36C10F19R0003-0007005.pdf

PDF 98 KB Posted

Attached to
Research Office Building (ROB) Connecting Bridge VAPHS, Pittsburgh, PA
Solicitation number
36C10F19R0003
Issued by

About this file

36C10F19R0003 0007 00000.E.contractorquest-answers-Amendment No.7 20190522.pdf

View the file

Other files

File Type Posted
36C10F19C0016-000.docx DOCX document
36C10F19R0003-0007000.docx DOCX document
36C10F19R0003-0007002.pdf PDF
36C10F19R0003-0007003.pdf PDF
36C10F19R0003-0007004.pdf PDF
36C10F19R0003-0007001.pdf PDF
36C10F19R0003-0006003.pdf PDF
36C10F19R0003-0006001.pdf PDF
36C10F19R0003-0006002.pdf PDF
36C10F19R0003-0006000.docx DOCX document
36C10F19R0003-0005000.docx DOCX document
36C10F19R0003-0005001.pdf PDF
36C10F19R0003-0005003.pdf PDF
36C10F19R0003-0005004.pdf PDF
36C10F19R0003-0005002.pdf PDF
36C10F19R0003-0004000.docx DOCX document
36C10F19R0003-0003000.docx DOCX document
36C10F19R0003-0002002.pdf PDF
36C10F19R0003-0002001.pdf PDF
36C10F19R0003-0002000.docx DOCX document
36C10F19R0003-0001001.pdf PDF
36C10F19R0003-0001000.docx DOCX document
36C10F19R0003-014.pdf PDF
36C10F19R0003-019.pdf PDF
36C10F19R0003-016.pdf PDF
36C10F19R0003-020.pdf PDF
36C10F19R0003-022.pdf PDF
36C10F19R0003-024.pdf PDF
36C10F19R0003-023.pdf PDF
36C10F19R0003-018.pdf PDF
36C10F19R0003-013.docx DOCX document
36C10F19R0003-017.pdf PDF
36C10F19R0003-021.pdf PDF
36C10F19R0003-015.pdf PDF
36C10F19R0003-000.docx DOCX document
36C10F19R0003.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. VA-36C10F19R0003 VAPHS – University Drive Division

Solicitation No. VA-36C10F19R0003

Connecting Bridge

Amendment No. 7 – May 22, 2019

01-11

01 57 19- 1

AMENDMENT NO. 7 CONTRACTOR QUESTIONS AND CLARIFICATION

1. There is (1) existing steam line and (2) existing vent lines that run under the existing elevated walk way in B30 - they are not shown to be relocated on the drawings. Please confirm what is to be done with existing lines.

Response: A field survey will be completed to fully understand location and routing of existing steam and vent lines. Demo and new construction drawings will be modified as necessary.

See revised drawings

• MD0-100 - SECOND FLOOR DEMO DUCTWORK PLAN

• MH0-100 - SECOND FLOOR NEW DUCTWORK PLAN

• MH0-301 - ENLARGED SECTIONS

• MH0-701 - HVAC DETAILS & SCHEDULES

- - E N D - - -

File details come from the government source that posted it.