36C10F19R0003-0006003.pdf

PDF 114 KB Posted

Attached to
Research Office Building (ROB) Connecting Bridge VAPHS, Pittsburgh, PA
Solicitation number
36C10F19R0003
Issued by

About this file

36C10F19R0003 0006 00000.E.contractorquest-answers-Amendment No.6 20190510.pdf

View the file

Other files

File Type Posted
36C10F19C0016-000.docx DOCX document
36C10F19R0003-0007000.docx DOCX document
36C10F19R0003-0007002.pdf PDF
36C10F19R0003-0007003.pdf PDF
36C10F19R0003-0007004.pdf PDF
36C10F19R0003-0007005.pdf PDF
36C10F19R0003-0007001.pdf PDF
36C10F19R0003-0006001.pdf PDF
36C10F19R0003-0006002.pdf PDF
36C10F19R0003-0006000.docx DOCX document
36C10F19R0003-0005000.docx DOCX document
36C10F19R0003-0005001.pdf PDF
36C10F19R0003-0005003.pdf PDF
36C10F19R0003-0005004.pdf PDF
36C10F19R0003-0005002.pdf PDF
36C10F19R0003-0004000.docx DOCX document
36C10F19R0003-0003000.docx DOCX document
36C10F19R0003-0002002.pdf PDF
36C10F19R0003-0002001.pdf PDF
36C10F19R0003-0002000.docx DOCX document
36C10F19R0003-0001001.pdf PDF
36C10F19R0003-0001000.docx DOCX document
36C10F19R0003-014.pdf PDF
36C10F19R0003-019.pdf PDF
36C10F19R0003-016.pdf PDF
36C10F19R0003-020.pdf PDF
36C10F19R0003-022.pdf PDF
36C10F19R0003-024.pdf PDF
36C10F19R0003-023.pdf PDF
36C10F19R0003-018.pdf PDF
36C10F19R0003-013.docx DOCX document
36C10F19R0003-017.pdf PDF
36C10F19R0003-021.pdf PDF
36C10F19R0003-015.pdf PDF
36C10F19R0003-000.docx DOCX document
36C10F19R0003.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. VA-36C10F19R0003 VAPHS – University Drive Division

Solicitation No. VA-36C10F19R0003

Connecting Bridge

Amendment No. 6 – May 10, 2019

01-11

01 57 19- 1

AMENDMENT NO. 6 CONTRACTOR QUESTIONS AND CLARIFICATION

1. Roof membrane is called out in the specs as being 60-mil, but it says fabric backed, which would be a 115-mil fleeceback membrane. Please verify that a fleecebacked membrane is required or if we can install standard 60-mil white TPO.

Response: Standard 60-mil white is acceptable; fabric backed is not required for a new roof. See revised specification Section 07 54 23

THERMOPLASTIC POLYOLEFIN (TPO) ROOFING.

2. Roofing spec calls for 5/8” coverboard, roof details show 5/8” substrate board and ½” coverboard, please verify correct assembly.

Response: Install cover board and substrate according to roof details on drawings; ½” cover board above insulation under roofing and 5/8” substrate under insulation. See revised specification Section 07 22 00-

ROOF AND DECK INSULATION.

3. Roofing spec does not list a vapor barrier; however, one is called out in the drawings. Per the warranty requirements vapor barrier is not required, but please verify if one is to be included in the system.

Response: Vapor barrier is required. See revised specification Section

07 22 00-ROOF AND DECK INSULATION.

4. Due to some inconsistencies in the door schedule, some assumptions were made on the hardware sets. Set 1 cannot use auto flush bolts as the doors are fire rated. Set 2 cannot use push/pull as rating requires it to be self-latching, and auto closing. Set 7 was missing from the specs. Please review door hardware.

Response: See revised specification 08 71 00 DOOR HARDWARE Amendment

No. 5 issued in Amendment 05.

5. On the Door Schedule, Dwg AS8-101, there are 2 doors; A-02 (Y), A-09

(U).

a. They are not detailed.

b. I am not able to locate them

Could you please shed some light on this for me?

Response: Doors A-02 and A-09 are door type A. See Amendment No. 5 for revised drawings AS1-101 and AS8-101 and Specification Section 08 71 00

DOOR HARDWARE Amendment No. 5 issued in Amendment 05

- - E N D - - -