3.4
F
F
E E.6
E.7
E.7
3.5
6.5
6.1
W12X26
W X
W X
W12X16
W X
W12X26
W8X10
W8X10
W8X10
W X
W X
W X
W X
W8X10
W8X10
W8X10
W X
W X
W8X10
W8X10
W8X10
W X
W X
W8X10
W8X10
8' - 0"4' - 0"18' - 0"
/4
(REMOVE)
(REMOVE)
(REMOVE)
(REMOVE)
(REMOVE)
(REMOVE)
(REMOVE)
(REMOVE)
(REMOVE)
(REMOVE)
(REMOVE)
(R E
M O
V E
(R E
M O
V E
(R E
M O
V E
(R E
M O
V E
(R
E M
O V
E
(R E
M O
V E
(R
E M
O V
E
(E X
IS
T
T
O R
E M
A
IN
(E
X
IS
T
T O
R E
M A
IN
(R E
M O
V E
(E
X
IS
T
T O
R E
M A
IN
(EXIST TO REMAIN)(EXIST TO REMAIN)
(REMOVE)
EXISTING DIAGONAL BRACING
TO BE REMOVED
SD1-101
x.1 x.2
EA
12.8
W8X18
W
X
W
X
W10X22 W16X40
W16X40
(REMOVE) (REMAINS)
(REMAINS) (REMAINS)
(R E
M A
IN
S
(R E
M A
IN
S x.1 x.2
EA
12.8
W
X
W
X
W14X30 W8X18
(REMOVE)
(R E
M A
IN
S
(R E
M A
IN
S
W
X
(R E
M A
IN
S
(REMAINS)
TRIM &
RECONNECT
AS REQ'D.(PROVIDE TEMP. SHORING)
2nd Flr - Building 30
1197' - 6 5/8"
Interm Elev Lobby - Building 30
1204' - 10 3/4"
1/4"
SAWCUT EXISTING
CONCRETE FLOOR SLAB
SEE 6/AS1-102
W12X26
(EXIST.)
W12X16
(EXIST.)
1/
4"
W21X93
1/
4"
EXISTING CONCRETE
FLOOR SLAB TO REMAIN
(EXIST.)
7' -4
/8
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - FEBRUARY 22, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
SD1-101
646CA2500.23
JLMB
DEMOLITION PLANS &
DETAILS
VAPHS UNIVERSITY DRIVE
1 & 30
1/4" = 1'-0"
ORIGINAL BRIDGE FLOOR - DEMOLITION
PLAN BLDG 30
NOTES:
1. REMOVE STAIR TO ELEVATED WALKWAY
2. REMOVE CONCRETE DECK ON ELEVATED WALKWAY
3. REMOVE BEAMS FRAMING ELEVATED WALKWAY AS INDICATED
4. REMOVE POSTS ALONG E.7 LINE
5. REMOVE W12X16 BETWEEN 6 AND 7 ALONG F LINE
6. FACADE BEAMS ALONG F LINE BETWEEN 3 AND 6 TO REMAIN
7. FRAMING BEAMS ALONG 3 BETWEEN E AND F TO REMAIN
1/4" = 1'-0"
BUILDING 1 - 2ND FLOOR DEMOLITION
PLAN
1/4" = 1'-0"
BUILDING 1 - ROOF DEMOLITION PLAN
3/4" = 1'-0"
SECTION @ EXISTING SLAB EDGE
SEE NOTE 1
a. ALL CONCRETE SHALL BE IN ACCORDANCE WITH A.C.I. 318 "BUILDING CODE
REQUIREMENTS FOR REINFORCED CONCRETE.
b. MINIMUM STRENGTHS DEVELOPED AT 28 DAYS SHALL BE AS FOLLOWS:
FOUNDATION PIER.........................4000 psi w/ 6% AIR PIER.................................................4000 psi w/ 6% AIR
COMPOSITE SLABS........................3000 psi
c. ALL REINFORCING SHALL BE ASTM A-615 SERIES 60. WELDED WIRE FABRIC SHALL BE
A.S.T.M. A-185. MESH LOCATED 1 1/2" ABOVE DECK.
d. SPLICES IN REINFORCING SHALL BE MADE ACCORDING TO A.C.I. 318, CHAPTER 12.
e. MINIMUM COVER FOR REINFORCING SHALL BE AS FOLLOWS:
ALL CONCRETE EXPOSED TO EARTH...............3"
ALL CONCRETE EXPOSED TO WEATHER:
#5 OR SMALLER.............1 1/2"
ALL OTHER...........................2"
SLABS NOT EXPOSED TO WEATHER............3/4"
f. ALL CONCRETE SHALL BE REGULAR WEIGHT (UNLESS NOTED)
1. CONCRETE
2. STRUCTURAL STEEL
a. ALL STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH THE AMERICAN INSTITUTE OF
STEEL CONSTRUCTION SPECIFICATION FOR THE DESIGN, FABRICATION AND ERECTION OF
STRUCTURAL STEEL FOR BUILDING (ASD), LATEST REVISION.
b. "W" SHAPES.........................................ASTM. A992 (Fy=50 KSI) "S", "M", AND "HP" SHAPES................ASTM. A36. (Fy=36 KSI ) ALL TUBES...........................................ASTM A500, CLASS B (Fy=46 KSI) ALL PIPES............................................ASTM. A53, TYPE E GRADE B (Fy=35 KSI) CHANNELS, ANGLES, AND PLATE...ASTM A36 (Fy=36 KSI )
c. SHOP CONNECTIONS MAY BE BOLTED OR WELDED.
d. FIELD CONNECTIONS MAY BE BOLTED OR WELDED.
1) BOLTED USING 3/4"DIA H.S. BOLTS - A.S.T.M. A325-N, FULLY TENSIONED.
2) WELDING IN ACCORDANCE WITH AMERICAN WELDING SOCIETY
e. ALL WELDING SHALL BE MADE WITH E-70 OR SAW-2 ELECTRODES.
f. FABRICATION/ERECTION INSPECTION AND TESTING LISTED IN THE QUALITY CONTROL
SPECIFICATIONS. VERIFICATION INSPECTION OF BOLTS AND WELDS SHALL BE DONE BY AN
INDEPENDENT TESTING AGENCY. VERIFICATION FIELD INSPECTION SHALL INCLUDE THE
FOLLOWING WITH THE RESULTS SUBMITTED TO THE ARCHITECT.
1) BOLTS: 20% OF ALL FIELD BOLTS MINIMUM 2 PER CONNECTION.
2) WELDING: VISUAL INSPECTION OF ALL WELDS.
NON DESTRUCTIVE ULTRASONIC TESTING FOR FULL PENETRATION WELDS.
MAGNETIC PARTICLE TESTING OF 20% OF FILLET WELD LENGTHS.
g. SUBMIT ALL FABRICATION DETAILS FOR APPROVAL PRIOR TO FABRICATION.
h. CUTTING OF HOLES THROUGH STRUCTURAL STEEL IN THE FIELD WILL NOT BE PERMITTED
UNTIL REVIEWED BY THE STRUCTURAL ENGINEER.
i. ALL STEEL SHALL BE SHOP PRIMED EXCEPT STEEL TO RECEIVE FIREPROOFING, GALVANIZED, OR ENCASED IN CONCRETE.
3. MISCELLANEOUS
a. ROOF AND FLOOR DECKS - ACCORDING TO STEEL DECK INSTITUTE DESIGN MANUAL FOR
FLOOR AND ROOF DECK, LATEST REVISION.
b. SHORE ALL COMPOSITE DECKS AS REQUIRED BY MANUFACTURER.
c. CONCRETE ON METAL DECK SHALL BE PLACED TO THE MINIMUM THICKNESS SHOWN.
CONTRACTOR SHALL BECOME FAMILIAR WITH THE DEFLECTION CHARACTERISTICS OF
STRUCTURAL FRAME AND DECKING AND INCLUDE ADDITIONAL CONCRETE DUE TO
DEFLECTIONS IN CALCULATING QUANTITIES OF CONCRETE FOR SLAB.
GENERAL NOTES
OCCUPANCY CATEGORY I.B.C. 2006 & ASCE 7 SECTION 1
OFFICE< 300 PEOPLE II
LIVE LOAD I.B.C. 2006
FLOOR LIVE LOAD 100 psf STAIRS & LOBBY 100 psf ROOF LIVE LOAD 30 psf + DRIFT
WIND LOAD ASCE 7/2005 SECTION 6
EXPOSURE B
BASIC VELOCITY 90 mph
IMPORTANCE FACTOR 1.0
DRIFT LOAD ASCE 7/2005 SECTION 7
GROUND SNOW (Pg) 25 psf
IMPORTANCE FACTOR 1.0
EARTHQUAKE LOAD ASCE 7/2005 SECTION 11-12
IMPORTANCE FACTOR 1.0
SPECTRAL RESPONSE SDS=.183
COEFFICIENTS SD1=..124
SITE CLASS B
DESIGN CATEGORY A
ANALYSIS PROCEDURE LATERAL FORCE
5. DESIGN LOADS
ONE ANGLE REQUIRED FOR EVERY 4" OF WALL
THICKNESS. END BEARING 4 1/2" MIN. OR 1" PER
FOOT OF OPENING. LONG LEG OF ANGLE
VERTICAL. ANGLES WELDED BACK TO BACK.
ALL EXTERIOR LINTELS TO BE HOT DIPPED
GALVANIZED.
ANGLE SIZE
1-L4 X3 1/2 X5/16
1-L6 X3 1/2 X5/16
FOR 10" CMU - HORZ. LEGS = 4" MIN. (2X)
OPENING
TO 5'-0"
7'-0" TO 10'-0"
LOOSE ANGLE LINTEL SCHEDULE
NON BEARING MASONRY WALLS
1-L5 X3 1/2 X5/16 5'-0" TO 7'-0"
AT ROOF
FOR OPENINGS LARGER THAN 12" SQUARE NOT SHOWN ON DWGS.
COORDINATE OPENINGS WITH MECHANICAL DRAWINGS
BEAM
BEAM
SADDLE Ls 6 X 4 X3/8
LSV 1/4" TEFLON PAD
HSS18X6X1/2
W10X49
PLATE 1/2" X 12"H X 8"W
BOTH SIDES - TYPICAL
THRU BOLTS
W/ SLOTTED
CONN.
7 5/8"
ERECTION SPACE
INFILL WITH STEEL FINGER SHIMS
AFTER STEEL ERECTION
CJP, TYP
HSS18X6X1/2
HSS6X6
PLATE 1/2" X 12"H X 8"W
BOTH SIDES - TYPICAL
THRU BOLTS
7 5/8"
/2
ERECTION SPACE
INFILL WITH STEEL FINGER SHIMS
AFTER STEEL ERECTION
9 5/8"
CJP, TYP
1/4" TEFLON PADS
1/2" PL
10 1/8"
1/2"1/2"
1"
W (SEE PLAN)
W (SEE PLAN)
1/
2" 4"
1/
2"
1' -0
NEW POST
W10X54
1/2" PLATE-B.S.
ALLOW FOR ERECTION
CLEARANCE
1" THICK BASE PLATE
REMOVE PORTION
OF EXIST. CONCRETE
FLOOR SLAB TO ATTACH
NEW POST
(4) - 3/4"Ø A325 BOLTS
IN VERTICAL SLOTS
1/4
1/4
1/4
1/4
W8,W10,C8,C10 2
MINIMUM SHEAR CAPACITIES
ROLLED SECTIONS
15 W8 - W10 2 15
BEAM TO
BEAM CONN.
MIN #
ROWS
kips
BEAM TO COLUMN
CONN.
MIN #
ROWS
kips
W12 - W14 3 30 W12 - W14 3 30
4 40 W16 4 50
5 50 W18 5 70
6 60 W21 6 100
7 70 W24 - W27 7 120
8 80 W30 - W33 8 140
9 90 W36 9 170
NOTES
a. SHEAR CONNECTION FOR GRAVITY LOADING ONLY UNLESS NOTED ON DRAWING
(SEE LEGEND). MOMENT CAPACITIES VARY AS SHOWN.
b. CONNECTION TO CONTAIN MINIMUM NUMBER OF BOLT ROWS SHOWN UNLESS
SPECIFIC DETAILING REQUIREMENTS JUSTIFY MODIFICATION.
c. CONNECTION CAPACITIES SHOWN USE ASD DESIGN LOADING AND ARE FOR USE IN
SPECIFIC DETAIL CASES NOT SHOWN ON DRAWING.
d. BEAM TO BEAM CONNECTIONS CAPACITIES BASED ON 5/16" SINGLE SHEAR PLATES WITH 3/4"∅ A325-N BOLTS IN SSLT HOLES PER AISC TABLE 10-9a
e. BEAM TO COLUMN CONNECTIONS SHALL BE 3/8" THICK DOUBLE ANGLE WITH MIN.
ROWS SHOWN, UNLESS SPECIFIC DETAILING REQUIREMENTS JUSTIFY MODIFICATION.
CAPACITIES BASED ON AISC TABLE 10-2 CASE II.
f. PROVIDE PLATE WASHERS AT ALL SLOTTED HOLES.
W16
W18
W21
W24 -W27
W30 - W33
W36 2nd Flr - Building 30
1197' - 6 5/8"
F
HSS8X4X3/8
HSS4X2X1/4
10"
EXP. JT.
2"
EOS
4"
/4
/4
W18X50
W21X50
EXIST.
EXIST.
1'-8"
COMPOSITE SLAB "A"
EXIST. CONCRETE
FLOOR SLAB
POUR STOP
FACE OF BRICK BEYOND
PL 1/2"X8
CONT
BETWEEN
COLUMNS
4-18
F
B/O ROOF DECK
1206' - 11 5/8"
W8x31
HSS8X4X3/8
3"X18GA. ROOF DECK
LOOSE ANGLE LINTEL
SEE SCHEDULE
BUILDING 30
COLD FORMED
METAL HEADER
1'-8" 2" EJ
FACE OF BRICK
2nd Flr - Building 1
1193' - 1 3/8"
EA
W6X8.5
W10X54
HSS8X4X3/8
HSS8X4X3/8
10"
POUR STOP
/4
COMPOSITE SLAB "A"
PLATE 1/2"
NEW ARCHITECTURAL FLOOR
3-12
3-12
1'-0" 1'-0"
FACE OF BRICK BEYOND
Interm Elev Lobby - Building 30
1204' - 10 3/4"
EA
W10X54
W10X54
/4
3"X18GA.
ROOF DECK
HSS8X4X3/8
LOOSE ANGLE LINTEL
SEE SCHEDULE
1'-0"1'-10"
FACE OF BRICK
2" EJ
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - FEBRUARY 22, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
SS0-101
646CA2500.23
JLMB
GENERAL NOTES &
SCHEDULES
VAPHS UNIVERSITY DRIVE
1 & 30
1/4" = 1'-0" A
MECHANICAL OPENINGS
1 1/2" = 1'-0"
C
TYPICAL SHOE CONN. DETAIL - WF
1 1/2" = 1'-0" D
TYPICAL SHOE CONN. DETAIL - HSS
3/4" = 1'-0"
B
TYPICAL NEW POST CONNECTION
3/4" = 1'-0" E
SECTION @ FLOOR SLAB - BLDG 30
3/4" = 1'-0" F
SECTION @ ROOF DECK - BLDG. 30
3/4" = 1'-0" G
SECTION @ FLOOR SLAB - BLDG. 1
3/4" = 1'-0" H
SECTION @ ROOF DECK - BUILDING 1
F
F
6.5
6.5 x.1 x.1 x.2
6.1
6.1
EA
12.8
GROUND FLOOR EL. 1162'-10 5/8"
BASEMENT FLOOR EL. 1146'-10 5/8"
BUILDING 30
BUILDING 1 - AREA W
BASEMENT FLOOR EL. 1155' - 9 1/4"
GROUND FLOOR EL. 1163' - 6 5/8"
BRIDGE ABOVE
BRIDGE ABOVE
SS5-101
SS5-101
EXISTING FOOTING
A 3' X 3' X 24"
12 - #4 EW
F = 8 TSF [ORIGINAL]
BR
P = 82.4k
ORIGINAL
P
REVISED
f = 6 TSF B
BOF 1156.55 BOF 1143.88
EXISTING FOOTING
C 4' X 4' X 26"
17 - #5 EW
F = 8 TSF [ORIGINAL]
BR
P = 187k
ORIGINAL
P = 212k
REVISED
f = 6.6 TSF B
UNDERGROUND UTILITIES EXIST IN THIS LOCATION.
EXTREME CARE MUST BE EXERCISED.
HAND DIG AS REQUIRED TO ESTABLISH UTILITY EXACT LOCATION.
8'-7 1/4"37'-5 1/2"
41'-9 1/8"
NOTE:
CONTRACTOR SHALL HAVE A LICENSED SURVEYOR
VERIFY EXISTING DIMENSIONS, FLOOR ELEVATIONS,
AND FLOOR-TO-FLOOR HEIGHTS BEFORE ORDERING,
FABRICATING, OR DETAILING STRUCTURAL COLUMNS
AND HORIZONTAL FRAMING. THIS INFORMATION MUST
BE CONFIRMED AT LOCATIONS WHERE NEW FLOORS
MEET EXISTING.
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - FEBRUARY 22, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
SS1-100
646CA2500.23
JLMB
GROUND / FOUNDATION
PLAN
VAPHS UNIVERSITY DRIVE
1 & 30
1/4" = 1'-0"
GROUND FLOOR FOUNDATION PLAN
BUILDING 30
NOTE:
1. UTILITES AND STORAGE TANKS ARE LOCATED WITHIN THE PROJECT BOUNDRIES.
2. EXTREME CARE SHALL BE EXERCISED WITH HEAVY EQUIPMENT AND CRANES.
3.4
F
F
E
E
E.7 x.G x.J x.L
6.5 x.4 x.5 x.1 x.1 x.2
6.1
EA
12.8
12.8
SS1-101
SS3-102
8' - 7 1/4"
/4
H S
S
X 6X
1/
H S
S
X 6X
1/
HSS8X4X3/8
HSS8X4X3/8
HSS8X4X3/8
HSS8X4X3/8
HSS6X6X3/8
H S
S 6X
6X 3/
HSS6X6X3/8
HSS18X6X1/2
/8
37' - 5 1/2"
'-1
5/
8"
1' - 8"
H S
S 6X
6 X 3/
HSS5X5X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
H S
S 8X
4X 3/
H S
S 8X
4X 3/
H S
S 8X
4X 3/
H S
S 8X
4X 3/
H S
S 4X
2X 1/
HSS5X5X3/8
1'
-0
1' -1
1/
8"
95.00°
/8
HSS4X0.250
HSS4X0.250
HSS4X0.25
HSS4X0.250
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
EXIST W21X50
EXIST W21X50
EXIST W18X35
EXIST W18X35
EXIST W18X35
EXIST W21X50
EXIST W18X35
EXIST W18X35
EXIST W18X35
EXIST W18X35
EXIST W18X35
EXIST W21X50
EXIST W18X35
EXIST W18X35
EXIST W21X50
EXIST W21X50
EXIST
W10X22
EXIST W16X40
EXIST W16X40
E X
IS
T
W X
E X
IS
T
W X
E X
IS
T
W X
W14X30
E X
IS
T
W X
5' - 11 1/4" 7' - 6"
7' - 6" 7' - 6"
SS3-102
SS3-101
SS3-101
SS5-101
HSS4X0.250
HSS4X
0.2
50 HSS4X0.250
HSS4
X0.
COMPOSITE SLAB "A"
C O
M P
O S
IT
E
S
LA
B
A
W10X54
NEW POST
W12X40
EXIST. COL.
W10X39
EXIST. COL.
W10X33
EXIST. COL.
W10X54
NEW POST
BUILDING 30
BUILDING 1
HSS18X6X1/2
(TYPICAL U.N.O.)
(TYPICAL U.N.O.)
(EXIST.)
NORTH
SOUTH
EAST
WEST
2ND FLOOR
EL. 1197'-6 5/8"
FINISHED FLOOR
EL. 1195'-10 1/8"
FINISHED FLOOR
EL. 1194'-3 3/8"
W10X54
HSS8X4X3/8
(LO-NEW)
G
SS0-101
W6X8.5
(HI-NEW)
R=20k @ EA. END
4' - 0"
H S
S 8X
4X 3/
H S
S 8X
4X 3/
HSS8X4X3/8
1'-6"
3' - 0"
W 8x
W8x31
.0
0°
1'-4"
E
SS0-101
SS1-101
40'-0"9'-10" 20'-0"
E X
IS
T
W X
E X
IS
T
W X
EXIST W16X40
EXIST W16X40
W 8X
W 8X
VIF
7'-5"
VIF
7'-4"
VIF
5'-3"
V
IF
C8X11.5
V
IF
/2
/4
NEW CONCRETE
& DECK INFILL
R=23k @ EA. END
C8X11.5
H
SS6X
6X 3/
8H S
S X
.2
HSS4X0.250
HSS
4X
0.
Interm Elev Lobby - Building 30
1204' - 10 3/4"
2nd Flr - Building 1
1193' - 1 3/8" x.1 12.8
8'-7 1/4"
HSS8X4X3/8
H S
S
X 6X
1/
H S
S
X 6X
1/
H S
S
X 6X
1/
H S
S
X 6X
1/
HSS8X4X3/8
/4
/4
COMPOSITE SLAB "A"
HSS5X5X3/8
HSS5X5X3/8
/4
3" X 18 GA. ROOF DECK
NOTE:
ALL TUBE STEEL CONNECTIONS
TO BE WELDED ALL AROUND-TYPICAL
LSV
LSV
LS
V
LS
V
LS
V
LS
V
L3x3x5/16 DECK SUPPORT
TYP
TYP
1/4
TYP
COMPOSITE SLAB "A"
5 1/4" THICK WITH 2" X 18 GA. COMPOSITE STEEL DECK AND
3 1/4" LWT. CONCRETE FILL. ONE LAYER OF W.W.F. 6 X 6 - W2.1
X W2.1 MINMUM 3 SPANS UNSHORED.
LEGEND
W16X31
XX (KIPS)
BEAM SIZE
SHEAR REACTION
(IF VALUE EXCEEDS SHEAR
TABLE ON DWG. SS0-101
MOMENT CONN.
(FULL ELASTIC MOMENT)
SHORE ALL COMPOSITE SLABS AS REQ'D. BY DECK MFR.
DECK MFR. MUST ADJUST NUMBER OF STUDS TO CONFORM
TO THEIR DECK PROFILE.
2nd Flr - Building 1
1193' - 1 3/8"
EA
W16X40
V
IF
/4
W16X40
W8X15C8X11.5
8'-3 1/2"
2'-2"
4 1/4"
EXIST.
EXIST.
1/4
COPE NEW BEAM TO EXIST.
TYP.
EXPANSION MAT'L.-TYP.
EXPANSION MAT'L.-TYP.
2" X 18 GA. COMPOSITE
STEEL DECK
EXIST. OPENING VIF
2'-8 3/4"
C8X11.5
NOTE:
CONTRACTOR SHALL HAVE A LICENSED SURVEYOR
VERIFY EXISTING DIMENSIONS, FLOOR ELEVATIONS,
AND FLOOR-TO-FLOOR HEIGHTS BEFORE ORDERING,
FABRICATING, OR DETAILING STRUCTURAL COLUMNS
AND HORIZONTAL FRAMING. THIS INFORMATION MUST
BE CONFIRMED AT LOCATIONS WHERE NEW FLOORS
MEET EXISTING.
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - FEBRUARY 22, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
SS1-101
646CA2500.23
JLMB
FLOOR FRAMING PLAN
VAPHS UNIVERSITY DRIVE
1 & 30
1/8" = 1'-0"
BRIDGE FLOOR FRAMING PLAN
3/4" = 1'-0"
TYPICAL BRIDGE SECTION @ BLDG 30
BRIDGE FLOOR EL. VARIES
SEE PLAN FOR NEW FINISHED FLOOR ELEVATIONS
3/4" = 1'-0"
SECTION - CONCRETE SLAB INFILL
EXIST SLAB
CONTROL JOINT IN SLAB ON STEEL
DECK AT DECK DIRECTION CHANGE
F
F
E.7 x.3
6.5 x.1 x.1 x.2
6.1
EA
12.8
SS1-101
SS3-102
/4
8' - 7 1/4"
95.00°
HSS18X6X1/2
H S
S 8X
4X 3/
H S
S 8X
4X 3/
H S
S 8X
4X 3/
H S
S 8X
4X 3/
H S
S 8X
6X 3/
7' - 6" 7' - 6"
7' - 6" 5' - 11 1/4"
/8
/8
HSS8X6X3/8
H S
S 8X
6X 3/
H
S S
X
6X 1/
H S
S
X 6X
1/
HSS8X6X3/8
HSS8X4X3/8
HSS8X4X3/8
HSS8X4X3/8
HSS8X4X3/8
W12X40
W10X33
W10X39
HSS5X5X3/8
SS3-102
SS3-101
SS3-101
HSS6X6X3/8
HSS4X0.250
HSS4X0.250
HSS4X
0.2
HSS4X0.250
HSS4X
0.2
50 HSS4X0.250 HSS4
X0.
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
3"X18 GA. ROOF DECK
3" X
G
A
R O
O F
D E
C K
EXIST. COL.
W10X54
NEW POST
EXIST. COL.
EXIST. COL.
W10X54
NEW POST
BUILDING 30
BUILDING 1
HSS18X6X1/2
(TYPICAL U.N.O.)
HSS4X0.250
NORTH
SOUTH
EAST
WEST
H S
S 8X
4X 3/
4' - 0"
W10X54 NEW
W
X
TRIM & CONNECT EXIST. BEAM TO NEW BEAM AS REQ'D
HSS8X4X3/8
H S
S 8X
4X 3/
C8X11.5
C 6X
8.
C 6X
8.
26"
6"
1'-3 5/8"4'-0"3'-3 5/8"
1'-6"
W 8x
HSS4X2X1/4
HSS4X2X1/4
.0
0°
/4
F
SS0-101
H
SS0-101
R=6k@ EA. END
R=5k @ EA. END
W8x31
HSS4
X0
.2
HSS4X0.250
TYP
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - FEBRUARY 22, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
SS1-102
646CA2500.23
JLMB
ROOF FRAMING PLAN
VAPHS UNIVERSITY DRIVE
1 & 30
1/8" = 1'-0"
BRIDGE ROOF FRAMING PLAN
BRIDGE-3D VIEW
2nd Flr - Building 30
1197' - 6 5/8"
Interm Elev Lobby - Building 30
1204' - 10 3/4"
2nd Flr - Building 1
1193' - 1 3/8"
7' - 6"7' - 6"7' - 6"
90.00°
/4
/4
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
HSS6X6X3/8
HSS18X6X1/2
HSS18X6X1/2
HSS8X4X3/8
HSS8X4X3/8
W10X54
NEW POST
HSS4X0.250
BRACE-TYP.
HSS4X0.250
HSS8X6X3/8
COMPOSITE
SLAB "A"
CRUCIFORM -SEE SS5-101
COMPOSITE
SLAB "A"
3"X18 GA.
ROOF DECK
2' -8
/4
BRACE-TYP.
SS3-101
E
SS3-101
F
SS3-101
G
SS3-101
H
FINISHED FLOOR
EL. 1195'-10 1/8"
BUILDING 30
3/4"
3/4"
TOWER
ALL TOWER CONNECTIONS
TO BE WELDED
W8x31
W8x31W8x31
2nd Flr - Building 30
1197' - 6 5/8"
Interm Elev Lobby - Building 30
1204' - 10 3/4"
B/O ROOF DECK
1206' - 11 5/8"
B/O ROOF DECK
1206' - 11 5/8"
2nd Flr - Building 1
1193' - 1 3/8"
W12X40
7' - 6"7' - 6"7' - 6"
HSS18X6X1/2
HSS18X6X1/2
HSS6X6X3/8
HSS8X6X3/8
/4
/4
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
COMPOSITE
SLAB "A"
3"X18 GA.
ROOF DECK
HSS6X6X3/8
HSS8X6X3/8
HSS8X4X3/8
HSS8X4X3/8
EXIST. COL.
CRUCIFORM -SEE SS5-101
2' -8
/4
W12X79
EXIST. COL.
W21X50
HSS4X0.250
BRACING - TYP.
SS3-101
A
SS3-101
B
SS3-101
C
SS3-101
D
FINISHED FLOOR
EL. 1195'-10 1/8"
BUILDING 30
4' - 0"
1 3/8"
C8X11.5 C6X8.2C6X8.2
T O
T /R
O O
F D
E C
K
T Y
P A
T T
O W
E R
'-1
/8
TOWER
ALL TOWER CONNECTIONS
TO BE WELDED
2nd Flr - Building 1
1193' - 1 3/8"
HSS18X6X1/2
HSS6X6X3/8
2' -8
/4
HSS6X6X3/8
COMPOSITE SLAB "A"
1/
4" x.1
CJP
PLATE 1/2" B.S.
SEE D/SS0-101
3/4" THRU BOLTS
PLATE 1/2"
1'-1"
HSS6X6X3/8
1' - 6"
HSS8X4X3/8
1/4" COVER PLATE
1/4
1/2"
Interm Elev Lobby - Building 30
1204' - 10 3/4"
HSS18X6X1/2
HSS8X6X3/8
3" ROOF DECK
x.1
CJP
HSS6X6X3/8
PLATE 1/2" B.S.
SEE D/SS0-101
3/4" THRU BOLTS
PLATE 1/2"
1'-6"
HSS8X4X3/8
1/4" COVER PLATE
1/4
1'-1"
HSS6X6X3/8
1/2" 2"4 1/2"
2"
2nd Flr - Building 30
1197' - 6 5/8"
W21X50
HSS18X6X1/2
W12X79
EXIST. COL.
W12X40
EXIST. COL.
COMPOSITE SLAB "A"
EXISTING
FLOOR SLAB
F
1'-8"
W10X49
FACE OF BRICK
EXIST W18X50
1/4"
1"
PLATE 1/2" B.S.
SEE C/SS0-101
CJP
THRU BOLTS
TEFLON PAD
HSS8X4X3/8
(2) 5/8" STIFF. PL. B.S.
3'-8"
1/4" COVER PLATE END
1/4
TYP
10"
EXIST. COL.
HSS18X6X1/23" ROOF DECK
F
HSS8X4X3/8
FACE OF WALL
1'-8" VIF
W10X49
PLATE 1/2" B.S.
SEE C/SS0-101
THRU BOLTS
TEFLON PAD
(2) 5/8" STIFF. PL. B.S.
MAX
1"
1/4
TYP
1/4" COVER PLATE END
& B.S. - AESS (TYP)
10"
CJP
2nd Flr - Building 30
1197' - 6 5/8"
W10X54
NEW POST
HSS18X6X1/2
COMPOSITE SLAB "A"
EXISTING
FLOOR SLAB
W18X50
(EXIST.)
1'-3"
W10X49
HSS4X2X1/4
F
FACE OF BRICK
TEFLON PAD
HSS8X4X3/8
PLATE 1/2" B.S.
SEE C/SS0-101
THRU BOLTS
CJP
1"
W8x31
1" BASE PLATE
SEE CONN. DETAIL
B/S00-101
8"
1/2" STIFF. PL.
1'-8"
1/4
HSS18X6X1/2
W10X54
NEW POST
3" ROOF DECK
F
1'-8"
HSS8X4X3/8
FACE OF BRICK
W10X49 10"
THRU BOLTS
TEFLON PAD
PLATE 1/2" B.S.
SEE C/SS0-101
CJP
(2) 5/8" STIFF. PL. B.S.
1" W8x31
SEE CONN. DETAIL
B/SS0-101
1/4
BOTH SIDES
1/2" END PALTE
HSS6X6X3/8
HSS18X6X1/2
COMPOSITE
SLAB "A"
HSS6X6X3/8
POST
HSS6X6X3/8
HSS8X4X3/8
PLATE 1/2" B.S.
SEE D/SS0-101
THRU BOLTS
2'-3"
1'-1"
1/2" PLATE
COMPOSITE SLAB "A"
1/4
1/4" COVER PLATE
CJP
Interm Elev Lobby - Building 30
1204' - 10 3/4"
HSS6X6X3/8
HSS8X6X3/8
HSS18X6X1/2
3" ROOF DECK
PLATE 1/2" B.S.
SEE D/SS0-101
THRU BOLTS
1/2" PLATE
HSS6X6X3/8 1'-1"
1/4
1/4" CAP PL.-TYP
1/4" CAP PLATE
1/2"
CJP
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - FEBRUARY 22, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
SS3-101
646CA2500.23
JLMB
ELEVATIONS
VAPHS UNIVERSITY DRIVE
1 & 30
1/4" = 1'-0"
SOUTH ELEVATION
1/4" = 1'-0"
NORTH ELEVATION
3/4" = 1'-0" A
CONNECTION DETAIL "A" NORTH
ELEVATION
3/4" = 1'-0" B
CONNECTION DETAIL "B" NORTH
ELEVATION
3/4" = 1'-0" C
CONNECTION DETAIL "C" NORTH
ELEVATION
3/4" = 1'-0" D
CONNECTION DETAIL "D" NORTH
ELEVATION
3/4" = 1'-0" E
CONNECTION DETAIL "E" SOUTH
ELEVATION
3/4" = 1'-0" F
CONNECTION DETAIL "F" SOUTH
ELEVATION
3/4" = 1'-0" G
CONNECTION DETAIL "G" SOUTH
ELEVATION
3/4" = 1'-0" H
CONNECTION DETAIL "H" SOUTH
ELEVATION
2nd Flr - Building 1
1193' - 1 3/8"
2nd Flr - Building 1
1193' - 1 3/8"
EA
SS1-101
7' - 6"7' - 6"7' - 6 5/8"
2'
/4
HSS8X6X3/8
HSS6X6X3/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
HSS18X6X1/2
HSS18X6X1/2 HSS8X4X3/8
COMPOSITE
SLAB "A"
3"X18 GA.
ROOF DECK
HSS8X4X3/8
HSS4X0.250
(BRACING TYP.)
1' - 10"
HSS8X6X3/8
HSS6X6X3/8
5 1/4"
W10X33
EXIST. COL.
W24X94
W18X60
SS3-102
J
4 3/4"
SS3-102
K
SS3-102
L
SS3-102
M
FINISHED FLOOR
EL. 1194'-3 3/8"
BUILDING 1
FINISHED FLOOR
EL. 1195'-10 1/8"
TOWER
ALL TOWER CONNECTIONS
TO BE WELDED
Interm Elev Lobby - Building 30
1204' - 10 3/4"
2nd Flr - Building 1
1193' - 1 3/8"
2nd Flr - Building 1
1193' - 1 3/8"
EA
SS1-101
2' -8
/4
1'-0"
31'-10 5/8"
32'-10 5/8"
1'-10"
1/
4"
30'-0 5/8"
7'-6" 7'-6" 7'-6" 7'-6 5/8"
HSS18X6X1/2
1/
2"
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
HSS18X6X1/2
HSS8X4X3/8
HSS8X4X3/8
H S
S X
X
/8
HSS6X6X3/8
COMPOSITE
SLAB "A"
3"X18 GA.
ROOF DECK
HSS4X0.250
BRACING-TYP.
HSS4X0.250
BRACING-TYP.
W10X54
NEW POST
CRUCIFORM -SEE SS5-101
HSS8X6X3/8
1' -6
BASE PL. 1"X12"X12"
ON 1" THK. NON-SHRINK
GROUT-(4) 1" DIA. ANCHOR
BOLTS-TYPICAL
SS3-102
N
SS3-102
P
SS3-102
Q
SS3-102
R
FINISHED FLOOR
EL. 1195'-10 1/8"
FINISHED FLOOR
EL. 1194'-3 3/8"
BUILDING 1
W10X39
EXIST. POST
TOWER
ALL TOWER CONNECTIONS
TO BE WELDED
2nd Flr - Building 1
1193' - 1 3/8"
EA
HSS18X6X1/2
W10X33
EXIST COL.
W24X94
COMPOSITE SLAB "A"
W10X54
HSS8X4X3/8
1' - 0"
FACE/WALL
W10X49
PLATE 1/2"
(2) 5/8" STIFF. PL. B.S.
W6X8.5
(NEW -NO COL.CONN.)
THRU BOLTS
1/4" COVER PLATE
EXIST. FLOOR SLAB
TEFLON PAD
ARCHITECTURAL FLOOR
(NEW)
CJP
1"
PLATE 1/2"
NEW/EXIST. SLAB TYP.
9" 1"
1/4
BOTH SIDES
1/4
TYP
10"
DEMO CONCRETE AROUND
COLUMN FOR STIFFENER
PLATE INSTALLATION
Interm Elev Lobby - Building 30
1204' - 10 3/4"
EA
HSS18X6X1/2
EXIST
W18X60
W10X33
EXIST. COL.
3" ROOF DECK
1'-0"
FACE/WALL
W10X49
10"
PLATE 1/2" B.S.
SEE C/SS0-101
(2) 5/8" STIFF. PL. B.S.
THRU BOLTS
W10X54
TEFLON PAD
EXIST. ROOF SLAB
CJP
4"4"
1/2"
1"
1/4
TYP
1/4" COVER PLATE
2nd Flr - Building 1
1193' - 1 3/8"
HSS18X6X1/2
4 3/4" 5 1/4"
HSS6X6X3/8
COMPOSITE SLAB "A"
HSS6X6X3/8
PLATE 1/2" B.S.
SEE D/SS0-100
3/4" THRU BOLTS
PLATE 1/2"
HSS6X6X3/8
1/4" COVER PLATE -
AESS (TYP)
1'-1"
1/4"
CJP
HSS18X6X1/2
HSS8X6X3/8
HSS6X6X3/8
3" ROOF DECK
HSS6X6X3/8
PLATE 1/2" B.S.
SEE D/SS0-100
3/4" THRU BOLTS
PLATE 1/2"
2'-3 1/4"
1/4" COVER PLATE
HSS8X4X3/8
1'-1"
CJP
1/4
2nd Flr - Building 1
1193' - 1 3/8"
/4
HSS6X6X3/8
HSS6X6X3/8
HSS18X6X1/25
1/
4"
COMPOSITE SLAB "A"
POST
1' - 6"
HSS8X4X3/8
HSS6X6X3/8
PLATE 1/2" B.S.
SEE D/SS0-101
THRU BOLTS
1/2" PLATE
1' - 1"
1/4" COVER PLATE
1/4
CJP
HSS18X6X1/2
HSS6X6X3/8
HSS8X6X3/8
3" ROOF DECK
PLATE 1/2" B.S.
SEE D/SS0-101
THRU BOLTS
1/2" PLATE
1'-6"
1'-1"
HSS6X6X3/8
HSS8X4X3/8
1/4" COVER PLATE
CJP
1/4
2nd Flr - Building 1
1193' - 1 3/8"
EA
3/
4"
1/ 4"
HSS18X6X1/2
W10X54
NEW POST
HSS8X4X3/8
HSS5X5X3/8
W10X49
W10X39
EXIST. COL.
PLATE 1/2"
W/ TEFLON PAD B.S.
THRU BOLTS
TEFLON PAD
W10X54
W6X8.5
(NEW-NO COL. CONN.)
(NEW)
(2) 5/8" STIFF. PL. BOTH SIDES
CJP
1"
1/4" COVER PLATE
PLATE 1/2"
TYP. NEW/EXIST. SLAB
1/4
BOTH SIDES
L3X3X1/4 AS REQ'D
TO SUPPORT SLAB-WELD TO POST
FINISHED FLOOR
EL. 1194'-3 3/8"
10"
Interm Elev Lobby - Building 30
1204' - 10 3/4"
EA
HSS18X6X1/2
W10X54
NEW POST
3" ROOF DECK
W10X49
PLATE 1/2" B.S.
SEE C/SS0-101
1'-0"
THRU BOLTS W10X54
EXIST W10X22
TEFLON PAD
(2) 5/8" STIFF. PL. B.S.
EXIST. ROOF SLAB
CJP
1"
PLATE 1/2"-CONT.
TRIM AT HSS 18
1/4
TYP
10"
1/4" COVER PLATE
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - FEBRUARY 22, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
SS3-102
646CA2500.23
JLMB
ELEVATIONS
VAPHS UNIVERSITY DRIVE
1 & 30
1/4" = 1'-0"
EAST ELEVATION/SECTION
1/4" = 1'-0"
WEST ELEVATION/SECTION
3/4" = 1'-0" J
CONNECTION DETAIL "J"-EAST
ELEVATION
3/4" = 1'-0" K
CONNECTION DETAIL "K"-EAST
ELEVATION
3/4" = 1'-0" L
CONNECTION DETAIL "L"-EAST
ELEVATION
3/4" = 1'-0" M
CONNECTION DETAIL "M"-EAST
ELEVATION
3/4" = 1'-0" N
CONNECTION DETAIL "N"-WEST
ELEVATION
3/4" = 1'-0" P
CONNECTION DETAIL "P"-WEST
ELEVATION
3/4" = 1'-0" Q
CONNECTION DETAIL "Q"-WEST
ELEVATION
3/4" = 1'-0" R
CONNECTION DETAIL "R"- WEST
ELEVATION
6.5 x.1
6.1
12.8
8'
/4
SS5-101
8'-7 1/4"
60" DIA. FOUNDATION PIER
@ 25'-0" DEEP
CONCRETE PIER
36" X 36"
4'-3 5/8" 4'-3 5/8"
4' -3
/8
4' -3
/8
.0
3'
- 0
" 3' - 0"
.6
.3
6.5 x.1
6.1
12.8
SS5-101
2'
- 0
5'
- 8
2' - 0"
6' - 5"
5' - 11 7/8"
5'
- 1
0 1 /2"
90.00°
.0
8'-7 1/4"
8'
/4
36" X 36"
CONCRETE PIER
HSS6X6X3/8
(TYPICAL)4
.3
.6
SLOPE TOP OF PIER CORNERS
TYPICAL
SS5-101
3' -0
3'-0"
#4 HAIRPINS W/ ALTERNATE
90°& 135° HOOKS
#4 TIES @ 16" O.C.
12 - #11 VERTICAL
ALL CORNERS TO BE
CHAMFERED-TYPICAL
V A
R
IE
S
2'-0"
#4 STIRRUPS @ 12" O.C.
5 -#6 TWO ROWS
TOP & BOTT.
ALL CORNERS TO BE
CHAMFERED-TYPICAL
Ground Floor - Building 30
1162' - 10 5/8"
2nd Flr - Building 1
1193' - 1 3/8"
Grd Floor
1163' - 6 5/8"
Mech. Rm. Floor
1160' - 0"
Basement - Building
1155' - 9 1/4"
2'
8"
1'
/4
36" X 36"
VARIES-SEE PLAN VARIES-SEE PLAN
8' -6
M
IN
3 SPA @ 4" 3 SPA @ 4"
5 -#6 TWO ROWS T & B
STD HOOK EACH END
TOP BARS
#4 STIRRUPS
@ 12" O.C.
#4
O .C
8' -6
C
O N
F
IN
E M
E N
T H
O O
P S
O
.C
8' -6
C
O N
F
IN
E M
E N
T H
O O
P S
12 -#11 VERT.
60" DIA.
@ 25'-0" DEEP
FULLY DEVELOP 12 -#11 PIER REBAR
INTO FOUNDATION PIER.
#4 TIES @ 16" O.C.
9 -#11 VERT.
#4 TIES @ 18" O.C.
E M
B E
D
1' -6
HSS6X6X3/8HSS6X6X3/8
PIER
FOUNDATION
PIER
BEAMBEAM
2' -1
5/
8" 4'
-2
/4
SLOPE TOP OF FOUNDATION
180 DEGREE
HOOK TYP
B/SS5-101
C /S
S -1
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BIDDING DOCUMENTS - FEBRUARY 22, 2019
VA CARES CONSOLIDATION
VAMC, PITTSBURGH, PA
CONNECTING BRIDGE
SS5-101
646CA2500.23
JLMB
CRUCIFORM PLAN &
DETAILS
VAPHS UNIVERSITY DRIVE
1 & 30
1/2" = 1'-0"
CRUCIFORM FOUNDATION PLAN
1/2" = 1'-0"
CRUCIFORM PLAN AT TOP
3/4" = 1'-0" B
PIER DETAIL
3/4" = 1'-0" C
BEAM DETAIL
TOP OF CAISSON EL. 1162'-10 5/8"
1/2" = 1'-0"
CRUCIFORM SECTION
| SD1-101 - DEMOLITION PLANS & DETAILS |
| Sheets |
| SD1-101 - DEMOLITION PLANS & DETAILS |
| SS0-101 - GENERAL NOTES & SCHEDULES |
| SS1-100 - GROUND / FOUNDATION PLAN |
| SS1-101 - FLOOR FRAMING PLAN |
| SS1-102 - ROOF FRAMING PLAN |
| SS3-101 - ELEVATIONS |
| SS3-102 - ELEVATIONS |
| SS5-101 - CRUCIFORM PLAN & DETAILS |
| SS0-101 - GENERAL NOTES & SCHEDULES |
| Sheets |
| SD1-101 - DEMOLITION PLANS & DETAILS |
| SS0-101 - GENERAL NOTES & SCHEDULES |
| SS1-100 - GROUND / FOUNDATION PLAN |
| SS1-101 - FLOOR FRAMING PLAN |
| SS1-102 - ROOF FRAMING PLAN |
| SS3-101 - ELEVATIONS |
| SS3-102 - ELEVATIONS |
| SS5-101 - CRUCIFORM PLAN & DETAILS |
| SS1-100 - GROUND - FOUNDATION PLAN |
| Sheets |
| SD1-101 - DEMOLITION PLANS & DETAILS |
| SS0-101 - GENERAL NOTES & SCHEDULES |
| SS1-100 - GROUND / FOUNDATION PLAN |
| SS1-101 - FLOOR FRAMING PLAN |
| SS1-102 - ROOF FRAMING PLAN |
| SS3-101 - ELEVATIONS |
| SS3-102 - ELEVATIONS |
| SS5-101 - CRUCIFORM PLAN & DETAILS |
| SS1-101 - FLOOR FRAMING PLAN |
| Sheets |
| SD1-101 - DEMOLITION PLANS & DETAILS |
| SS0-101 - GENERAL NOTES & SCHEDULES |
| SS1-100 - GROUND / FOUNDATION PLAN |
| SS1-101 - FLOOR FRAMING PLAN |
| SS1-102 - ROOF FRAMING PLAN |
| SS3-101 - ELEVATIONS |
| SS3-102 - ELEVATIONS |
| SS5-101 - CRUCIFORM PLAN & DETAILS |
| SS1-102 - ROOF FRAMING PLAN |
| Sheets |
| SD1-101 - DEMOLITION PLANS & DETAILS |
| SS0-101 - GENERAL NOTES & SCHEDULES |
| SS1-100 - GROUND / FOUNDATION PLAN |
| SS1-101 - FLOOR FRAMING PLAN |
| SS1-102 - ROOF FRAMING PLAN |
| SS3-101 - ELEVATIONS |
| SS3-102 - ELEVATIONS |
| SS5-101 - CRUCIFORM PLAN & DETAILS |
| SS3-101 - ELEVATIONS |
| Sheets |
| SD1-101 - DEMOLITION PLANS & DETAILS |
| SS0-101 - GENERAL NOTES & SCHEDULES |
| SS1-100 - GROUND / FOUNDATION PLAN |
| SS1-101 - FLOOR FRAMING PLAN |
| SS1-102 - ROOF FRAMING PLAN |
| SS3-101 - ELEVATIONS |
| SS3-102 - ELEVATIONS |
| SS5-101 - CRUCIFORM PLAN & DETAILS |
| SS3-102 - ELEVATIONS |
| Sheets |
| SD1-101 - DEMOLITION PLANS & DETAILS |
| SS0-101 - GENERAL NOTES & SCHEDULES |
| SS1-100 - GROUND / FOUNDATION PLAN |
| SS1-101 - FLOOR FRAMING PLAN |
| SS1-102 - ROOF FRAMING PLAN |
| SS3-101 - ELEVATIONS |
| SS3-102 - ELEVATIONS |
| SS5-101 - CRUCIFORM PLAN & DETAILS |
| SS5-101 - CRUCIFORM PLAN & DETAILS |
| Sheets |
| SD1-101 - DEMOLITION PLANS & DETAILS |
| SS0-101 - GENERAL NOTES & SCHEDULES |
| SS1-100 - GROUND / FOUNDATION PLAN |
| SS1-101 - FLOOR FRAMING PLAN |
| SS1-102 - ROOF FRAMING PLAN |
| SS3-101 - ELEVATIONS |
| SS3-102 - ELEVATIONS |
| SS5-101 - CRUCIFORM PLAN & DETAILS |