2025_QAP_-_Pasadena_(Revised2)_FINAL.pdf
PDF 4 MB Posted
- Attached to
- Construction Management for Holly Street Bridge Seismic Retrofit & Rehabilitation Project (HBP)
- Solicitation number
- 2026-RFP-0213
- Issued by
- Los Angeles County, California
About this file
This is a Qualified Allocation Plan (QAP) document for the City of Pasadena, California, outlining the allocation of Low-Income Housing Tax Credits (LIHTC) for 2025. The QAP establishes the City's priorities, selection criteria, and application procedures for distributing federal tax credits to support affordable housing development. The document specifies evaluation criteria for housing projects, including project feasibility, developer experience, community benefit, and compliance with local and federal requirements. Applications are evaluated on a competitive basis with scores determining funding awards. The plan details the application timeline, including submission deadlines, review periods, and announcement of selected projects. Projects must demonstrate financial viability, experienced development teams, and alignment with Pasadena's housing goals and fair housing policies. The QAP covers various housing types and special populations, including family housing, senior housing, and supportive housing for persons with special needs.
The QAP establishes funding requirements and sources, with allocations derived from the annual federal LIHTC distribution to California, administered through the California Tax Credit Allocation Committee (TCAC). The document outlines project costs, financing structures, and reserves required for successful development. Set-asides and preferences are identified for specific project types or populations, including geographic preferences and targeting of extremely low-income households. The plan includes detailed underwriting standards, development cost limits, and operating expense projections to ensure project sustainability. The document also addresses fair housing requirements, environmental review processes, and compliance monitoring obligations for awarded projects throughout their affordability periods.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION
DLA FINAL MATERIALS CERTIFICATION
DOT LAPM 16-E (NEW 02/2025)
Americans with Disabilities Act (ADA) Notice: This document is available in alternative accessible formats. For more information, please contact the Forms Management Unit at (279) 234-2284, TTY 711, in writing at Forms Management Unit, 1120 N Street, MS-89, Sacramento, CA 95814, or by email at Forms.Management.Unit@dot.ca.gov.
DATE LOCAL PUBLIC AGENCY (LPA) FEDERAL PROJECT NUMBER
PROJECT NAME
MATERIALS CERTIFICATION
This is to certify that the results of the tests on acceptance samples show that both the materials used in the construction work and the construction operations controlled by sampling conform to the approved plans and specifications.
No exceptions to the plans and specifications were found.
Exceptions to the plans and specifications are explained in the following (or on attached sheet).
I agree that by providing my electronic signature for this form, I agree to conduct business transactions by electronic means and that my electronic signature is the legal binding equivalent to my handwritten signature. I hereby agree that my electronic signature represents my execution or authentication of this form, and my intent to be bound by it.
DISTRIBUTION: Original – LPA Project File Copy – DLAE
DATERESIDENT ENGINEER SIGNATURE
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION
DLA FINAL MATERIALS CERTIFICATION
DOT LAPM 16-E (NEW 02/2025)
Americans with Disabilities Act (ADA) Notice: This document is available in alternative accessible formats. For more information, please contact the Forms Management Unit at (279) 234-2284, TTY 711, in writing at Forms Management Unit, 1120 N Street, MS-89, Sacramento, CA 95814, or by email at Forms.Management.Unit@dot.ca.gov.
Instructions
Any material represented by an acceptance test that does not meet the criteria contained in the plans and specifications is considered an exception. If there are exceptions, check the exceptions box and note all nonconforming materials on the form. Use additional sheets if necessary. The following list includes, but is not limited to, types of non-conforming materials that must be noted as exceptions on the form:
1. Materials accepted by applying a specified pay factor or deficiency adjustment, such as for hot mix asphalt concrete pavement or rapid strength concrete.
2. Materials out of “operating range” but within “contract compliance” for which a specified payment deduction was made.
3. Materials not in compliance with the as-bid contract plans or specifications for which a contract change order was approved to accept the material.
4. Materials that require certificates of compliance but one or more have not been submitted.
Sampling and Testing Frequency
January 2018
Sampling and Testing Frequency Table for projects OFF the SHS
(a) Exact tonnage of sample location to be determined by Random Sampling Plans
(b) Compaction determined by Neclear Density Device. Core testing required if compaction fails the neclear test (c) Correlation between core densities and nuclear device required only if compaction fails the nuclear test
(d) Report the average of 3 tested briquettes from a single split source
(e) Use CT 309 to determine maximum theoretical density in lieu of CT 367 calculated maximum theoretical density
(f) No testing required unless warranted by concern ; sample and store until completion of project
Sample for Local Agency QAPs
Sampling and Testing Frequency Table for projects OFF the SHS.
HOT MIX ASPHALT (HMA) / ASPHALT CONCRETE (AC)
Quality Characteristic Test Method Minimum Sampling and Testing Frequency Location/Time of Sampling
Aggregate Gradation (Sieve) CT 202 1 Per 1000 Tons or Part Thereof ; Minimum 1 per day during production/placement of at least 300 tons per day.
At Plant Per CT 125 (a)
Sand Equivalent CT 217 Asphalt Binder Content CT 382 Loose Mix Behind Paver Per CT 125
In‐Place Density and Relative Compaction (Nuclear )
Nuclear (b) 1 Per 1000 Tons or Part Thereof ; Minimum 1 per day during production/placement of at least 300 tons per day. (b)
Random Locations Per CT 375 (c CT 375 or ASTM D2950 (c
Theoretical Maximum Specific Gravity and Density (Rice)
CT 309
1 Per Day During Production/Placement of At Least 300 Tons Per Day
Loose Mix Behind Paver Per CT 125 HMA Moisture Content CT 226 or CT 370 Stabilometer Value (d) CT 366
Asphalt Binder Sample per Section 92 Sample 1 min. per day for production over 300 tons per day; See
(f) regarding testing.
At Plant Per CT 125
Smoothness 12‐foot Straightedge As necessary to confirm contract compliance. Final Pavement Surface
Attachment No. 1
SUBGRADE (DISTURBED BASEMENT SOIL) OR EMBANKMENT
Quality Characteristic Test Method Minimum Sampling and Testing Frequency Location/Time of Sampling
Maximum Density and Relative Compaction
CT 216/CT 231
1 Min. Test per 5000 sq ft under vehicle traveled way and shoulder
1 Min. Test Per 300 linear foot under sidewalk
Random locations as determined by the Engineer in place after compaction.
AGGREGATE BASES AND SUBBASES, IMPORTED BORROW
Quality Characteristic Test Method Minimum Sampling and Testing Frequency Location/Time of Sampling Sieve Analysis CT 202
1 Min. Test Per Material Source Sample from site stockpile/plant prior to placement. R‐Value CT 301 Sand Equivalent CT 217
1 Min. Test per 5000 sq ft
Random locations as determined by
STRUCTURE BACKFILL, SELECT BACKFILL
Sieve Analysis CT 202 1 Min. Test Per Material Source
Sample from site stockpile/plant prior to placement
R‐Value CT 301 Sand Equivalent CT 217
1 Min. Test Per 2 Vertical Lifts of Placement
Random locations as determined by
PORTLAND CEMENT CONCRETE (PCC) ‐ STRUCTURAL AND SIGNAL/LIGHTING FOUNDATIONS
COARSE AGGREGATE
Sieve Analysis CT 202
1 min. test per 500 cu yds and per each material source ; 1 min. test on smaller projects; If bridge, 1 min. set per separate pour per abutment/pier/deck.
Sample from site stockpile/plant prior to placement Cleanness Value CT 227
FINE AGGREGATE
Sieve Analysis CT 202
1 min. test per 500 cu yds and per each material source ; 1 min. test on smaller projects; If bridge, 1 min. set per separate pour per
Sample from site stockpile/plant prior to placement Sand Equivalent CT 217
WET MIX
Slump/Penetration CT 533 2 per day
Sample from truck/work site Cylinders CT 539/540 1 min. set of 3 per day; If bridge, 1 min. set per separate pour of
Exhibit 16-Z2 Local Assistance Procedures Manual Acceptance Testing Result Summary Log
Exhibit 16-Z2 Acceptance Testing Results Summary Log
Project Name: __________________________________________________________
Test Method Name: ___________________ Test Method Number: ___________________ Contract Number: _______________________________________________________
Test
Number Date Sampled Name of Sampler or Tester Production Test Results Remarks
Tester Certification on file? Location (Stations, depths, etc) Production Quantity
Represented Required Result Actual Result Pass/Fail Include action taken for any failing test result;
note test number of any retest.
Attachment No. 2
Materials Requiring a Certificate of Compliance per Caltrans Standard Specifications
* For those materials requiring additional information on or with the COC, see specification. Page 1 of 9 October 2024
Materials Requiring a Certificate of Compliance per Caltrans Standard Specifications
Caltrans 2024 Standard Specifications
Material Additional Info and/or Attachments Required*
6-1.04 BUY AMERICA
6-1.04B Crumb rubber COC
6-1.04C Steel and iron materials COC + cert. mill test reports
6-1.07B Telecommunications and Video Surveillance Equipment COC
11-2 WELDING QUALITY CONTROL
11-2.03D Welding COC
11-3 WELDING FOR OVERHEAD SIGN STRUCTURES, STANDARDS, AND POLES
11-3.303 Welding COC
12-3 TEMPORARY TRAFFIC CONTROL DEVICES
12-3.03A(3) Plastic Traffic Drums COC
12-3.20A(3) Temporary Barrier System COC
12-3.23A(3) Impact Attenuator COC
12-3.32A(3) Portable CMS COC
12-3.33A(2) Portable Signal System COC
13-2 WATER POLLUTION CONTROL PROGRAM
13-9 TEMPORARY CONCRETE WASHOUTS
13-9.01C Fabric bags for gravel-filled bags COC
Plastic liner COC
13-10 TEMPORARY LINEAR SEDIMENT BARRIERS
13-10.01C Fiber rolls COC
Silt fence fabrics COC
Sediment filter bags COC
Foam barriers COC
Fabric for gravel-filled bags COC
Compost Socks COC
16-2.03 TEMPORARY HIGH-VISIBILITY FENCES
16-2.03A(3) High-visibility fabric COC
18 DUST PALLIATIVES
18-1.01C Dust suppressant COC
Dust control binders COC
Fibers COC
20 LANDSCAPE
20-2 IRRIGATION
Attachment No. 3A
* For those materials requiring additional information on or with the COC, see specification. Page 2 of 9 October 2024
Caltrans 2024 Standard Specifications
Material Additional Info and/or Attachments Required*
20-2.08A(3) Polyethylene pipe COC
Plastic pipe supply line COC
20-3 PLANTING
20-3.01A(3)(c) Sod COC
Soil amendment COC
Plant tubes COC
20-5 LANDSCAPE ELEMENTS
20-5.03A(1)(c) Filter fabric COC + product data
20-5.03D(1)(c) Solidifying emulsion COC + product data & samples
20-5.04A(3) Wood mulch COC + sample & authorization
21-2 EROSION CONTROL WORK
21-2.01C(1) Straw COC
Weed-free straw COC + cert. of quarantine
Fiber COC
RECP COC
Fasteners COC
Hydraulically applied erosion control materials Submit records
21-2.01C(2) Compost Submit reports
21-2.01C(3) Seed Submit reports
21-2.01C(4) Tackifier COC + SDS + Reports
Bonded fiber matrix COC + SDS + Reports
21-2.01C(5) Fiber Reinforced Matrix COC + Manufacturer information
24 STABILIZED SOILS
24-1.01C(1) Stabilizing agent COC + sample
24-3 CEMENT STABILIZED SOIL
24-3.01C Cement COC + sample
30-4 FULL DEPTH RECYCLING - CEMENT
30-4.01C(2) Cement COC
30-5 PARTIAL DEPTH RECYCLING
30-5.01C(3) Recycling agent COC + SDS + test results
Cement COC + SDS
Other Additives COC + SDS
* For those materials requiring additional information on or with the COC, see specification. Page 3 of 9 October 2024
Caltrans 2024Standard Specifications
Material Additional Info and/or Attachments Required*
36-2 BASE BOND BREAKER
36-2.01C Base bond breaker COC
37 SEAL COATS
37-1.01C Asphalt binder COC + test results
Asphalt emulsion COC + test results
37-2 CHIP SEALS
37-2.04A(3) Asphalt rubber binder ingredients COC + test results+ Submittals
37-3 SLURRY SEALS AND MICRO-SURFACINGS
37-3.01A(3) Asphaltic emulsion COC + samples & test results
Polymer modified asphaltic emulsion COC + samples & test results
Micro-surfacing emulsion COC + sample & test results
37-5 PARKING AREA SEALS
37-5.01C Parking area seal material COC + sample & test results
37-6 CRACK TREATMENTS
37-6.01C Crack treatment materials COC or sample & test results
39-2 HOT MIX ASPHALT
39-2.01A(3)(f) Liquid antistrip COC + sample & production data
39-2.03A(3)(c) Crumb rubber modifier COC + test results
Asphalt modifier COC + test results
39-2.03B(3)(c) Crumb rubber modifier COC + test results
39-2.05A(1)(c) Asphaltic emulsion COC + test results+sample
40 CONCRETE PAVEMENT
40-1.01C(2) Tie bars COC
Splice couplers for threaded bars COC
Dowel bars COC
Tie bar baskets COC
Dowel bar baskets COC
Joint filler COC
Epoxy-powder coating COC
41 EXISTING CONCRETE PAVEMENT
41-1.01C Fast-setting concrete COC + SDS & instructions
Polyester resin binder COC + SDS & instructions
Bonding agent COC + SDS & instructions
* For those materials requiring additional information on or with the COC, see specification. Page 4 of 9 October 2024
Caltrans 2024 Standard Specifications
Material Additional Info and/or Attachments Required*
41-5 JOINT SEALS
41-5.01C Liquid joint sealant COC + SDS & instructions
Backer rods COC + SDS & instructions
Compression joint seal COC + SDS & instructions
Lubricant adhesives COC + SDS & instructions
41-10 DRILL AND BOND BARS
41-10.01C Tie bars COC
Dowel bars COC
Dowel bar lubricant COC
Chemical adhesive COC
Epoxy powder coating COC
47-6 ALTERNATIVE EARTH RETAINING SYSTEMS
47-6.01C(3) Alternative earth retaining system COC
48-2 FALSEWORK
48-2.01C(1) Structural composite lumber COC + submittals
Timber COC + submittals
48-4 TEMPORARY DECKING
48-4.01C Temporary decking materials COC
49-2 DRIVEN PILING
49-2.02A(3)(d) Steel pipe piles COC + tests & mill reports
49-2.03A(3) Structural shape steel piling COC + test reports
51 CONCRETE STRUCTURES
51-1.01C(3) Bonding materials COC or sample & authorization
51-1.01C(5) Chemical adhesive COC + SDS + Instructions
51-2 JOINTS
51-2.01A(3) Acetal copolymer material for snowplow deflectors COC
51-2.02B(1)(c) Joint seals, backer rods, and primer COC + SDS + Instructions
51-2.02C(1)(c) Elastomeric joint seal COC + test reports
Lubricant-adhesive COC + test reports
51-2.02D(1)(c) Joint seal materials COC + authorization
51-2.02E(1)(c)(iii) Joint seal assembly materials COC
51-2.02F(1)(c)(iv) Material used in the joint seals COC + test reports
51-2.04A(3) Waterstop material COC + a statement
* For those materials requiring additional information on or with the COC, see specification. Page 5 of 9 October 2024
Caltrans 2024 Standard Specifications
Material Additional Info and/or Attachments Required*
51-3 BEARINGS
51-3.02A(3)(c)(ii) Plain elastomeric bearing pads COC + test reports
51-3.02A(3)(c)(iii) Steel-reinforced elastomeric bearing pads COC + test reports
51-3.03A(3)(a) Materials used in PTFE bearings COC + test reports + statement
51-4 PRECAST CONCRETE MEMBERS
51-4.01C(1) Concrete box culvert COC
52 REINFORCEMENT
52-1.01C(3) Reinforcement (rebar) COC + mill test report
52-2 EPOXY-COATED REINFORCEMENT
52-2.02A(3)(c) Epoxy-coated reinforcement COC + submittals
Patching material COC + a statement
52-2.023A(3)(c) Epoxy-coated reinforcement COC + submittals
Patching material COC + a statement
52-5.01C(2)(b) Headed bar reinforcement COC + test samples
52-5.01C(4) Headed bar reinforcement COC + test reports
52-6 SPLICING
52-6.01C(3)(b) Service and butt splice samples COC + samples
52-6.01C(5) Service or butt splice material COC + submittals
54 WATERPROOFING
54-3 PREFORMED MEMBRANE WATERPROOFING
54-3.01C Preformed membrane sheet COC + report
54-5 DECK SEAL
54-5.01C Preformed membrane sheet COC + report
55 STEEL STRUCTURES
55-1.01c(1) Steel materials used COC + Test reports
57-2 WOOD STRUCTURES
57-2.01A(3) Timber and lumber COC + report
Glued laminated timbers/decking COC
57-3 PLASTIC LUMBER STRUCTURES
57-3.01C(1) Plastic lumber COC + test report & sample
58-2 MASONRY BLOCK
58-2.01C(7) CMUs COC
Aggregate for grout COC
Grout COC
* For those materials requiring additional information on or with the COC, see specification. Page 6 of 9 October 2024
Caltrans 2024 Standard Specifications
Material Additional Info and/or Attachments Required*
59 STRUCTURAL STEEL COATINGS
59-1.01C Blast cleaning material COC + SDS
59-5 THERMAL SPRAY COAT STRUCTURAL STEEL
59-5.01C(1) Wire feedstock COC
60-3.04B POLYESTER CONCRETE OVERLAYS
60-3.04B(1)(c) Methacrylate resins COC + samples & test report
Polyester resins COC + samples & test report
Aggregates COC + samples & test report 60-3.05B(1)(c) Filler material and bonding agents COC + samples
61-2 CULVERT AND DRAINAGE PIPE JOINTS
61-2.01C Joint systems COC + test results & reports
Couplers COC + test results & reports
62 STORMWATER TREATMENT
62-1.01C Source material COC
62-3.01C Source material COC
64 PLASTIC PIPE
64-1.01C Plastic pipe COC + report
65-2 REINFORCED CONCRETE PIPE
65-2.01C RCP, direct design method COC + report
66 CORRUGATED METAL PIPE
66-1.01C Corrugated steel materials COC
Corrugated aluminum materials COC
67-3 METAL LINE PLATE PIPE
67-2.01C Structural metal plate pipe, arches, and pipe arches COC + Instructions
67-3.01C Metal liner plate pipe COC + mill test reports
68 SUBSURFACE DRAINS
68-1.01C Subsurface drain COC
68-2 UNDERDRAINS
68-2.01C Pipe COC
Tubing COC
Fittings COC
68-7 GEOCOMPOSITE DRAIN SYSTEMS
68-7.01C Geocomposite drain COC + flow capability graph
68-8.01C(1) Prefabricated vertical drain COC+ Test samples
* For those materials requiring additional information on or with the COC, see specification. Page 7 of 9 October 2024
Caltrans 2024 Standard Specifications
Material Additional Info and/or Attachments Required*
69 OVERSIDE DRAINS
69-1.01C Steel COC
Aluminum COC
Plastic COC
70-6 GRATED LINE DRAINS
70-6.01C Grated line drains COC + Report
71-3.09 MACHINE SPIRAL WOUND PVC PIPELINERS
71-3.09A(1)(c) Each reel of PVC strip COC + Report
72-16 GABIONS
72-16.01C Gabion basket COC
PVC coating COC
74 PUMPING EQUIPMENT AND CONTROLS
74-2.01C(3) Impeller balancing and drainage pump tests COC + Report
75-3 MISCELLANEOUS BRIDGE METAL
75-3.01C(1) Anchorage devices COC
75-3.01C(2) BRIDGE DECK DRAINAGE SYSTEM
75-3.01C(2) Fiberglass pipe and fittings COC + Test results
80-3 CHAIN LINK FENCES
80-3.01C Protective coating system COC
Posts and braces COC + Report
81 MISCELLANEOUS TRAFFIC CONTROL DEVICES
81-2 DELINEATORS
81-2.01C Metal target plates COC
Enamel coating COC
81-3 PAVEMENT MARKERS
81-3.01C Pavement markers COC
82 SIGNS AND MARKERS
82-2 SIGN PANELS
82-2.01C Aluminum sheeting COC
Retroreflective sheeting COC
Color imaging methods and film COC
Protective overlay film COC
* For those materials requiring additional information on or with the COC, see specification. Page 8 of 9 October 2024
Caltrans 2024 Standard Specifications
Material Additional Info and/or Attachments Required*
82-5 MARKERS
82-5.01C Metal target plates COC
Enamel coating COC
Retroreflective sheeting COC
83-2 METAL RAILINGS AND BARRIERS
83-2.08A(3) Tubular railing components COC + Shop drawings
83-3 CONCRETE BARRIERS
83-3.01C Type 60K portable concrete barrier COC or test reports
84-2 TRAFFIC STRIPES AND PAVEMENT MARKINGS
84-2.01C Stripe material COC + SDS + Instructions
Primer COC + SDS + Instructions
Glass beads COC + SDS + Instructions
Thermoplastic COC + SDS + test results
DIVISION X ELECTRICAL WORK
86-1.01C(6) Signal heads COC + test data
86-1.01C(8) Visors COC + test data
87-2 LIGHTING SYSTEMS
87-2.01C High mast lighting luminaires COC + test data
90 CONCRETE
90-1.01C(3) Cementitious materials COC
Blended cement COC + SCM weight
90-1.01C(4) Admixture COC + authorization
90-1.01C(5) Curing compound COC + test samples
90-1.01C(12) Cast-In-Place structural concrete material COC
90-1.01C(13) Polymer Fibers COC + Instructions
90-2 MINOR CONCRETE
90-2.01C Minor concrete COC + weighmaster cert
90-3 RAPID STRENGTH CONCRETE
90-3.01C(3) Aggregate COC + weighmaster cert
Cementitious materials COC + weighmaster cert
Admixtures COC + weighmaster cert
90-4 PRECAST CONCRETE
90-4.01C(2) and 90-4.01D(2)(a)
Cementitious materials COC + app. signature
Precast members (each) COC + app. signature
Curing compound COC + test samples
* For those materials requiring additional information on or with the COC, see specification. Page 9 of 9 October 2024
Caltrans 2024 Standard Specifications
Material Additional Info and/or Attachments Required*
94 ASPHALTIC EMULSIONS
94-1.01C Asphaltic emulsion COC + reports
95 EPOXY
95-1.01C Epoxy COC
96 GEOSYNTHETICS
95-1.01C(1) Geosynthetic COC + test samples
Materials Requiring a Certificate of Compliance per the Greenbook
Greenbook 2024 Materials Requiring a Certificate of Compliance or Certified Test Reports
Material Section # Section Title Additional Comments
1 Any material or assembled material if required by the Engineer
4-5 Certificate of Compliance General Requirements from 2024 edition of Greenbook
2 Scales and Metering Equipment 4-7 Weighing Equipment Engineer to "approve" prior to operation.
4 Fly Ash 201-1.2.7.3 Fly Ash Specific language/info required on the COC.
Must also submit test data upon request.
5 Pozzolans 201-1.2.7.4 Class N Pozzolans Specific language/info required on the COC.
Must also submit test data upon request.
6 Fiber Reinforcement for fiber reinforced concrete or air placed concrete, method B
201-2.3 Fiber Reinforcement
7 Joint Sealant, Type E 201-3.9 Test Report and Certification Specific language/info required on certified test reports upon request
8 Sheet Curing Materials 201--4.3 Test Report and Certification Must submit certified test report upon request.
9 Paving Asphalt 203-1.3 Test Report and Certification Specific language/info required on certified test reports.
10 Liquid Asphalt 203-2.2 Test Report and Certification Specific language/info required on certified test reports.
11 Microsurfacing Emulsion (MSE) 203-3.4.6 Microsurfacing Emulsion (MSE) A COC for each shipment of MSE delivered to the work site
12 Emulsified Asphalt 203-3.5 Certificate of Compliance Must also submit test data upon request
13 Asphalt Rubber Hot Mix (ARHM) 203-11.2 Materials Must also submit test reports with the COC.
14 Crumb Rubber Modifier (CRM) 203-11.2.3.1 General (Crumb Rubber Modifier) Specific language/info required on the COC.
16 Tire Rubber Modified Asphalt Concrete
(TRMAC)
203-14-2.1 Tire Rubber Modified Paving Asphalt Specific Language/info required on the COC.
17 Polymer Modified Asphalt Concrete
(PMAC)
203-16.2.1 Polymer Modified Paving Asphalt Specific Language/info required on the COC.
18 Treatment with Preservatives 204-2.4 Quality Control Specific language/info required on the COC.
Structural Steel, Rivets, Bolts, Pins and Anchor Bolts 206-1.1.2 Certification Specific language/info required on certified test reports.
20 Gray Iron and Ductile Iron Castings 206-3.4.2.1
206-3.7
General (Tensile Testing)
Acceptance
Must also submit test reports with the COC.
December 2024
Attachment No. 3B
21 Gray Cast Iron Castings 206-3.4.2.2
206-3.7
Gray Cast Iron Castings
Acceptance
Specific language/info required on the COC and must submit certified test results.
23 Ductile Iron Castings 206-3.4.2.3
206-3.7
Ductile Iron Castings
Acceptance
Specific language/info required on the COC and must submit certified test results.
24 Composite Manhole Frames and Covers 206-7.11 Acceptance Specific language/info required on the COC and must submit certified test results.
25 Reinforced Concrete Pipe (RCP) 207-2.9 Basis for Acceptance, General Specific language/info required on the COC.
26 Vitrified Clay Pipe (VCP) 207-8.5.1 Testing Requirement, General Specific language/info required on the COC.
27 Corrugated Steel Pipe, pipe arches. 207-11.2.1 General (Materials)
28 Structural Steel Products Plate Pipe Arches and Pipe Arches
207-12.2.1 General (Materials) Specific language/info required on the COC.
29 Structural Aluminum Plate Pipe Arches and Pipe Arches
207-14.2.1 General (Materials) Specific language/info required on the COC.
30 PVC Gravity Pipe 207-17.4.1 General (Test Requirements) Specific Language/info required on the CO, shall include the test result data.
31 Polyethylene(PE) Solid Wall Gravity Pipe 207-19.2 Material Composition The Engineer may require a COC and test results.
32 Profile Polypropylene Pipe with Smooth Interior, With Bell and Spigot Joints
207-25.6.1 General (Man. Facility Testing)
33 Materials used in Sewers 211-2 Chemical Resistance (Pickle Jar) Test Specific language/info required on the COC.
34 Hand Held Viscometer Test 211-4.2 Calibration Specific language/info required on the COC.
35 Water and Sewer System Valves and Appurtenances
212-1.1 Submittal Package (Supporting Information)
36 Engineering Geosynthetics 213-1 General (Engineering Geosynthetics) Specific language/info required on the COC.
37 Traffic Striping, Curb and Pavement Markings, and Pavement Markers
214-2 Test Reports and Certificate of Compliance
Specific language/info required on certified test reports OR
COC
38 Precast Reinforced Concrete Manholes
(PRCMH)
215-8 Basis of Acceptance Specific language/info required on the COC.
39 Precast Reinforced Concrete Box (PRCB) 216-8 Basis of Acceptance Specific language/info required on the COC.
40 Lime-Treated Soil 301-5-2.1 Lime
41 Slurry Seal Surfacing 302-4-2.1 General (Mix Designs)
42 Asphalt Concrete Pavement 302-5.2.3
302-5.3.2
Tack Coat
Certificate of Compliance
43 Concrete Structures, Placing Reinforcement
303-1.7.2 Splicing All Radiographs shall be submitted to the Engineer with Radiographic report and COC
44 Plastic Liner Installation 311-1.10 Quality Assurance Tests
45 Deformed/Re-formed HDPE Pipe Liner 500-5.7.2 Material Composition COC and test results required
46 Folded and Re-Formed PVC pipe Liner 500-5.10.2
500-5.10.3
Material Acceptance (Type A)
Material Acceptance (Type B)
47 Manholes and Structure Rehabilitation 502-2 Submittals
48 Lining Systems 502-5.1.2.2 Integral Locking PVC Liner
49 Segmented PVC Lining System 502-5.2.1 General
50 Fiberglass Standards 700-3.3.4 Fiberglass Standards Specific language/info required on the COC and test reports.
51 Conductors for Series Circuits, 5000V 700-4.2.2 Conductors for Series Circuits
52 Conductors and Cable 700-5.3.1 General (Conductors and Cable)
53 Lamp Receptable Conductors 700-5.5.7 Electrical Components COC Required if required information is not marked on the insulation.
54 Circular Light Emitting Diode (LED) Signal Modules
700-5.5.11.8 Certificate of Compliance
55 LED Pedestrian Signal Section “Upraised Hand” Module
700-5.6.6.7 Certificate of Compliance
56 Soil Fertilizing and Conditioning Materials 800-1.2.1 General Submit COC when required by the Engineer
| Tester Certification on file1: |
| Location Stations depths etc1: |
| Production Quantity Represented1: |
| Required Result1: |
| Actual Result1: |
| PassFail1: |
| Include action taken for any failing test result note test number of any retest1: |
| Tester Certification on file2: |
| Location Stations depths etc2: |
| Production Quantity Represented2: |
| Required Result2: |
| Actual Result2: |
| PassFail2: |
| Include action taken for any failing test result note test number of any retest2: |
| Tester Certification on file3: |
| Location Stations depths etc3: |
| Production Quantity Represented3: |
| Required Result3: |
| Actual Result3: |
| PassFail3: |
| Include action taken for any failing test result note test number of any retest3: |
| Tester Certification on file4: |
| Location Stations depths etc4: |
| Production Quantity Represented4: |
| Required Result4: |
| Actual Result4: |
| PassFail4: |
| Include action taken for any failing test result note test number of any retest4: |
| Tester Certification on file5: |
| Location Stations depths etc5: |
| Production Quantity Represented5: |
| Required Result5: |
| Actual Result5: |
| PassFail5: |
| Include action taken for any failing test result note test number of any retest5: |
| Tester Certification on file6: |
| Location Stations depths etc6: |
| Production Quantity Represented6: |
| Required Result6: |
| Actual Result6: |
| PassFail6: |
| Include action taken for any failing test result note test number of any retest6: |
| Tester Certification on file7: |
| Location Stations depths etc7: |
| Production Quantity Represented7: |
| Required Result7: |
| Actual Result7: |
| PassFail7: |
| Include action taken for any failing test result note test number of any retest7: |
| Tester Certification on file8: |
| Location Stations depths etc8: |
| Production Quantity Represented8: |
| Required Result8: |
| Actual Result8: |
| PassFail8: |
| Include action taken for any failing test result note test number of any retest8: |
| Tester Certification on file9: |
| Location Stations depths etc9: |
| Production Quantity Represented9: |
| Required Result9: |
| Actual Result9: |
| PassFail9: |
| Include action taken for any failing test result note test number of any retest9: |
| Tester Certification on file10: |
| Location Stations depths etc10: |
| Production Quantity Represented10: |
| Required Result10: |
| Actual Result10: |
| PassFail10: |
| Include action taken for any failing test result note test number of any retest10: |
| Tester Certification on file11: |
| Location Stations depths etc11: |
| Production Quantity Represented11: |
| Required Result11: |
| Actual Result11: |
| PassFail11: |
| Include action taken for any failing test result note test number of any retest11: |
| Tester Certification on file12: |
| Location Stations depths etc12: |
| Production Quantity Represented12: |
| Required Result12: |
| Actual Result12: |
| PassFail12: |
| Include action taken for any failing test result note test number of any retest12: |
| Tester Certification on file13: |
| Location Stations depths etc13: |
| Production Quantity Represented13: |
| Required Result13: |
| Actual Result13: |
| PassFail13: |
| Include action taken for any failing test result note test number of any retest13: |
| Tester Certification on file14: |
| Location Stations depths etc14: |
| Production Quantity Represented14: |
| Required Result14: |
| Actual Result14: |
| PassFail14: |
| Include action taken for any failing test result note test number of any retest14: |
| Tester Certification on file15: |
| Location Stations depths etc15: |
| Production Quantity Represented15: |
| Required Result15: |
| Actual Result15: |
| PassFail15: |
| Include action taken for any failing test result note test number of any retest15: |
| Tester Certification on file16: |
| Location Stations depths etc16: |
| Production Quantity Represented16: |
| Required Result16: |
| Actual Result16: |
| PassFail16: |
| Include action taken for any failing test result note test number of any retest16: |
| Tester Certification on file17: |
| Location Stations depths etc17: |
| Production Quantity Represented17: |
| Required Result17: |
| Actual Result17: |
| PassFail17: |
| Include action taken for any failing test result note test number of any retest17: |
| Tester Certification on file18: |
| Location Stations depths etc18: |
| Production Quantity Represented18: |
| Required Result18: |
| Actual Result18: |
| PassFail18: |
| Include action taken for any failing test result note test number of any retest18: |
| Tester Certification on file19: |
| Location Stations depths etc19: |
| Production Quantity Represented19: |
| Required Result19: |
| Actual Result19: |
| PassFail19: |
| Include action taken for any failing test result note test number of any retest19: |
| Tester Certification on file20: |
| Location Stations depths etc20: |
| Production Quantity Represented20: |
| Required Result20: |
| Actual Result20: |
| PassFail20: |
| Include action taken for any failing test result note test number of any retest20: |
| Tester Certification on file21: |
| Location Stations depths etc21: |
| Production Quantity Represented21: |
| Required Result21: |
| Actual Result21: |
| PassFail21: |
| Include action taken for any failing test result note test number of any retest21: |
| Tester Certification on file22: |
| Location Stations depths etc22: |
| Production Quantity Represented22: |
| Required Result22: |
| Actual Result22: |
| PassFail22: |
| Include action taken for any failing test result note test number of any retest22: |
| Tester Certification on file23: |
| Location Stations depths etc23: |
| Production Quantity Represented23: |
| Required Result23: |
| Actual Result23: |
| PassFail23: |
| Include action taken for any failing test result note test number of any retest23: |
| Tester Certification on file24: |
| Location Stations depths etc24: |
| Production Quantity Represented24: |
| Required Result24: |
| Actual Result24: |
| PassFail24: |
| Include action taken for any failing test result note test number of any retest24: |
| Tester Certification on file25: |
| Location Stations depths etc25: |
| Production Quantity Represented25: |
| Required Result25: |
| Actual Result25: |
| PassFail25: |
| Include action taken for any failing test result note test number of any retest25: |
| Check Box1: |
| 0: |
| 0: Off |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: |
| 0: |
| 0: Off |
| 1: |
| 0: |
| 0: Off |
| 1: |
| 0: |
| 0: Off |
| 1: |
| 0: |
| 0: Off |
| 1: |
| 0: |
| 0: Off |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| TMN: |
| TMNO: |
| PN: |
| CNO: |
| DS01: |
| DS02: |
| DS03: |
| DS04: |
| DS05: |
| DS06: |
| DS07: |
| DS08: |
| DS09: |
| DS10: |
| DS11: |
| DS12: |
| DS13: |
| DS14: |
| DS15: |
| DS17: |
| DS18: |
| DS19: |
| DS20: |
| DS21: |
| DS22: |
| DS23: |
| DS25: |
| DS24: |
| DS16: |
File details come from the government source that posted it. Updated .