36C10F19R0003-0007001.pdf

PDF 303 KB Posted

Attached to
Research Office Building (ROB) Connecting Bridge VAPHS, Pittsburgh, PA
Solicitation number
36C10F19R0003
Issued by

About this file

36C10F19R0003 0007 MD0-100 - SECOND FLOOR DEMO DUCTWORK PLAN.pdf

View the file

Other files

File Type Posted
36C10F19C0016-000.docx DOCX document
36C10F19R0003-0007000.docx DOCX document
36C10F19R0003-0007002.pdf PDF
36C10F19R0003-0007003.pdf PDF
36C10F19R0003-0007004.pdf PDF
36C10F19R0003-0007005.pdf PDF
36C10F19R0003-0006003.pdf PDF
36C10F19R0003-0006001.pdf PDF
36C10F19R0003-0006002.pdf PDF
36C10F19R0003-0006000.docx DOCX document
36C10F19R0003-0005000.docx DOCX document
36C10F19R0003-0005001.pdf PDF
36C10F19R0003-0005003.pdf PDF
36C10F19R0003-0005004.pdf PDF
36C10F19R0003-0005002.pdf PDF
36C10F19R0003-0004000.docx DOCX document
36C10F19R0003-0003000.docx DOCX document
36C10F19R0003-0002002.pdf PDF
36C10F19R0003-0002001.pdf PDF
36C10F19R0003-0002000.docx DOCX document
36C10F19R0003-0001001.pdf PDF
36C10F19R0003-0001000.docx DOCX document
36C10F19R0003-014.pdf PDF
36C10F19R0003-019.pdf PDF
36C10F19R0003-016.pdf PDF
36C10F19R0003-020.pdf PDF
36C10F19R0003-022.pdf PDF
36C10F19R0003-024.pdf PDF
36C10F19R0003-023.pdf PDF
36C10F19R0003-018.pdf PDF
36C10F19R0003-013.docx DOCX document
36C10F19R0003-017.pdf PDF
36C10F19R0003-021.pdf PDF
36C10F19R0003-015.pdf PDF
36C10F19R0003-000.docx DOCX document
36C10F19R0003.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DNUP

DN

6.5

FE

C.6 x.G x.J x.L x.N

3.4

E.7

EA

x.12 x.13

3.4

FE

E.6

D

C.6

E.7 x.G x.J x.L x.N x.P x.3

6.5 x.4 x.5 x.6 x.7 x.8x.1 x.2 x.14 x.15 x.16 x.17 x.18 x.19

6.1

EA

x.C

12.8

30"x24"

"x

"x

"x

24"x8"

18"x14"

18"x14"

22"x8"

10"x4"

10"x6"

18"x8"

"x

180"x132"

14"x6"

"x

BAG IN BAG OUT

FILTER HOUSING

64"x54"

DUCT THROUGH ROOF

DUCT THROUGH MECH

ROOM

24"x12"

24"x10"

UP TO ELEV.

LOBBY

24"x10"

EXISTING RISES TO

MECH ROOM FLOOR

REMOVE 60" X 36"

EXHAUST LOUVER

REMOVE 14'x9' OA LOUVER. PROVIDE GALV. STEEL INSULATED

WALL CAP ON INTERIOR OF LOUVERS. INSULATION SHALL BE 2"

THICK RIGID FIBERGLASS. SEAL AROUND CAP W/ SILICON

CAULKING AND FASTEN W/ SS SCREWS.

21"x10" 24"x15"

12"x10"

32"x10" 32"x10"

"x

15"x12"

8"x10"

8"ø

8"ø

"x

"8"ø

8"ø

6"ø

7"ø

12"x10"

"x

32"x10"

10"x10" 8"ø

16"x10"

8"ø 10"ø

"x

8"ø

8"ø 10"ø

10"ø

12"x10"

8"ø

8"ø

24"x16"

EX

10ø

D1

8ø

EX

8ø EX

8ø

EX

8ø

EX

EX

8ø

D1

8ø

D1

8ø

EX

8ø

EX

8ø

EX

8ø

D1

8ø

EX

8ø

D1

8ø

EX

8ø

EX

8ø

EX

8ø

EX

8ø

EX

8ø

EX

8ø

EX

8ø

D1

8ø D1

8ø

EX

8ø

D1

8ø

EX

8ø

EX

8ø

D1

8ø

MH0-301

AIR HANDLING

UNIT

UP TO ROOF

DOWN TO FLOOR BELOW

MH0-301

12"x10"

D

E

E.6

E.7

F

3.4

6.5

6.1

12.8 x.8x.7x.6x.5x.4 x.C

EA

x.J x.L x.N x.P x.3

GENERAL DEMOLITION NOTES:

1. DEMOLITION PLAN IS PROVIDED WITH THE EXPLICIT INTENT OF DESCRIBING IN GENERAL

TERMS THE EQUIPMENT AND DEVICES TO BE REMOVED TO FACILITATE THE INSTALLATION

OF NEW WORK. ALL ACCESSORIES , RELATED DEVICES, SUPPORTS, ETC. ASSOCIATED

WITH EQUIPMENT IDENTIFIED TO BE REMOVED SHALL BE REMOVED AS WELL WHETHER

OR NOT SPECIFICALLY CALLED OUT, UNLESS NOTED OTHERWISE TO REMAIN, ALL

EQUIPMENT AND DEVICES INTENDED TO REMAIN FOR INTEGRATION IN THE NEW WORK

SHALL BE PROTECTED FROM DAMAGE.

2. REFER TO SPECS FOR CUTTING AND PATCHING OF EXISTING ROOF, ROOF PRODUCTS

AND APPURTENANCES. MATCH EXISTING ADJACENT MATERIALS, AND CONDITIONS OF

EXISTING ROOF WARRANTY.

3. PIPING TO BE REMOVED: REMOVE PORTION OF PIPING INDICATED TO BE REMOVED AND

CAP OR PLUG REMAINING PIPING WITH SAME OR COMPATIBLE PIPING MATERIAL.

4. DUCTS TO BE REMOVED: REMOVE PORTION OF DUCTS INDICATED TO BE REMOVED AND

PLUG REMAINING DUCTS WITH SAME OR COMPATIBLE DUCTWORK MATERIAL

5. EQUIPMENT TO BE REMOVED AND REINSTALLED: DISCONNECT AND CAP SERVICES AND

REMOVE, CLEAN AND STORE EQUIPMENT; WHEN APPROPRIATE, REINSTALL, RECONNECT

AND MAKE EQUIPMENT OPERATIONAL.

6. EACH PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING AND PATCHING ALL

WALL, ROOF AND FLOOR CUTTING AND PATCHING RELATED TO THEIR CONTRACTS.

KEYED NOTES:

REMOVE, CLEAN AND STORE EXISTING FAN. WHEN

APPROPRIATE, REINSTALL PER NEW WORK PLAN MH0-100.

30"x10"

REMOVE EXISITING DUCT

MH0-301

"x

L P

S

REMOVE EXISTING

CONDENSATE TRAP. CAP LPC

LINE AT FLOOR. 1

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Facilities

Management o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

BIDDING DOCUMENTS - FEBRUARY 22, 2019

VA CARES CONSOLIDATION

VAMC, PITTSBURGH, PA

CONNECTING BRIDGE

MD0-100

646CA2500.23

AuthorChecker

SECOND FLOOR DEMO

DUCTWORK PLAN

VAPHS UNIVERSITY DRIVE

1 & 30

1/8" = 1'-0"

HVAC DEMOLITION FLOOR PLAN

1 AMENDMENT 7 05-23-19

Sheets
MD0-100 - SECOND FLOOR DEMO DUCTWORK PLAN