36C10F19R0003-0005002.pdf

PDF 686 KB Posted

Attached to
Research Office Building (ROB) Connecting Bridge VAPHS, Pittsburgh, PA
Solicitation number
36C10F19R0003
Issued by

About this file

36C10F19R0003 0005 AS1-101 - FLOOR PLANS.pdf

View the file

Other files

File Type Posted
36C10F19C0016-000.docx DOCX document
36C10F19R0003-0007000.docx DOCX document
36C10F19R0003-0007002.pdf PDF
36C10F19R0003-0007003.pdf PDF
36C10F19R0003-0007004.pdf PDF
36C10F19R0003-0007005.pdf PDF
36C10F19R0003-0007001.pdf PDF
36C10F19R0003-0006003.pdf PDF
36C10F19R0003-0006001.pdf PDF
36C10F19R0003-0006002.pdf PDF
36C10F19R0003-0006000.docx DOCX document
36C10F19R0003-0005000.docx DOCX document
36C10F19R0003-0005001.pdf PDF
36C10F19R0003-0005003.pdf PDF
36C10F19R0003-0005004.pdf PDF
36C10F19R0003-0004000.docx DOCX document
36C10F19R0003-0003000.docx DOCX document
36C10F19R0003-0002002.pdf PDF
36C10F19R0003-0002001.pdf PDF
36C10F19R0003-0002000.docx DOCX document
36C10F19R0003-0001001.pdf PDF
36C10F19R0003-0001000.docx DOCX document
36C10F19R0003-014.pdf PDF
36C10F19R0003-019.pdf PDF
36C10F19R0003-016.pdf PDF
36C10F19R0003-020.pdf PDF
36C10F19R0003-022.pdf PDF
36C10F19R0003-024.pdf PDF
36C10F19R0003-023.pdf PDF
36C10F19R0003-018.pdf PDF
36C10F19R0003-013.docx DOCX document
36C10F19R0003-017.pdf PDF
36C10F19R0003-021.pdf PDF
36C10F19R0003-015.pdf PDF
36C10F19R0003-000.docx DOCX document
36C10F19R0003.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DNUP

DN

UP

DN

UP

TOILET

FLOOR PLAN

GENERAL NOTES

1. SEE DRAWING AS8-102 FOR PARTITION TYPES.

PARTITION RATING LEGEND

S S S S S

1 HOUR FIRE HARZARDOUS AREA

2 HOUR FIRE SHAFT

1 HOUR SMOKE BARRIER SMOKE ZONE

2 HOUR FIRE/SMOKE SMOKE ZONE

3.4

F

F

E E.6DC.6 E.7

x.Gx.G x.J

AS3-101

x.L x.N

AS5-102

AS5-102

AS5-103

6.5

AS3-101

AS3-101

x.4 x.5 x.6 x.7 x.11 x.1 x.1 x.2 x.14 x.15 x.16 x.17

AS5-103

x.18 x.19 x.20

AS3-1012

8' -0

8'-0"

8'-8 3/4"

24'-9 3/8" 23'-4"

'-1

/8

6.1

RAMP DN

34'-2"

8'-7 1/4"

R A

M P

D N

'-3

9"

INFILL FLOOR OPENING - SEE

STRUCTURAL DRAWINGS

ROOF BELOW

1197'-6 5/8" +/-

1195'-10 1/8" +/-

LANDING 2

1193'-1 3/8"

2nd FLOOR

AREA W

1197'-6 5/8"

2nd FLOOR

1204'-10 3/4"

BRIDGE LEVEL

1197'-6 5/8"

2nd FLOOR

1197'-6 5/8" +/-

LANDING 1

SECOND FLOOR

BUILDING 30

8' -0

M

IN

EXISTING AREA W

EXISTING

BUILDING 1

EXISTING

BUILDING 30

AS3-101

9' -0

'-0

'-0

'-0

10"

34'-11 1/2"1'-8"

'-8

/8

'-1

/4

EA

x.Cx.C

'-4

/4

AS3-101

1' -0

10"

12.8

8' -7

/4

1:20

1:

AS5-102

AS1-101

AS5-101

x.F x.E x.D

8' -0

M

IN

6' -0

"4' -0

1194'-3 3/8"

LANDING 3

AS5-102

RAMP DN

1:20

AS5-101

A -0

A-02

A -0

A -0

1 1

1'-0"

HANDRAIL

EXTENSION

1' -0

H A

N D

R A

IL

E

X T

E N

S

IO

N

CONT.

ALUM.

HANDRAIL

AS3-101

1'-0"

HANDRAIL

EXTENSION

BOTH SIDES

ALUM. HANDRAILS AT

34" AFF, BOTH SIDES

A -0

INFILL WINDOW OPENING; MATCH EXISTING

CONSTRUCTION

NEW PARAPET, ROOFING INSULATION,

MEMBRANE, AND FLASHING. REFER TO

SECTION DETAIL.

AS5-101

A-09

AS1-102

ELECTRIC

GA146

TELECOM

2W112

LINEAR

WORK

C2003

EXISTING

ELEVATOR

LOBBY

2A143

CORRIDOR

GA153

EXISTING

VESTIBULE

2A145

EXISTING

ELEVATOR

LOBBY

3A146

MECHANICAL

ROOM

GA155

AS8-101

RESEARCH

LAB

3A143

OFFICE

2W146

MIN.

3'-8"

5' -0

7'-0"

6' -0

AS1-102

5'-0"

5' -0

AS3-1018

STAFF M

TOILET

2W122

STAFF W

TOILET

2W123

OFFICE

2W144

9 9 9

AS8-101

15 1313131313131313

AS8-101

6' -0

4'

-6

6' -0

4'

-6

6' -0

4'

-6

6' -0

4'

-6

6' -0

AS8-101

1197'-6 5/8"

2nd FLOOR

12'-2 1/2"

1'-0"

HANDRAIL

EXTENSION

BOTH SIDES

WD1

WD1

WD1

WD1

WD1

7'-6"

AS0-001

AS9-341

A-15

CORRIDOR

C2W3

CORRIDOR

C2W3

TELEHEALTH

EDUCATION

TRAINING

2W109

TELEHEALTH

EDUCATION

TRAINING

2W110

CORRIDOR

2W113

ELEC

2W106

STAFF

BREAK

2W108

LOCKER

AREA

2W111

SEE DRAWING AS9-341 FOR

CONTINUATION OF PLAN

EXISTING TO REMAIN

NEW CONSTRUCTION

1 KEYNOTE

EXISTING DOOR

NEW DOOR

FLOOR PLAN LEGEND

PATTERN DENOTES RAISED STRUCTURAL

CONCRETE FLOOR PANEL ON MTL FRAMING.

REFER TO FINISH PLAN FOR FLOORING

MATERIAL.

AS5-102

x.1 x.2

AS5-103

EA

12.8

EA

7'-6 3/4"

4 4

8" 8"

7/

8"

1' -0

3"

1' -0

R A

M P

FOAMED INSULATION CORE - HORIZ. METAL

WALL PANELS -INSTALL OVER AIR/VAPOR

BARRIER ON 5/8" GYP. SHEATHING

EXPANSION JOINT

EXTRUDED ALUMINUM

TOOTH-IN BRICK W/ EXISTING.

RECONSTRUCT EXTERIOR WALL

TO MATCH EXISTING

RIGID INSULATION

METAL FRAMING

EXISTING GWB ON MTL. FRAMING

- PATCH & REPAIR AS REQ'D DUE

TO NEW CONSTRUCTION

ALUM

HANDRAIL, TYP.

WALL

EXPANSION

COVER

AS5-102

2" EXPANSION

JOINT COVER

9"

STRUCTURAL CONCRETE PANELS

ON COLD FORM METAL FRAMINGEXISTING WALL

TOOTH-IN BRICK W/ EXISTING.

RECONSTRUCT EXTERIOR WALL

TO MATCH EXISTING

6 3/8"

8'-0"

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities

Management o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

BIDDING DOCUMENTS - FEBRUARY 22, 2019

VA CARES CONSOLIDATION

VAMC, PITTSBURGH, PA

CONNECTING BRIDGE

AS1-101

646CA2500.23

AuthorChecker

FLOOR PLANS

VAPHS UNIVERSITY DRIVE

1 & 30

1/8" = 1'-0"

SECOND FLOOR BRIDGE PLAN

1/2" = 1'-0"

ENLARGED PLAN @ BUILDING 1

PLAN KEY NOTES

Circle Keynote Description

1 NEW 2 HOUR WALL WITH 90 MINUTE DOUBLE EGRESS

DOORS. PROVIDE THRESHOLD.

2 EXPANSION JOINT WITH COVER

3 PAINTED STEEL RAILING AND GUARD RAIL WITH GATE

4 NEW 1 HOUR RATED PARTITION

5 NEW PAINTED DRYWALL COLUMN ENCLOSURE.

6 NEW RETRACTABLE LADDER.

7 NEW EXTERIOR LOUVER ABOVE, SEE ELELVATION

8 COMPOSITE SLAB TO FOLLOW RAMP SLOPES AND LANDINGS

9 FLOOR FINISH TO BE RESTORED TO "LIKE NEW" FINISH

AFTER PARTIAL DEMOLITION

10 NEW 2 HOUR FIRE WALL. CONTINUITY OF STAIRWELL

ENCLOSURE TO REMAIN FROM FLOOR BELOW.

11 ALIGN NEW PARTITION WITH EXISTING PARTITIONS

12 NEW 90 MINUTE DOOR INTO STAIRWELL; PROVIDE

THRESHOLD.

13 PATCH WINDOW OPENING WHERE WINDOW BLINDS AND

STOOL WERE REMOVED

14 RELOCATED FIRE EXTINGUISHER

15 FIRE EXTINGUISHER AND CABINET

16 NEW ALUMINUM WINDOWS

17 NEW 1 HR WALL WITH 45 MINUTE DOOR.

1 AMENDMENT NO. 5 03 MAY 2019

Sheets
AS1-101 - FLOOR PLANS
AS8-101 - DOOR & WINDOW TYPES, DETAILS, LADDER DETAILS

File details come from the government source that posted it.