26-8703_Sheet_A-101.2.pdf
PDF 778 KB Posted
- Attached to
- Immokalee Sports Complex Phase 1A & 1B
- Solicitation number
- 26-8703
- Issued by
- Collier County, Florida
About this file
This file is an architectural drawing (Sheet A-101.2) for the Field Restroom and Pavilion Plan associated with Collier County's Immokalee Sports Complex Phase 1A & 1B construction project (IFB 26-8703). The drawing depicts the floor plan layout of a 1,184-square-foot sports field restroom facility and a 618-square-foot open-air pavilion structure, with detailed annotations showing room designations including men's and women's restrooms, storage areas, and equipment yards. The plan includes specifications for concrete slabs at elevation 0'-0", CMU wall construction with various finishes (stucco and tile), metal stud framing details, roof overhangs, and utility provisions such as electrical panels, hose bibs, wall sconces, and a manual roll-up door. General notes require the contractor to field verify the locations of existing sports lighting poles and foundations to ensure they do not conflict with the proposed building, with all existing poles to be braced and supported during construction. The drawing references coordination with structural, civil, electrical, and plumbing drawings, as well as a finish schedule on Sheet A-711. The site is located at 505 Escambia Street, Immokalee, Florida, with sealed bids due November 2 or November 12, 2026 (per conflicting notices) at 3:00 p.m. local time, and a non-mandatory pre-bid meeting scheduled for October 16, 2026 at 10:00 a.m. in Naples, Florida.
The anticipated contract budget for the entire Immokalee Sports Complex Phase 1A & 1B project is $6.24 million, with a $500,000 Owner's Allowance for unforeseen conditions. Substantial completion must be achieved within 180 calendar days from Notice to Proceed, with final completion within 30 days after punch list delivery; liquidated damages are assessed at $5,549 per calendar day for failure to meet the substantial completion deadline. The contractor must provide a bid bond of 5 percent of the total bid amount, Payment and Performance Bonds equal to 100 percent of the contract award, and comprehensive insurance including workers' compensation at statutory limits, general liability of $1 million per occurrence/$2 million aggregate, employer's liability of $1 million, and automobile liability of $1 million. Bidders must demonstrate a minimum of 10 years of experience as a business entity and 10 years providing construction services relevant to parks and recreation facilities, with submission of at least five completed projects, including three qualifying projects with minimum contract values of $1 million each, at least two completed within four years of the bid due date and all three within ten years, and at least one demonstrating experience at an operating facility while maintaining operations.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEN'S
WOMEN'S
J.C.
1 2
A
B
4 A-602
8 A-602
STORAGE
104A
104B
L2 L1 L1
L1 L1
12 A-602
A-200.2
R.O.
R.O.
SLOPE
D.F.
D.F.
R .O
R
.O
R .O
A-200.2
A-200.2
A-200.2
A-500.2
A-500.2
A-500.2
A-500.2
A-500.2
A-500.2
A-500.2
A-500.2
L1
L1
L1
L1
P
W
W
W
W
P
EDGE OF ROOF
OVERHANG ABOVE
T.O. SLAB
EL. 0'-0"
T.O. SLAB
EL. 0'-0"
H.C.
H.C. H.C.
H.C. H.C. H.C.
CONCRETE COLUMNS, SEE
STRUCTURAL DRAWINGS
GENERAL NOTES:
1. Contractor shall field verify the location of all existing sports lighting poles, foundations, and associated clearances relative to the proposed field restroom building.
Verify that all existing utilities, slabs, walls, footings, and roof lines of the proposed building clear the existing lighting poles and pole foundations. All existing lighting poles shall be braced and adequately supported during all phases of building construction activities. Contractor shall field stake all proposed building corners prior to construction and notify the Architect and Civil Engineer of any discrepancies, conflicts, or issues identified during field verification for review and resolution prior to proceeding with construction. Coordinate as required to avoid delays or impacts to existing facilities.
2. REFER TO SHEET A-711 FOR FINISH SCHEDULE, RESTROOM TABULATIONS, PLUMBING FIXTURE AND RESTROOM ACCESSORIES SCHEDULE.
WALL SCONCE
WALL SCONCE
7' X 12' MANUAL
ROLL-UP DOOR
CMU WALL, EXPOSED
HOSE BIB
ELECTRICAL
PANEL
4" CONCRETE
PAD FOR
TRANSFORMER
T.O. SLAB
EL. 0'-0"
CMU WALL
WALL SCONCE
HOSE BIB
TYPICAL
CONTROL
JOINTS
SLAB ON GRADE PATIO.
SEE STRUCTURAL
DRAWINGS
4"X6" ALUMINUM BOX
GUTTER WITH 4"X4"
ALUMINUM DOWNSPOUT
CONNECTED TO STORM
LINE, SEE CIVIL DRAWINGS.
CONCRETE WALKWAY
REFER TO CIVIL DRAWINGS
FLUSH
CONCRETE WALKWAY
REFER TO CIVIL DRAWINGS
FLUSH
CONCRETE WALKWAY
REFER TO CIVIL DRAWINGS
1/2" MAX
FE
FIRE EXTINGUISHER
CHAINLINK FENCE
AND GATE
EQUIPMENT YARD
CHAINLINK FENCE
4"X4" DOWNSPOUT
CONCRETE SPLASH PAD
4"X4" DOWNSPOUT
CONCRETE SPLASH PAD
W
W
P
2"
2"
2"
EXISTING
LIGHT POLE
(V.I.F.)
(V .I
.F
EWH
FLOOR AREA TABLE
FLOOR AREA AND BUILDING HEIGHT
FLOOR AREA, LDC SEC1.08.02. DEFINITIONS: MEASURED FROM THE OUTSIDE OF EXTERIOR WALL:
INCLUDES HABITABLE SPACE: EXCLUDES ACCESSORY SPACE (COURTS & VENT SHAFTS)
FLOOR AREA, LDC PARKING ONLY (SEC4.05.04.B.1 PARKING SPACE REQUIREMENT):
MEASURED FROM INSIDE OF EXTERIOR WALLS, INCLUDES HABITABLE AND ACCESSORY SPACE
(COURTS & VENT SHAFTS)
(FLOOR AREA GROSS) BUILDING FBC (DEFINITIONS, SEC.202): THE AREA INCLUDED WITHIN
SURROUNDING EXTERIOR WALLS (OR EXTERIOR WALLS AND FIRE WALLS) EXCLUSIVE OF
VENT SHAFTS AND COURTS. AREAS OF THE BUILDING NOT PROVIDED WITH THE
SURROUNDING WALLS SHALL BE INCLUDED IN THE BUILDING AREA IF SUCH AREAS ARE
INCLUDED WITHIN THE HORIZONTAL PROJECTION OF THE ROOF OR FLOOR BELOW
BUILDING TYPE AND SQUARE FOOTAGE (SF)
SPORTS FIELD AND STORAGE FACILITY/ PAVILION
1,184.16 SF
N/A
1,792.44 SF
DBL. ROW OF 3-5/8" 25GA. METAL
STUD FRAMING @ 24" O.C.
5/8"
REFER
TO
FLOOR
PLAN 3 5/8"
5/8"
3-1/2" FIBER GLASS SOUND BATT
INSUL.
THINSET MORTAR
WALL TILE
3 5/8"
STL. RUNNER BRACING, SCREW TO STUDS
(1) LAYER 5/8" GWB MOISTURE RESISTANT TYPE, FULL-HT.
P
3 5/8" MTL. STUD CHASE WALL TILED
PLAN VIEW
3 5/8" (6") 5/8"5/8"
(1) LAYER MOISTURE RESISTANT 5/8" GWB, FULL-HT.
3-5/8" MTL. STUD PARTITION NON-RATED
METAL STUDS @ 24" O.C., FULL-HT.
4 7/8" (7 1/4")
EXTERIOR VIEW5/8" 7 5/8"1 1/2"
W
CMU - 1 1/2" MTL FURRING
9 3/4"
SEE FINISH SCHEDULEVERIFY RESTROOM WALL FINISH
5/8" GWB
1 1/2" STEEL HAT CHANNEL
FI-FOIL MULTI LAYER REFLECTIVE
INSULATION. R-VALUE TO MEET ENERGY
CALCULATIONS
8" NOM. CMU WALL
INTERIOR VIEW
SHIM AS NEEDED
EXTERIOR VIEW5/8" 7 5/8"1 1/2"
W
CMU - 1 1/2" MTL FURRING - STUCCO FIN.
10 3/8"
5/8" THICK STUCCO
5/8" GWB
1 1/2" STEEL HAT CHANNEL
FI-FOIL MULTI LAYER REFLECTIVE
INSULATION. R-VALUE TO MEET ENERGY
CALCULATIONS
8" NOM. CMU WALL
INTERIOR VIEW
SHIM AS NEEDED
5/8"
EXTERIOR VIEW7 5/8"
W
CMU - STUCCO FIN.
8 1/4"
5/8" THICK STUCCO
8" NOM. CMU WALL
INTERIOR VIEW 5/8"
SEE FINISH SCHEDULE
8" X 5" CONCRETE CURB
TILE COVE BASE
DBL. ROW OF 3-5/8" 25GA. METAL
STUD FRAMING @ 24" O.C.
5/8"
3 5/8"
5/8"
3-1/2" FIBER GLASS SOUND BATT
INSUL.
THINSET MORTAR
WALL TILE
STL. RUNNER BRACING, SCREW TO STUDS
(1) LAYER 5/8" GWB MOISTURE RESISTANT TYPE, FULL-HT.
P
3 5/8" MTL. STUD CHASE WALL TILED
8" X 5" CONCRETE CURB
TILE COVE BASE
EXTERIOR VIEW5/8" 7 5/8"1 1/2"
W
TILE ON CMU- 1 12" MTL. FURRING
W-STUCCO FINISH
9 3/4"
8" STUCCO (OMIT STUCCO ON INTERIOR)
5/8" MR GWB ON 1 12" MTL. FRAMING
THINSET MORTAR
WALL TILE
8" NOM. CMU WALL
INTERIOR VIEW
CONC. SLAB
5/8"
SHLUTER TILE EDGING TRIM
PLASTER
FIELD RESTROOM AND PAVILION PLAN
Scale: 1/4" = 1'-0"
A-101.2
P10
P6
P10
P6
P10
P6
P10
P6
P10
P6
A8
A8
A9
P7
P11 P11
A5 A5 A5A6
A6
A14
A14
A14
P8
A10
A10
A10
A10
A1 A2
A1 A2
A2
A2
A12
A12
A4
A3
A4
A4
A3
A4
A3
A4
A3
A14 A14
P9
A11 A11
A13
A13
A13
A3
A3
P4
P4
P2
P2
A3
P2
A13
P2
P4
P4
P7
P4
A9
FIELD RESTROOM
AND PAVILION PLAN
A
T T
E N
T
IO
N
T h e s e d ra w in g s m a y i n c lu d e i n fo rm a ti o n p ro v id e d b y o th e rs
S ta n te c h a s n o t v e ri fi e d th e a c c u ra c y a n d /o r c o m p le te n e s s o f th is in fo rm a ti o n a n d s h a ll n o t b e r e s p o n s ib le f o r a n y e rr o rs o r o m is s io n s w h ic h m a y b e in c o rp o ra te d h e re in a s a r e s u lt
A-101.2
A13
A3 P4
A13
| 2026-11-10T13:40:30-0500 | |
| Elvira C Freire Santamaria | |
| I have reviewed this document |
File details come from the government source that posted it. Updated .