26-8703_Phase_1A_Sheet_C106.pdf

PDF 2 MB Posted

Attached to
Immokalee Sports Complex Phase 1A & 1B
Solicitation number
26-8703
Issued by
Collier County, Florida

About this file

This document is a grading, paving, and drainage plan (Sheet C106) prepared by Stantec Consulting Services for Collier County's Immokalee Sports Complex Phase 1A project located at 505 Escambia Street, Immokalee, Florida 34142. The plan depicts Field 1 with proposed grading, drainage infrastructure, and site improvements including perimeter berm re-establishment, swale construction, stormwater pipe extensions, and related utility work. The drawing indicates existing drainage structures, proposed concrete bleacher pads (Phase 1B), equipment building locations, fencing details, and parking restrictions. The plan is dated November 5, 2026, and reflects final revisions incorporating bidder responses to re-solicitation comments. The project scope requires contractors to restore Field 1 upon completion, as it serves as the construction staging area during Phase 1A and 1B implementation.

The technical specifications shown on this plan form part of the comprehensive contract documents for IFB 26-8703, with sealed bids due November 2, 2026, at 3:00 p.m. local time (later revised to November 12, 2026). The anticipated total contract value is $6.24 million, with a $500,000 Owner's Allowance for unforeseen conditions. Bidders must demonstrate a minimum of 10 years of relevant construction experience and submit at least five completed projects, including three qualifying projects of $1 million or greater in value within ten years, with at least two completed within four years of the bid due date. The contractor must achieve substantial completion within 180 calendar days from Notice to Proceed, with liquidated damages of $5,549 per day for failure to meet this deadline. Required bonds include a 5 percent bid bond and 100 percent Payment and Performance Bonds, along with comprehensive insurance coverage including $1 million general liability per occurrence and workers' compensation at statutory limits.

View the file

Other files

File Type Posted
26-8703_Sheet_A-711.pdf PDF
26-8703_Sheet_A-700.2.pdf PDF
26-8703_Sheet_A-602.pdf PDF
26-8703_Sheet_A-101.2.pdf PDF
26-8703_Phase_1B_Sheet_C109.pdf PDF
26-8703_Phase_1B_Sheet_C106.pdf PDF
26-8703_Phase_1A_Sheet_C508.pdf PDF
26-8703_Phase_1A_Sheet_C500.pdf PDF
26-8703_Phase_1A_Sheet_C109.pdf PDF
26-8703_Exhibit_K_SFWMD_ERP_Permit.pdf PDF
26-8703_Bid_Schedule_(rev._1).xlsx XLSX spreadsheet
26-8703_Solicitation_(rev._1).pdf PDF
26-8703_Pre-Bid_Meeting_Audio.MP3 MP3 file
26-8703_Geotechnical_Report.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
Construction_Services_Agreement_2025_Template_ver_3_with_Exhibits.pdf PDF
26-8703_Supplemental_Qualifications.pdf PDF
26-8703_Scope_of_Work_Phase_1A_&_1B.pdf PDF
26-8703_Exhibit_M3_Phase_1A_Landscape_Architecture_Plans.pdf PDF
26-8703_Exhibit_M2_Phase_1A_Civil_Engineering_Plans.pdf PDF
26-8703_Exhibit_M1_Phase_1A_Keysheet.pdf PDF
26-8703_Exhibit_J3_Phase_1B_Technical_Specifcations_Part_2.pdf PDF
26-8703_Exhibit_J2_Phase_1B_Technical_Specifications_Part_1.pdf PDF
26-8703_Exhibit_J1_Phase_1A_Technical_Specifications.pdf PDF
26-8703_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
26-8703_Exhibit_M10_Phase_1B_Landscape_&_Irrigation_Plans.pdf PDF
26-8703_Exhibit_M9_Phase_1B_Structural_Plans.pdf PDF
26-8703_Exhibit_M8_Phase_1B_Electrical_Plans.pdf PDF
26-8703_Exhibit_M7_Phase_1B_Mechanical_&_Plumbing_Plans.pdf PDF
26-8703_Exhibit_M6_Phase_1B_Architecture_Plans.pdf PDF
26-8703_Exhibit_M5_Phase_1B_Civil_Engineering_Plans.pdf PDF
26-8703_Exhibit_M4_Phase_1B_Keysheet.pdf PDF
Construction_Bid_Instructions.pdf PDF
26-8703_Bid_Schedule.xlsx XLSX spreadsheet
26-8703_Solicitation.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X

X X

X

X X X

X X X

NO PARKING

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X X

X X

XX

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

P R

O

JE

C T

LI

M

IT

R

O

JE

C T

LI

O

JE

C T

LI

RO

JE

CT

L

IM

JE

CT

L

JE

CT

L

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

P R

O

JE

C T

LI

O

JE

C T

LI

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

R

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

JE

CT

L

JE

CT

L

JE

CT

L

JE

CT

L

O

JE

C T

LI

O

JE

C T

LI

JE

CT

L

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

PROJE

CT LI

MIT

PROJE

CT LI

MIT

PROJE

CT LI

MIT

PROJECT LIMIT

PROJECT LIMIT PROJECT LIMIT

P R

O

JE

C T

LI

O

JE

C T

LI

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

P R

O

JE

C T

LI

O

JE

C T

LI

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

R

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

O

JE

C T

LI

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PR

O

JEC

T LIM

IT

PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

F x

Fx Fx Fx Fx Fx Fx Fx Fx Fx Fx

Fx

Fx

Fx

Fx Fx Fx Fx Fx Fx

Fx Fx

Fx Fx

Fx

Wx Wx

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

Wx

W x

W x

W x

W x

W x

W x

W x

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F F

F

NO PARKING

FFF

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EU

x

EUx

EUx

EUx EUx

EUx EUx

EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx

EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx EUx

IRx IRx IRx IRx IRx IRx IRx IRx

IRx

IR

x

IR

x IRx

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IR

x

IRx

IR

x

IR

x IRx

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

SDx SDx SDx SDx SDx

SDxSDxSDxSDxSDx

SDx

SDx

SDx

SDx

SDx

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SDx

SDx

SDx

SDx

SDx

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

Project No.:

Scale:

Revision:

Drawing No.

Sheet:

Title

C lie nt /P ro je ct

Permit/Seal

Dsgn. Chkd. YYYY.MM.DDDwn.

Th e

C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns

. D O

N O

T s ca le th e dr aw in g

- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay

Th e

C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec

. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.

of

File Name: 08-215617053-C103

ORIGINAL SHEET - ARCH D

us

-p pf ss

\s ha re d_ pr oj ec ts\

4\ ci vil \0

2_ dr aw in gs \a rc hi ve \2

5_ ph 1a

_f in al _r ev

\0 8-

3-c1

.1

1.

2:

:4

PM

Iss ue d By

Ap pd

YY

YY

.M M

.D D

Re vis io n

By Ap pd

YY

YY

.M

M .D

D

Te l:

w w w .st an te c.

co m

St an te c

C on su ltin g Se rv ic es In c.

K ra ft

Ro ad

S ui te

Na pl es

F L 3

-2

(2

) 6

-4

A

B

C

D

1 2 3 4 5

C ol lie r C ou nt y Bo ar d of C ou nt y C om m iss io ne rs, C ol lie r C ou nt y Pa rk s a nd R ec re at io n

Im m ok al ee S po rts

C om pl ex

Ph as e

1A

Es ca m bi a St re et

, I m m ok al ee

, F L 3

-3

215617854

2025.10.17 m ru fa tt

N ov em be r 2

2:

pm

\\u s0

6-pp fs s0 1\ sh ar ed _p ro je ct s\

4\ ci vi l\0

2_ dr aw in gs \A rc hi ve \2

5_ ph 1a

_f in al _r ev

\0 8-

3- C

3.

dw g

L ay ou t =

C

Ph as e

1A S ub m itt al

0%

M K

JC

.0

9.

Ph as e

1A S ub m itt al

Fi na l)

M K

JC

.1

0.

Ph as e

1A S ub m itt al

F in al (R ev 1)M K

JC

.0

7.

AT

TE

N

TI

O

N

Th es e dr aw in gs m ay in cl ud e in fo rm at io n pr ov id ed b y ot he rs

. S ta nt ec h as n ot v er ifi ed th e ac cu ra cy a nd

/o r c om pl et en es s of th is in fo rm at io n an d sh al l n ot b e re sp on si bl e fo r an y er ro rs o r o m is si on s w hi ch m ay b e in co rp or at ed h er ei n as a re su lt.

C106

MK JCDP

M

K

JC

.0 7.

Re

-so lic ita tio n C om m en ts

M

R M

K

.1

1.

Bi dd er R es po ns es

FIELD 1 GRADING,

PAVING & DRAINAGE

PLAN

MATCHLINE - SEE SHEET C105

11 24

AutoCAD SHX Text

HB

AutoCAD SHX Text

WASHINGTON AVENUE

AutoCAD SHX Text 0.5%

AutoCAD SHX Text

FIELD 1

AutoCAD SHX Text

PROP. CONCRETE BLEACHER PAD (UNDER PHASE 1B)

AutoCAD SHX Text

PROP. CONCRETE BLEACHER PAD (UNDER PHASE 1B)

AutoCAD SHX Text

PROPERTY BOUNDARY

AutoCAD SHX Text

PROPOSED EQUIP. BUILDING (N.I.C.)

AutoCAD SHX Text

CONNECT RE-ESTABLISHED PERIMETER BERM TO EXISTING TOP OF BERM EL.=34.1'

AutoCAD SHX Text

RE-ESTABLISH PERIMETER BERM TO EXISTING TOP OF BERM EL.=34.1'

AutoCAD SHX Text

SWALE BOTTOM EL.=33.1' (TYP.)

AutoCAD SHX Text

EX. STR #12 GRATE EL = 33.39 INV = 31.69 N INV = 32.39 NW INV = 31.73 S

AutoCAD SHX Text

REMOVE PLUG AND EXTEND APPROXIMATELY 13 LF OF 15" RCP TO PROP. CB #11

AutoCAD SHX Text

EX. 15" RCP

AutoCAD SHX Text

6" PLUG FOR ROOF/STORM RELIEF DRAIN INV = 30.50

AutoCAD SHX Text

20' BACK STOP FENCE

AutoCAD SHX Text

20' BACK STOP FENCE

AutoCAD SHX Text

ROLLING GATE

AutoCAD SHX Text

PROP. 18" PVC PLUG @ INV.:29.00

AutoCAD SHX Text

PROP. 10" PVC PLUG @ INV.:29.50

AutoCAD SHX Text PROP. 27 LF OF 12" C900 PVC, CLASS 305, DR14 PIPE AND CAP (CLEAR DRIVEWAY AND UTILITIES) INV.:29.50

AutoCAD SHX Text PROP. 35 LF OF 12" C900 PVC, CLASS 305, DR14 PIPE AND CAP (CLEAR DRIVEWAY AND UTILITIES) INV.:29.50

AutoCAD SHX Text

PROP. 33 LF OF 15" PVC PIPE AND CAP (CLEAR DRIVEWAY AND UTILITIES) INV.:29.50

AutoCAD SHX Text

PROP. 6" PVC PLUG AT 29.50'

AutoCAD SHX Text THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY MICHELLE KELLY, P.E. ON THE DATE ADJACENT TO THE SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Scale 1"=20' (Full Size)

AutoCAD SHX Text

SHADED AREA NOT PART OF THIS PROJECT (N.I.C.)

AutoCAD SHX Text

LEGEND:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Sheets and Views
C106
2026-11-05T17:41:19-0500
Michelle Kelly

File details come from the government source that posted it. Updated .