36C10F19R0003-019.pdf

PDF 569 KB Posted

Attached to
Research Office Building (ROB) Connecting Bridge VAPHS, Pittsburgh, PA
Solicitation number
36C10F19R0003
Issued by

About this file

36C10F19R0003 COMBINED FIRE PROTECTION.pdf

View the file

Other files

File Type Posted
36C10F19C0016-000.docx DOCX document
36C10F19R0003-0007000.docx DOCX document
36C10F19R0003-0007002.pdf PDF
36C10F19R0003-0007003.pdf PDF
36C10F19R0003-0007004.pdf PDF
36C10F19R0003-0007005.pdf PDF
36C10F19R0003-0007001.pdf PDF
36C10F19R0003-0006003.pdf PDF
36C10F19R0003-0006001.pdf PDF
36C10F19R0003-0006002.pdf PDF
36C10F19R0003-0006000.docx DOCX document
36C10F19R0003-0005000.docx DOCX document
36C10F19R0003-0005001.pdf PDF
36C10F19R0003-0005003.pdf PDF
36C10F19R0003-0005004.pdf PDF
36C10F19R0003-0005002.pdf PDF
36C10F19R0003-0004000.docx DOCX document
36C10F19R0003-0003000.docx DOCX document
36C10F19R0003-0002002.pdf PDF
36C10F19R0003-0002001.pdf PDF
36C10F19R0003-0002000.docx DOCX document
36C10F19R0003-0001001.pdf PDF
36C10F19R0003-0001000.docx DOCX document
36C10F19R0003-014.pdf PDF
36C10F19R0003-016.pdf PDF
36C10F19R0003-020.pdf PDF
36C10F19R0003-022.pdf PDF
36C10F19R0003-024.pdf PDF
36C10F19R0003-023.pdf PDF
36C10F19R0003-018.pdf PDF
36C10F19R0003-013.docx DOCX document
36C10F19R0003-017.pdf PDF
36C10F19R0003-021.pdf PDF
36C10F19R0003-015.pdf PDF
36C10F19R0003-000.docx DOCX document
36C10F19R0003.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DNUP

DN

6.5

FE

D x.G x.J x.L x.5 x.6

E.7

EA

x.12 x.13

EXISTING BUILDING 1

2ND FLOOR

AREA W

EXISTING BUILDING 30

2ND FLOOR

~ FP

F P

F P

F P

FP

D

E

E.6

E.7 F

3.4

6.5

6.1

12.8 x.8x.7x.6x.5x.4 x.19x.18x.17x.16x.14 x.2 x.1 x.C

EA

x.J x.L x.N x.P x.3

FP

FP

FP

2" ETR

2"

ETR

2"

ETR

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities

Management o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

BIDDING DOCUMENTS - JANUARY 30, 2019

VA CARES CONSOLIDATION

VAMC, PITTSBURGH, PA

CONNECTING BRIDGE

FAD-101

646CA2500.23

MPBER

FIRE PROTECTION

DEMOLITION FLOOR PLAN

VAPHS UNIVERSITY DRIVE

1 & 30

1/8" = 1'-0"

PLUMBING / FIRE PROTECTION DEMOLITION FLOOR PLAN

1 DISCONNECT AND REMOVE EXISTING SPRINKLERS AND

ASSOCIATED BRANCH PIPING ABOVE AND BELOW DEMOLISHED

RAISED WALKWAY IN THIS AREA.

DISCONNECT AND REMOVE EXISTING SPRINKLERS AND

ASSOCIATED BRANCH PIPING THIS AREA.

FIRE PROTECTION KEYED NOTES

EXISTING SPRINKLER RISER3

EXISTING BUILDING #30 - 2ND FLOOR ZONE CONTROL VALVE

ASSEMBLY.

EXISTING BRIDGE ZONE CONTROL VALVE ASSEMBLY.5

EXISTING SPRINKLER FEED MAIN.6

EXISTING SPRINKLER FEED MAIN TO 2ND FLOOR SPRINKLER

SYSTEM.

EXISTING STANDPIPE WITH 2-1/2" FIRE HOSE VALVE. RAISE

EXISTING 2-1/2" FIRE HOSE VALVE AS REQUIRED.

EXISTING BUILDING #1 - 2ND FLOOR ZONE CONTROL VALVE

ASSEMBLY: DISCONNECT, RELOCATE & RECONNECT AS

REQUIRED TO ACCOMMODATE NEW CORRIDOR WALL.

EXISTING SPRINKLER SYSTEM TO REMAIN THIS AREA.10

1 AMENDMENT 3 01-31-17

ABBREVIATIONS

PRESSURE SWITCH

VALVE - CHECK (SHOWN W/FLOW)

VALVE - OS&Y

DIRECTION OF FLOW

PIPE ANCHOR

UNION

VALVE

BACKFLOW PREVENTER (BFP)

SPRINKLER HEAD - CONCEALED

FIRE PROTECTION PIPING - EXISTING

FIRE PROTECTION PIPING

FIRE PROTECTION PIPING - DEMO

EX. FP

FP

SPRINKLER HEAD - UPRIGHT

SYMBOLS

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

IN INCHES

ITC INSPECTORS TEST CONNECTION

MD MAIN DRAIN

NA NOT APPLICABLE

N.C. NORMALLY CLOSED

NIC NOT IN CONTRACT

NO. NUMBER

N.O. NORMALLY OPEN

NS NOT SPRINKLERED

NTS NOT TO SCALE

N&C NIPPLE AND CAP

OSW OPEN SITE WASTE

OS&Y OUTSIDE SCREW AND YOKE

P PUMP

PG PRESSURE GAUGE

PIV POST INDICATOR VALVE

PKG PACKAGE

POC POINT OF CONNECTION

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

QTY QUANTITY

RN RISER NIPPLE

RPM REVOLUTIONS PER MINUTE

SCV SECTIONAL CONTROL VALVE W/ TAMPER SWITCH

SP STANDPIPE

SPKR SPRINKLER

SUB-CTR. SUB CONTRACTOR

SYS SYSTEM

TB THRUST BLOCK

TEMP TEMPERATURE

TH THERMOMETER

TS TAMPER SWITCH

TYP TYPICAL

UG UNDERGROUND

UNO UNLESS OTHERWISE NOTED

VEL VELOCITY

VERT VERTICAL

VIF VERIFY IN FIELD

W/ WITH

W/O WITHOUT

WIP WALL INDICATOR POST

DEMOLITION NOTES

DESIGN CRITERIA

VALVE - POST INDICATOR

VALVE - DRY PIPE

DPV

PIV

VALVE - SOLENOID

VALVE - CONTROL

ELBOW DOWN

ELBOW UP

PUMP (SCHEMATIC)

BOTTOM DROP

FLOW SWITCH

FIRE DEPARTMENT VALVE

FIRE HOSE CABINET

FIRE DEPARTMENT HOSE VALVE

FIRE DEPARTMENT CONNECTION

FIRE DEPARTMENT CONNECTION - FREE-STANDING

FIRE PUMP TEST HEADER - FLUSH

FIRE PUMP TEST HEADER - FREE-STANDING

POINT OF CONNECTION (NEW TO EXISTING)

POINT OF CONNECTION (NEW TO EXISTING)

AREA MATCHLINE

FDV

FHC

FDC

CAPPED PIPING

FPT

1. DEMOLITION INFORMATION SHOWN ON THE DRAWINGS IS BASED ON EXISTING

DRAWINGS AND A PRELIMINARY REVIEW OF THE EXISTING CONDITIONS.

PERFORM ALL WORK OF A DEMOLITION NATURE THAT MAY BE REQUIRED

OR NECESSARY FOR A FULL AND COMPLETE EXECUTION OF THE WORK,

WHETHER OR NOT SHOWN OR SPECIFIED. THE EXACT EXTENT OF

DEMOLITION MAY NOT BE FULLY INDICATED ON THE DRAWINGS.

CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS PRIOR TO BIDS

AND CONFIRM COMPLETE EXTENT OF DEMOLITION REQUIRED.

2. MATERIALS AND EQUIPMENT TO BE SALVAGED SHALL BE

IDENTIFIED BY THE OWNER. THESE ITEMS ARE THE PROPERTY OF THE

OWNER AND SHALL BE RETURNED TO THE OWNERS DESIGNATED

STORAGE AREA. WHERE REMOVAL IS REQUIRED THE CONTRACTOR

SHALL BE RESPONSIBLE FOR CARE TAKEN DURING THE HANDLING OF

THESE ITEMS.

3. DEMOLISHED MATERIALS AND EQUIPMENT NOT BEING SALVAGED OR

REUSED, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND

REMOVED FROM THE SITE AND LEGALLY DISPOSED OF.

4. COORDINATE ALL DEMOLITION WORK REQUIRED INCLUDING DRAINING OF SYSTEMS,

PHASING, SHUTDOWNS AND/OR DISRUPTIONS AS REQUIRED.

1. SPRINKLER SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH THE

V.A. FIRE PROTECTION DESIGN MANUAL SEVENTH EDITION 2015,

NFPA 13 AND FM STANDARDS. NEW SPRINKLER PIPING

SHALL BE HYDRAULICALLY SIZED TO MEET THE FOLLOWING CRITERIA:

A. OCCUPANCY CLASSIFICATION LIGHT HAZARD, AREA OF

APPLICATION LARGEST ROOM, DESIGN DENSITY .10 GPM/SQ. FT.

SPRINKLER K FACTOR 5.6, CLASSIFICATION 135 DEGREE F.

B. LIGHT HAZARD OCCUPANCY - DENSITY .10 GPM PER SQ. FT.

OVER MOST HYDRAULICALLY REMOTE 1500 SQ. FT. MAXIMUM

COVERAGE PER HEAD 225 SQ. FT.

C. ORDINARY HAZARD - DENSITY .15 GPM PER SQ. FT. OVER MOST

HYDRAULICALLY REMOTE 1500 SQ. FT. MAXIMUM COVERAGE

PER HEAD 130 DQ. FT.

D. EXACT LOCATION OF SPRINKLER HEADS IN FINISHED AREAS WITH

SUSPENDED CEILINGS SHALL BE ON CENTER OF TILE AND AS

INDICATED ON SPRINKLER CEILING PLANS. PIPING TO BE

COORDINATED WITH OTHER TRADES.

E. DISCHARGE FROM EACH SPRINKLER HEAD SHALL NOT BE LESS

THAN REQUIRED FOR AREA COVERED BY THIS HEAD. AREA

COVERAGE PER HEAD SHALL BE DETERMINED IN ACCORDANCE

WITH NFPA STANDARD NO. 13, PARAGRAPH 7-4.3.1.2.

F. MINIMUM PRESSURE AT SPRINKLER HEAD 7 PSI.

G. HYDRAULIC CALCULATIONS SHALL BE BROUGHT BACK TO

CONNECTION TO WATER SUPPLY.

H. CONTRACTOR SHALL ORDER HYDRANT FLOW TEST AND BASE

ALL HYDRAULIC CALCULATIONS ON RESULTS OF TEST.

1. HYDRANTS TESTED SHALL BE LOCATED AS CLOSE AS

POSSIBLE TO POINT OF FIRE SERVICE CONNECTION TO

CITY MAIN.

2. TEST DATA SHALL INDICATE STATIC PRESSURE, RESIDUAL

PRESSURE AT TEST FLOW AND GRADE ELEVATION AT

HYDRANT TESTED.

3. HYDRANT TEST DATA SHALL BE SUBMITTED FOR REVIEW

ALONG WITH SHOP DRAWINGS AND HYDRAULIC

CALCULATIONS.

I. RESULT OF HYDRAULIC CALCULATIONS SHALL INDICATE MINIMUM

10 PSI PRESSURE SAFETY MARGIN, I.E. EXCESS OF PRESSURE

AVAILABLE OVER PRESSURE REQUIRED.

2. FIRE PUMP INFORMATION:

A. FIRE PUMP PATTERSON PUMP MODEL 5x4x12 SSC HORIZONTAL SPLIT CASE

FIRE PUMP. RATED AT 750 GPM AT 140 PSI 323' TDH, DRIVEN BY 100 HP,

3550 RPM, 460 VOLT, 3 PHASE 60 CYCLE. (COUNTER CLOCKWISE ROTATION).

B. JOCKEY PUMP - PATTERSON PUMP MODEL PM3-17 VERTICAL MULTI-STAGE

CENTRIFUGAL JOCKEY PUMP. RATED AT 15 GPM AT 164 PSI 379' TDH, 3 HP,

460 VOLT, 3 PHASE, 60 CYCLE, 3450 RPM.

POINT OF DISCONNECT (DEMO TO EXISTING)

VALVE - BALL

GENERAL NOTES

1. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE AN AUTOMATIC SPRINKLER

SYSTEM TO PROTECT ALL AREAS OF THE FACILITY.

2.

THE COMPLETE INSTALLATION AND TESTING OF THE AUTOMATIC SPRINKLER SYSTEM

SHALL CONFORM TO THE REQUIREMENTS OF THE APPLICABLE EDITION OF NFPA 13,

AND THE AUTHORITY HAVING JURISDICTION AND THE CONTRACT SPECIFICATIONS.

3.

THE FIRE PROTECTION DRAWINGS ARE INTENDED FOR BIDDING PURPOSE ONLY

AND ARE NOT INTENDED TO COVER EACH AND EVERY ITEM REQUIRED FOR AN

APPROVED SYSTEM. SHOULD ADDITIONAL SPRINKLER HEADS OR EQUIPMENT

NEED TO BE INSTALLED TO MEET THE REQUIREMENTS SET FORTH BY NFPA, THE

FIRE PROTECTION CONTRACTOR SHALL DO SO AT HIS EXPENSE.

4.

THE FIRE PROTECTION CONTRACTOR SHALL VERIFY ALL CEILING TYPES, CEILING

HEIGHTS, ROOM DIMENSIONS, AND SPRINKLER HEAD LOCATIONS BEFORE

PERFORMING ANY WORK. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

AND ROOM FINISH SCHEDULES.

6.

THE FIRE PROTECTION CONTRACTOR SHALL SHOW ALL LIGHT FIXTURES, HVAC

GRILLES, EXPOSED DUCTWORK, AND BULKHEADS ON THE SPRINKLER SHOP

DRAWINGS.

SPRINKLER HEADS NEAR HEATERS AND LOCATED WITHIN HEATER ZONES AS

DEFINED BY NFPA 13 SHALL BE HIGH TEMPERATURE RATED.

8.

9.

SPRINKLER PIPING SHALL NOT BE INSTALLED ABOVE ELECTRICAL PANELS OR

SWITCHGEAR IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE.

ALL VALVE SUPERVISORY SWITCHES AND WATER FLOW SWITCHES SHALL BE

FURNISHED AND INSTALLED BY THE FIRE PROTECTION CONTRACTOR AND WIRED

BY THE ELECTRICAL CONTRACTOR. (EXISTING TO REMAIN).

11.

ALL DRAIN LINES INCLUDING THE DRAIN FOR THE AUTOMATIC SPRINKLER SYSTEM

INSPECTOR'S TEST CONNECTION AND THE AUTOMATIC SPRINKLER SYSTEM MAIN DRAIN

SHALL BE GALVANIZED STEEL. THE INSPECTORS TEST CONNECTION SHALL TERMINATE

WITH A FULL PORT BALL VALVE AND A SMOOTH BORE CORROSION RESISTANT OUTLET

GIVING FLOW EQUIVALENT TO ONE SPRINKLER HEAD.

14.

A PRESSURE TEST OF THE AUTOMATIC SPRINKLER SYSTEM SHALL BE WITNESSED BY

THE FIRE DEPARTMENT. TWO WEEKS ADVANCED WRITTEN NOTICE OF TEST SHALL BE

GIVEN. ALL LEAKAGE EVIDENCED BY THE TESTING SHALL BE REPAIRED AT THE

CONTRACTOR'S EXPENSE BY TIGHTENING OR REPLACING FITTINGS OR EQUIPMENT.

15.

16.

MAXIMUM SPRINKLER SPACING FOR LIGHT HAZARD AREAS SHALL NOT EXCEED 225

SQUARE FEET PER SPRINKLER. MAXIMUM SPACING FOR ALL ORDINARY HAZARD AREAS

SHALL NOT EXCEED 130 SQUARE FEET PER SPRINKLER.

17.

THE SPRINKLER HEAD TEMPERATURE RATING (EXCEPT WHERE HIGHER

TEMPERATURE REQUIRED BY NFPA 13) SHALL BE 165 DEGREES F.

13.

ALL SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY DESIGNED TO PROVIDE THE

MINIMUM DENSITIES AS INDICATED OR SPECIFIED. THE FIRE PROTECTION HYDRAULIC

CALCULATIONS FOR THE AUTOMATIC SPRINKLER SYSTEMS SHALL INCORPORATE A

MINIMUM 10 PSI SAFETY FACTOR.

12.

ALL PIPE PENETRATIONS OF SMOKE PARTITIONS AND BARRIERS, FIRE WALLS AND

BARRIERS, AND FLOORS SHALL BE PROVIDED WITH SLEEVES AND SEALED WITH FIRE

RESISTANT MATERIALS PER MANUFACTURERS RECOMMENDATIONS IN ACCORDANCE

WITH DIVISION 7. REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS FOR

LOCATIONS OF SMOKE PARTITIONS AND FIRE RATED CONSTRUCTION.

5.

COORDINATE ALL FIRE PROTECTION WORK WITH ALL OTHER TRADES TO

ASSURE PROPER INSTALLATION AND AVOID INTERFERENCES. ANY ADDITIONAL

PIPING, OFFSETS, ETC.. REQUIRED SHALL BE PROVIDED AT NO ADDITIONAL

COST OVER THE CONTRACT AMOUNT.

10.

ALL WATERFLOW SWITCHES MUST BE ISOLATED BY MEANS OF A FITTING OR UNION ON

BOTH SIDES TO FACILITATE REMOVAL AND SERVICE OF THE FLOW SWITCH. (EXISTING

ASSEMBLY TO BE RELOCATED AS REQUIRED)

7.

ALL SPRINKLER HEADS LOCATED IN LAY-IN CEILING TILES SHALL BE LOCATED IN THE

CENTER OF THE 2x2 PORTION OF THE 2x4 CEILING TILES. REFER TO THE ARCHITECTS

REFLECTED CEILING PLANS. IF FOR ANY REASON SPRINKLERS CANNOT BE LOCATED IN

THE CENTER OF 2x2 PORTION OF THE 2x4 CEILING TILES OR WHERE SHOWN IN OTHER

TYPES OF CEILINGS, THE ARCHITECT SHALL BE CONTACTED FOR NEW LOCATIONS

BEFORE INSTALLING ANY SPRINKLER HEADS OR PIPING.

AC AIR COMPRESSOR

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AP ACCESS PANEL

ARCH ARCHITECTURE

ASSY ASSEMBLY

ATM ATMOSPHERE

AUTO AUTOMATIC

AUX AUXILIARY

BOB BOTTOM OF BEAM

BOP BOTTOM OF PIPE

CA COMPRESSED AIR OR CLEAN AGENT

CALCS CALCULATIONS

CAP CAPACITY

CC CEILING COLUMN

CCD CHICAGO CITY DATUM

CLG CEILING

CM CENTIMETER

CO2 CARBON DIOXIDE

COL COLUMN

CONC CONCRETE

CONN. CONNECTION

CONT. CONTINUED

CSP COMBINED STANDPIPE/SPRINKLER SYSTEM

CV CHECK VALVE

DCV DOUBLE CHECK VALVE

DDCV DOUBLE DETECTOR CHECK VALVE

DIA DIAMETER

DIM DIMENSION

DN DOWN

DPV DRY PIPE VALVE

DR DRAIN

DV DRAIN VALVE

DWG DRAWING

EA EACH

ELEV. ELEVATION

ELEC ELECTRICAL

EQUIP EQUIPMENT

EX EXISTING

EXIST EXISTING

EXP EXPANSION

F FAHRENHEIT

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FBO FURNISHED BY OTHERS

FDC FIRE DEPARTMENT CONNECTION

FDV FIRE DEPARTMENT VALVE

FEC FIRE EXTINGUISHER CABINET

FH FIRE HOSE

FHC FIRE HOSE CABINET

FHR FIRE HOSE RACK

FIN FINISHED

FLR FLOOR

FP FIRE PROTECTION

FPC FIRE PUMP CONTROLLER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTC FIRE PUMP TEST CONNECTION

FS FLOW SWITCH

FT FEET

FIRE SPRINKLER WATER DEMAND

CORRIDOR GA153.

LANDING 1,2, & 3.

STAIR #5

OCCUPANCY CLASSIFICATION:

TYPE OF SPRINKLER SYSTEM:

DESIGN OF WATER APPLICATION:

MINIMUM DENSITY

SPRINKLER TEMERATURE RATING

SPRINKLER 'K' FACTOR:

SPRINKLER HEAD TYPE:

HOSE STREAM ALLOWANCE:

LIGHT HAZARD

WET

1500 SQ. FT.

.10 GPM/SQ. FT.

135°

K = 5.6

QUICK RESPONSE CONCEALED PENDENT

100 GPM

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities

Management o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

BIDDING DOCUMENTS - JANUARY 30, 2019

VA CARES CONSOLIDATION

VAMC, PITTSBURGH, PA

CONNECTING BRIDGE

FA1-001

646CA2500.23

AuthorChecker

FIRE PROT. SYMBOLS &

ABBREVIATIONS

VAPHS UNIVERSITY DRIVE

1 & 30

1 AMENDMENT 3 01-31-17

6.5

FE

D x.G x.J x.L x.5 x.6

E.7

EA

x.12

F P

F P

FP

FP

F P

F P

FPFP

F P

D

E

E.6

E.7 F

6.5

6.1

12.8 x.11x.10x.8x.7x.6x.5x.4 x.19x.18x.17x.16x.14 x.2 x.1 x.C

EA

x.D x.E x.F x.G

FP

FP

FP ~

ETR

ETR

(TYP.)

ETR

ETR

(TYP.)

ETR

(TYP.)

2"ETR

2"

ETR

2"

2"

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities

Management o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

BIDDING DOCUMENTS - JANUARY 30, 2019

VA CARES CONSOLIDATION

VAMC, PITTSBURGH, PA

CONNECTING BRIDGE

FA1-101

646CA2500.23

MPBER

FIRE PROTECTION FLOOR

PLAN

VAPHS UNIVERSITY DRIVE

1 & 30

1/8" = 1'-0"1

FA1-101_1_

1 EXTENT OF NEW SPRINKLER WORK CONNECTING TO EXISTING

BRIDGE ZONE CONTROL VALVE ASSEMBLY.

EXTENT OF NEW SPRINKLER WORK CONNECTING TO EXISTING

BULIDING 1 - 2ND FLOOR ZONE CONTROL VALVE ASSEMBLY.

FIRE PROTECTION KEYED NOTES

CONNECT NEW SPRINKLER FEED MAIN TO EXISTING

SPRINKLER FEED MAIN CAPPED CONNECTION (FIELD VERIFY

EXACT SIZE, LOCATION & ELEVATION).

NEW SPRINKLER: PROVIDE NEW BRANCH PIPE AND CONNECT

TO EXISTING SPRINKLER FEED MAIN PIPING.

4 4 4

4 4 4 4 44

NEW SPRINKLER: CONNECT TO NEW SPRINKLER FEED MAIN

PIPING.

EXISTING SPRINKLER (TYP.)6

EXISTING SPRINKLER RISER7

EXISTING BUILDING #30 - 2ND FLOOR ZONE CONTROL VALVE

ASSEMBLY.

EXISTING BRIDGE ZONE CONTROL VALVE ASSEMBLY.9

EXISTING SPRINKLER FEED MAIN TO 2ND FLOOR SPRINKLER

SYSTEM.

EXISTING STANDPIPE, RAISE WITH 2-1/2" FIRE HOSE VALVE

TO NOT LESS THAN 3'-0" OR MORE THAN 5'-0" ABOVE NEW

FLOOR LINE.

RELOCATED BUILDING #1 - 2ND FLOOR ZONE CONTROL

VALVE ASSEMBLY.

6 6

PROVIDE AUXILLIARY

DRAIN AS REQUIRED

1 AMENDMENT 3 01-31-17

FAD-101 - FIRE PROTECTION DEMOLITION FLOOR PLAN
Sheets
FA-001 - FIRE PROT. SYMBOLS & ABBREVIATIONS
FA-101 - FIRE PROTECTION FLOOR PLAN
FAD-101 - FIRE PROTECTION DEMOLITION FLOOR PLAN
FA1-001 - FIRE PROT- SYMBOLS & ABBREVIATIONS
Sheets
FA1-001 - FIRE PROT. SYMBOLS & ABBREVIATIONS
FA1-101 - FIRE PROTECTION FLOOR PLAN
PL1-001 - SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
PL1-101 - PLUMBING NEW WORK PLANS
PL1-401 - PLUMBING DETAILS
FA1-101 - FIRE PROTECTION FLOOR PLAN
Sheets
FA1-001 - FIRE PROT. SYMBOLS & ABBREVIATIONS
FA1-101 - FIRE PROTECTION FLOOR PLAN
PL1-001 - SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
PL1-101 - PLUMBING NEW WORK PLANS
PL1-401 - PLUMBING DETAILS

File details come from the government source that posted it.