE
SERVICE
OFFICER
1A-102A
CONFERENCE
ROOM
1A-101
OUTPATIENT
COORD
1A-103
LIVING/DINING
1D-142
HALLWAY
1D-142G
UTILITY
ROOM
1D-142B
BATH
RM.
1D-142E
PHSY
EXAM
1D-140
CLOSET
1D-142F
CLOSET
1D-142D
BEDROOM
1D-142C
EXAM/TREAT
1D-134
EXAM/TREAT
1D-138
NURSE
STATION
C1-105A
KITCHEN
1D-142A
HAC
1D-136
EXAM/TREAT
1D-133
EXAM/TREAT
1D-127
PHSY
EXAM
1D-125 NEURO
EXAM
1D-191
OFFICE
1D-100
CLEAN
UTILITY
1D-103
FEMALE
TOILET
1B103
PHYSICAL
THERAPY
1B-208
CLEAN
UTILITY
1B-208D
SOILED
UTILITY
1B-108C
TOILET
1B-108B
STAIR
OCCUPATIONAL
THERAPY
1B-224
NURSE
STATION
MEDICATION
1C-133
CHASE
ROOM
1B-139
TOILET
1C-129A
S.
UTILITY
1C-167
SHOWER
ROOM
1C-139
TUB RM
1C-139B x10.5 x10.5 x10 x10 x9.3 x9.3 x9 x9 x29 x29 x28.1 x28.1 x28 x28 x11.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .