260469_PP_signed_GMEDITS.pdf

PDF 328 KB Posted

Attached to
Request For Proposal (RFP) - Towing and Recovery Services
Solicitation number
260469
Issued by
Orange County, California

About this file

This procurement document is an interoffice memorandum from the Orange County Transportation Authority (OCTA) dated July 31, 2026, outlining the procurement plan for RFP 260469 for Towing and Recovery Services. The RFP seeks qualified contractors to provide towing and recovery services on an as-needed basis to support OCTA's operational requirements. The contract is structured as a three-year term with a total budget of $435,000 for the initial term. No specific response dates, due dates, site visits, or bidder conferences are referenced in this procurement plan document.

The contract will be awarded on a Time and Expense basis with firm-fixed hourly rates, with evaluation criteria weighted as follows: Qualifications of the Firm (30%), Staffing and Project Organization (20%), Work Plan (25%), and Cost (25%). The evaluation team includes Dara Doeum (Contracts Administrator), Casey Gladding (Section Manager II, MRM), Kevin Levan (Section Manager II, Maintenance-Specialty Shops), and Jason Morris (Section Manager II, Facilities Maintenance-Santa Ana), with CAMM serving as a non-scoring member. The procurement is funded through Local Measure M sources. No prevailing wage requirements, liquidated damages, retention provisions, or DBE goals are specified in this procurement plan. Requisition R001064 has been received, and an independent cost estimate has been completed.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised: 07/20/2010

INTEROFFICE MEMO

Date: July 31, 2026

To: Christine Herrera, Contracts Analyst, Maintenance Resource

Management (MRM)

From: Dara Doeum, Contract Administrator, CAMM

Subject: Procurement Plan for Release, Selection and Award

RFP 260469 “Towing and Recovery Services”

Please review the procurement plan for the subject RFP and advise your concurrence with the evaluation criteria and contract elements. Include suggested evaluation team members and/or comments. Thanks.

Procurement Type: RFP IFB

A Request for Proposals (RFP) is issued as the nature of the procurement demands that evaluation criteria, in addition to price, be used to select a firm.

Evaluation Criteria:

PROPOSAL WEIGHT

Qualifications of the Firm 30% Staffing/Project Organization 20% Work Plan 25% Cost 25% Justification:

The criteria are structured to select a contractor that can safely and reliably support OCTA’s towing and recovery needs. Greater weight is placed on qualifications and work plan to ensure demonstrated experience, proper equipment, and effective response procedures. Staffing is weighted to evaluate coverage and operator capability. Cost is weighted at 25% in accordance with requirements; however, due to the safety-sensitive and operational nature of these services, experience and reliability are prioritized to reduce risk and service disruption.

Georgia Martinez Cross-Out The greatest weight is placed on qualification of the firm at 30 percent as the firm must demonstrate relevant experience performing similar towing and recovery services. Staffing and Project Organization is weighted at 20 percent to ensure sufficient operator coverage is available for these as-needed services. Work Plan and Cost and Price are weighted equally at 25 percent to ensure the firm demonstrates its approach to meeting the requirements of the scope at the level of service required and ensure that OCTA receives competitive pricing to perform these services.

Procurement Plan, RFP 260469

Revised: 0720/2010

Contract Type: Time & Expense CTO-Based Firm Fixed Price

Justification (Explain the rationale for using the particular contract type):

A time and expense contract is appropriate for this procurement as firms are required to provide services on an as-needed basis at a firm-fixed hourly rate.

Retention: Yes No N/A

Prevailing Wages: Yes $ No N/A

Liquidated Damages: Yes $ No N/A

Procurement Schedule: Attached

Internal Evaluators:

Dara Doeum, Contracts Administrator, Contracts Administration and Materials Management

Casey Gladding, Section Manager II, MRM

Kevin Levan, Section Manager II, Maintenance-Specialty Shops Administrator

Jason Morris, Section Manager II, Facilities Maintenance-Santa Ana

Contract Term: Three (3) year term

Funding Source: Local Measure M Federal (CMAQ)

Dollar Amount: Initial Term $435,000.00 Option Term

Independent Cost Estimate Received: Yes No

Requisition Received: Yes Req. R001064

DBE Goal: Yes No

Georgia Martinez Cross-Out CAMM No longer evaluates or scores so make sure you state that you will be a non-scoring member.

Procurement Plan, RFP 260469

Revised: 0720/2010

Date

Project Manager Concurrence:

Christine Herrera, Contracts Analyst, Maintenance Resource Management

CAMM Section/Department Manager Concurrence:

Javier Lopez Jr., Section Manager II, Contracts and Procurement

Date

8/5/2026

08/20/2026

File details come from the government source that posted it. Updated .