About this file
This is a Final Construction Documents Submittal (Phase 1B) for the Immokalee Sports Complex project in Collier County, Florida, prepared by Stantec Consulting Services Inc. The project, located at 505 Escambia Street, Immokalee, Florida, encompasses the construction of a Men's and Women's Field Restrooms building of approximately 1,800 gross square feet featuring CMU walls, concrete tie beams, prefabricated wood trusses, and standing seam metal roofing. The project also includes an adjacent open-air pavilion of approximately 720 gross square feet with four square concrete structural columns supporting exposed glulam beams, wooden trusses, and standing seam metal roofing. The construction documents are dated May 13, 2026, as the final submittal following a 90% submittal issued on January 30, 2026. The documents address Phase 1B of the overall Immokalee Sports Complex project and include comprehensive architectural, mechanical, electrical, plumbing, and structural drawings with detailed specifications for materials, construction methods, accessibility compliance, and installation requirements.
The project must comply with the 2023 Florida Building Code (8th Edition), 2020 National Electrical Code (NFPA 70), 2023 Florida Fire Prevention Code (8th Edition), 2010 ADA Standards for Accessible Design, and applicable Florida Accessibility Code provisions. The construction documents specify all work must include ADA-compliant accessibility features, proper MEP coordination, fire-rated assemblies where required, and termite protection treatments. The documents require the Construction Manager to verify all dimensions in the field, secure necessary permits and licenses, coordinate with the Owner and design professionals regarding any discrepancies, maintain the site continuously free of debris, and comply with all OSHA regulations and local safety ordinances. The project involves delegated design services for roof trusses, requiring sealed statements from responsible design professionals confirming compliance with performance and design criteria. Materials specified include Kynar 500-coated aluminum roofing panels, non-corroding louvers, galvanized steel doors and frames, and stainless steel hardware appropriate for Florida's coastal environment.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ap ar ke
M ay
1:
am
U
:\2
\la nd sc ap e\ de si gn \d ra w in g\ sh ee t\C om po ne nt Sh ee t_
AR
_P
H 1B
.d w g L ay ou t = A
C op yr ig ht S ta nt ec ; A ll id ea s, d es ig ns
, a rra ng em en ts
, a nd p la ns re pr es en te d by th is d ra w in g ar e ow ne d by a nd th e pr op er ty o f S ta nt ec
, a nd w er e cr ea te d fo r t he e xc lu si ve u se o f t he s pe ci fie d pr oj ec t.
Th es e id ea s, d es ig ns , a rra ng em en ts o r p la ns s ha ll no t b e us ed b y, o r d is cl os ed to a ny p er so n, fi rm
, o r c or po ra tio n w ith ou t t he w rit te n pe rm is si on o f S ta nt ec x w w w .s ta nt ec .c om
+1 .2
.6
.4
K ra ft R oa d, S ui te
, N ap le s, F
L
U
SA
IM
M
O
KA
LE
E
SP
O
R
TS
C O
M
PL
EX
PR
O
JE
C T
ID
: 2
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
S U
BM
IT
TA
L
(P H
AS
E
1B
M
AY
3, IMMOKALEE SPORTS COMPLEX
505 Escambia St., Immokalee, Florida
Final Construction Documents Submittal - Phase 1B
Stantec Project ID: 215617854 County Project #80429.1.1 and 80320.1
County PO #4500236356
PROJECT COMPONENT SECTION
Architecture w w w .s ta nt ec .c om
+1 .2
.6
.4
K ra ft R oa d, S ui te
, N ap le s, F
L
U
SA
SH
EE
T N
U M
B
ER
SHEET TITLE
SC
A
LE
Ph as e 1B
S ub m itt al (9
0%
.3
0.
Ph as e 1B
F in al C
D S ub m itt al
.1
3.
G-001 DRAWING SUBMITTAL LOG & SHEET INDEX n/a ● ●
G-002 GENERAL NOTES, ABBREVIATIONS, & LEGEND n/a ● ●
A-050 ADA GUIDELINES n/a ● ●
A-051 ADA GUIDELINES n/a ● ●
A-101.2 FIELD RESTROOM AND PAVILION PLAN as shown ● ●
A-102.2 FIELD RESTROOM AND PAVILION ROOF PLAN 1/4" = 1'-0" ● ●
A-200.2 FIELD RESTROOM AND PAVILION EXTERIOR ELEVATIONS 1/4" = 1'-0" ● ●
A-300.2 FIELD RESTROOM AND PAVILION RCP 1/4" = 1'-0" ● ●
A-500.2 FIELD RESTROOM AND PAVILION BUILDING SECTIONS 1/4" = 1'-0" ● ●
A-510.2 FIELD RESTROOM AND PAVILION WALL SECTIONS 3/4" = 1'-0" ● ●
A-540 ROOF DETAILS 3" = 1'-0" ● ●
A-602 FIELD RESTROOM INTERIOR ELEVATIONS 1/4" = 1'-0" ● ●
A-700.2 DOOR AND LOUVER SCHEDULES n/a ● ●
A-711 PLUMBING FIXTURE & RESTROOM ACCESSORY SCHEDULES - NEW FIELD RESTROOMS n/a ● ●
M-000 MECHANICAL SYMBOLS, ABBREVIATIONS AND NOTES n/a ●
M-201 FIELD RESTROOM NEW PLAN 1/4" = 1'-0" ●
M-701 MECHANICAL DETAILS n/a ●
M-801 MECHANICAL SCHEDULES n/a ●
E-001 ELECTRICAL NOTES & SPECS n/a ●
E-101 PHASE 1B SITE PLAN 1/4" = 1'-0" ●
E-201 FIELD RESTROOM LIGHTING PLAN 1/4" = 1'-0" ●
E-301 FIELD RESTROOM POWER PLAN 1/4" = 1'-0" ●
E-401 ONE-LINE DIAGRAM -PHASE 1B n/a ●
E-402 SITE LIGHTING RISER DIAGRAM - PHASE 1B n/a ●
E-601 SCHEDULES & CALCS n/a ●
E-602 SCHEDULES & CALCS n/a ●
E-701 SOCCER 3 LIGHTING PLAN 1/16" = 1'-0" ●
E-702 SOCCER 2 LIGHTING PLAN 1/16" = 1'-0" ●
E-703 SOCCER 1 LIGHTING PLAN 1/16" = 1'-0" ●
E-801 ELECTRICAL DETAILS n/a ●
P-000 PLUMBING NOTES n/a ●
P-201 FIELD RESTROOM NEW PLAN - SAN as shown ●
P-202 FIELD RESTROOM NEW PLAN - DOM as shown ●
P-401 PLUMBING DETAILS n/a ●
P-402 PLUMBING DETAILS n/a ●
ST1-000 STRUCTURAL NOTES n/a ● ●
ST1-010 SITE PLAN 1" = 60'-0" ● ●
ST1-020 FIELD RESTROOM & PAVILLION WIND PRESSURES as shown ● ●
ST1-101 FIELD RESTROOM & PAVILLION FRAMING PLAN 3/16" = 1'-0" ● ●
ST1-200 FIELD RESTROOM & PAVILLION BUILDING SECTIONS as shown ● ●
ST1-300 FOUNDATION DETAILS 3/4" = 1'-0" ● ●
ST1-310 SLAB ON GRADE DETAILS 3/4" = 1'-0" ● ●
ST1-320 BEAM SCHEDULE 3/4" = 1'-0" ●
ST1-330 MASONRY DETAILS 3/4" = 1'-0" ● ●
ST1-340 ROOF DETAILS as shown ● ●
ST1-350 TYPICAL PREENGINEERED TRUSS DETAILS as shown ●
ELECTRICAL COMPONENT DRAWINGS
PLUMBING COMPONENT DRAWINGS
STRUCTURAL COMPONENT DRAWINGS
DRAWING SUBMITTAL LOG and SHEET INDEX
MECHANICAL COMPONENT DRAWINGS
ARCHITECTURAL COMPONENT DRAWINGS
SUBMITTAL
● = ISSUED R = REVISION
Project No.:
Scale:
Revision:
Drawing No.
Sheet:
Title
C lie nt /P ro je ct
Permit/Seal
Dsgn. Chkd. YYYY.MM.DDDwn.
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
of
File Name: G-SHEETS
ORIGINAL SHEET - ARCH D
Iss ue d By
Ap pd
YY
YY
.M M
.D D
Re vis io n
By Ap pd
YY
YY
.M
M .D
D
Te l:
w w w .st an te c.
co m
St an te c
C on su ltin g Se rv ic es In c.
K ra ft
Ro ad
S ui te
Na pl es
F L 3
-2
(2
) 6
-4
A
B
C
D
1 2 3 4 5
C ol lie r C ou nt y Bo ar d of C ou nt y C om m iss io ne rs, C ol lie r C ou nt y Pa rk s a nd R ec re at io n
Im m ok al ee S po rts
C om pl ex
Ph as e
1B
Es ca m bi a St re et
, I m m ok al ee
, F L 3
-3
215617854
2026.05.13
Ph as e
1B S ub m itt al
AC
P
KG
M
.0 1.
Ph as e 1B
F in al C
D S ub m itt al
AC
P
FA
D
.0 5.
AT
TE
N
TI
O
N
Th es e dr aw in gs m ay in cl ud e in fo rm at io n pr ov id ed b y ot he rs
. S ta nt ec h as n ot v er ifi ed th e ac cu ra cy a nd
/o r c om pl et en es s of th is in fo rm at io n an d sh al l n ot b e re sp on si bl e fo r an y er ro rs o r o m is si on s w hi ch m ay b e in co rp or at ed h er ei n as a re su lt.
1. DEVELOPMENT TO MEET ACCESSIBILITY REQUIREMENTS FLORIDA ACCESSIBILITY CODE 2020, AS APPLICABLE:
CODE NOTES
SECTION 206 -ACCESSIBLE ROUTES
SECTION 206.2.1 -SITE ARRIVAL POINTS
SECTION 206.2.8 -EMPLOYEE WORK AREAS
SECTION 206.4 -ENTRANCES
207 -ACCESSIBLE MEANS OF EGRESS
215- FIRE ALARM SYSTEMS
304.4 - DOOR SWING
305.6 - APPROACH
305.7 - MANUEVERING CLEARANCE
306 -KNEE AND TOE CLEARANCE
307 -PROTRUDING OBJECTS
1. THIS DRAWING IS ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION WORK AND IS NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL
REMOVE ALL EXISTING ITEMS AS REQUIRED TO COMPLETE THE JOB.
2. NOT ALL ITEMS TO BE DEMOLISHED ARE SHOWN ON THE PLAN. CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING A WALK-THRU OF THE PROJECT PRIOR TO SUBMITTING A BID TO THE OWNER FOR IDENTIFYING POSSIBLE CRITICAL ITEMS, NOT OR INCORRECTLY ADDRESSED, WHICH REQUIRE REMOVAL/ RELOCATION.
3. PROVIDE SAFETY FEATURES DURING WORK COMPLYING WITH APPLICABLE CODES, RULES AND REGULATIONS HAVING JURISDICTION OF THE PROJECT.
4. CUT, REMOVE, PATCH, ALTER AND REFINISH EXISTING CONSTRUCTION AS REQUIRED TO LEAVE WORK COMPLETE AND IN SATISFACTORY CONDITION. CLOSELY
MATCH TEXTURE AND FINISH OF EXISTING ADJACENT SURFACE.
5. CONTRACTOR SHALL TAKE ALL PRECAUTIONS REQUIRED TO PROTECT ALL UNDERGROUND OR OTHER CONCEALED UTILITIES. CONTRACTOR IS TO INSPECT CEILING AND CHASES TO ASSURE PROPER IDENTIFICATION OF UTILITIES PRIOR TO CUTTING, PATCHING, ETC. AS REQUIRED AND INDICATED ON M.E.P. DOCUMENTS.
6. OPENINGS LEFT THROUGH RATED AND SMOKE PARTITIONS DUE TO REMOVAL OF DUCTWORK AND/OR CONDUITS SHALL BE CLOSED (BOTH SIDES).TO MAINTAIN THE
FIRE RATING INTEGRITY OF PARTITION PER THE APPLICABLE UL LISTING.
7. RENOVATION WORK SHALL ENTAIL INTERVENTIONS IN AREAS OUTSIDE OF THE IMMEDIATE SCOPE OF WORK, INCLUDING WORK ABOVE AND/OR BELOW THE FLOOR LEVEL WITHIN THE SCOPE. IT SHALL REQUIRE WORK INVOLVING REMOTE UTILITY LINES (ELECTRICAL, MECHANICAL, PLUMBING, COMMUNICATIONS, ETC.). ANY SUCH WORK SHALL BE ALL-INCLUSIVE. PROVIDE ALL STRUCTURES, UTILITIES, FINISHES AND EQUIPMENT REQUIRED TO RESTORE THE AREA TO FULLY OPERATIONAL CONDITIONS AND COMPLIANCE WITH RATING INTEGRITIES TO MEET THE OWNER'S APPROVAL. ALL WORK AS DESCRIBED IN THIS NOTE SHALL BE INCLUDED AS PART
OF THE BASE CONTRACT PRICE.
8. CONTRACTOR SHALL COORDINATE DEMOLITION WORK SCHEDULE WITH ADMINISTRATION IN ORDER TO PROVIDE SUFFICIENT ADVANCE NOTICE FOR THE BEGINNING
OF WORK IN EACH EXISTING AREA OR FLOOR LEVEL.
9. PATCH AND REPAIR ALL EXISTING SURFACES DAMAGED BY DEMOLITION AND/OR INSTALLATION OF NEW WORK AND/OR UTILITIES, PROVIDE A FLUSH AND EVEN SURFACE AS REQUIRED TO MATCH ADJACENT SURFACES AND/OR RECEIVE NEW SCHEDULED FINISHES.
10. ALL DEMOLITION WORK IS DENOTED BY BROKEN LINES. ANY DISCREPANCIES OR DOUBTS SHALL BE BROUGHT TO THE ARCHITECTS ATTENTION PRIOR TO
COMMENCING WORK FOR CLARIFICATION.
11. ALL AREAS SCOPED FOR DEMOLITION WORK SHALL BE LEFT PREPPED TO RECEIVE NEW WORK. CONTRACTOR TO COORDINATE WITH NEW WORK PLANS
12. ARCHITECTURAL DRAWINGS WILL IDENTIFY DEMOLITION OF CERTAIN ITEMS INVOLVING OTHER DISCIPLINES HOWEVER IT'S THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL OTHER CONSULTANT DRAWINGS (STRUCTURAL, CIVIL, LANDSCAPE, MEP'S, POOL, ETC) APPLICABLE TO THIS PROJECT TO IDENTIFY FULL SCOPE.
13. ALL ITEMS NOTED TO BE DEMOLISHED SHALL INCLUDE ALL CORRESPONDING COMPONENTS AND ACCESSORIES TO IT'S ENTIRETY.
14. DRAWINGS ARE NOT TO BE SCALED FOR INFORMATION
15. PLUMBING FIXTURE NEW LOCATIONS MAY INVOLVE THE DEMOLITION OF THE EXISTING SLAB ON GRADE TO PROVIDE NEW PLUMBING TIE-INS. SIMILAR WILL APPLY. TO NEW COLD & HOT WATER CONNECTIONS WHICH WILL INVOLVE THE DEMOLITION OF WALLS. CONTRACTOR SHALL PROVIDE A FIELD INSPECTION TO
ASSESS. THE EXTENT OF THE DEMOLITION AND INCLUDE IN OVERALL BID (SCOPE OF WORK).
GENERAL DEMOLITION NOTES
DELEGATED DESIGN SERVICES
A. PERFORMANCE AND DESIGN CRITERIA: WHERE PROFESSIONAL DESIGN SERVICES OR CERTIFICATIONS BY A DESIGN PROFESSIONAL ARE SPECIFICALLY REQUIRED OF CONTRACTOR BY THE CONTRACT DOCUMENTS, PROVIDE PRODUCTS AND SYSTEMS COMPLYING WITH SPECIFIC PERFORMANCE AND DESIGN
CRITERIA INDICATED.
B. DELEGATED DESIGN SERVICES STATEMENT: SUBMIT A STATEMENT SIGNED AND SEALED BY THE RESPONSIBLE DESIGN PROFESSIONAL, FOR EACH PRODUCT AND SYSTEM SPECIFICALLY ASSIGNED TO CONTRACTOR TO BE DESIGNED OR CERTIFIED BY A DESIGN PROFESSIONAL, INDICATING THAT THE PRODUCTS AND SYSTEMS ARE IN COMPLIANCE WITH PERFORMANCE AND DESIGN CRITERIA INDICATED. INCLUDE LIST OF CODES, LOADS, AND OTHER FACTORS USED IN
PERFORMING THESE SERVICES.
ELEV
25'-0"
BUILDING SECTION KEY
GENERAL LEGEND
SPOT ELEVATION
KEY
EXTERIOR ELEVATION KEY
ENLARGED PLAN KEY
ALIGN KEY
DETAIL NUMBER
DRAWING NUMBER
REVISION KEY
DIMENSION LINE
DETAIL KEY:
N.I.C. SHADING
MATCH LINE
MATCH LINE
SEE X/XXXX
COLUMN LINE INDICATORS
WINDOW TYPE
PRECAST CONCRETE TYPE
DOOR NUMBER
SEALANT & BACKER ROD
SEALANT
DRINKING FOUNTAIN
FIRE EXTINGUISHER - BRACKET
MOUNTED
FLOOR DRAIN
ROOF DRAIN
MULTIPLE INTERIOR
ELEVATIONS
1 13/32"
S
S
DF
FD
RD
WALL SECTION KEY
A400
INTERIOR ELEVATION KEY
FIRE EXTINGUISHER
CABINET - SEMI-
RECESSED
LOUVER TYPE
A-101
1 SIM
LIMIT OF WORK
FINISH TAG
A-202b
SIM
A510
SIM
DECK DRAINDD
FIRE EXTINGUISHER
CABINET - SURFACE
MOUNTED
FIRE EXTINGUISHER CABINET -
FULLY RECESSED
FC
WALL
BASE
FLOOR
ROOM NAME
FS
FR
FE
ACT1
10' - 0"
RCP TAG
C.5
C.5 COLUMN LINE INDICATORS
(EXSITING BUILDINGS)
A500
A500
F ASSEMBLY TYPE (P / W / F / R)
TYPE (W/ ALFA MODIFIER IF
INDICATED)
1x
PARTITION (P) /
EXTERIOR WALL (W) /
FLOOR (F) / ROOF (R)
ASSEMBLY TAG
C
W1
LOBBY
ROOM NAME
ROOM NUMBER
1 FIXTURE / ACCESSORY TAG
L1
FINISH SYMBOLPT-1
GENERAL NOTES
1. CONSTRUCTION MANAGER (CM) – THE TERM “CONSTRUCTION MANAGER (CM) ” "GENERAL CONTRACTOR" AND "CONTRACTOR" SHALL HAVE THE SAME MEANING UNLESS NOTED OTHERWISE
2. IT IS THE RESPONSIBILITY OF THE CM AND EACH OF HIS SUBCONTRACTORS TO REVIEW ALL DRAWINGS, ADDENDA, ETC. TO ENSURE COORDINATION OF ALL WORK AFFECTING EACH TRADE. FAILURE TO REVIEW ALL CONTRACT DOCUMENTS FOR APPLICABLE ITEMS OF WORK SHALL NOT RELIEVE THE RESPONSIBLE PARTY FROM PERFORMING ALL WORK
REQUIRED.
3. IT IS THE RESPONSIBILITY OF THE CM AND EACH OF HIS SUBCONTRACTORS TO REVIEW ALL DRAWINGS, ADDENDA, ETC. TO INCLUDE ALL SCOPE APPLICABLE TO EACH TRADE. FAILURE TO REVIEW ALL CONTRACT DOCUMENTS OR NOT CLARIFY QUESTIONS FOR APPLICABLE ITEMS OF WORK SHALL NOT RELIEVE THE RESPONSIBLE PARTY FROM
PERFORMING ALL WORK REQUIRED.
4. THE CM SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL SAFETY REGULATIONS. ALL WORK SHALL COMPLY WITH ALL LOCAL GOVERNING ORDINANCES AND OTHER LEGAL
REQUIREMENTS OF PUBLIC AUTHORITIES WHICH BEAR ON PERFORMANCE OF WORK.
5. THE CM SHALL COMPLY WITH ALL OSHA REGULATIONS 2020 FBC SAFEGUARDS DURING CONSTRUCTION REQUIREMENTS.
6. THE CM SHALL LIMIT CONSTRUCTION OPERATIONS TO WITHIN THE LIMITS OF CONSTRUCTION. (THE CM IS SOLELY RESPONSIBLE FOR ANY DAMAGES OUTSIDE THE LIMITS OF
CONSTRUCTION & NEEDS TO REMEDIATE TO ITS ORIGINAL STATE.)
7. THE CM SHALL COOPERATE WITH THE OWNER, THE OWNER'S REPRESENTATIVES, USERS, FIRE DEPARTMENT, BUILDING DEPARTMENT AND OTHER ENTITIES WHILE WORKING ON THIS
PROJECT
8. THE CM SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF ALL WORK UNDER THE CONTRACT REGARDLESS OF WHICH DRAWING SHEETS MAY DEPICT THE WORK WHILE OTHERS MAY NOT. CM SHALL COORDINATE ALL THE WORK OF SUBCONTRACTORS ON SITE TO COMPLETE THE PROJECT.
A. DISCREPANCIES AND OMISSIONS
CONTRACT DOCUMENTS ARE PART AND PARCEL TO ONE ANOTHER. ALL DRAWINGS AND SHEETS SHALL BE CONSIDERED IN ITS ENTIRETY, AS THE "CONTRACT DOCUMENTS"
9. THE CM SHALL HAVE THEIR CONSTRUCTION SCHEDULE APPROVED BY THE OWNER AND OWNER'S REPRESENTATIVES PRIOR TO COMMENCING CONSTRUCTION WORK WITHIN THE TIME
PERIOD SPECIFIED IN THE CONTRACT DOCUMENTS.
10. THE CM SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND ARCHITECT'S OFFICE MUST BE NOTIFIED OF ANY VARIATIONS FROM THE
DIMENSIONS AND CONDITIONS SHOWN BY THE CONTRACT DOCUMENTS.
11. THE CM SHALL SECURE AND PAY FOR, AS NECESSARY PROPER EXECUTION AND COMPLETION OF WORK, AS APPLICABLE AT TIME OF RECEIPT OF BIDS:
A. PERMITS
B. GOVERNMENT FEES
C. LICENSES
12. THE CM SHALL PROMPTLY SUBMIT WRITTEN NOTICE TO THE OWNER OR OWNER'S REPRESENTATIVES ANY OBSERVED DISCREPANCIES IN THE CONTRACT DOCUMENTS FROM LEGAL REQUIREMENTS PRIOR TO BIDDING AND/OR PRIOR TO START OF WORK. MODIFICATIONS TO CONTRACT DOCUMENTS SHALL BE MADE AS NECESSARY TO DEPICT SUCH MODIFICATION PRIOR TO PROCEEDING WITH THE WORK. THE CM SHALL ASSUME RESPONSIBILITY FOR EXECUTED WORK WHEN KNOWN TO BE CONTRARY TO THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
13. THE CM SHALL ESTABLISH ALL ITEMS THAT REQUIRE IMMEDIATE PROCESSING DUE TO LONG LEAD ORDERING TIME. A LIST OF THESE ITEMS SHALL BE SUBMITTED TO THE OWNER OR OWNER'S REPRESENTATIVES WITHIN ONE WEEK AFTER THE CONTRACT IS AWARDED, TIME ADJUSTMENTS WILL NOT BE MADE FOR LONG LEAD ITEMS.
14. THE STAGING AREA MAY BE LOCATED BY THE OWNER, OWNER'S REPRESENTATIVES PRIOR TO THE BEGINNING OF CONSTRUCTION. THE CM SHALL COORDINATE WITH
OWNER REGARDING PAYMENT FOR MATERIAL STORAGE.
15. THE CM’S PERSONNEL SHALL BE READILY AVAILABLE VIA CELL TELEPHONE AT ALL TIMES. CONSTRUCTION EQUIPMENT WILL BE PERMITTED TO PARK OVERNIGHT ONLY WITHIN THE
SECURED PROJECT PHASING LIMITS.
16. THE CM'S SUPERINTENDENT SHALL BE:
A. ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS WHILE THIS PROJECT IS IN PROGRESS.
B. DESIGNATED RESPONSIBLE CM REPRESENTATIVE.
C. AVAILABLE IN CASE OF EMERGENCIES ON A 24-HOUR DAILY BASIS.
17. THE CM SHALL PROVIDE JOB SITE ACCESS TO THE OWNER, ARCHITECT AND THEIR REPRESENTATIVES FOR INSPECTION OR OBSERVATION PURPOSES.
18. THE CM AND EACH SUBCONTRACTOR MUST HAVE WORKMAN'S COMPENSATION AS REQUIRED BY LAW, AND MEET OWNER REQUIREMENTS HAVING SUFFICIENT PROTECTION FOR CLAIMS AGAINST PERSONAL INJURY, INCLUDING DEATH, SHOULD THEY ARISE FROM OPERATIONS UNDER CONTRACT.
19. THE CM SHALL DEVELOP ALL PHASING AND ALTERNATE DAILY ROUTES DURING CONSTRUCTION AS PART OF THEIR MEANS AND METHODS. COORDINATE ALL PHASING WITH OWNER
AND OWNER'S REPRESENTATIVES.
20. THE CM SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT EXISTING ABOVE GROUND AND BELOW GROUND STRUCTURES, WHICH ARE TO REMAIN IN PLACE, FROM DAMAGE. ALL SUCH IMPROVEMENTS OR STRUCTURES DAMAGED BY THE CM'S OPERATIONS SHALL BE REPAIRED OR RECONSTRUCTED OR REPLACED, SATISFACTORY TO THE OWNER, AT THE EXPENSE OF
THE CM AND THEIR SUBCONTRACTORS.
21. THE CM SHALL BE RESPONSIBLE FOR THE INSTALLATION OF SAFETY BARRICADES AND OTHER SAFETY PRECAUSTIONARY MEASURES TO ENSURE SAFETY ON THE CONSTRUCTION SITE DURING CONSTRUCTION IN AREAS AFFECTED BY THIS CONTRACT AND MUST COMPLY WITH OSHA REQUIREMENTS.
22. BARRICADES ARE TO REMAIN UNTIL ALL PROJECT CONSTRUCTION IS COMPLETED UNLESS NOTED OTHERWISE.
23. THE CM SHALL BE RESPONSIBLE FOR SECURING THEIR WORK AREA AND COORDINATING THE OVERALL SECURITY OF THE WORK AREA, AFFECTED BUILDING AREAS, AND MATERIAL
STORAGE AND STAGING AREAS.
24. CONSTRUCTION EQUIPMENT SHALL BE PARKED ONLY WITHIN THE CM'S SECURED WORK AREA. LOCATION TO BE COORDINATED WITH OWNER'S REPRESENTATIVE.
25. THE CM SHALL CONTINUOUSLY MAINTAIN THE SITE FREE OF RUBBISH AND CONSTRUCTION DEBRIS TO THE MAXIMUM EXTENT POSSIBLE. ALL RUBBISH AND CONSTRUCTION DEBRIS SHALL BE REMOVED IN ITS ENTIRETY FROM THE WORK AREA BEFORE THE END OF EACH WORK PERIOD. THE CM SHALL PROVIDE AND MAINTAIN AT LEAST ONE COVERED DUMPSTER FOR TRASH
DISPOSAL AT AN APPROVED LOCATION.
26. UPON COMPLETION OF CONSTRUCTION, THE CM SHALL CLEAN AND RESTORE THE SITE. ALL RUBBISH AND OTHER MATERIAL SHALL BE DISPOSED OFF FROM THE PROPERTY AT THE CM'S DISCRETION AND EXPENSE. THE CM SHALL RESTORE TO ITS PRE CONSTRUCTION CONDITION ALL GRASS AND PAVED AREAS THAT ARE NOT A PART OF THE CONTRACT BUT HAS BEEN
DISTURBED BY CONSTRUCTION ACTIVITY.
27. THE CM SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK DURING CONSTRUCTION AGAINST DAMAGES, BREAKAGE, COLLAPSE, DISTORTIONS AND OFF-
ALIGNMENT ACCORDING TO APPLICABLE CODES, STANDARDS AND GOOD PRACTICE.
28. ALL CHANGE ORDERS SHALL BE APPROVED BY OWNER, THE CM, AND ARCHITECT OF RECORD.
29. DRAWINGS THESE DRAWINGS SHALL NOT BE SCALED. REFER TO DIMENSIONS INDICATED, ACTUAL SIZES OF CONSTRUCTION ITEMS OR OTHER METHOD OF LOCATING CONSTRUCTION. WHERE NO DIMENSIONS OR METHODS OF DETERMINING A LOCATION ARE GIVEN, VERIFY CORRECT LOCATION WITH THE ARCHITECT PRIOR TO INSTALLATION.
30. THE CONTRACT DOCUMENTS SHALL CONSIST OF THE COMPLETE SET OF CONSTRUCTION DRAWINGS .
31. DETAILS NOTED AS "TYPICAL" ARE TO APPLY FOR ALL SUCH CASES WHERE THEY OTHERWISE APPEAR IN THE DOCUMENTS, UNLESS SPECIFICALLY NOTED TO THE CONTRARY OR
OTHERWISE
32. ALL MATERIALS AND CONSTRUCTION TO BE INCORPORATED IN THE WORK SHALL BE IN STRICT ACCORDANCE WITH THE LATEST EDITION OF THE A.S.T.M. SPECIFICATIONS AS APPLICABLE, AND TO CONFORM WITH THE STANDARDS AND RECOMMENDATIONS OF THE VARIOUS TRADE INSTITUTES ( A.C.I., A.I.S.C.,etc.). ALL MATERIAL INCORPORATED INTO THE WORK SHALL BE NEW.
33. THE CM SHALL APPLY WATER, CHEMICALS, VEGETATION OR OTHER MATERIALS TO PREVENT THE OCCURRENCE OF DUST THAT WILL BE OBJECTIONABLE TO THE OPERATIONS OR USERS OF THE AREAS. THE CM SHALL ALSO DISCONTINUE OPERATIONS, WHICH VIOLATE EXISTING LAWS AND REGULATIONS OR CREATE AN UNDUE HAZARD. ALL COST FOR CONTROLLING DUST OR POLLUTANTS TO THE AIR OF ANY KIND SHALL BE INCIDENTAL TO THE CONTRACT.
34. DIMENSIONS - DIMENSIONS ON PLANS ARE FROM FACE OF MASONRY. INTERIOR DIMENSIONS ARE FROM FACE OF MASONRY, FACE OF FINISH OR FACE OF EXISTING WALL, UNLESS NOTED
OTHERWISE.
EXTERIOR DIMENSIONS ARE FROM FACE OF MASONRY, UNLESS NOTED OTHERWISE. DIMENSIONS INDICATED AS CLEAR SHALL BE A MINIMUM DIMENSION, FACE TO FACE OF FINISH
MATERIALS.
35. ALL DIMENSIONS MUST BE FIELD VERIFIED BY THE CM AND THE SUBCONTRACTORS BEFORE COMMENCING ANY WORK. ANY DISCREPANCY MUST BE BROUGHT TO THE ATTENTION OF THE OWNER OR OWNER'S REPRESENTATIVE IMMEDIATELY AND IN WRITING PRIOR TO PROCEEDING WITH ANY WORK.
36. CEILING HEIGHTS ARE DIMENSIONED IN RELATIONSHIP TO THE FINISHED FLOOR, UNLESS SPECIFICALLY NOTED OTHERWISE.
37. AS BUILT DRAWINGS - PRINTS OF PLANS TO BE USED BY THE CM FOR RECORDING "AS-BUILT" INFORMATION SHALL BE KEPT AT THE JOB SITE AT ALL TIMES AND ALL CHANGES SHALL BE MARKED IN RED AS THE WORK PROGRESSES. UPON COMPLETION OF THE WORK, AND PRIOR TO APPROVAL OF THE APPLICATION FOR FINAL PAYMENT, THE COMPLETED SET OF "AS-BUILT"
PLANS SHALL BE COORDINATED WITH SPECIFICATIONS AND DELIVERED TO THE OWNER.
38. SHOP DRAWINGS- ALL SUBCONTRACTORS SHALL SUBMIT SHOP DRAWINGS:
A. THROUGH THE CM. ONCE REVIEWED, THE CM SHALL THOROUGHLY REVIEW AND SUBMIT THE SHOP DRAWINGS TO THE OWNER OR OWNER'S REPRESENTATIVES TO BE APPROVED BY THE ARCHITECT OF RECORD BEFORE PROCEEDING WITH FABRICATION AND/OR INSTALLATION.
B. DIMENSIONS SHALL BE FIELD VERIFIED, REVIEWED AND APPROVED BY THE CM BEFORE SUBMITTAL.
39. SHOP DRAWINGS THAT ARE INCOMPLETE, OR LACKING SUFFICIENT INFORMATION, WILL BE RETURNED WITHOUT REVIEW. (REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS.)
40. SHOP DRAWINGS ARE TO BE COORDINATED WITH ALL EXISTING CONDITIONS AND WORK BY OTHER TRADES.
41. THE MANUFACTURER'S DIRECTIONS FOR APPLICATION, INSTALLATION AND METHODS SHALL BE FOLLOWED AND ARE HEREIN MADE PART OF THE CONSTRUCTION DOCUMENTS.
42. NO SUBSTITUTIONS ARE TO BE MADE WITHOUT APPROVAL BY ARCHITECT. THE CM IS TO SUBMIT SUBSTITUTE MATERIAL SPECIFICATIONS FOR APPROVAL IN WRITING TO ARCHITECT
PRIOR TO COMMENCEMENT OF WORK .
43. FIRE RATED ITEMS AND FIRE STOPPING- ALL PENETRATIONS OF FIRE RATED PARTITIONS SHALL BE PROTECTED BY UNDERWRITING LABATORIES (UL) LISTED PRODUCTS AND ASSEMBLIES.
RATED PARTITIONS, FLOOR-CEILING AND ROOF ASSEMBLIES SHALL BE FIRE RATED AS INDICATED AND SHALL ALSO BE BY (UL) LISTED ASSEMBLIES.
44. WHERE NEW WORK ABUTS OR ALIGNS WITH EXISTING, THE CM AND THEIR SUBCONTRACTORS SHALL MAKE A SMOOTH AND EVEN TRANSITION, PATCH WORK TO MATCH EXISTING
ADJACENT WORK IN TEXTURE AND APPEARANCE.
45. ALL BARRIERS AND OVERHEAD PROTECTION COVERED WALKWAYS SHALL COMPLY WITH CHAPTER 33 OF THE FLORIDA BUILDING CODE AND CHAPTER 14 OF THE FLORIDA BUILDING CODE
EXISTING BUILDING.
46. NOISE CONTROL- PROVIDE ALL NECESSARY REQUIREMENTS FOR NOISE CONTROL DURING CONSTRUCTION PERIOD. CONFORM WITH APPLICABLE OSHA REQUIREMENTS AND LOCAL
ORDINANCES HAVING JURISDICTION.
47. MEP- CHECK ALL HEIGHTS AND POSSIBLE CEILING CONDITIONS FOR CLEARANCES AND COORDINATION OF DUCTWORK AND ALL OTHER CONSTRAINTS TO ENSURE THE LOCATION AND SIZE OF ALL SYSTEMS AND ITEMS TO BE INSTALLED. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND ENGINEER IN WRITING IMMEDIATELY BEFORE
PROCEEDING
48. PRIOR TO CLOSING OF ANY CEILINGS, ALL MECHANICAL SYSTEMS TELEPHONE AND COMMUNICATIONS (TC) AND SECURITY(S) (MEP) ARE TO BE INSPECTED AND WHERE REQUIRED, TESTED BY LOCAL AUTHORITIES AND/OR TESTING AGENCIES HAVING JURISDICTION TO ENSURE THEIR PROPER INSTALLATION AND FUNCTION.
49. ALL MEP AND FIRE SPRINKLER WORK IS TO BE COORDINATED WITH ALL OTHER TRADES AND MILLWORK, EQUIPMENT, OWNER FURNISHED ITEMS, ETC. SPRINKLER HEAD COVERS TO MATCH SOFFIT COLOR OR WOOD FINISH. LIGHT FIXTURE LOCATIONS TAKE PRECEDENT IN LOCATING MEP ITEMS.
50. COORDINATE AND IDENTIFY MEP VALVE LOCATIONS CLEAN OUTS AND OTHER ITEMS REQUIRING ACCESS PANELS WITH ARCHITECT AND FOR APPROVAL IN SHOP DRAWINGS PRIOR TO
INSTALLATION
51. THE WORDS “OR EQUAL” ARE UNDERSTOOD TO APPLY WHERE A COPYRIGHTED, BRAND NAME, TRADE NAME, CATALOG REFERENCE, OR PATENTED PRODUCT IS REFERENCED. REFERENCES TO SUCH SPECIFIC PRODUCT ARE INTENDED AS DESCRIPTIVE, NOT RESTRICTIVE, UNLESS OTHERWISE STATED. COMPARABLE PRODUCT WILL BE CONSIDERED IF PROOF OF COMPATIBILITY IS PROVIDED, INCLUDING APPROPRIATE CATALOG EXCERPTS, DESCRIPTIVE LITERATURE, SPECIFICATIONS AND TEST DATA, ETC. THE ARCHITECT’S/ENGINEER’S DECISION AS TO ACCEPTANCE OF
THE PRODUCT AS EQUAL SHALL BE FINAL.
ABBREVIATIONS
P&S - Power & Signal PAR - Parallel PB - Particle Board PC - Precast PD- Planter Drain PERF - Perforated PERIM - Perimeter PERP - Perpendicular PL - Plate PLAM - Plastic Laminate PLAS - Plaster PLBG - Plumbing PLYWD - Plywood PM - Pressed Metal PNEU - Pneumatic PNL - Panel POL - Polished POLY - Polyethelene PR - Pair PRCST - Precast PREFAB - Prefabricated PREFIN - Prefinished PT - Pressure Treated PTD - Painted PTN - Partition PVC - Polyvinyl Chloride PVG - Paving
QT - Quarry Tile QTY - Quantity QUAL - Quality
R - Radius or (Stair) Risers RAD - Radiator RBR - Rubber RCP - Reflected Ceiling Plan RD - Roof Drain REC - Recessed REF - Reference REFR - Refrigerator REG - Register REINF - Reinforced or Reinforcing REM - Removable REQD - Required REQS - Requirements RESIL - Resilient RF - Resilient Flooring RFG - Roofing RH - Right Hand RHR - Right Hand Reverse RLG - Railing RM - Room RO - Rough Opening RV - Roof Vent RWL - Rain Water Leader
S - South SC - Solid Core SAFB - Sound Attenuation Fiber Blanket SCHED - Schedule SCR - Screw SCRN - Screen SDT - Static Dissipative Tile SECT - Section SF - Square Foot or Feet SHR - Shower SHT - Sheet SHTG - Sheathing SHV - Shelving SIM - Similar SK - Sink SLV - Sleeve SM - Sheet Metal SP - Spray Particle Paint SPEC - Specifications SQ - Square SS - Stainless Steel SSF - Solid Surface SSK - Service Sink ST - Street STA - Station STAG - Stagger STC - Sound Transmission Class STD - Standard STG - Storage STL - Steel STN - Stone STR - Structural SUSP - Suspended SYM - Symbol SYMM - Symmetrical SVF - Sheet Vinyl Flooring S4S - Surface Four Sides SYS - System
T - Treads (Stairs) T&B - Top and Bottom T&G - Tongue and Groove TBD - To Be Determined TBM - Top of Beam TC - Top of Concrete TD - Trench Drain TDO - Thermoset Decorative Overlay TEL - Telephone TEMP - Temporary TERR - Terrazzo TF - Top of Footing TFF - Top of Finished Floor THK - Thickness THRES - Threshold THRU - Through TKBD - Tackboard TMPD - Tempered T.O. - Top Of TOC - Top Of Concrete TOF - Top of Footing TOL - Tolerance TOM - Top Of Masonry TOP - Top of Pavement TOS - Top Of Steel TOSL - Top of Slab TOW - Top Of Wall TPO - Thermoplastic-Polyolefin Roofing TRANS - Translucent TV - Television TYP - Typical
UL - Underwriters Laboratory UNEX - Unexcavated UNFIN - Unfinished UON - Unless Otherwise Noted UPS - Uninterruptible Power Supply UR - Urinal UV - Ultraviolet
VAC - Vacuum VB - Vapor Barrier or Vinyl Base VCT - Vinyl Composition Tile VER - Verify VERT - Vertical VEST - Vestibule VIF - Contractor to Verify In Field VNR - Veneer VR - Vapor Retarder VWC - Vinyl Wall Covering
W - West W/ - With W/O - Without WC - Water Closet WD - Wood WGL - Wired Glass WLD - Welded WP - Working Point WSCT - Wainscot WT - Weight WTH - Width WTPRF - Waterproofing WWF - Welded Wire Fabric
FIN - Finish FL - Flashing FLR - Floor FLUOR - Fluorescent FOC - Face of Concrete FOF - Face of Finish FOM - Face of Masonry FOS - Face of Stud FPRF - Fireproofing FR - Fire Resistant FRT - Fire Retardant Treated FS - Full Size FSH - Fire Sprinkler Head FSTP - Firestopping FT - Foot or Feet FTG - Footing FTR - Fin Tube Radiation FURN - Furniture FURR - Furring FUT - Future FWC - Fabric Wall Covering
G - Gas GA - Gauge GALV - Galvanized GB - Grab Bar GC - General Contractor GEN - Generator GFRC - Glass Fiber Reinforced Concrete GFRG - Glass Fiber Reinforced Gypsum GL - Glass GLMU - Glass Masonry Unit GMMU - Glass Mesh Mortor Unit GND - Ground GR - Grade GRL - Grille GRTG - Grating GSF - Gross Square Footage
GT - Grout GVL - Gravel GWB - Gypsum Wall Board
HB - Hose Bibb HC - Hollow Core HDBD - Hardboard HDWD - Hardwood HDW - Hardware HGR - Hanger HT - Height HM - Hollow Metal HMD - Hollow Metal Door HNDRL - Handrail HO - Hold Open HORIZ - Horizontal HP - High Point HSS- Hollow Steel Sections HVAC - Heat, Ventilation & Air Conditioning
ID - Inside Diameter IF - Inside Face IN - Inch or Inches INSUL - Insulation INT - Interior IWH - Instantaneous Water Heater
JAN - Janitor JST - Joist JT - Joint
KD - Knocked Down KIT - Kitchen KO - Knockout KOP - Knockout Panel KPL - Kickplate
L - Length or Left LAB - Laboratory LAD - Ladder LAM - Laminate LAV - Lavatory LB - Pound LBL - Label LF - Linear Foot or Feet LH - Left Hand LHR - Left Hand Reverse LIB - Library LIN - Linear LKR - Locker LNM - Linoleum LNTL - Lintel LONG - Longitudinal LP - Low Point LT - Light LTG - Lighting LTWT - Lightweight LVR - Louver
MACH - Machine MAINT - Maintenance MAS - Masonry MATL - Material MAX - Maximum MDF - Medium Density Fiberboard MDO - Medium Density Overlay MECH - Mechanical MED - Medium MEL - Melamine MEMB - Membrane MEZZ - Mezzanine MF - Metal Flashing MFR - Manufacturer MH - Manhole MIN - Minimum MIR - Mirror MISC - Miscellaneous MKBD - Markerboard ML - Metal Lath MLDG - Molding MLWK - Millwork MO - Masonry Opening MTD - Mounted MTR - Mortar MTL - Metal MULL - Mullion MVBL - Movable
N - North NA - Not Applicable NAT - Natural NIC - Not In Contract NO - Number NOM - Nominal NTS - Not To Scale
OA - Overall OC - On Center OD - Outside Diameter OF - Outside Face OFCI - Owner Furnished/Contractor Installed OFF - Office OFS - Overflow Scupper OH - Overhead OPNG - Opening OPP - Opposite OTS - Open to Structure
& - And < - Angle @ - At C - Center Line Ø - Diameter # - Pound ± - Tolerance Dimension
A/E - Architect / Engineer AB - Anchor Bolt AC - Air Conditioning ACBL - Accessible (ADA Compliant) ACOUS - Acoustical ACT - Acoustic Ceiling Tile AD - Access Door ADA - The Americans with Disabilities Act ADBL - Adaptable (ADA Compliant) ADDL - Additional ADH - Adhesive ADJ - Adjustable ADJC - Adjacent AF - Access Floor AFF - Above Finished Floor AGGR - Aggregate AH - Air Handler AL - Aluminum ALT - Alternate ANOD - Anodized AP - Access Panel APPROX - Approximately ARCH - Architect ASC - Above Suspended Ceiling ASPH - Asphalt
BD - Board BETW - Between BLDG - Building BLKG - Blocking BM - Beam BO - By Others BOS - Bottom of Slab BOT - Bottom BR - Brass BRZ - Bronze
CAB - Cabinet CB - Casing Bead CEM - Cement CEMTS - Cementitious CER - Ceramic CG - Corner Guard CHAN - Channel CHBD - Chalkboard CHFR - Chamfer CHR - Chrome CI - Cast Iron CJ - Construction Joint CK - Cork CLG - Ceiling CLG - Control Joint CLO - Closet CLR - Clear CLRM - Classroom CMPST - Composite CMU - Concrete Masonry Unit CNTR - Counter CO - Cased Opening COL - Column COMP - Compressible CONC - Concrete CONN - Connection CONSTR - Construction CONT - Continuous CONTR - Contractor COPP - Copper CPRS - Compressible or Compression CPT - Carpet CORR - Corridor CRS - Cold Rolled Steel CS - Cast Stone CSK - Countersunk CSMT - Casement CSWK - Casework CT - Ceramic Tile CYL - Cylinder
DBL - Double DD - Deck Drain DEMO - Demolition DEPT - Department DF - Drinking Fountain DIA - Diameter DIM - Dimension DISP - Dispenser DIV - Division DMPF - Dampproofing DN - Down DO - Ditto DOP - Door Opening DR - Door DS - Downspout DSP - Dry Standpipe DST - Door Stop DTL - Detail DW - Dishwasher DWG - Drawing DWR - Drawer
E - East EA - Each EB - Expansion Bolt EIFS - Exterior Insulation Finish System EJ - Expansion Joint EL - Elevation ELAST - Elastomeric ELEC - Electrical ELEV - Elevator EMER - Emergency ENCL - Enclosure ENGR - Engineer ENTR - Entrance EOS - Emergency Overflow scupper EP - Electrical Panel EPDM - Ethylene Propylene Diene Monomer EPRF - Explosion Proof EQ - Equal EQUIP - Equipment ESCAL - Escalator ESMT - Easment EST - Engineered Stone ETR - Existing to Remain EW - Each Way EWC - Electric Water Cooler EX / EXIST - Existing EXC - Excavate EXH - Exhaust EXP - Expansion EXT - Exterior
F/F - Face to Face FA - Fire Alarm FACP - Fire Alarm Control Panel FB - Flat Bar FCO - Floor Clean Out FD - Floor Drain FDC - Fire Department Connection FDN - Foundation FE - Fire Extinguisher FEC - Fire Extinguisher Cabinet FF - Fabric Flashing FGL - Fiberglass FHC - Fire Hose Cabinet FHP - Full Height Partition FHY - Fire Hydrant
GSKT - Gasket
C. Description The project includes the new construction of a Men's and Women's Field Restrooms building that is approximately 1,800 gross sq. ft.
The structure will be all cmu/ walls, concrete tie beams, prefabricated wood trusses with a standing seam metal roof. Adjacent to the new restrooms will be an open air pavilion on top a concrete patio. The Pavilion is approximately 720 gross sq. ft. The Pavilion is comprised of 4 square concrete structural columns, supporting large exposed gluelam beams with wooden trusses and a standing seam metal roof.
2020 National Electrical Code - NFPA 70 2010 ADA Standards for Accessible Design - 28 CFR Part 36 (Title III) 2023 Florida Fire Prevention Code (FFPC) – 8th Edition Florida Building Code 2020 – Accessibility, 8th Edition 2023 Florida Building Code – Fuel Gas, 8th Edition 2023 Florida Building Code – Mechanical, 8th Edition 2023 Florida Building Code – Plumbing, 8th Edition
B. Applicable Building Codes 2023 Florida Building Code – Building, 8th Edition
A. Building Location: Immokalee, FL
1. PROJECT DESCRIPTION
Project No.:
Scale:
Revision:
Drawing No.
Sheet:
Title
C lie nt /P ro je ct
Permit/Seal
Dsgn. Chkd. YYYY.MM.DDDwn.
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
of
File Name: G-SHEETS
ORIGINAL SHEET - ARCH D
Iss ue d By
Ap pd
YY
YY
.M M
.D D
Re vis io n
By Ap pd
YY
YY
.M
M .D
D
Te l:
w w w .st an te c.
co m
St an te c
C on su ltin g Se rv ic es In c.
K ra ft
Ro ad
S ui te
Na pl es
F L 3
-2
(2
) 6
-4
A
B
C
D
1 2 3 4 5
C ol lie r C ou nt y Bo ar d of C ou nt y C om m iss io ne rs, C ol lie r C ou nt y Pa rk s a nd R ec re at io n
Im m ok al ee S po rts
C om pl ex
Ph as e
1B
Es ca m bi a St re et
, I m m ok al ee
, F L 3
-3
215617854
2026.05.13
Ph as e
1B S ub m itt al
AC
P
KG
M
.0 1.
Ph as e 1B
F in al C
D S ub m itt al
AC
P
FA
D
.0 5.
AT
TE
N
TI
O
N
Th es e dr aw in gs m ay in cl ud e in fo rm at io n pr ov id ed b y ot he rs
. S ta nt ec h as n ot v er ifi ed th e ac cu ra cy a nd
/o r c om pl et en es s of th is in fo rm at io n an d sh al l n ot b e re sp on si bl e fo r an y er ro rs o r o m is si on s w hi ch m ay b e in co rp or at ed h er ei n as a re su lt.
TERMITE STATEMENT:
R318.1 Termite protection.
Termite protection shall be provided by registered termiticides, including soil applied pesticides, baiting systems, and pesticides applied to wood, or other approved methods of termite protection labeled for use as a preventative treatment to new construction. See Section 202, "Registered termiticide." Upon completion of the application of the termite protective treatment, a Certificate of Compliance shall be issued to the building department by the licensed pest control company that contains the following statement: "The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and Consumer Services." Refer to 2023 Florida Building Code - Residential, Eight Edition, Section R318- Protection Against Termites, if applicable.
2023, 8TH EDITION, IF APPLICABLE:
MANEUVERING CLEARANCE AT DOORS
CODE REFERENCE: FBC -ACCESSIBILITY
EIGHTH EDITION CHAPTER 4,
SECTION 404.2.4
CODE REFERENCE: FBC - ACCESSIBILITY
EIGHTH EDITION CHAPTER 4,
SECTION 404.2.6
CODE REFERENCE:
FBC-ACCESSIBILITY
EIGHTH EDITION
CHAPTER 3,
SECTION 305.3
PULL SIDE
PULL SIDE
PUSH SIDE PUSH SIDE
PUSH SIDE
PULL SIDE 30"
MIN.
18"
MIN
12"
36" MIN. 42" MIN. 22" MIN.
FRONT APPROACH,
PULL SIDE
FRONT APPROACH
PUSH SIDE
FRONT APPROACH, PUSH
SIDE, DOOR PROVIDED
WITH BOTH CLOSER AND
LATCH
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PUSH SIDE TWO HINGED DOORS IN SERIES TWO HINGED DOORS IN SERIES WHEEL CHAIR CLEAR FLOOR
SPACE
PULL SIDE
PUSH SIDE PULL SIDE PUSH SIDE PUSH SIDE
22" MIN 24" MIN.
24" MIN. 24" MIN.
24" MIN.
HINGE APPROACH, PUSH SIDE, DOOR
PROVIDED WITH BOTH CLOSER AND LATCH
LATCH APPROACH,
PULL SIDE
MANEUVERING CLEAR.
LATCH SIDE APPROACH
DOOR PROVIDED WITH CLOSER
AND LATCH
MANEUVERING CLEAR.
LATCH SIDE APPROACH
LATCH APPROACH, PUSH
SIDE, DOOR PROVIDED
WITH CLOSER TWO HINGED DOORS IN SERIES
ACCESSIBLE ROUTE WHEEL CHAIR TURNING SPACE
CODE REFERENCE:
FBC -ACCESSIBILITY - EIGHTH EDITION,
CHAPTER 3, SECTION 303.2
CODE REFERENCE: FBC -ACCESSIBILITY -
EIGHTH EDITION CHAPTER 4, SECTION 403.5.2
CODE REFERENCE: FBC -ACCESSIBILITY - EIGHTH EDITION CHAPTER 3,
SECTION 304.3.1
12" MIN.
36" MIN.
32" MIN.
12" MIN.
MINIMUM CLEAR WIDTH
CODE REFERENCE: FBC -ACCESSIBILITY - EIGHTH EDITION CHAPTER 4,
SECTION 403.5.1 & 403.5.3
BEVELED WALL (TYP)
WALL
(TYP)
WALL (TYP)
WALL (TYP)
42" MIN.
VERTICAL
ACCESSIBLE ROUTE
NOTE TO CONTRACTOR:
1. MAX. CHANGE OF FLOOR LEVEL ALLOWED IS 1/4"
OR 1:2 FROM 1/4" TO 1/2" MAX.
2. CHANGE IN LEVEL ABOVE 1/2" SHOULD BE RAMPED
PROTRUDING OBJECTS
CODE REFERENCE:
FBC -ACCESSIBILITY - EIGHTH EDITION,
CHAPTER 3, SECTION 307
36" MIN. X<48" 36" MIN.
X<48" 42" MIN. MIN. 60" TURNING DIAMETER FOR
WHEELCHAIR. 36" MIN. 60"
180 DEGREE TURN 180 DEGREE TURN EXCEPTION
FBC ACCESSIBILITY SECTION 403.5.2
60" DIAMETER TURNING
SPACE
T-SHAPED SPACE FOR 180-DEGREE TURNS
FBC ACCESSIBILITY 304.3.2 MIN. CLEAR WIDTH FOR SINGLE WHEELCHAIR MIN. CLEAR WIDTH FOR TWO WHEELCHAIRS
AT 200' INTERVALS MAX.
DRINKING FOUNTAIN CLEARANCES
CODE REFERENCE:FBC, -ACCESSIBILITY - EIGHTH EDITION CHAPTER 3, SECTION 307 & CHAPTER 6, SECTION 602.
FLOOR CLEARANCE :CHAPTER 3, SECTION 305.3
KNEE AND TOE CLEARANCE: FBC CHAPTER 3 FIGURE 306
EXCEPTION: A PARALLEL APPROACH COMPLYING WITH 305 SHALL BE PERMITTED AT UNITS FOR CHILDREN'S USE WHERE THE SPOUT IS 30 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND
AND IS 3 1/2 INCHES MAXIMUM FROM THE EDGE OF THE UNIT, INCLUDING BUMPERS.
TOE AND KEE CLEARANCE
CODE REFERENCE:
FBC -ACCESSIBILITY - EIGHTH EDITION,
CHAPTER 3, SECTION 306
4" MAX. 17" - 19" 8" MIN.15" MIN.
DETECTABLE RAIL
25" MAX.
11" MIN.
MIN.
8"
MAX.
6" 30" MIN. (a)48" MIN. 48" MIN
ELEVATION PLAN ELEVATION PLAN
(b) (a) (b)
DRINKING FOUNTAIN CLEARANCES FRONT - APPROACH PARALLEL APPROACH BUILT - IN
KNEE CLEARANCE
LIMITS OF PROTRUTING OBJECTS REDUCED VERTICAL CLEARANCE NOTE:
1. ALL DIMENSIONS ARE TO BE CONSIDERED
FROM FINISHES AND A.F.F.
REACH RANGES
CODE REFERENCE:
FBC -ACCESSIBILITY - EIGHTH EDITION,
CHAPTER 4, SECTION 308
10" MAX. 20" MAX. >20"-25" MAX 10" MAX.
> 10" -24"
GENERAL NOTES
MOUNTING HEIGHTS
1. OPERABLE PARTS STATED UNDER FBC 2023 ACCESSIBILITY
SECTION 205.1 INCLUDING ADVISORY SHALL COMPLY WITH
SECTION 309.
2. OPERABLE PARTS OF THE CONTROLS ARE TO BE LOCATED
NO HIGHER THAN 48 INCHES AND NO LOWER THAN 15 INCHES
TO CENTERLINE ABOVE THE FLOOR FINISH.
3. THE REACH OVER AN OBSTRUCTION IN WHICH THE DEPTH
EXCEEDS 20 INCHES AND MAXIMUM IS 25 INCHES THE HIGH
FORWARD REACH SHALL BE 44 INCHES MAXIMUM FOR A
FORWARD APPROACH; OR 46 INCHES MAXIMUM FOR A SIDE
APPROACH IN WHICH THE OBSTRUCTION IS NOT HIGHER
THAN 34 INCHES AND NO DEEPER THAN 24 INCHES MAX.
4. OBSTRUCTIONS SHALL NOT EXTEND OUT MORE THAN 25
INCHES FROM THE WALL IN WHICH AN ACCESSIBLE CONTROL
IS LOCATED.
(a)
UNOBSTRUCTED FORWARD REACH UNOBSTRUCTED SIDE REACH
(b)
OBSTRUCTED HIGH FORWARD REACH
(a)
OBSTRUCTED HIGH SIDE REACH
(b)
ACCESSIBILITY NOTES
1. CHANGES IN LEVEL BETWEEN 1/4" HIGH MAX. VERTICALLY AND 1/2"
HIGH MAXIMUM SHALL BE BEVELED WITH A SLOPE NOT STEEPER THAN
1:2 PER FLORIDA ACCESSIBILITY CODE SECTION 303
2. ACCESSIBILITY ROUTE FROM R.O.W. MINIMUM 60".
3. THE LAYOUT AND DESIGN OF SPACES DEPICTED. ON PLANS SHALL
COMPLY WITH 2023 FLORIDA ACCESSIBILITY CODE FOR BUILDING
EIGHTH EDITION.
4. HANDICAP TOILET FLUSH CONTROL TO BE LOCATED ON WIDE SIDE
AREA OF STALL.
5. WRAP ALL EXPOSED PIPES UNDER LAVATORY WITH INSULATED PIPE
PROTECTION COVERS TO PROTECT AGAINST CONTACT.
6. AL HANDLES TO BE LEVER HANDLES
7. ALL PASSENGER LOADING ZONES, SHALL COMPLY WITH ANSI 2003
SECT 503, INCLUDING VEHICLE PULL-UP SPACE SIZE, ACCESS AISLE,
FLOOR SURFACES, AND VERTICAL CLEARANCE. ACCESSIBLE ROUTES
FROM COMMON USE ACCESSIBLE PARKING TO COVERED DWELLING
UNIT AND COMMON USE BUILDINGS AND FACILITIES SHALL COMPLY
WITH ANSI 2003 SECT 402 ACCESSIBLE ROUTES, 403 WALKING
SURFACES, 302 FLOOR SURFACES, 303 CHANGES IN LEVEL, 304
TURNING SPACE, 307 PROTRUDING OBJECTS, 404 DOORS AND
DOORWAYS, 405 RAMPS, 406 CURB RAMPS, AND 505 HANDRAILS.
DOOR HARDWARE AND HANDLES NOTES:
1. DOOR HARDWARE. HANDLES, PULLS, LATCHES, LOCKS, AND
OTHER OPERATING DEVICES ON ACCESSIBLE DOORS SHALL
BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE
TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST AS
PER 2023 FLORIDA ACCESSIBILITY CODE SECTION 309.4
2. THE FORCE REQUIRED TO ACTIVATE OPERABLE PARTS SHALL
BE 5 POUNDS MAXIMUM.
3. LEVER OPERATED MECHANISMS, PUSH TYPE MECHANISMS,
AND UNSHAPED HANDLES ARE ACCEPTABLE DESIGNS.
4. WHEN SLIDING DOORS ARE IN THE FULLY OPEN POSITION,
THE OPERATING HARDWARE SHALL BE EXPOSED AND USABLE
FROM BOTH SIDES.
5. HARDWARE REQUIRED FOR ACCESSIBLE DOOR PASSAGE
SHALL BE MOUNTED BETWEEN 34 INCHES MINIMUM AND 48"
MAXIMUM ABOVE THE FINISH FLOOR.
TOE CLEARANCE
6" MAX. 25" MAX.
X > 80"
1/2" M
AX
15" M
IN
1/4" M
AX.
48" M
AX.
1/4" M
AX
60" M
IN
X > 27" 48" M
IN
48" M
IN
48" M
IN
15" M
IN
48" M
AX
48" M
IN
48" M
IN
48 M
AX.
27" M
AX
60" M
IN
X < 80"
44" M
AX.
54" M
IN
60" M
IN
34" M
AX
9" M
IN
27" M
IN
36" M
AX.
48" M
AX.
M
IN
48"
42" M
IN
15" M
IN
54" M
IN
4" M
AX.
60" M
IN
D
IAM
ETER
60" M
IN
48" M
AX.
36" M
IN
48" M
IN
30" M
IN
30" M
IN
M
AX.
4"
15" M
IN
42" M
IN
48" M
IN
48" M
IN
24" M
IN
27" M
IN
9" M
IN
48" M
IN
9"
60" 48"
ADA
GUIDELINES
A-050
Project No.:
Scale:
Revision:
Drawing No.
Sheet:
Title
C lie nt /P ro je ct
Permit/Seal
Dsgn. Chkd. YYYY.MM.DDDwn.
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
of
File Name: AG SHEETS & FIXTURE SCHEDULES
ORIGINAL SHEET - ARCH D
Iss ue d By
Ap pd
YY
YY
.M M
.D D
Re vis io n
By Ap pd
YY
YY
.M
M .D
D
Te l:
w w w .st an te c.
co m
St an te c
C on su ltin g Se rv ic es In c.
K ra ft
Ro ad
S ui te
Na pl es
F L 3
-2
(2
) 6
-4
A
B
C
D
1 2 3 4 5
C ol lie r C ou nt y Bo ar d of C ou nt y C om m iss io ne rs, C ol lie r C ou nt y Pa rk s a nd R ec re at io n
Im m ok al ee S po rts
C om pl ex
Ph as e
1B
Es ca m bi a St re et
, I m m ok al ee
, F L 3
-3
215617854
2026.05.13
Ph as e
1B S ub m itt al
AC
P
KG
M
.0 1.
Ph as e 1B
F in al C
D S ub m itt al
AC
P
FA
D
.0 5.
AT
TE
N
TI
O
N
Th es e dr aw in gs m ay in cl ud e in fo rm at io n pr ov id ed b y ot he rs
. S ta nt ec h as n ot v er ifi ed th e ac cu ra cy a nd
/o r c om pl et en es s of th is in fo rm at io n an d sh al l n ot b e re sp on si bl e fo r an y er ro rs o r o m is si on s w hi ch m ay b e in co rp or at ed h er ei n as a re su
BATHROOM SIGNAGE ROLL-IN SHOWER CLEARANCES
6" MIN. (TYP.)
CODE REFERENCE: FBC -
ACCESSIBILITY EIGHTH EDITION
CHAPTER 6 , SECTION 608
ACCESSIBLE SHOWER, SECTION
608.2.2
CONTROLS AND HANDSHOWER
LOCATION, SECTION 608.5
SHOWER SEATS, SECTION 610
MAX
6"
BACK WALL
ADJUSTABLE SHOWER SPRAY 48"
AFF WITH 59" HOSE. THE SHOWER
SPRAY UNIT SHALL HAVE AN
ON/OFF CONTROL WITH A NON-
POSITIVE SHUTOFF.
27" MAX.
MAX
18"
WOMEN RAISED
LETTERS
BRAILLE
SIGN #1 SIGN #2
NOTE:
1.ALL LETTERS AND NUMERALS ARE TO BE RAISED 1/32 INCHES, UPPER CASE,
SANS SERIF OR SIMPLE SERIF AT LEAST 5/8" HIGH BUT NO HIGHER THAN 2".
BRAILLE IS TO BE GRADE 2.
2.PROVIDE & INSTALLED BY G.C. TYPICAL AT ALL RESTROOMS
3. TACTILE CHARACTERS ON SIGNS SHALL BE LOCATED 48 INCHES MINIMUM
A.F.F. MEASURED FROM THE BASELINE OF THE LOWEST TACTILE CHARACTER
AND 60 INCHES MAXIMUM ABOVE THE F.F MEASURED FROM THE BASELINE OF
THE HIGHEST TACTILE CHARACTER.
4. WHERE A TACTILE SIGN IS PROVIDED AT A DOOR, THE SIGN SHALL BE
LOCATED ALONGSIDE THE DOOR AT THE LATCH SIDE.
5. SIGNS CONTAINING TACTILE CHARACTERS SHALL BE LOCATED SO THAT A
CLEAR FLOOR SPACE OF 18" (455 MM) MIN. BY 18" (455 MM) MIN., CENTERED ON
THE TACTILE CHARACTERS, IS PROVIDED BEYOND THE ARC OF ANY DOOR
SWING BETWEEN THE CLOSED POSITION AND 45 DEGREE OPEN POSITION.
SIGN #3
MEN
60" MIN.
TYPICAL 30" X 60" ROLL-IN SHOWER PLAN
BACK WALL WITH SEAT
27" MAX. SEAT 18"
CL
CONTROL
AREA
36"
BACK WALL
ACCESSIBLE SHOWER CLEARANCES
CODE REFERENCE: FBC -ACCESSIBILITY - EIGHTH EDITION CHAPTER 6 , SECTION 608
ACCESSIBLE SHOWER, SECTION 608.2
GRAB BARS LOCATION, SECTION 608.3.1
CONTROLS AND HANDSHOWER LOCATION, SECTION 608.4.1
SHOWER SEATS, SECTION 610.3.2 AND 610.3.3
ADJUSTABLE SHOWER SPRAY UNIT WITH A
HOSE 59" LONG MINIMUM THAT CAN BE USED IN
A FIXED POSITION OR AS A HAND HELD
SHOWER. SHOWER SPRAY ADJUSTABLE
HEIGHT TO BE LOCATED WITHIN 48" MAX.
HEIGHT REACH IN RANGE. THE SHOWER SPRAY
UNIT SHALL HAVE AN ON/OFF CONTROL WITH
A NON-POSITIVE SHUTOFF.
CONTROL AREA.
PROVIDE ANTI-SCALD
THERMOSTATIC
MIXING VALVE.
BOTTOM OF ADJUSTABLE
BAR AT 38" A.F.F.
4" MAX
SIDE
TYPICAL 30" X 60" ROLL-IN
SHOWER ELEVATIONS
60" MIN.
TYPICAL 30" X 60" ROLL-IN SHOWER PLAN
WITH SEAT
GRAB BAR MOUNTING REQUIREMENTS
CODE REFERENCE:FBC -ACCESSIBILITY - EIGHTH EDITION, CHAPTER 6 , SECTION 609
SCHEDULED MTL. STUD
@ 16"O.C. (TYP)
SEE FLOOR PLANS; BTS
MAX.
1 1/2"
HOLD
1 1/2" PAN HEAD
SCREW; BTS
5/8" THICK GYP. BD.
1 1/2" OUTSIDE DIA. GRAB BAR
TYP. GRAB BARS
20 GA. 6" HIGH STEEL PLATE (GRAB BAR
LENGTH + 4" EACH END) SECURED TO METAL
STUD AT WALL; BTS
GRAB BAR NOTES:
1. STRUCTURAL STRENGTH. ALLOWABLE STRESSES SHALL NOT BE
EXCEEDED FOR MATERIALS USED WHEN A VERTICAL OR
HORIZONTAL FORCE OF 250 POUNDS IS APPLIED AT ANY POINT ON
THE GRAB BAR, FASTENER, MOUNTING DEVICE, OR SUPPORTING
STRUCTURE.
2. GRAB BARS SHALL NOT ROTATE WITHIN THEIR FITTINGS.
3. ALL EDGES SHALL HAVE A MINIMUM RADIUS OF 1/8 INCH.
WALL NOTE:
PROVIDE 20 GA. METAL STUD AT ALL REST ROOM WALLS.
30" MIN.
KNEE CLEARANCE
8" MIN.
17" MIN. DEPTH
1'-8" WHERE 2 HORIZONTAL GRAB BARS ARE
REQUIRED PER ANSI; BTS
LAVATORY CLEARANCES
NOTE:
1. HEIGHTS ARE TO BE CONSIDERED A.F.F.
TOILET STALLS
CODE REFERENCE: FBC -ACCESSIBILITY - EIGHTH EDITION (ANSI A117.1-2009) CHAPTER 6 , SECTION 604
CODE REFERENCE: FBC ACCESSIBILITY EIGHTH EDITION, CHAPTER 6, SECTION 604.8.1.2
TOILET POSITION :SECTION 604.2
AMBULATORY SECTION 604.10
CL
16" MIN. - 18" MAX.3' - 6"
CL
15" MIN. 3' - 0" PREFERRED
(30" MIN.)
60" MIN.
30" MIN.
60" MIN.
30" x 48" MIN.
CLR. FLOOR
SPACE AT
LAVATORY.
60" X 50" MIN.
CLR. FLOOR
SPACE AT STALL
DOOR.
4" MAX.
18 MAX.
16" MIN.
18" MAX.
16" MIN.
MAX
1' - 0"
SPACE
FLOOR
CLEAR
1 1/2" O.D. GRAB BARS
CL
54" MIN.
MIN
3' - 6"
7" MIN. - 9" MAX.
MIN
2' - 0"
MIN
1' - 0"
MAX
6"
CL
MIRROR
BOTTOM EDGE OF
REFLECTING SURFACE
OR 36" IF PRIVACY SCREENS
ARE DEEPER THAN 24"
HAND OPERATED OR
AUTOMATIC CONTROL
PRIVACY
SCREEN
OPERABLE PUSH BUTTON
TOUCH FREE SENSOR AREA
STANDARD STALL
FIXTURES MOUNTING HEIGHTS
CODE REFERENCE:FBC ACCESSIBILITY, EIGHTH EDITION
TOILET: SECTION 604.2
GRAB BARS: SECTION 610
MIRROR: SECTION 603.3
URINALS SECTION 605.2
NOTE: NOT TO BE INSTALLED
BEHIND ACCESSIBLE TOILET OR
WITHIN 12" ABOVE GRAB BARS
OR 1 1/2" BELOW GRAB BARS.
CLEAR FLOOR SPACE AT
LAVATORIES
NOTE:
WHERE THE COMBINED TOTAL WATER CLOSET COMPARTMENTS AND URINALS
PROVIDED IN A TOILET ROOM OR BATHING ROOM IS SIX OR MOR,E, AT LEAST
ONE AMBULATORY ACCESSIBLE WATER CLOSET COMPARTMENT SHALL BE
PROVIDED IN ADDITION TO THE WHEELCHAIR-ACCESSIBLE COMPARTMENT
AMBULATORY ACCESSIBLE COMPARTMENT
6" MAX TOE CLEARANCE
ALTERNATE DOOR
POSITION
OUTSWING DOOR
CLEAR
FLOOR
SPACE
32" CLR.
WIDE
OPENING
35" MIN. - 37" MAX.
LAVATORY CLEARANCES
CODE REFERENCE: FBC -ACCESSIBILITY
EIGHTH EDITION CHAPTER 3,
KNEE CLEARANCE: SECTION 306.2.3
TOE CLEARANCE: SECTION 306.2
LAVATORY HEIGHT: SECTION 606.3
BOTTOM EDGE OF THE
REFLECTING SURFACE
TOP OF
LAVATORY
PROVIDE PIPE
PROTECTION BELOW
LAVATORY
TOILET STALLS
CODE REFERENCE: FBC -ACCESSIBILITY - EIGHTH EDITION (ANSI A117.1-2009)
CHAPTER 6 , SECTION 604
15" 4"
5' - 0" MIN
16" MIN-18" MAX
19" MAX.
17" MIN. 42" GRAB BAR
TYP. BOTH
SIDES.
BACK (LONG) SIDE
48" MIN.
TYPICAL 36" X 36" ACCESSIBLE
SHOWER PLAN
ROLL IN SHOWER WITH SEAT
SEAT WALL
TYPICAL 36" X 36" ACCESSIBLE
SHOWER ELEVATIONS
BACK WALL CONTROL WALL
NOTE: ACCESSIBLE BATHTUBS AND SHOWERS
SHALL DELIVER WATER THAT IS 120°F (49° C) MAX.
SELF CLOSING
DOOR
13 1/2" MIN
LAVATORY FLOOR
FINISH
42" MIN. LATCH APPROACH
OTHER APPROACHES 48"
MIN.
60" X 56" MIN. CLR. FLOOR
SPACE (WALL MTD. WC.)
60" X 59" MIN. CLR. FLOOR
SPACE (FLR. MTD. WC.)
STALL DOOR SHALL BE 4" MAX.
FROM THE CORNER OF THE
STALL.
NOTE:
THE LAVATORY SHALL NOT OVERLAP THE CLEAR FLOOR SPACE FOR THE TOILET. STALL IS REQUIRED TO INCLUDE A LAVATORY UNDER NEW CONSTRUCTION IN FLORIDA. TYPICAL ACCESSIBLE TOILET STALL PLANS INSWING DOOR . PROVIDE ACCESSIBLE PULL HARDWARE ON BOTH SIDES OF EACH
ACCESSIBLE STALL DOOR - TYPICAL.
SINK SERVICE CONNECTION REQUIREMENT
LAVATORY/ HAND SINK
& AS SPECIFIED
MIN.
32"
STANDARD STALL
TOILET TISSUE
DISPENSER
NOTE:
1. PLUMBING FIXTURES CANNOT PROJECT
MORE THAN 4" FROM WALL, TYP.
2. ALL HEIGHTS ARE TO BE CONSIDERED A.F.F
3. FOR HAND DRYER TOUCH FREE SENSOR
REFER TO MANUF. RECOMENDATIONS,
HOWEVER NOT TO EXCEED 48" AFF.
4. BATHROOM ACCESSORIES CANNOT PROJECT
MORE THAN 4" FROM FINISH WALL WHEN
LOCATED BETWEEN 27" TO 80" ABOVE FINISH
FLOOR ELEVATION.
ACCESSORIES MOUNTING HEIGHTS
CODE REFERENCE:
FBC ACCESSIBILITY , EIGHTH EDITION CHAPTER 6, SECTION 603 & 604
SPOUT HEIGHT SECTION 602.4
SPOUT HEIGHT STANDING PERSON SECTION 602.7
MIRROR SECTION 603.3
COAT HOOKS & SHELVES SECTION 603.4
SEAT HEIGHT SECTION 604.4
TOILET TISSUE DISPENSER SECTION 604.7
NOT ALLOWED
BEHIND GRAB BARS.
105 DEG. HOT WATER MIXING
VALVE (TV-1) SET AT 105 DEG.
NOTE THAT MIXING VALVE
SHALL NOT DELIVER HOT
WATER THAT EXCEEDS 120 DEG
FAHRENHEIT (49 DEG CELCIUS)
PROVIDE LAV. GUARD MODEL #103 E-
Z. P-TRAP COVER. BY TRUEBRO, INC.
OR EQUAL ALTERNATE APPROVED BY
ARCHITECT
A1
PAPER TOWEL
DISPENSER
NOTE:
1. PROVIDE PROTECTION AS PER FBC 2023- 606.5.
2. ALL HOT WATER PIPES, DRAIN PIPES EXPOSED SHALL BE
INSULATED OR PROTECTED SO AS TO PROTECT AND PREVENT
AGAINST CONTACT. THERE SHOULD BE NO SHARP, HOT OR
ABRASIVE SURFACES UNDER SINKS. ARCHITHERM-ENGINEERED
POLYMER FOAM INSULATION. (SHEET )
A2
PAPER TOWEL
DISPENSER
B1
TOILET
TISSUE
DISPENSER
NOTE:
1. ALL HEIGHTS ARE TO BE CONSIDERED A.F.F
2. ALL MIN AND MAX HEIGHTS ARE TO OPERABLE PARTS OR DISPENSING
PORTION OF THE ACCESSORY UNLESS OTHERWISE NOTED.
3. REFER TO ACCESSORY AND PLUMBING SCHEDULES FOR ALL
MANUFACTURER & MODEL INFORMATION
B4
TOILET
TISSUE
DISPENSER
C1
SOAP
DISPENSER
C2
SOAP
DISPENSER
E1
ROBE
HOOK
H1
SHOWER
ROD
I
MIRROR
REFER TO SPECS
FOR SIZE J1
GRAB BAR
TOILET
J2
GRAB BAR
TOILET
COLD WATER LINE
HOT COLD
CAST BRASS "P" TRAP
ANGLE STOP (TYP.)
3'-0" BACK WALL
MIN
3'-6" SIDE WALL
MIN
BOTTOM EDGE OF
REFLECTING SURFACE
WATER CLOSET SEAT
PROVIDE ADA LOOPED BATON
WITHIN 15" TO 48"
CENTER OF LOWER DRINKING
FOUNTAIN TO BE ATLEAST 15"
FROM NEAREST OBSTRUCTION
INCLUDING BASE BOARD.
18" MAX
16" MIN
5. ALL WATER CLOSETS, URINALS, LAVATORIES AND
BIDETS TO COMPLY WITH FBC-P 405.3.1. A WATER
CLOSET, URINAL, LAVATORY OR BIDET SHALL NOT BE
SET CLOSER THAN 15 IN FROM ITS CENTER TO ANY
SIDE WALL, PARTITION, VANITY OR OTHER
OBSTRUCTION. WHERE PARTITIONS OR OTHER
OBSTRUCTIONS DO NOT SEPARATE ADJACENT
FIXTURES, FIXTURES SHALL NOT BE SET CLOSER THAN
30 IN CENTER TO CENTER BETWEEN ADJACENT
FIXTURES. THERE SHALL BE NOT LESS THAN A 21-INCH
CLEARANCE IN FRONT OF A WATER CLOSET, URINAL,
LAVATORY OR BIDET TO ANY WALL, FIXTURE OR DOOR.
2' - 3" SOAP
DISPENSER
ADA
ACCESSIBLE
URINAL
URINAL STANDARD
URINAL
SANITARY
NAPKIN
DISPENSER
FEMININE
NAPKIN
DISPOSAL
SEAT COVER
DISPENSER
HAND
DRYER
WATER SUPPLY AND DRAIN PIPES
UNDER LAVATORIES AND SINKS
SHALL SHALL BE INSULATED OR
OTHERWISE CONFIGURED TO
PROTECT AGAINST CONTACT.
THERE SHALL BE NO SHARP OR
ABRASIVE SURFACES UNDER
LAVATORIES AND SINKS. TYPICAL.
K1
CHANGING
STATION
WC-2
WATER
CLOSET
EWC-1
ELECTRIC
WATER
COOLER
1/2" M
IN
(TYP.)
6" M
IN
. (TYP.)
33" M
IN
. - 36" M
AX. AFF.
9' M
AX.
7' M
IN
18"
4" C
LR
32"
3' - 2" 5' - 0"
5' - 8" A.F.F.
W
ITH
W
ALL M
O U
N
TED
W C
56" M
IN
48" M
AX.
4' - 2" A.F.F.
48" M
AX.
W
. FLO
O R
M O
U N
TED
W
C
59"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .