36C10F19R0003-022.pdf
PDF 856 KB Posted
- Solicitation number
- 36C10F19R0003
About this file
36C10F19R0003 COMBINED PLUMBING.pdf
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
ICEU
P
D N
U P
D N
EXISTING BUILDING 1
2ND FLOOR
AREA W
LV
LA
G
LV
LA
G
LV
LA
G
G LA
LV
G
LA
LV
G
LA
LV
G
LA
LV
S T
12.8 x.7x.6x.5x.4 x.17x.16x.14 x.2 x.C
EA
6.5
FE E.7
S T
ST
S T
O
F D
E.6 x.J x.L x.N x.12 x.13
12.8 x.6x.5x.4 x.16x.14 x.2 x.1 x.C
EA
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - JANUARY 30, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
PLD-101
646CA2500.23
MPBER
PLUMBING DEMOLITION
FLOOR PLANS
VAPHS UNIVERSITY DRIVE
1 & 30
1/8" = 1'-0"1
BUILDING 1 - 2ND FLOOR PLUMBING DEMOLTION PLAN
1 DISCONNECT, REMOVE AND RELOCATE EX. 3" V. PIPING
LOCATED BELOW EXISTING WALKWAY. REFER TO NEW WORK
PLAN FOR NEW LOCATION.
DISCONNECT AND REMOVE EX. 4" ST. & 4" ST. (OFD) PIPING
LOCATED BELOW EXISTING WALKWAY.
DISCONNECT AND REMOVE EX. 4" VRC (OFD).
DISCONNECT AND REMOVE EX. 4" VRC.
PLUMBING KEYED NOTES
1/8" = 1'-0"3
BUILDING 30 - 2ND FLOOR PLUMBING DEMOLITION PLAN
1/8" = 1'-0"2
BUILDING 1 - 1ST FLOOR PLUMBING DEMOLITION PLAN
EX. 3" V. UP
FROM FL. BLW.
EX. 3" V. UP
TO 3" VTR.
EX. 6" VRC.
DN.
DISCONNECT AND REMOVE EX. 4" VRC (OFD) TO POINT OF
DISCONNECT TO EX. 6" ST. (OFD) LOCATED AT THE GROUND FL.
CEILING.
DISCONNECT AND REMOVE EX. 4" ST. PIPING (LOCATED AT 1ST.
FL. CEILING) TO POINT OF DISCONNECT FROM TO EX. 6" VRC.
DISCONNECT AND REMOVE EX. 4" S. PIPING ABOVE CEILING
SERVING DEMOLISHED WATER CLOSET ON FL. ABOVE. CAP PIPING
GAS-TIGHT AT POINT OF DISCONNECTION FROM EX. 4" SS.
DISCONNECT AND REMOVE EX. CW. PIPING ABOVE CEILING SERVING
DEMOLISHED FIXTURES ON FL. ABOVE. CAP PIPING GAS-TIGHT AT
POINT OF DISCONNECTION AT EX. SHUT-OFF VALVE.
9 DISCONNECT AND REMOVE EX. W. PIPING ABOVE CEILING SERVING
DEMOLISHED LAVATORY ON FL. ABOVE. CAP PIPING GAS-TIGHT AT
POINT OF DISCONNECTION.
10 DISCONNECT, REMOVE AND RELOCATE EX. 4" V AND VTR -
REFER TO NEW WORK PLAN FOR NEW LOCATION.
10 11 DISCONNECT, REMOVE AND RELOCATE EX. CW. RISER. REFER
TO NEW WORK PLAN FOR NEW LOCATION.
12 DISCONNECT AND REMOVE EX. CW., HW. & W. PIPING ABOVE
CEILING SERVING DEMOLISHED SINK ON FL. ABOVE. CAP PIPING
GAS-TIGHT AT POINT OF DISCONNECTION.12
13 DISCONNECT AND REMOVE EX. LV, LA & G. RISERS AND
ASSOCIATED PIPING ABOVE CEILING. CAP PIPING GAS-TIGHT AT
POINT OF DISCONNECTION AT EX. SHUT-OFF VALVES.
14 DISCONNECT AND REMOVE EX. W. PIPING ABOVE CEILING SERVING
DEMOLISHED SINK ON FL. ABOVE. CAP PIPING GAS-TIGHT AT POINT
OF DISCONNECTION.
15 DISCONNECT AND REMOVE EX. LV., LA., & G. ZONE VALVE BOXES
AND ALL ASSOCIATE PIPING.
15 15
16 DISCONNECT AND REMOVE EX. LV., LA., & G. RISERS AND ALL
ASSOCIATE PIPING.
17 DISCONNECT AND REMOVE ALL EX. LV., LA., & G. PIPING ABOVE
CEILING.
18 DISCONNECT AND REMOVE EX. WATER CLOSET AND ALL
ASSOCIATED PIPING NO LONGER REQUIRED TO REMAIN AS PART
OF AN ACTIVE SYSTEM. CAP PIPING GAS TIGHT AT POINT OF
DISCONNECTIONS.
19 DISCONNECT AND REMOVE EX. LAVATORY AND ALL ASSOCIATED
PIPING NO LONGER REQUIRED TO REMAIN AS PART OF AN ACTIVE
SYSTEM. CAP PIPING GAS TIGHT AT POINT OF DISCONNECTIONS.
20 DISCONNECT AND REMOVE EX. SINK, EYE WASH AND ALL
ASSOCIATED PIPING NO LONGER REQUIRED TO REMAIN AS PART
OF AN ACTIVE SYSTEM. CAP PIPING GAS TIGHT AT POINT OF
DISCONNECTIONS.
21 DISCONNECT AND REMOVE EX. SINK AND ALL ASSOCIATED PIPING
NO LONGER REQUIRED TO REMAIN AS PART OF AN ACTIVE
SYSTEM. CAP PIPING GAS TIGHT AT POINT OF DISCONNECTIONS.
22 DISCONNECT, REMOVE & RELOCATED EX. CW. & HW. RISERS.
REFER TO NEW WORK PLAN FOR NEW LOCATION.
EX. 4" VRC.
EX. 4" ST. DN. FROM
EX. 4" RD. ABV.
CUT AND CAP ALL PLUMBING PIPING BACK TO THE MAIN LATERAL
TO ENSURE NO DEAD LEGS OR ENDS ARE CREATED.
GENERAL PLUMBING DEMOLITION NOTES:
1.
23 REMOVE EXISTING FLOOR DRAIN AND RELATED PIPING. CAP AT
MAIN AS REQUIRED.
24 DISSCONNECT AND REMOVE EXISTING 3" S. PIPING ABOVE
CEILING SERVING DEMOLISHED FLOOR DRAIN ON FLOOR ABOVE.
REMOVE PIPING BACK TO THE MAIN.
COORDINATE ALL NEW AND DEMOLITION WORK REQUIRED WITH
EXISTNG USERS TO KEEP AREAS OF WORK UP AND RUNNING IN
CASE OF POSSIBLE SHUTDOWNS AND OR DISRUPTIONS.
2.
25 REMOVE AND RE-ROUTE EXISTING 3/4" CW. PIPING SERVING THE
HOSE BIBB AS REQUIRED.
1 AMENDMENT 3 01-31-17
ABBREVIATIONS
P101
WR
SECTION INDICATOR
TOP INDICATES SECTION NUMBER
BOTTOM INDICATES DRAWING NUMBER
STORM
STORM - EXISTING
STORM - DEMO
WASTE
WASTE - EXISTING
WASTE - DEMO
VENT - DEMO
VENT - EXISTING
VENT
HOT WATER RETURN - DEMO
HOT WATER RETURN
HOT WATER RETURN - EXISTING
HOT WATER - EXISTING
HOT WATER
HOT WATER - DEMO
COLD WATER - DEMO
COLD WATER
COLD WATER - EXISTING
BACKFLOW PREVENTER (BFP)
SLEEVE
WATER HAMMER ARRESTER (LETTER
INDICATES SIZE)
WR
ELBOW DOWN
ELBOW UP
DROP OR RISE
VALVE - PRESSURE-TEMPERATURE RELIEF (PRV)
PLUG END OF PIPE
AQUASTAT
"A"
A
PRESSURE GAUGE WITH GAUGE COCK (PG)
THERMOMETER
STRAINER
CLEANOUT - WALL
CO CLEANOUT
DRAIN - FLOOR
DRAIN - ROOF
WH
HB
WALL HYDRANT - NON-FREEZE
HOSE BIB
VALVE - PRESSURE REDUCING (PRV)
VALVE - ANGLE
PLUG VALVE
UNION
PIPE ANCHOR
DIRECTION OF FLOW
PIPE GUIDE
CAPPED PIPING
VALVE - CHECK (SHOWN W/FLOW)
VALVE - BALANCING
VALVE - OS&Y
VALVE - SAFETY/RELIEF
VALVE - SOLENOID
VALVE - GAS PRESSURE REGULATOR
UNDERGROUND SANITARY OR STORM
UNDERGROUND SANITARY OR STORM EXISTING
UNDERGROUND SANITARY OR STORM DEMO
UNDERGROUND VENT DEMO
UNDERGROUND VENT EXISTING
UNDERGROUND VENT
CLEANOUT - FLOORFCO
DRAIN - FLOOR
DRAIN - TRENCH
SYMBOLS
GENERAL NOTES
INDIRECT WASTE
INDIRECT WASTE - EXISTING
INDIRECT WASTE - DEMO
ABV ABOVE
AC AIR COMPRESSOR
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AP ACCESS PANEL
ATM ATMOSPHERE
AUTO AUTOMATIC
B/S BELOW SLAB
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BOB BOTTOM OF BEAM
BOP BOTTOM OF PIPE
BTU BRITISH THERMAL UNIT
BV BALL VALVE
CA COMPRESSED AIR
CALC CALCULATE
CAP CAPACITY
CLG CEILING
CM CENTIMETER
CO CLEANOUT
COL COLUMN
COMPR COMPRESSOR
CONC CONCRETE
CV CHECK VALVE
CW COLD WATER
DCV DOUBLE CHECK VALVE
DIA DIAMETER
DIM DIMENSION
DN DOWN
DR DRAIN
DS DOWNSPOUT OR RAIN LEADER
DW DISHWASHER
DWG DRAWING
DHW DOMESTIC HOT WATER
EA EACH
EF EXISTING FIXTURE TO REMAIN
EFF EFFICIENCY
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV. ELEVATION
EQUIP EQUIPMENT
ES EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
EXP EXPANSION
F FAHRENHEIT
FA FIRE ALARM
FCO FLOOR CLEANOUT
FD1,2,3...FLOOR DRAIN
FF FINISHED FLOOR
FH FUME HOOD
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH OR FLOOR SINK
FT FOOT/FEET
FV FLUSH VALVE
G NATURAL GAS
GC GENERAL CONTRACTOR
GCO GRADE OR GROUND CLEANOUT
GI GREASE INTERCEPTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GTV GATE VALVE
GW GARAGE WASTE
H HYDROGEN PIPING
HB HOSE BIBB
HD HEAD OR HUB DRAIN
HE HELIUM PIPING
HP HORSEPOWER OR HIGH POINT
HR HOUR
HS HOSE STATION
HVAC HEATING-VENTILATION-AIR CONDITIONING
HW HOT WATER
HWR HOT WATER RETURN
HYD HYDRAULIC
HZ HERTZ
IC INSULATING COUPLING
ID INDIRECT DRAIN
IM ICE MACHINE
IN INCHES
INSUL INSULATION
INV. ELEV. INVERT ELEVATION
IW INDIRECT WASTE
IWH INTERIOR WALL HYDRANT
KEC KITCHEN EQUIPMENT CONTRACTOR
KW KITCHEN WASTE
L LAVATORY
LA LABORATORY AIR
LBS POUNDS
LP LIQUID PROPANE
LPA LINE PRESSURE ALARM
LPG LIQUID PROPANE GAS
LPM LITERS PER MINUTE
LPT LOW POINT
LSK LAB SINK
LT LAUNDRY TUB
LV LABORATORY VACUUM
LW LAUNDRY WASTE OR LAB WASTE
LWH LAB WATER HEATER
MAX MAXIMUM
MD MAIN DRAIN
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM OR MINUTES
MM MILLIMETER
MS MOP SINK
MTD MOUNTED
MV MEDICAL VACUUM
N.C. NORMALLY CLOSED
NIC NOT IN CONTRACT
NO. NUMBER
N.O. NORMALLY OPEN
NTS NOT TO SCALE
OBY OIL BASIN VENT
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OM OXYGEN MANIFOLD
OS&Y OUTSIDE SCREW AND YOKE
PBV PRESSURE BALANCING VALVE
PC PLUMBING CONTRACTOR
PG PRESSURE GAUGE
PH PENTHOUSE OR PHASE
PITCH PITCHES UP OR DOWN
PIV POST INDICATOR VALVE
PKG PACKAGE
POCPOINT OF CONNECTION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
QTY QUANTITY
RD ROOF DRAIN
ROBROD OUT BASIN
RP RECIRCULATING PUMP
RPM REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE ZONE
RTU ROOF TOP UNIT
SAN SANITARY SEWER (EXTERIOR)
SB SETTLING BASIN
S.F. SQUARE FOOT
SH SHOWER
SK SINK
SL SLOPE
SMP SUMP PUMP
SP STANDPIPE
SQ SQUARE
SS SERVICE SINK
SSS SURGEONS SCRUB SINK
ST STORM SEWER
STK STACK
SYS SYSTEM
T&P TEMPERATURE AND PRESSURE
TB THRUST BLOCK
TD TRENCH DRAIN
TEMP TEMPERATURE
TH THERMOMETER
TMV THERMOSTATIC MIXING VALVE
TOB TRIPLE OIL BASIN
TW TEMPERED WATER
TYP TYPICAL
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UR URINAL
V VENT
VB VACUUM BREAKER
VEL VELOCITY
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THRU ROOF
W WASTE (INTERIOR)
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WCO WALL CLEANOUT
WF WASH FOUNTAIN OR WATER FILTER
WH WALL HYDRANT
WM WATER METER
WR WATER RISER
YH YARD HYDRANT
YCO YARD CLEANOUT
ZVB ZONE VALVE BOX
DEMOLITION NOTES
VALVE - BALL
VALVE - CONTROL
CLEANOUT - GROUNDGCO
P-TRAP
DROP OFF BOTTOM
EXPANSION JOINT
FLEXIBLE CONNECTION
WATER METER
EXPANSION LOOP
VENT THRU ROOF
ZONE VALVE BOX
WASHING MACHINE SUPPLY AND DRAIN BOX
KEYED NOTE TAG - DEMOLITION
M
X
(E)XXX
EXISTING EQUIPMENT TAG
EXISTING
AREA MATCHLINE1. DEMOLITION INFORMATION SHOWN ON THE DRAWINGS IS BASED
ON EXISTING DRAWINGS AND A REVIEW OF THE EXISTING CONDITIONS.
2. PERFORM ALL WORK OF A DEMOLITION NATURE THAT MAY BE
REQUIRED OR NECESSARY FOR A FULL AND COMPLETE EXECUTION
OF THE WORK, WHETHER OR NOT SHOWN OR SPECIFIED. THE
EXACT EXTENT OF DEMOLITION MAY NOT BE FULLY INDICATED BY
THE DRAWINGS. DETERMINE THE NATURE AND EXTENT OF
DEMOLITION THAT WILL BE NECESSARY BY COMPARING THE
CONTRACT DOCUMENTS WITH THE EXISTING FIELD CONDITIONS
PRIOR TO BIDS.
3. MATERIALS AND EQUIPMENT TO BE SALVAGED OR REUSED SHALL
BE IDENTIFIED BY THE OWNER. THESE ITEMS ARE THE PROPERTY
OF THE OWNER AND SHALL BE RETURNED TO THE OWNERS
DESIGNATED STORAGE AREA. WHERE REMOVAL IS REQUIRED THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CARE TAKEN DURING
THE HANDLING OF THESE ITEMS.
4. DEMOLISHED MATERIALS AND EQUIPMENT NOT BEING SALVAGED
OR REUSED, SHALL BECOME THE PROPERTY OF THE CONTRACTOR
AND REMOVED FROM THE SITE AND LEGALLY DISPOSED OF.
5. WHERE EXISTING FIXTURES ARE INDICATED TO BE DEMOLISHED.
THIS SHALL INCLUDE ALL ASSOCIATED PIPING, CARRIERS, SUPPORTS,
SLEEVES, HANGERS, FITTINGS, AND OTHER ACCESSORIES. PIPING
SHALL BE REMOVED TO A LOCATION ABOVE CEILING OR BEHIND
WALLS AND CAPPED. HOWEVER NO INACTIVE BRANCH OF MORE
THAN 2 FEET IN LENGTH CAN REMAIN ON ANY PIPE. CONTRACTOR
SHALL REMOVE AS REQUIRED.
6. WHERE DEMOLITION OF FIXTURE AND REMOVAL OF PIPING OR
OTHER ACCESSORY LEAVES AN OPENING IN THE FLOOR, WALL, OR
CEILING, SAME SHALL BE PATCHED TO MATCH EXISTING ADJACENT
FINISH.
POINT OF CONNECTION (NEW TO EXISTING)
POINT OF DISCONNECT (REMOVE PIPING IN IT'S
ENTIRETY BACK TO MAIN)
9.
NO PIPING SHALL BE INSTALLED ABOVE ELECTRICAL PANELS OR
SWITCHGEAR IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE.
7.
FURNISH AND INSTALL ACCESS PANELS IN CEILINGS (EXCEPT LAY-IN
TILE CEILING) AND WALLS FOR ACCESS TO VALVES, CLEANOUTS AND
SIMILAR EQUIPMENT FOR THE OPERATION OF THE PLUMBING SYSTEM.
3.
COORDINATE LOCATIONS OF FLOOR DRAINS IN MECHANICAL ROOMS
WITH ACTUAL EQUIPMENT BEING INSTALLED.
11.
COORDINATE ALL PLUMBING WORK WITH ALL OTHER TRADES TO
ASSURE PROPER INSTALLATION AND AVOID INTERFERENCES. ANY
ADDITIONAL PIPING, OFFSETS, ETC. REQUIRED SHALL BE PROVIDED AT
NO ADDITIONAL COST OVER THE CONTRACT AMOUNT.
2.
THE PLUMBING DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO
CONVEY SLOPE AND GENERAL ARRANGEMENT ONLY. REFER TO
ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND DETAILS OF
CONSTRUCTION.
THE PLUMBING CONTRACTOR SHALL LOCATE UNDERGROUND PIPING
WITHIN LIMITS OF THE STRUCTURE IN COORDINATION WITH THE OTHER
CONTRACTORS TO ASSURE NO FOOTING WILL BE UNDERMINED BY
TRENCHING. ALL PIPING BELOW GRADE SHALL BE INSTALLED TO CLEAR
FOOTINGS AND SHALL NOT BE BELOW THE 45° BEARING PLANE OF THE
FOOTING. WHEN THE BOTTOM OF THE PIPING TRENCH MUST BE LOWER
THAN THE BOTTOM OF THE FOOTING, TO ENSURE THAT THE TRENCH
DOES NOT ENCROACH ON THE BEARING PLANE OF THE FOOTING, THE
TRENCH SHALL BE INSTALLED ONE AND ONE HALF (1-1/2) UNITS
HORIZONTALLY FOR EACH UNIT VERTICALLY THAT THE BOTTOM OF THE
TRENCH IS BELOW THE BOTTOM OF THE FOOTING (I.E. FOR A TRENCH 1
FOOT BELOW THE BOTTOM OF THE FOOTING THE TRENCH SHALL BE 1-
1/2 FEET AWAY FROM THE FOOTING). IF THIS CRITERIA CANNOT BE MET,
CONSULT THE DESIGN PROFESSIONAL FOR DIRECTION.
12.
13.
14.
ALL VENT TERMINALS SHALL BE A MINIMUM OF 3" IN DIAMETER AND
SHALL TERMINATE A MINIMUM OF 2'-0" ABOVE THE ROOF MAINTAINING A
DISTANCE OF 10'-0" FROM ANY AIR INTAKE. IF THE 10'-0" DISTANCE
CANNOT BE MAINTAINED THE VENT TERMINAL SHALL EXTEND A MINIMUM
OF 3'-0" ABOVE THE AIR INTAKE.
16.
ALL PIPE PENETRATIONS OF SMOKE-STOP PARTITIONS, FIRE WALLS
AND/OR FLOOR SLABS SHALL BE PROVIDED WITH SLEEVES AND SEALED
AIRTIGHT WITH FIRE RESISTANT MATERIALS PER MANUFACTURERS
RECOMMENDATIONS.
15.
REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL ROOF PENETRATION DETAILS.
17.
REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS FOR LOCATIONS OF
SMOKE PARTITIONS AND FIRE RATED WALLS.
5.
ALL HORIZONTAL SANITARY DRAINAGE PIPING 3" AND SMALLER SHALL
BE SLOPED NO LESS THAN 1/4" PER FOOT AND NO LESS THAN 1/8" PER
FOOT FOR PIPING 4" AND LARGER. HORIZONTAL VENT PIPING SHALL BE
SLOPED BACK TO THE SOIL OR WASTE PIPE IT SERVES.
8.
ALL PIPING IN FINISHED AREAS SHALL BE INSTALLED ABOVE THE CEILING
AND/OR WITHIN WALLS. IN AREAS WITHOUT FINISHED CEILINGS PIPING
SHALL BE INSTALLED AS CLOSE TO THE STRUCTURE ABOVE AS
POSSIBLE.
18. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING
AND/OR PATCHING OF WALLS, FLOORS AND ROOF OPENINGS AS
REQUIRED BY THE INSTALLATION OF THE PLUMBING WORK.
THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
PLUMBING SYSTEMS WITHIN THE BUILDING TO APPROXIMATELY 5'-0"
FROM THE EXTERIOR OF THE BUILDING.
1.
THE MATERIALS AND INSTALLATION OF THE PLUMBING SYSTEM
SHALL CONFORM TO THE REQUIREMENTS OF THE APPLICABLE
EDITION OF THE INTERNATIONAL PLUMBING CODE AND THE
CONTRACT SPECIFICATIONS.
10.
ALL PIPING SHALL BE INSTALLED IN SUCH A WAY THAT DOES NOT
HAMPER ACCESS TO VALVES, ACCESS DOORS OR EQUIPMENT.
4.
PROVIDE CLEANOUTS IN SANITARY AND STORM PIPING AT ENDS OF
RUNS, AT CHANGES IN DIRECTION GREATER THAN 45°, AT THE BASE
OF STACKS, EVERY 50'-0" FOR HORIZONTAL RUNS 4" AND SMALLER,
EVERY 100'-0" FOR HORIZONTAL RUNS 6" AND LARGER AND
ELSEWHERE AS INDICATED. ALL CLEANOUTS SHALL BE THE FULL
SIZE OF THE PIPE FOR SIZES 4" AND SMALLER AND SHALL BE 4" FOR
PIPE SIZES LARGER THAN 4".
INSTALL TRAP PRIMER VALVE ASSEMBLIES AT ALL FLOOR DRAIN
TRAPS TO PROTECT AGAINST EVAPORATION UNLESS THE FLOOR
DRAIN TRAP RECEIVES A REGULAR WASTE DISCHARGE.
6.
RISER INDICATOR - TOP INDICATES TYPE
OF RISER, BOTTOM INDICATES RISER
NUMBER (ARROW INDICATES DIRECTIONAL
VIEW OF ISOMETRIC RISERS)
RISER INDICATOR / DETAIL NO.
TOP INDICATES TYPE OF RISER / DETAIL NO.
BOTTOM INDICATES RISER NUMBER / DWG NO
RD
FD
FD
TD
WCO
GPR
TH
V
V
V
W
W
W
ST
ST
ST
IW
IW
IW
VALVE
X KEYED NOTE TAG - NEW
VALVE - GAS COCK
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - JANUARY 30, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
PL1-001
646CA2500.23
MPBER
SYMBOLS, ABBREVIATIONS
AND GENERAL NOTES
VAPHS UNIVERSITY DRIVE
1 & 30
DNUP
DN
ICEU
P
D N
U P
D N
EXISTING BUILDING 30
2ND FLOOR
3"
3"
3"
3"
3"
3"
4"
2"
3/4"3/4"
S T
ST
S T
S T
EXISTING BUILDING 1
2ND FLOOR
D
E
E.6
E.7
F
6.5
6.1 x.19x.18x.17 x.16x.14 x.1 x.C
EA
4"
3/4" x.12 x.13
4"
3/4"
3/4"3/4" x.16x.14 x.2 x.1 x.C
EA
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - JANUARY 30, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
PL1-101
646CA2500.23
MPBER
PLUMBING NEW WORK
PLANS
VAPHS UNIVERSITY DRIVE
1 & 30
1/8" = 1'-0"
BUILDINGS 1 & 30 - 2ND FLOOR PLUMBING NEW WORK PLAN
CONNECT NEW 3" V. TO EX. 3" V., RISE UP & OFFSET ABOVE
CEILING.
PLUMBING KEYED NOTES
1/8" = 1'-0"
BUILDING 1 - 1ST FLOOR PLUMBING NEW WORK PLAN
CONNECT NEW 3" V. TO EX. 3" V. RISE AT CEILING.2
CONNECT NEW 4" V. TO EX. 4" SV. & OFFSET ABOVE CEILING.3
CONNECT NEW 3/4" CW. TO EX. CW. ABOVE CEILING (FIELD
VERIFY EXACT SIZE & LOCATION).
NEW 3/4" CW. & 4" V. ABOVE CEILING: RISE UP TO FLOOR
ABOVE.
CONNECT NEW 3/4" CW. & 3/4" HW. TO EX. CW. & HW. ABOVE
CEILING (FIELD VERIFY EXACT SIZE & LOCATION).
NEW 3/4" CW. & 3/4" HW. ABOVE CEILING: RISE UP TO FLOOR
ABOVE.
CO
NEW 3" ST. DN. FROM ROOF DRAIN (RD-1) ON ROOF ABOVE:
OFFSET ABOVE CEILING.
CO
EX. 4" VRC.
EX. 4" ST. DN. FROM
EX. 4" RD. ABV.
CONNECT NEW 3" ST. TO EX. 4" VRC.9
EX. 3/4" CW. UP TO
ROOF ABV.
NEW 3/4" CW. & 4" V. UP FROM FLOOR BELOW: RISE ABOVE
CEILING & OFFSET.
PROVIDE NEW 4" VENT THRU ROOF - MAINTAIN 25'-0" FROM ANY
O.A. INTAKES
CONNECT NEW 3/4" CW. TO EX. 3/4" CW. ABOVE CEILING (FIELD
VERIFY EXACT SIZE & LOCATION).
CONNECT NEW 2" V. TO EX. 2" V. ABOVE CEILING, EXTEND AND
CONNECT TO 4" VENT ABOVE CEILING. (FIELD VERIFY EXACT
SIZE & LOCATION).
NEW 3/4" CW. & 3/4" HW. UP FROM FLOOR BELOW: RISE ABOVE
CEILING & OFFSET.
NEW 3/4" CW. & 3/4" HW. ABOVE CEILING: DROP DN. IN CHASE
& CONNECT TO EX. CW. & HW. (FIELD VERIFY EXACT SIZE &
LOCATION).
GENERAL PLUMBING NOTES:
COORDINATE ALL NEW AND DEMOLITION WORK REQUIRED WITH
EXISTNG USERS TO KEEP AREAS OF WORK UP AND RUNNING IN
CASE OF POSSIBLE SHUTDOWNS AND OR DISRUPTIONS.
1.
3" ST PIPING LOCATED IN
BULKHEAD PROVIDED BY G.C.
NOTES
1.
2.
ATTACH SUPPORTS FOR ALL PIPING SUSPENDED FROM THE STEEL
STRUCTURE TO THE TOP CORD OF JOISTS OR BEAMS WHERE
POSSIBLE.
PROVIDE COPPER OR PLASTIC COATED HANGERS FOR
NON-INSULATED COPPER PIPE.
CONTINUOUS HANGER ROD TO BEAM
OR FRAMING CHANNEL
ADJUSTABLE CLEVIS
PIPE INSULATION SHIELD REQUIRED FOR
INSULATED PIPE
WHERE REQUIRED BY CODE. HANGER ROD
SIZE FOR LOAD AND SPACING TO MEET
REQUIREMENTS FOR SEISMIC RESTRAINT
8" THROUGH 12" PIPE
ADJUSTIBLE STEEL YOKE PIPE ROLL
FOR PIPING WITH HIGH EXPANSION AND
CONTRACTION FORCES
2 1/2" THROUGH 6" PIPE
INSULATION PROTECTION. PIPE SADDLE
SIZE TO FIT INSULATION AND PIPE SIZE
WHERE REQUIRED BY CODE. HANGER ROD
SIZE FOR LOAD AND SPACING TO MEET
REQUIREMENTS FOR SEISMIC RESTRAINT
PIPE HANGER FOR LIGHT WEIGHT PIPE
PIPE INSULATION SHIELD REQUIRED FOR
INSULATED PIPE
CONTINUOUS HANGER ROD TO BEAM
OR FRAMING CHANNEL
CONTINUOUS HANGER ROD TO BEAM
OR FRAMING CHANNEL
HANGER ROD
HEAVY DUTY CLEVIS
HANGER
LOCKING NUT
EYE SOCKET
STEEL BEAM
WELDED BEAM
ATTACHMENT
HANGER ROD
LOCKING NUT
STEEL BEAM
INSULATION WHERE SPECIFIED
SHALL COVER PIPE HANGER
STURCTURAL STEEL BEAM.
SEE PROJECT PLANS FOR
SIZES.
ADJUSTABLE BEAM
CLAMP
ADJUSTABLE BAND
HANGER
INSULATION WHERE SPECIFIED
SHALL COVER PIPE HANGER
STURCTURAL STEEL BEAM.
SEE PROJECT PLANS FOR
SIZES.
LENGTH VARIES
"C" TYPE BEAM CLAMP (2"
PIPE AND SMALLER)
ALL THREAD ROD(TYP)
BAR JOIST
FENDER WASHER
DOUBLE NUT
STEEL STRUCTURE
BAR JOIST
NOTES:
1. FOR HANGER PLACMENT REQUIREMENTS, AND HANGER ROD SPACING,
REFER TO THE SPECIFICATIONS
2. HANGER LOAD SHALL BE LIMITED PER MANUFACTURES RECOMMENDATIONS
LENGTH VARIES
3M FS-195 WRAP/STRIP
AND CP 25 CAULK TO
MAINTAIN FIRE RATING
PIPE & INSULATION
(WHERE APPLICABLE)
INTERIOR WALL
WALL CONSTRUCTION
(SEE ARCH. DWGS.)SHEET METAL SLEEVE
STAINLESS STEEL
ESCHUTCHION
PLATE IN FINISHED
AREAS ONLY
1"1"
1.
2.
NOTES:
INSTALL ALL MATERIALS IN ACCORDANCE WITH MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS.
SEE ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR FLOOR CONSTRUCTION MATERIALS AND OTHER PERTINENT INFORMATION.
STANDARD WEIGHT STEEL PIPE
FLOOR SLEEVE. TERMINATE 1"
ABOVE FINISHED FLOOR SURFACE
FLOOR
PIPE
CENTER PIPE IN SLEEVE
PIPE
INSULATION
SEAL OR CAULK SLEEVE WITH
FIRE STOPPING MATERIAL TO
MEET WALL FIRE, SMOKE, OR
COMBINATINO RATING
INSULATED UNINSULATED
BALLAST SEE
ARCH DWGS
SUMP RECEIVER
ROOF DRAIN, SEE SPECS
FOR REQUIREMENTS
ROOFING MATERIAL,
SEE ARCH DWGS
INSULATION
METAL DECK
16 GA SHEET
METAL WELDED TO
BOTTOM OF DECK
UNDER DECK CLAMPDEFLECTION
CONNECTION
INSULATE DRAIN BODY AND
HORIZONTAL STORM WATER
PIPING TO THE VERTICAL
PVC PIPING
3/4" DCW
3/4" DCW
4" V
4" V
3" ST
3" ST
3" ST
4" ST
4" ST
EXISTING
EXISTING
3/4" DCW
EXISTING
4" SAN
3" SAN
3/4" DCW
1/2" DCW
EXISTING
EXISTING
EXISTING
RELOCATED
4" V
ABV. CLG.
ABV. CLG.
ETR
ETR
1" DHW
EXISTING
3/4" DHW
1/2" DHW
3/4" DCW
3/4" DHW
EXISTING
EXISTING
EXISTING
EXISTING
3/4" DHW 3/4" DCW
EXISTING EXISTING
1 1/2" DCW
EXISTING
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - JANUARY 30, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
PL1-401
646CA2500.23
MPBER
PLUMBING DETAILS
VAPHS UNIVERSITY DRIVE
1 & 30
NTS
PL1-401_1_
NTS
PL1-401_2_
NTS3
PL1-401_3_
NTS4
Plumbing
NTS7
PL1-401_7_
NTS6
ROOF DRAIN
PLUMING RISER DIAGRAM
4" VTR
RD-1
RD-1
CO
CO
| PLD-101 - PLUMBING DEMOLITION FLOOR PLANS |
| Sheets |
| PL-001 - SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| PL-101 - PLUMBING NEW WORK PLANS |
| PL-401 - PLUMBING DETAILS |
| PLD-101 - PLUMBING DEMOLITION FLOOR PLANS |
| PL1-001 - SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| Sheets |
| FA1-001 - FIRE PROT. SYMBOLS & ABBREVIATIONS |
| FA1-101 - FIRE PROTECTION FLOOR PLAN |
| PL1-001 - SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| PL1-101 - PLUMBING NEW WORK PLANS |
| PL1-401 - PLUMBING DETAILS |
| PL1-101 - PLUMBING NEW WORK PLANS |
| Sheets |
| FA1-001 - FIRE PROT. SYMBOLS & ABBREVIATIONS |
| FA1-101 - FIRE PROTECTION FLOOR PLAN |
| PL1-001 - SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| PL1-101 - PLUMBING NEW WORK PLANS |
| PL1-401 - PLUMBING DETAILS |
| PL1-401 - PLUMBING DETAILS |
| Sheets |
| FA1-001 - FIRE PROT. SYMBOLS & ABBREVIATIONS |
| FA1-101 - FIRE PROTECTION FLOOR PLAN |
| PL1-001 - SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| PL1-101 - PLUMBING NEW WORK PLANS |
| PL1-401 - PLUMBING DETAILS |
File details come from the government source that posted it.