This is a bid schedule for Construction Invitation to Bid No. 26-8703 issued by Collier County, Florida for the Immokalee Sports Complex Phase 1A & 1B Project. The project encompasses two phases of construction work organized into multiple divisions including procurement and contracting requirements, general requirements, concrete work, equipment installation, furnishings, special construction, earthworks, exterior improvements, and utilities. Phase 1A includes 58 line items encompassing survey and mobilization, tree and plant protection, concrete sidewalks and slabs (406 square yards), chain link fencing (2,200 linear feet), artificial turf field installation (2 fields), soft net backstops (6 units), bleachers, lighting maintenance painting (15 units), site clearing and erosion control, asphalt paving (507 square yards), irrigation systems covering over 182,000 square feet, landscaping with 26 canopy trees and 9 palm trees, and utility installations including fire hydrant, sanitary sewer connections, and stormwater drainage pipes ranging from 6 inches to 24 inches in diameter. Phase 1B includes 38 line items with similar scope elements plus a field restroom, storage, and pavilion structure (1,190 square feet building and 618 square foot pavilion), covering smaller quantities of fencing, concrete, and landscaping work. A non-mandatory pre-bid meeting was held on October 16 at 10:00 a.m. in Naples, Florida, with sealed bids due no later than November 2 at 3:00 p.m. local time. Prospective bidders were required to register on the Collier County procurement portal to obtain complete project documents.
All line items in the bid schedule are presented with zero dollar amounts, indicating this is a blank bid form for contractor pricing submission. The schedule includes two bid alternates for Phase 1A: an electric rolling gate with Knox Box (ALT-1) and a planting irrigation water treatment system (ALT-2), with contractors required to provide add-alternate pricing as part of their bids. Multiple total bid scenarios are provided including Phase 1A base bid, Phase 1A with alternates, Phase 1B base bid, and combined Phase 1A and 1B totals with various alternate combinations. Collier County has allocated a $500,000 Owner's Allowance for unforeseen conditions and work directed by the Owner, with expenditures to be made through change orders supported by proper documentation of time and materials. The allowance inclusion in the contract price does not guarantee payment of any portion of the full amount to the contractor.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Vendor Name: | |||||
| BID SCHEDULE | |||||
| CONSTRUCTION ITB: 26-8703 | |||||
| IMMOKALEE SPORTS COMPLEX PHASE 1A & 1B | |||||
| PHASE 1A | |||||
| DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 1 | Survey - Layout and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 2 | Mobilization/Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 3 | Payment and Performance Bond | 1 | LS | $ - 0 | $ - 0 |
| 4 | Maintenance of Traffic | 1 | LS | $ - 0 | $ - 0 |
| 5 | Record Drawings - Provide and Maintain record (as-built) drawings for Engineer's Certification | 1 | LS | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS: | $ - 0 | ||||
| DIVISION 01 -GENERAL REQUIREMENTS | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 6 | Temporary Tree and Plant Protection - Construction-phase tree and plant protection, trimming, protection - zone fencing, and pruning | 1 | ALLOW | $ - 0 | $ - 0 |
| 7 | Construction Waste Management and Disposal - Salvaging, recycling, and disposing of non-hazardous demolition and construction waste | 1 | ALLOW | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 01 - GENERAL REQUIREMENTS: | $ - 0 | ||||
| DIVISION 03 - CONCRETE | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 8 | 5" thick reinforced concrete sidewalk or slab w/ sub-base - Bleacher pads, sidewalks | 406 | SY | $ - 0 | $ - 0 |
| 9 | 6" thick reinforced concrete pavement with sub-base - Drive apron | 77 | SY | $ - 0 | $ - 0 |
| 10 | Detectable Warning Surface | 3 | EA | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 03 - CONCRETE: | $ - 0 | ||||
| DIVISION 11 - EQUIPMENT | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 11 | Galvanized Chain Link Fence - 8.0' height 6-gauge galvanized chain link fence, posts, footings, fasteners, etc. | 2,200 | LF | $ - 0 | $ - 0 |
| 12 | Single Swing Gate - 8.0' height x 4' wide 6-gauge galvanized chain link gate, latch hardware, posts, footings, fasteners, etc. | 2 | EA | $ - 0 | $ - 0 |
| 13 | Double Swing Gate - 8.0' height x 8' wide (two 4' panels) 6-gauge galvanized chain link gates, latch hardware, posts, footings, fasteners, etc. | 1 | EA | $ - 0 | $ - 0 |
| 14 | Manual Rolling Gate & Knox Box - 16' manual rolling gate atop v-track and concrete grade beam w/ Knox Box | 2 | EA | $ - 0 | $ - 0 |
| 15 | Artificial Turf Field & Infrastructure - Includes Removal of Upper 6 Inches of Existing Field, Installation of Field/Underdrain system, Backfill, Turf Carpet, Field Striping, 8" Ribbon Curb Around Field & Furnishing, Zeofill Topping | 2 | EA | $ - 0 | $ - 0 |
| 16 | 20'H soft net backstops - 20'H soft net backstops, inline and freestanding poles, concrete ribbon curb/grade beam, net hoist system | 6 | EA | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 11 - EQUIPMENT: | $ - 0 | ||||
| DIVISION 12 - FURNISHINGS | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 17 | Trash Receptacle - Product selection by Collier County Parks and Recreation Department | 2 | EA | $ - 0 | $ - 0 |
| 18 | Recycle Receptacle - Product selection by Collier County Parks and Recreation Department | 2 | EA | $ - 0 | $ - 0 |
| 19 | Bleacher (Fixed) - Bleacher locations #3 and #4 between fields 2 and 3 | 2 | EA | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 12 - FURNISHINGS: | $ - 0 | ||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 20 | Vehicular Rated Bollards - Vehicular rated guard bollard painted yellow with reflective markings | 3 | EA | $ - 0 | $ - 0 |
| 21 | Sports Lighting Painting (does not include pool area)- Includes all materials, equipment, and labor to remove mold, algae, and staining buildup; prepare the pole for paint (1) coat primer per surface type (metal or concrete) and apply (2) coats high-quality Sherwin-Williams paint up to a height of 20' | 15 | EA | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 13 - SPECIAL CONSTRUCTION: | $ - 0 | ||||
| DIVISION 31 - EARTHWORKS | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 22 | Site Clearing - Clearing, grubbing, vegetation protection, stumping, stripping and stockpiling topsoil and rock, and disconnecting utilities. Includes removal of existing hardscape, irrigation and fencing | 1 | LS | $ - 0 | $ - 0 |
| 23 | Erosion Control and NPDES - Includes silt fencing | 1 | LS | $ - 0 | $ - 0 |
| 24 | Embankment - Includes miscellaneous fill as needed for construction and berm restoration - fields not included | 800 | CY | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 31 - EARTHWORKS: | $ - 0 | ||||
| DIVISION 32 - EXTERIOR IMPROVEMENTS | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 25 | 1.5" thick asphaltic concrete type SP-12.5 - structural course | 507 | SY | $ - 0 | $ - 0 |
| 26 | 1" thick asphaltic concrete type SP-9.5 - friction course | 507 | SY | $ - 0 | $ - 0 |
| 27 | 10" Limerock Base | 607 | SY | $ - 0 | $ - 0 |
| 28 | Type F Curb | 62 | LF | $ - 0 | $ - 0 |
| 29 | Painted pavement Markings STD | 1 | LS | $ - 0 | $ - 0 |
| 30 | 6" PVC Conduits - Irrigation sleeves | 60 | LF | $ - 0 | $ - 0 |
| 31 | 4" PVC Conduits - Irrigation sleeves | 60 | LF | $ - 0 | $ - 0 |
| 32 | Planting Irrigation Retrofit - Includes Rerouting and Quick Connection Valves w/ Valve Box (includes repair and reactivation of Field #1 upon completion of construction) | 74,134 | SF | $ - 0 | $ - 0 |
| 33 | Planting Irrigation New Installation - Includes irrigation control system, piping, valves, drip, bubbler, and sprinkler distribution (excludes field #1 irrigation intended to remain for re-use) | 107,927 | SF | $ - 0 | $ - 0 |
| 34 | Soil Preparation (Performance Specification) - 6" depth in shrub beds for planting soils specified according to tesed performance requirements (particle size, organic matter percentage, pH, CEC, fertility, etc.), layered soil assemblies | 1,682 | CY | $ - 0 | $ - 0 |
| 35 | Sod Areas - Seeded, sodded, plugged, and sprigged turf; pesticides, erosion-control materials, turf renovation, and grass paving. (includes sod replacement of Field #1 upon completion of construction) | 181,685 | SF | $ - 0 | $ - 0 |
| 36 | Plants - Canopy Tree - Nursery-grown trees and other plants, pesticides, tree stabilization, tree watering devices, landscape edgings, and tree grates | 26 | EA | $ - 0 | $ - 0 |
| 37 | Plants - Palm Tree - Nursery-grown trees and other plants, pesticides, tree stabilization, tree watering devices, landscape edgings, and tree grates | 9 | EA | $ - 0 | $ - 0 |
| 38 | Plants - Mulch Rings - 4' dia mulch ring x 3" depth typical | 6 | CY | $ - 0 | $ - 0 |
| 39 | Plants - Root Barrier - Deeproot UB24-2: 24" deep rigid panel root barrier | 126 | LF | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 32 - EXTERIOR IMPROVEMENTS: | $ - 0 | ||||
| DIVISION 33 - UTILITIES | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 40 | Proposed Fire Hydrant - Assumes up to 300 ft of fire main; fire hydrant installation; valves, fittings and isolation valve | 1 | LS | $ - 0 | $ - 0 |
| 41 | Sanitary Sewer tie-in and clean-out - Assume 6" PVC pipe | 32 | LF | $ - 0 | $ - 0 |
| 42 | Connect/modifications to existing drainage structures - 15-inch drainage pipe connection | 1 | EA | $ - 0 | $ - 0 |
| 43 | Clean out existing Drainage Structures and flush pipe - 9 structures. Flush all pipes | 1 | LS | $ - 0 | $ - 0 |
| 44 | 15" RCP Stormwater Pipe | 13 | LF | $ - 0 | $ - 0 |
| 45 | 12" HPStorm PE Pipe | 374 | LF | $ - 0 | $ - 0 |
| 46 | 15" HPStorm PE Pipe | 390 | LF | $ - 0 | $ - 0 |
| 47 | 18" HPStorm PE Pipe | 506 | LF | $ - 0 | $ - 0 |
| 48 | 24" HPStorm PE Pipe | 415 | LF | $ - 0 | $ - 0 |
| 49 | 6" PVC Drainage Pipe and Cap | 40 | LF | $ - 0 | $ - 0 |
| 50 | 10" PVC Drainage Pipe and Cap | 2 | LF | $ - 0 | $ - 0 |
| 51 | 12" PVC Drainage Pipe (C900 PVC, Class 305, DR 14) - Add 2 caps | 62 | LF | $ - 0 | $ - 0 |
| 52 | 15" PVC Drainage Pipe (C900 PVC, Class 305, DR 14) | 33 | LF | $ - 0 | $ - 0 |
| 53 | 2" Potable water tie-in and stub out - Water line serving Restroom | 24 | LF | $ - 0 | $ - 0 |
| 54 | 1" Potable water tie-in and stub out w/ Valve - Water line to service future 1" polytube to Phase 2 pool | 12 | LF | $ - 0 | $ - 0 |
| 55 | Outlet Control Structure - Structure prior to Mitered End Sections (M.E.S.) | 2 | EA | $ - 0 | $ - 0 |
| 56 | FDOT Mitered End Section | 2 | EA | $ - 0 | $ - 0 |
| 57 | Proposed Catch Basin - Type C | 15 | EA | $ - 0 | $ - 0 |
| 58 | Proposed Yard Drain - 18" ADS Basin | 9 | EA | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 33 - UTILITIES: | $ - 0 |
| BID ALTERNATES | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| ALT-1 | Electric Rolling Gate & Knox Box - 16' electric motor w/ emergency vehicle accessibility rolling gate atop v-track and concrete grade beam w/ Knox Box. Contractor to provide add alt pricing as part of bidding | 1 | EA | $ - 0 | $ - 0 |
| ALT-2 | Planting Irrigation Water Treatment System - Well-water treatment system to mitigate high levels of iron, sulfur, bacteria, and sediment. Contractor to provide add alt pricing as part of bidding | 1 | EA | $ - 0 | $ - 0 |
| SUBTOTAL BID ALTERNATES: | $ - 0 |
| PHASE 1A BASE BID TOTAL: | $ - 0 |
| PHASE 1A BASE BID + ALT-1: | $ - 0 |
| PHASE 1A BASE BID + ALT-2: | $ - 0 |
| PHASE 1A BASE BID + ALT-1 + ALT-2: | $ - 0 |
| PHASE 1B | |||||
| DIVISION 00 - PROCUREMENT AND CONTRACT REQUIREMENTS | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 59 | Survey - Layout and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 60 | Mobilization/Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 61 | Payment and Performance Bond | 1 | LS | $ - 0 | $ - 0 |
| 62 | Maintenance of Traffic | 1 | LS | $ - 0 | $ - 0 |
| 63 | Record Drawings - Provide and Maintain record (as-built) drawings for Engineer's Certification | 1 | LS | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 00 - PROCUREMENT AND CONTRACT REQUIREMENTS: | $ - 0 | ||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 64 | Temporary Tree and Plant Protection - Construction-phase tree and plant protection, trimming, protection - zone fencing, and pruning | 1 | ALLOW | $ - 0 | $ - 0 |
| 65 | Construction Waste Management and Disposal - Salvaging, recycling, and disposing of non-hazardous demolition and construction waste | 1 | ALLOW | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 01 - GENERAL REQUIREMENTS: | $ - 0 | ||||
| DIVISION 03 - CONCRETE | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 66 | 5" thick reinforced concrete sidewalk or slab w/ sub-base - Bleacher pads, sidewalks | 446 | SY | $ - 0 | $ - 0 |
| 67 | Detectable Warning Surface | 1 | EA | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 03 - CONCRETE: | $ - 0 | ||||
| DIVISION 11 - EQUIPMENT | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 68 | Galvanized Chain Link Fence - 8.0' height 6-gauge galvanized chain link fence, posts, footings, fasteners, etc. | 60 | LF | $ - 0 | $ - 0 |
| 69 | Single Swing Gate - 8.0' height x 4' wide 6-gauge galvanized chain link gate, latch hardware, posts, footings, fasteners, etc. | 1 | EA | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 11 - EQUIPMENT: | $ - 0 | ||||
| DIVISION 12 - FURNISHINGS | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 70 | Trash Receptacle - Product selection by Collier County Parks and Recreation Department; Installed by Contractor | 3 | EA | $ - 0 | $ - 0 |
| 71 | Recycle Receptacle - Product selection by Collier County Parks and Recreation Department; Installed by Contractor | 3 | EA | $ - 0 | $ - 0 |
| 72 | Bleacher (Fixed) -Bleacher locations #1 and #2 between fields 1 and 2 | 2 | EA | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 12 - FURNISHINGS: | $ - 0 | ||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 73 | Vehicular Rated Bollards - 1 Bollard (2 bollards installed with fire hydrant Ph 1A - NIC) | 1 | EA | $ - 0 | $ - 0 |
| Field Restroom / Storage / Pavilion | Assumes a 1,190 square foot CMU building on slab consisting of storage space, men’s and women’s restroom facilities, and a utility closet, along with a 618 square foot open-air pavilion structure. The building is assumed to include a standing seam metal roof, code-compliant LED lighting, mechanical ventilation, plumbing systems, and ADA-compliant restroom fixtures and accessories. The pavilion is assumed to include a standing seam metal roof supported by columns, lighting, ceiling fan, and a drinking fountain with bottle filler. | ||||
| 74 | Building Construction (1,190 SF) - CMU structure, slab, roof, interior buildout, plumbing, electrical, ventilation, drinking fountain | 1 | LS | $ - 0 | $ - 0 |
| 75 | Pavilion Structure - Columns, standing seam metal roof, slab, lighting, fan, drinking fountain | 1 | LS | $ - 0 | $ - 0 |
| 76 | Utility Tie-Ins - Water, sewer, electrical connections – assumed nearby | 1 | LS | $ - 0 | $ - 0 |
| 77 | Site Preparation - Clearing, grading, building pad preparation | 1 | LS | $ - 0 | $ - 0 |
| 78 | Signage - Wall mounted signage including ADA placards | 1 | LS | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 13 - SPECIAL CONSTRUCTION: | $ - 0 | ||||
| DIVISION 31 - EARTHWORKS | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 79 | Site Clearing - Clearing, grubbing, vegetation protection, stumping, stripping and stockpiling topsoil and rock, and disconnecting utilities. Includes removal of existing hardscape, irrigation and fencing | 1 | LS | $ - 0 | $ - 0 |
| 80 | Erosion Control and NPDES - Includes silt fencing | 1 | LS | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 31 - EARTHWORKS: | $ - 0 | ||||
| DIVISION 32 - EXTERIOR IMPROVEMENTS | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 81 | 6" PVC Conduits - Irrigation sleeves | 48 | LF | $ - 0 | $ - 0 |
| 82 | 4" PVC Conduits- Irrigation sleeves | 48 | LF | $ - 0 | $ - 0 |
| 83 | Planting Irrigation Retrofit - Includes Rerouting and Quick Connection Valves w/ Valve Box (includes repair and reactivation of Field #1 upon completion of construction) | 74,134 | SF | $ - 0 | $ - 0 |
| 84 | Planting Irrigation New Installation - Includes irrigation control system, piping, valves, drip, bubbler, and sprinkler distribution (excludes field #1 irrigation intended to remain for re-use) | 18,976 | SF | $ - 0 | $ - 0 |
| 85 | Soil Preparation (Performance Specification)- Avg. 6" depth in shrub beds for planting soils specified according to tesed performance requirements (particle size, organic matter percentage, pH, CEC, fertility, etc.), layered soil assemblies | 1,758 | CY | $ - 0 | $ - 0 |
| 86 | Sod Areas - Seeded, sodded, plugged, and sprigged turf; pesticides, erosion-control materials, turf renovation, and grass paving. (Includes sod replacement of Field #1 upon completion of construction) | 93,109 | SF | $ - 0 | $ - 0 |
| 87 | Plants - Canopy Tree - Nursery-grown trees and other plants, pesticides, tree stabilization, tree watering devices, landscape edgings, and tree grates | 6 | EA | $ - 0 | $ - 0 |
| 88 | Plants - Palm Tree - Nursery-grown trees and other plants, pesticides, tree stabilization, tree watering devices, landscape edgings, and tree grates | 8 | EA | $ - 0 | $ - 0 |
| 89 | Plants - Shrub / Groundcovers (Large) - Nursery-grown shrubs and other plants, pesticides, tree stabilization, tree watering devices, landscape edgings, and tree grates | 36 | EA | $ - 0 | $ - 0 |
| 90 | Plants - Shrub / Groundcovers (Small) - Nursery-grown shrubs and other plants, pesticides, tree stabilization, tree watering devices, landscape edgings, and tree grates | 180 | EA | $ - 0 | $ - 0 |
| 91 | Plants - Mulch Rings - 4' dia mulch ring x 3" depth typical | 2 | CY | $ - 0 | $ - 0 |
| 92 | Plants - Root Barrier - Deeproot UB24-2: 24" deep rigid panel root barrier | 157 | LF | $ - 0 | $ - 0 |
| 93 | Mulch - 3" depth typical | 17 | CY | $ - 0 | $ - 0 |
| 94 | #57 Stone - 4" depth washed #57 stone atop geotextile fabric - see landscape drawings | 377 | SF | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 32 - EXTERIOR IMPROVEMENTS: | $ - 0 | ||||
| DIVISION 33 - UTILITIES | |||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL COST |
| 95 | Connect/modifications to existing drainage structures - (1) 6-inch drainage pipe connection to serve bldg roof drain | 1 | EA | $ - 0 | $ - 0 |
| 96 | 6" PVC Drainage Pipe and Fittings / Cleanout - Serving building roof drainage and sanitary sewer | 188 | LF | $ - 0 | $ - 0 |
| 97 | 2" Potable water tie-in and stub out and valve - Serving restroom building | 50 | LF | $ - 0 | $ - 0 |
| SUBTOTAL DIVISION 33 - UTILITIES: | $ - 0 |
PHASE 1B BASE BID TOTAL: $ - 0
| PHASE 1A BASE BID + PHASE 1B BASE BID: | $ - 0 |
| PHASE 1A BASE BID + PHASE 1B BASE BID + ALT-1: | $ - 0 |
| PHASE 1A BASE BID + PHASE 1B BASE BID + ALT-2: | $ - 0 |
| PHASE 1A BASE BID + PHASE 1B BASE BID + ALT-1 + ALT-2: | $ - 0 |
Staff has allocated $500,000.00 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.