36C10F19R0003-0007003.pdf
PDF 303 KB Posted
- Solicitation number
- 36C10F19R0003
About this file
36C10F19R0003 0007 MH0-100 - SECOND FLOOR NEW DUCTWORK PLAN.pdf
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DNUP
DN
T
T
30"x24"
"x
"x
24"x8"
18"x14"
18"x14"
22"x8"
10"x6"
18"x8"
14"x6"
"x
BAG IN BAG OUT
FILTER HOUSING
64"x54"
24"x12"
24"x10"
UP TO ELEV.
LOBBY
24"x10"
21"x10" 24"x15"
12"x10"
32"x10" 32"x10"
"x
15"x12"
8"ø
"x
"8"ø
8"ø
6"ø
12"x10"
32"x10"
"x
8"ø
8"ø 10"ø
10"ø
12"x10"
8"ø
"x
D1
8ø
EX
8ø EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø
EX
8ø EX
8ø
EX
8ø
30"x10"
24"x10"
AIR HANDLING
UNIT
MH0-301
MH0-301
12"x10"
15"x12"
"ø
8"ø
D1 8ø
15"x9"
10"ø12"x12" D1 10ø
D1 10ø
10"ø
D1 10ø
14"x12"12"x12"1 "ø
D1
10ø
10"ø
D1 10ø
D1
10ø
D1 10ø
D1
10ø
D1 10ø
D1
10ø
D1
10ø
"x
"x
"x
D
E
E.6
E.7
F
3.4
6.5
6.1
12.8 x.8x.7x.6x.5x.4 x.19x.18x.17 x.16x.14 x.2 x.C
EA
x.J x.L x.N x.P x.3
3/4" HWS
1" HWR
3/4" HWS
3/4" HWR
3/4" HWS
120"X80" OA LOUVER. COORDINATE
OPENING AND LOCATION WITH
ARCHITECTURE. SEE DETAIL 8 ON
SHEET AS3-101.
D1
6ø
D1
6ø
R1
24x24
TU-P02
R1
24x24
R1
24x24
PROVIDE NEW
THERMOSTAT TO
SERVE TU-2-5
TU-2-5
60x36 EXHAUST
LOUVER (ABOVE).
COORDINATE FINAL
LOCATION WITH
ARCHITECTURE.
PROVIDE NEW
THERMOSTAT TO
SERVE TU-P02
RP-1 29'
3.9 1.0
3/4" HWR
3/4" HWSM
EF-12
22"x18" WIRE
MESH END CAP
3/4" HWS
3/4" HWS
REBALANCE TU-2-5
FOR 1360 CFM
TU-2-3
REBALANCE TU-2-3
FOR 1125 CFM
1" HWS
1" HWR
"x
MH0-301
R1
24x24
COLD ROOM
2W121
LAB
2W119
RESEARCH
LAB
2W133
RESEARCH
LAB
3A143
OFFICE
2W146
OFFICE
2W144
STAFF M
TOILET
2W122
CORRIDOR
GA153
EXISTING
ELEVATOR
LOBBY
2A143
EXISTING
VESTIBULE
2A145
Room
GA145
"x
FD
20"x14"
FD
RP-2 28'
3.8 1.0
RP-1 29'
3.9 1.0
RP-2 28'
3.8 1.0
RP-2 28'
3.8 1.0
/3
ELECTRIC
GA146
FD
FD
FD
10" LPS
8" L
P S
82"x60"
60"x86"
PROVIDE STEAM
TRAP BELOW
LOBBY FLOOR AT
BOTTOM OF 8"
LPS RISER.
CONNECT TO
EXISTING 4" LPC
IN CEILING SPACE
OF 1ST FLOOR.
INSTALL STEAM PIPE ABOVE CEILING OF
CORRIDOR AT SAME ELEVATION AS
EXISTING STEAM LINE IN MECH ROOM
8" L
P S
OFFSET 8" STEAM LINE BELOW
ELEVATOR LOBBY SLAB AS NEEDED
TO CONNECT TO EXISTING STEAM
LINE BELOW LOBBY FLOOR.
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - FEBRUARY 22, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
MH0-100
646CA2500.23
AuthorChecker
SECOND FLOOR NEW
DUCTWORK PLAN
VAPHS UNIVERSITY DRIVE
1 & 30
HVAC KEY NOTES
1/8" = 1'-0"6
HVAC NEW DUCTWORK PLAN
CONNECT NEW 1" HWS & HWR
PIPING TO EXISTING 4'" HWS &
HWR LOCATION AT SHAFT AT
COLUMN LINES C-6 ON THE SECOND
FLOOW. SEE DETAIL 7
REPLACE EXISTING RETURN GRILL
WITH NEW ONE TO MATCH THE NEW
CEILING HEIGHT.
3 RE-ROUTE CHILLED WATER SUPPLY AND RETURN,
STEAM SUPPLY AND CONDENSATE RETURN PIPING
TO COORDINATE WITH NEW FLOOR PLANS. FIELD
VERIFY SIZES AND EXACT LOCATIONS.
FAN SCHEDULE
UNIT NO. Service TYPE CFM SP (IN. WC) FAN RPM DRIVE
MOTOR
BHP HP RPM VSD V/PH/HZ
EF-12 MECHANICAL ROOM CENTRIFUGAL INLINE 2550 1.3 1184 BELT 1.07 1.5 1725 YES 460/3/60
4 MOVE EXISTING FAN TO NEW LOCATION . REFER TO
THE SCHEDULE BELOW.
RADIANT CEILING PANEL
MARK TYPE
LINEAR
LINEAR
RP-1
RP-2
WIDTH
6"
6"
LENGTH
29'
28'
AVERAGE WATER TEMP
170 F
170 F
CAPACITY (MBH)
3.9
3.8
MANUFACTURER
RITTLING
RITTLING
MODEL
6" WIDE PANEL, 1 TUBE
6" WIDE PANEL, 1 TUBE
1 AMENDMENT 7 05-23-19
WELDED 316 STAINLESS STEEL FUME HOOD EXHAUST DUCT.6
| Sheets |
| MD0-100 - SECOND FLOOR DEMO DUCTWORK PLAN |
| MH0-100 - SECOND FLOOR NEW DUCTWORK PLAN |
| MH0-301 - ENLARGED SECTIONS |
| MH0-701 - HVAC DETAILS & SCHEDULES |
File details come from the government source that posted it.