26-8703_Phase_1B_Sheet_C106.pdf

PDF 2 MB Posted

Attached to
Immokalee Sports Complex Phase 1A & 1B
Solicitation number
26-8703
Issued by
Collier County, Florida

About this file

This is a civil engineering drawing sheet (C106) for the Immokalee Sports Complex Phase 1B project in Collier County, Florida, prepared by Stantec Consulting Services Inc. The drawing depicts Field 1 grading, paving, and drainage plan details for the project located at 505 Escambia Street, Immokalee, Florida 34142. Field 1 is designated as the construction staging area with no scheduled improvements to the existing natural turf field itself; restoration requirements are referenced on Sheet LP104. The plan illustrates proposed concrete bleacher pads, drainage infrastructure including storm relief systems, existing and proposed piping connections, swale configurations, perimeter berm re-establishment, fencing requirements including backstop and rolling gate installations, and utility coordination details. Contractors are required to brace existing light poles during construction of associated improvements. The drawing indicates connections to Phase 1A infrastructure and notes that multiple utility pipes from previous phases must be capped or extended, including specifications for 12-inch, 15-inch, and 18-inch PVC piping at various invert elevations. The document is dated November 5, 2026, and has been digitally signed and sealed by Michelle Kelly, P.E.

The drawing serves as a technical reference document for bid preparation and construction execution under IFB 26-8703, which carries an anticipated contract budget of $6.24 million with substantial completion required within 180 calendar days from Notice to Proceed. The document contains standard professional specifications for grading, drainage design, and construction staging, with a scale of 1 inch equals 20 feet and includes a legend identifying project limit boundaries and shaded areas not part of the Phase 1B scope. All work must comply with 2023 Florida Building Code and associated standards, and contractors are required to utilize Collier County's Procore project management platform for documentation and submittals.

View the file

Other files

File Type Posted
26-8703_Sheet_A-711.pdf PDF
26-8703_Sheet_A-700.2.pdf PDF
26-8703_Sheet_A-602.pdf PDF
26-8703_Sheet_A-101.2.pdf PDF
26-8703_Phase_1B_Sheet_C109.pdf PDF
26-8703_Phase_1A_Sheet_C508.pdf PDF
26-8703_Phase_1A_Sheet_C500.pdf PDF
26-8703_Phase_1A_Sheet_C109.pdf PDF
26-8703_Phase_1A_Sheet_C106.pdf PDF
26-8703_Exhibit_K_SFWMD_ERP_Permit.pdf PDF
26-8703_Bid_Schedule_(rev._1).xlsx XLSX spreadsheet
26-8703_Solicitation_(rev._1).pdf PDF
26-8703_Pre-Bid_Meeting_Audio.MP3 MP3 file
26-8703_Geotechnical_Report.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
Construction_Services_Agreement_2025_Template_ver_3_with_Exhibits.pdf PDF
26-8703_Supplemental_Qualifications.pdf PDF
26-8703_Scope_of_Work_Phase_1A_&_1B.pdf PDF
26-8703_Exhibit_M3_Phase_1A_Landscape_Architecture_Plans.pdf PDF
26-8703_Exhibit_M2_Phase_1A_Civil_Engineering_Plans.pdf PDF
26-8703_Exhibit_M1_Phase_1A_Keysheet.pdf PDF
26-8703_Exhibit_J3_Phase_1B_Technical_Specifcations_Part_2.pdf PDF
26-8703_Exhibit_J2_Phase_1B_Technical_Specifications_Part_1.pdf PDF
26-8703_Exhibit_J1_Phase_1A_Technical_Specifications.pdf PDF
26-8703_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
26-8703_Exhibit_M10_Phase_1B_Landscape_&_Irrigation_Plans.pdf PDF
26-8703_Exhibit_M9_Phase_1B_Structural_Plans.pdf PDF
26-8703_Exhibit_M8_Phase_1B_Electrical_Plans.pdf PDF
26-8703_Exhibit_M7_Phase_1B_Mechanical_&_Plumbing_Plans.pdf PDF
26-8703_Exhibit_M6_Phase_1B_Architecture_Plans.pdf PDF
26-8703_Exhibit_M5_Phase_1B_Civil_Engineering_Plans.pdf PDF
26-8703_Exhibit_M4_Phase_1B_Keysheet.pdf PDF
Construction_Bid_Instructions.pdf PDF
26-8703_Bid_Schedule.xlsx XLSX spreadsheet
26-8703_Solicitation.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X

X X

X

X X X

X X X

NO PARKING

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X X

X X

XX

FIELD #1

THERE ARE NO SCHEDULED IMPROVEMENTS TO

THE EXISTING NATURAL TURF FIELD AS PART OF

THIS PROJECT. THE FIELD WILL BE UTILIZED FOR

CONSTRUCTION STAGING PURPOSES. REFER TO

SHEET LP104 FOR CONSTRUCTION STAGING

AND RESTORATION NOTES AND REQUIREMENTS.NEW SPLASH PAD -REFER TO AQUATIC

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

P R

O

JE

C T

LI

M

IT

R

O

JE

C T

LI

O

JE

C T

LI

RO

JE

CT

L

IM

JE

CT

L

JE

CT

L

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

P R

O

JE

C T

LI

O

JE

C T

LI

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

R

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

Fx Fx Fx Fx Fx Fx Fx Fx Fx Fx

Fx

Fx

Fx

Fx Fx Fx Fx Fx Fx

Fx Fx

Fx Fx

Fx

Wx Wx

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

W x

W x

W x

W x

W x

W x

W x

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F

NO PARKING

FFF

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EUx

EUx

EUx EUx

EUx EUx

EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx

EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx

IRx IRx IRx IRx IRx IRx IRx IRx

IRx

IR

x

IR

x IRx

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IRx

IR

x

IR

x IRx

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

SDx SDx SDx SDx SDx

SDxSDxSDxSDxSDx

SDx

SDx

SDx

SDx

SDx

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SDx

SDx

SDx

SDx

SDx

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

Project No.:

Scale:

Revision:

Drawing No.

Sheet:

Title

C lie nt /P ro je ct

Permit/Seal

Dsgn. Chkd. YYYY.MM.DDDwn.

Th e

C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns

. D O

N O

T s ca le th e dr aw in g

- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay

Th e

C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec

. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.

of

File Name: 08-215617053-C103

ORIGINAL SHEET - ARCH D

us

-p pf ss

\s ha re d_ pr oj ec ts\

4\ ci vil \0

2_ dr aw in gs \0

8-

3-c1

.1 1.

:4 4:

P

M

Iss ue d By

Ap pd

YY

YY

.M M

.D D

Te l:

w w w .st an te c.

co m

St an te c

C on su ltin g Se rv ic es In c.

K ra ft

Ro ad

S ui te

Na pl es

F L 3

-2

(2

) 6

-4

A

B

C

D

1 2 3 4 5

C ol lie r C ou nt y Bo ar d of C ou nt y C om m iss io ne rs, C ol lie r C ou nt y Pa rk s a nd R ec re at io n

Im m ok al ee S po rts

C om pl ex

Ph as e

1B

Es ca m bi a St re et

, I m m ok al ee

, F L 3

-3

215617854

2026.05.13 m ru fa tt

N ov em be r 2

:4

4p m

\\u s0

6-pp fs s0 1\ sh ar ed _p ro je ct s\

4\ ci vi l\0

2_ dr aw in gs \0

8-

3-

C

3.

dw g L ay ou t = C

Ph as e

1B S ub m itt al

)M

K

JC

.0 1.

Ph as e 1B

F in al C

D S ub m itt alM

K

JC

.0 5.

AT

TE

N

TI

O

N

Th es e dr aw in gs m ay in cl ud e in fo rm at io n pr ov id ed b y ot he rs

. S ta nt ec h as n ot v er ifi ed th e ac cu ra cy a nd

/o r c om pl et en es s of th is in fo rm at io n an d sh al l n ot b e re sp on si bl e fo r an y er ro rs o r o m is si on s w hi ch m ay b e in co rp or at ed h er ei n as a re su lt.

C106

MK JCDP

Re vis io n

By Ap pd

YY

YY

.M

M .D

D M

R M

K

.1

1.

Bi dd er R es po ns es

FIELD 1 GRADING,

PAVING & DRAINAGE

PLAN

MATCHLINE - SEE SHEET C105

11 24

AutoCAD SHX Text

HB

AutoCAD SHX Text

WASHINGTON AVENUE

AutoCAD SHX Text 0.5%

AutoCAD SHX Text

FIELD 1

AutoCAD SHX Text

PROP. CONCRETE BLEACHER PAD

AutoCAD SHX Text

PROP. CONCRETE BLEACHER PAD

AutoCAD SHX Text

PROPERTY BOUNDARY

AutoCAD SHX Text

PROPOSED EQUIP. BUILDING (N.I.C.)

AutoCAD SHX Text

CONNECT RE-ESTABLISHED PERIMETER BERM TO EXISTING TOP OF BERM EL.=34.1'

AutoCAD SHX Text

RE-ESTABLISH PERIMETER BERM TO EXISTING TOP OF BERM EL.=34.1'

AutoCAD SHX Text

SWALE BOTTOM EL.=33.1' (TYP.)

AutoCAD SHX Text

EX. STR #12 GRATE EL = 33.39 INV = 31.69 N INV = 32.39 NW INV = 31.73 S

AutoCAD SHX Text

REMOVE PLUG AND EXTEND APPROXIMATELY 13 LF OF 15" RCP TO PH.1 - CB #11

AutoCAD SHX Text

EX. 15" RCP

AutoCAD SHX Text

6" PLUG FOR ROOF/STORM RELIEF DRAIN INV = 30.50

AutoCAD SHX Text

20' BACK STOP FENCE

AutoCAD SHX Text

20' BACK STOP FENCE

AutoCAD SHX Text

ROLLING GATE

AutoCAD SHX Text 35.60'

AutoCAD SHX Text

PH.1A - 18" PVC PLUG @ INV.:29.00

AutoCAD SHX Text

PH.1A - 10" PVC PLUG @ INV.:29.50

AutoCAD SHX Text

PH.1A - 27 LF OF 12" PVC PIPE AND CAP (CLEAR DRIVEWAY AND UTILITIES) INV.:29.50

AutoCAD SHX Text

PH.1A - 35 LF OF 12" PVC PIPE AND CAP (CLEAR DRIVEWAY AND UTILITIES) INV.:29.50

AutoCAD SHX Text

PH.1 - 33 LF OF 15" PVC PIPE AND CAP (CLEAR DRIVEWAY AND UTILITIES) INV.:29.50

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PROP. CL SWALE

AutoCAD SHX Text

PROP. CL SWALE

AutoCAD SHX Text

PROP. CL SWALE

AutoCAD SHX Text

ESTABLISH BUILDING CONNECTION UNDER PHASE 1B, EXTEND 30 LF

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text CONTRACTOR TO BRACE EX. LIGHT POLES WHEN CONSTRUCTING BUILDING, SIDEWALK, DRAINAGE SWALES, UNDERGROUND UTILITIES, AND ALL ASSOCIATED IMPROVEMENTS (TYP. ALL LOCATIONS)

AutoCAD SHX Text CONTRACTOR TO BRACE EX. LIGHT POLES WHEN CONSTRUCTION BUILDING, SIDEWALK, DRAINAGE SWALES, UNDERGROUND UTILITIES, AND ALL ASSOCIATED IMPROVEMENTS (TYP. ALL LOCATIONS)

AutoCAD SHX Text REMOVE PLUG (INV. 31.57) EXTEND 6" PVC FOR ROOF/STORM RELIEF. TO BUILDING PER ARCHITECTS PLANS OR MIN. 24" BELOW GRADE (INV.:33.10)

AutoCAD SHX Text

PROVIDE 6" CORE INV.=29.00

AutoCAD SHX Text

45° BEND

AutoCAD SHX Text

45°BEND

AutoCAD SHX Text

45°BEND

AutoCAD SHX Text

98 LF 6" PVC ROOF/STORM RELIEF @ MIN. 1.00% AND 6" CLEANOUT

AutoCAD SHX Text

6" CLEANOUT

AutoCAD SHX Text 8" ROUND DOME NYLOPLAST YARD DRAIN TO BE PLACED ALONG STORM LATERAL.(REFER TO LANDSCAPE ARCHITECT DRAWINGS AND DETAILS) RIM = 35.30 INV = 31.18

AutoCAD SHX Text 8" ROUND DOME NYLOPLAST YARD DRAIN TO BE PLACED ALONG STORM LATERAL.(REFER TO LANDSCAPE ARCHITECT DRAWINGS AND DETAILS) RIM = 35.30 INV = 30.55

AutoCAD SHX Text THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY MICHELLE KELLY, P.E. ON THE DATE ADJACENT TO THE SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Scale 1"=20' (Full Size)

AutoCAD SHX Text

SHADED AREA NOT PART OF THIS PROJECT (N.I.C.)

AutoCAD SHX Text

LEGEND:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Sheets and Views
C106
2026-11-05T17:51:35-0500
Michelle Kelly

File details come from the government source that posted it. Updated .