26-8703_Geotechnical_Report.pdf
PDF 4 MB Posted
- Attached to
- Immokalee Sports Complex Phase 1A & 1B
- Solicitation number
- 26-8703
- Issued by
- Collier County, Florida
About this file
This is a geotechnical report prepared for Collier County, Florida in support of the Immokalee Sports Complex Phase 1A & 1B construction project (IFB 26-8703). The report provides subsurface soil and geological analysis for the project site located at 505 Escambia Street, Immokalee, Florida. Sealed bids are due November 2, 2026 at 3:00 p.m. local time, with a non-mandatory pre-bid meeting scheduled for October 16 at 10:00 a.m. in Naples, Florida. The project encompasses Phase 1A work including two artificial turf athletic fields, stormwater improvements, fencing, landscaping, and hardscaping, along with Phase 1B work consisting of a 1,190-square-foot field restroom facility, a 618-square-foot open-air pavilion, and associated site improvements. The anticipated contract budget is $6.24 million, with substantial completion required within 180 calendar days from Notice to Proceed and final completion within 30 days thereafter. Liquidated damages are assessed at $5,549 per calendar day for failure to achieve substantial completion.
Bidders must demonstrate a minimum of 10 years of business and construction service experience relevant to parks and recreation facilities, with a portfolio of at least five completed projects, including a minimum of three qualifying projects valued at $1 million or greater. At least two of the three qualifying projects must be completed within four years of the bid due date, with all three completed within ten years, and at least one demonstrating experience at an operating facility. Bidders must provide a bid bond of 5 percent of the total bid amount, Payment and Performance Bonds equal to 100 percent of the contract award, and comprehensive insurance including workers' compensation at statutory limits, general liability of $1 million per occurrence/$2 million aggregate, employer's liability of $1 million, and automobile liability of $1 million. All work must comply with the 2023 Florida Building Code, 2020 National Electrical Code, and 2023 Florida Fire Prevention Code, with structures designed for 151 mph ultimate design wind speeds and FEMA Zone AH flood elevation. Contractors must utilize Collier County's Procore project management platform and complete a county facilities background check. A $500,000 Owner's Allowance is available to cover unforeseen conditions.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .