1737010dwg6of8VOL2.pdf

PDF 34 MB Posted

Attached to
DESIGN-BID-BUILD P171 WEAPONS MAGAZINES AT NAVAL WEAPONS STATION YORKTOWN
Solicitation number
N4008526R0020
Issued by

About this file

This document is a comprehensive set of design drawings for the P-171 Weapons Magazines project at Naval Weapons Station Yorktown, Virginia. The drawings are organized into structural, electrical, and telecommunications design specifications and include detailed plans, elevations, sections, and construction details for five magazine structures (Magazines 1-5) that will be constructed using a Design-Bid-Build delivery method under Navy solicitation N4008526R0020.

The structural design encompasses reinforced concrete construction with cast-in-place concrete foundations, walls, and roof systems; blast-resistant door mechanisms with internal locking devices (ILD); bridge crane systems; security pilasters; drainage systems; and ventilation components. Electrical systems include 208Y/120V three-phase power distribution through multiple panelboards (MDP-M, DP1, DP2) fed from a 13.2kV pad-mounted transformer; comprehensive lightning protection and grounding systems with secondary ground rings, air terminals, and guard rails; ordnance and static ground bus bars for safety; LED lighting fixtures with occupancy sensors; and blast door control systems with manual override capability. Telecommunications infrastructure consists of intrusion detection systems (IDS) with motion detectors and door contacts, security monitoring through closed-circuit television roughins, fiber optic connectivity to base infrastructure, and voice communication outlets. The design reflects NAVSEA OP-5 ammunition safety requirements, NFPA 780 lightning protection standards, and incorporates site-adaptation provisions for local conditions at Yorktown. All conduit runs are specified as rigid galvanized steel with minimum 50-foot separation from buildings for utility connections, and electrical equipment is rated for wet/corrosion environments per UFC standards.

View the file

Other files

File Type Posted
Amendment 0003 P171 Weapons Magazines.pdf PDF
Attachment M - Amendment 003 Drawings 2 of 2.pdf PDF
Attachment M - Amendment 003 Drawings 1 of 2.pdf PDF
CJA ML-23-80 - Redacted.pdf PDF
JA ML-26-58 P171 AIRVAC 911 Brand Name Item - Redacted.pdf PDF
JA ML-26-57 P171 Interior Finishes Brand Name or Equal - Redacted.pdf PDF
Amendment 0002 P171 Weapons Magazines.pdf PDF
Updated Attachment H - P171 Price Proposal Form REV1.docx DOCX document
Amendment 0001 P171 Weapons Magazines.pdf PDF
Updated Attachment K - Wage Determination VA20260169 05-18-26.pdf PDF
Attachment L - P171 Site Visit Log.pdf PDF
Attachment F - SBPCD.docx DOCX document
Attachment K - Wage Determination VA20260169 01-30-2026.pdf PDF
1737010dwg4of8VOL1.pdf PDF
1737010dwg5of8VOL1.pdf PDF
1737010dwg8of8VOL4.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Attachment I - SECNAV FORM 5512.pdf PDF
1737010dwg3of8VOL1.pdf PDF
1737010spc1of2.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment E - Historical SB Utilization.docx DOCX document
1737010dwg1of8VOL1.pdf PDF
1737010dwg2of8VOL1.pdf PDF
1737010dwg7of8VOL3.pdf PDF
1783999dwg7of9.pdf PDF
Solicitation - N4008526R0020.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment H - P171 Price Proposal Form .pdf PDF
Attachment J - Pass and ID Office Meeting Location.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

STRUCTURAL STEEL:

GENERAL:

DESIGN CRITERIA:

CONSTRUCTION PROCEDURES & SAFETY REQUIREMENTS:

FOUNDATIONS:

CAST-IN-PLACE CONCRETE:

DESIGN CRITERIA (CONT.) FOUNDATIONS (CONT.): CAST-IN-PLACE CONCRETE (CONT.):

VAA MTW CWJ

S-001

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

03/26/2026

Approved by LCDR VINCE DEL GRECO, ROICC with PWD

YORKTOWN, via Email.

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SPECIAL INSPECTION SCHEDULE/ VERIFICATION SPECIAL INSPECTION NOTES:

STRUCTURAL ABBREVIATIONS:

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

LA

N

T

PD

C C

O R

E N

AV

AL

S

TA

TI

O

N N

O R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

S-002

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DOOR COATINGS:

ELECTRICAL BONDING & GROUNDING

LIGHTWEIGHT CONCRETE: PLUMBING MATERIALSMECHANICAL MATERIALS

STEEL DECK:

BLAST DOOR NOTES:

VAA MTW CWJ

AS SHOWN

S-003

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_S

TR

UC

T\ S-

4 G

EN

ER

AL

N

OT

ES

4.d wg L

AY

OU

T

NA

ME

: S

-0

G

EN

ER

AL

N

OT

ES

PL

OT

TE

D:

T ue sd ay , M ar ch

, 2

6 -

1:

pm U

SE

R:

m igu el.

wa lke r

##SITE SPECIFIC DESIGN CRITERA:

SITE ADAPTATION FOUNDATION NOTES:

DESIGNER OF RECORD (DOR) NOTES:

VAA MTW CWJ

AS SHOWN

S-004

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

DOOR TAG

GENERAL PROJECT SYMBOLS

101 WINDOW TYPE TAG SPECIALITY ITEM TAG

PARTITION TYPE

INDICATOR

A1 A-301

---------------------------- A-401 INTERIOR ELEVATION

INDICATOR

EXTERIOR ELEVATION

INDICATOR

A1 A-301

WALL / PARTIAL

BUILDING SECTION

INDICATOR

A1 A-301

BUILDING SECTION

INDICATORA1

A-301

A1

A1

A1

234B

A1

ROOM

101 ROOM IDENTIFIERDETAIL

INDICATOR

A-901 PHOTOGRAPH

INDICATOR

A1

A-501

KEYNOTE INDICATOR1

A1 SCALE: 1/8" = 1'-0"

PLAN TITLE A1A1

A-101

ENLARGED PLAN

SCALE: 1/4" = 1'-0" A1 DETAIL/SECT/ELEV

SCALE: 1/8" = 1'-0"

A1

A-101

POST-INSTALLED ANCHOR NOTES:

03/26/2026

Approved by LCDR VINCE DEL

MAGAZINE 5

F.F.E.=68.71 22'-8" TYP12

1' -6

107' 114'

57'

69'-6"

MAGAZINE 4

F.F.E.=67.61

57'

MAGAZINE 3

F.F.E.=67.90

22'-8" TYP

107' 114'

57' 57'

107' 114'

57'

SCALE: 1" = 30'

OVERALL PLANB1

22'-8" TYP 22'-8" TYP

107' 69'-6"114'

57'

107' 114'

57' 57'

MAGAZINE 2

F.F.E.=69.00

MAGAZINE 1

F.F.E.=70.11

T/

FT

G

.7

T/

FT

G

.7

T/

FT

G

.6

T/

FT

G

.6

T/

FT

G

.9

T/

FT

G

.9

T/

FT

G

.1

T/

FT

G

.1

T/

FT

G

.0

T/

FT

G

.0

2'

2'

PLAN

NORTH

T/

FT

G

.0

38'-5" 114'

2'

16'-1" 15'

1'-4"

T/WALL

EL. 100.90'

T/WALL

EL. 90.46'

A4

15' 16'-1" 22'-5" 114'16'-1"15'

1'-4"

T/WALL

EL. 99.80'

T/WALL

EL. 89.36'

15'16'-1"22'-5"

1'-4"

A4

22'-5" 114'16'-1"15'

1'-4"

T/WALL

EL. 100.09'

T/WALL

EL. 89.65'

15'16'-1"22'-5"

1'-4"

22'-5"

SCALE: 1" = 30'

HEADWALL ELEVATIONA1

114'16'-1"15'

1'-4"

T/WALL

EL. 101.19'

T/WALL

EL. 90.75'

15'16'-1"22'-5"

1'-4"

A4

22'-5"

1'-4"

38'-5"114'

2'

16'-1"15'

1'-4"

T/WALL

EL. 102.30'

T/WALL

EL. 91.86'

15'16'-1"22'-5"

A4

MAGAZINE 5

F.F.E.=68.71

MAGAZINE 4

F.F.E.=67.61

MAGAZINE 3

F.F.E.=67.90

MAGAZINE 2

F.F.E.=69.00

MAGAZINE 1

F.F.E.=70.11

A4

NTS

SECTIONA4

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_S

TR

UC

T\ S-

1-

S

OV

ER

AL

L P

LA

N

- S

IT

E

AD

AP

TE

D

- 2 .5

SL

OP

E

- B

ID

O

PT

IO

N.

dw g

LA

YO

UT

N

AM

E:

S

-0

-S O

VE

RA

LL

P

LA

N

- S

IT

E

AD

AP

TE

D P

LO

TT

ED

: T ue sd ay , M ar ch

, 2

6 -

1:

pm U

SE

R:

m igu el.

wa lke r

SHEET NOTES

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

VAA MTW CWJ

AS SHOWN

S-010-S

DLB

KEY PLAN

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

BRIDGE CRANE AND CANOPY FRAMING PLANA1

0 8' 32'16'

GRAPHIC SCALES

KEYNOTES

VAA MTW CWJ

AS SHOWN

S-102

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010PLAN

NORTH

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

ROOF FRAMING PLANA1

0 8' 32'16'

GRAPHIC SCALES

VAA MTW CWJ

AS SHOWN

S-103

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010PLAN

NORTH

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

ROOF REINFORCING PLANA1

0 8' 32'16'

GRAPHIC SCALES

VAA MTW CWJ

AS SHOWN

S-104

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010PLAN

NORTH

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

0 8' 32'16'

GRAPHIC SCALESDRAINAGE/FLOOR PLANA2

VAA MTW CWJ

AS SHOWN

S-105

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010PLAN

NORTH

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_S

TR

UC

T\ S2

OA

B

UI

LD

IN

G

EL

EV

AT

IO

NS

1A

.dw g

LA

YO

UT

N

AM

E:

S

1A B

UI

LD

IN

G

EL

EV

AT

IO

NS

1A P

LO

TT

ED

: T ue sd ay , M ar ch

, 2

6 -

1:

pm U

SE

R:

m igu el.

wa lke r

GENERAL SHEET NOTESGENERAL SHEET NOTES

A1 S-101

FRONT ELEVATION - MAGAZINE 5C1

A1 S-101

REAR ELEVATION - MAGAZINE 5A1

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

VAA MTW CWJ

AS SHOWN

S201A

DLB

GRAPHIC SCALES

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_S

TR

UC

T\ S2

OB

B

UI

LD

IN

G

EL

EV

AT

IO

NS

1B

.dw g

LA

YO

UT

N

AM

E:

S

1B B

UI

LD

IN

G

EL

EV

AT

IO

NS

1B P

LO

TT

ED

: T ue sd ay , M ar ch

, 2

6 -

1:

pm U

SE

R:

m igu el.

wa lke r

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_S

TR

UC

T\ S2

OB

B

UI

LD

IN

G

EL

EV

AT

IO

NS

1B

.dw g

LA

YO

UT

N

AM

E:

S

1B B

UI

LD

IN

G

EL

EV

AT

IO

NS

1B P

LO

TT

ED

: T ue sd ay , M ar ch

, 2

6 -

1:

pm U

SE

R:

m igu el.

wa lke r

GENERAL SHEET NOTESGENERAL SHEET NOTES

A1 S-101

FRONT ELEVATION - MAGAZINE 4C1

A1 S-101

REAR ELEVATION - MAGAZINE 4A1

VAA MTW CWJ

AS SHOWN

S201B

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

GRAPHIC SCALES

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_S

TR

UC

T\ S2

OC

B

UI

LD

IN

G

EL

EV

AT

IO

NS

1C

.dw g

LA

YO

UT

N

AM

E:

S

1C B

UI

LD

IN

G

EL

EV

AT

IO

NS

1C P

LO

TT

ED

: T ue sd ay , M ar ch

, 2

6 -

1:

pm U

SE

R:

m igu el.

wa lke r

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_S

TR

UC

T\ S2

OC

B

UI

LD

IN

G

EL

EV

AT

IO

NS

1C

.dw g

LA

YO

UT

N

AM

E:

S

1C B

UI

LD

IN

G

EL

EV

AT

IO

NS

1C P

LO

TT

ED

: T ue sd ay , M ar ch

, 2

6 -

1:

pm U

SE

R:

m igu el.

wa lke r

GENERAL SHEET NOTESGENERAL SHEET NOTES

A1 S-101

FRONT ELEVATION - MAGAZINE 3C1

A1 S-101

REAR ELEVATION - MAGAZINE 3A1

VAA MTW CWJ

AS SHOWN

S201C

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

GRAPHIC SCALES

03/26/2026

Approved by LCDR VINCE DEL

VAA MTW CWJ

AS SHOWN

12941978

S201D

DLB

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_S

TR

UC

T\ S2

OD

B

UI

LD

IN

G

EL

EV

AT

IO

NS

1D

(B

ID

O

PT

IO

N)

.dw g

LA

YO

UT

N

AM

E:

S

1O D

BU

ILD

IN

G

EL

EV

AT

IO

NS

1D (B

ID

O

PT

IO

N) P

LO

TT

ED

: T ue sd ay , M ar ch

, 2

6 -

1:

pm U

SE

R:

m igu el.

wa lke r

GENERAL SHEET NOTESGENERAL SHEET NOTES

A1 S-101

FRONT ELEVATION - MAGAZINE 2C1

A1 S-101

REAR ELEVATION - MAGAZINE 2A1

GRAPHIC SCALES

03/26/2026

Approved by LCDR VINCE DEL

VAA MTW CWJ

AS SHOWN

S201E

DLB

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_S

TR

UC

T\ S2

OE

B

UI

LD

IN

G

EL

EV

AT

IO

NS

1 (

BI

D

OP

TI

ON

).d wg L

AY

OU

T

NA

ME

: S

1O

E

BU

ILD

IN

G

EL

EV

AT

IO

NS

1 (

BI

D

OP

TI

ON

PL

OT

TE

D:

T ue sd ay

, M ar ch

, 2

6 - 1:

pm

U

SE

R:

m igu el.

wa lke r

GENERAL SHEET NOTESGENERAL SHEET NOTES

A1 S-101

FRONT ELEVATION - MAGAZINE 1C1

A1 S-101

REAR ELEVATION - MAGAZINE 1A1

GRAPHIC SCALES

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

0 8'4' 16'

GRAPHIC SCALES

GENERAL SHEET NOTES

A1 S-101

SIDE ELEVATIONA1

VAA MTW CWJ

AS SHOWN

S-202

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

A1 S-101

RETAINING WALL ELEVATIONA1

VAA MTW CWJ

AS SHOWN

S-203

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

GRAPHIC SCALES

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

C1 S-201

ELEVATION - DOOR IN CLOSED POSITIONC1

C1 S-201

ELEVATION - DOOR IN OPEN POSITIONA1

VAA MTW CWJ

AS SHOWN

S-204

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

GRAPHIC SCALES

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

8'0 4' 16'

GRAPHIC SCALES

2'0 1' 4'

0 1' 2'6"

1' 2'0 6"

A1 S-205

DETAILC1 A1

S-205

DETAILC2 A1

S-205

LEADING DOOR EDGE JAMB DETAILC3

A1 S-205

SECURITY PILASTER POCKET AT DOOR PLOWC4

A1 S-205

SECTIONA5

A1 S-205

LEADING DOOR JAMB AT TRENCHA4ELEVATION - DOOR BEARING SURFACESA1

VAA MTW CWJ

AS SHOWN

S-205

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

4'0 2' 8'

GRAPHIC SCALES

ELEVATION - HEADWALL, HEADER BEAM, PILASTER REINFORCINGA1

VAA MTW CWJ

AS SHOWN

S-206

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

8'0 4' 16'

GRAPHIC SCALESA1

S-101

SECTIONA1

A1 S-101

SECTIONC1

VAA MTW CWJ

AS SHOWN

S-301

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

4'0 2' 8'

GRAPHIC SCALES

A1 S-101

SECTIONA1

VAA MTW CWJ

AS SHOWN

S-302

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

0 2' 4'1'

GRAPHIC SCALES

C1

S-301

SECTIONA1

A1 S-301

SECTIONC3

A1 S-403

SECTIONA3

VAA MTW CWJ

AS SHOWN

S-303

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

4'0 2' 8'

GRAPHIC SCALES

A1 S-103

BLAST PILASTER REINFORCEMENT SECTIONA1 A1

S-403

RETAINING WALL SECTIONA4

A1 S-403

RETAINING WALL SECTIONC4C1

S-301

REINF. AT MAGAZINE DOOR / TRENCHC1

VAA MTW CWJ

AS SHOWN

S-304

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

C3 JOINT DETAIL

S-201A

C1

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

0 2' 4'1'

GRAPHIC SCALES

2'0 1' 4'

A1 S-101

BOUNDARY ELEMENTS TIE REINFORCING AT CORNERSC1 A1

S-101

BOUNDARY ELEMENTS TIE REINFORCING AT INTERSECTIONSC3

A1 S-305

BRIDGE CRANE CONTINUOUS CORBEL DETAILA3A1

S-305

BRIDGE CRANE CONTINUOUS CORBEL DETAILA1

VAA MTW CWJ

AS SHOWN

S-305

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

0 4' 8'2'

GRAPHIC SCALES

GENERAL SHEET NOTES

A1 S-101

TRENCH LAYOUT PLANA1

A1 S-101

TRENCH COVER LAYOUT PLANC1

VAA MTW CWJ

AS SHOWN

S-401

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

PLAN

NORTH

PLAN

NORTH

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

A1 S-102

ENLARGED CANOPY FRAMING PLAN A1

A1 S-102

ENLARGED DOOR RAIL SUPPORT FRAMING PLANC1

GRAPHIC SCALES

VAA MTW CWJ

AS SHOWN

S-402

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

PLAN

NORTH

PLAN

NORTH

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

A1 S-101

RETAINING WALL FOUNDATION - MECHANICAL ROOMA1

VAA MTW CWJ

AS SHOWN

S-403

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

PLAN

NORTH

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

0 2' 4'1'

GRAPHIC SCALES

2'0 1' 4'

1' 2'0 6"

A3 S-501

DETAILD3

A1 S-502

DETAILB3

A1/C1 S-204

SECTIONA3A1

S-402

DETAILA1

A1 S-502

DETAILD1

A1 S-502

DETAILB1

VAA MTW CWJ

AS SHOWN

S-501

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

14'-0"

(TYP)

16'-11"

VARIES

(TYP)

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

A1 S-502

DETAILD1

A1/C1 S-204

SECTIONC1 A1

S-502

DETAILC2

D1 S-502

SECTIONC4

C1 S-402

DETAILD4

A1 S-502

DETAILA3C1/S-301

C1/S-402

SECTIONA1

VAA MTW CWJ

AS SHOWN

S-502

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

A1 S-206

END PILASTER - THRU HEADER BEAMC1

A1 S-206

HEADER BEAM AT END PILASTERSC4

A1 S-206

END PILASTER - THRU ROOF SLABA1 A1

S-206

SECTIONA4

A1 S-206

HEADER BEAM MIDSPANB4

VAA MTW CWJ

AS SHOWN

S-503

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

2'0 1' 4'

GRAPHIC SCALES

A1 S-206

INFILL WALL AND MIDDLE WALL INTERSECTION DETAILC1 A1

S-206

HEADWALL AND MIDDLE WALL INTERSECTION DETAILC3

A1 S-206

HEADER BEAM AND MIDDLE WALL INTERSECTION DETAILA1 A1

S-206

INFILL WALL FOUNDATION CONNECTION DETAILA3

VAA MTW CWJ

AS SHOWN

S-504

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

2'0 1' 4'

GRAPHIC SCALES

A1 S-206

END PILASTER - ABOVE HEADER BEAM (@HEADWALL)B1 A1

S-206

END PILASTER - BELOW HEADER BEAM B3

A1 S-206

INTERIOR PILASTER BELOW HEADER BEAMA1 A1

S-206

END PILASTER - ABOVE ROOF SLABA3

VAA MTW CWJ

AS SHOWN

S-505

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

2'0 1' 4'

GRAPHIC SCALES

A1 S-206

INTERIOR PILASTER - ABOVE HEADER BEAMC1 A1

S-206

INTERIOR PILASTER - THROUGH ROOF SLABC3

A1 S-206

INTERIOR PILASTER - THROUGH HEADER BEAMA1

VAA MTW CWJ

AS SHOWN

S-506

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

1' 2'0 6"

GRAPHIC SCALES

TRENCH ASSEMBLY AND WELDMENTD1 C1

S-401

TRENCH COVER PLATE AT MAGAZINE DOORD3

C1/S-301 A1/S-401

TRENCH AT MAGAZINE WITH OPEN GATEB1

C1 S-401

TRENCH AT MAGAZINE WITH CLOSED COVERB3

C1 S-401

TRENCH AT RETAINING WALLA1 A1

S-401

TRENCH AT MAGAZINE AT DRAINA3

VAA MTW CWJ

AS SHOWN

S-507

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

C1 S-401

TRENCH COVER PLATE AT RETAINING WALLD1 D3

S-507

DETAIL - TRENCH PLATE MANUAL LIFTD3

A1 S-401

TRENCH AT RETAINING WALL WITH CLOSED COVERB1

A1/C1 S-401

TRENCH AT PILASTER WITHOUT COVERB3

A1 S-401

TRENCH AT RETAINING WALL AT DRAINA1

DOOR ALIGNMENT AT TRENCHA3

VAA MTW CWJ

AS SHOWN

S-508

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

DETAIL - PLATE PLOW ISOMETRIC VIEWC1 A1

S-102

BRIDGE CRANE RAIL STOPC3

A1/C1 S-204

DETAIL - DOOR STOPB1

B1 S-509

SECTION - DOOR STOPA1 B3

S-509

DETAIL - PLATE PLOW SIDE ELEVATIONA3

DETAIL - PLATE PLOW PLANB3

VAA MTW CWJ

AS SHOWN

S-509

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

B3/S-507 B1/S-508

TYPICAL TRENCH COVER ROLLERC1

DETAIL - DOOR ALTERNATIVE DRIVE ARRANGEMENTB1 A1

S-401

DETAIL - TRENCH END PLATEB3

A1 S-401

TRENCH DRAIN BLOCKOUTA1 A1

S-702

DETAIL - DOOR WHEELA3

VAA MTW CWJ

AS SHOWN

S-510

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

SECURITY PILASTER ELEVATION FROM FRONT OF MAGAZINEB1 SECURITY PILASTER ELEVATIONB3

ILD BOLTSWORKS BLOCKOUTA1 SECURITY PILASTER PLANA3

VAA MTW CWJ

AS SHOWN

S-511

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

SECTION - TYP SECURITY PILASTERB1

SECURITY PILASTER REINFORCEMENTC3

DETAIL - TYP SECURITY PILASTER POCKET WELDMENTB3

SECTION - TYP SECURITY PILASTERA3DETAIL - ILD BOLTWORKS SLEEVEA1

VAA MTW CWJ

AS SHOWN

S-512

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

2 BUTTON DOOR CONTROL CAST INTO CONC. PILASTER W/ ACCESS DOORA1 TRENCH COVER PLATE FLIPPING TOOL (SUPPLY TWO FOR EACH MAGAZINE)A4

VAA MTW CWJ

AS SHOWN

S-513

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

TYPICAL MISCELLANEOUS HOUSEKEEPING PAD (INTERIOR)A1

WALL REINFORCEMENT AT CORNERS AND INTERSECTONSB1

DEPTH GAUGE DETAILC3

TYPICAL BOTTOM STEP FOOTING / GRADE BEAMB3

CONSTRUCTION JOINT DETAILA3

REINFORCING SPLICE SCHEDULEC1

REINFORCING SPLICED3

VAA MTW CWJ

AS SHOWN

S-514

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

RECTANGULAR OPNG DETAIL CIRCULAR OPNG DETAIL

CIRCULAR OPNG DETAIL

EXTRA REINFORCING AROUND MECH.

DUCTWORK OPENINGS

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HOOK DIMENSIONSC1

EXTRA REINFORCING AROUND OPENINGSA1 ALUMINUM GUARDRAIL DETAILA3

SEISMIC HOOP CLOSED STIRRUP/ TIE DETAILD4

VAA MTW CWJ

AS SHOWN

S-515

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

EXTRA REINFORCING AROUND MECH. DUCTWORK OPENINGSC2

03/26/2026

Approved by LCDR VINCE DEL

9"

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

DOOR FRAMING ELEVATIONA2

A2 S-701

DOOR FRAMING SECTIONC2

DOOR HARDWARE SCHEDULEA1

DOOR LEGENDC1

VAA MTW CWJ

AS SHOWN

S-701

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

C4 AND WHEEL MOTOR

DETAIL - DOOR WHEEL

B4 DETAIL - DOOR WHEEL

A4 RECEIVER DOOR FILL

DETAIL - ILD BOLT

DOOR INTERIOR PLATE ELEVATIONC1

DOOR EXTERIOR PLATE ELEVATIONA1

VAA MTW CWJ

AS SHOWN

S-702

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GRAPHIC SCALES

A4 BMS BLOCKOUT LOCATIONA1 ELEVATION - TYPICAL CONFIGURATION OF DOOR INFILL A3 BMS BLOCKOUT DETAIL

A5 STIFFENER CONNECTION

EXTERIOR PLATE TO HSS

B2 DETAIL AT BOTTOM OF DOOR B3 DETAIL AT TOP OF DOOR B4 WELD DETAIL AT DOOR EDGE B5 INTERIOR STIFFENERS

WELD DETAIL AT

C1 TOP/ BOTTOM DOOR SECTIONS

DOOR STIFFENER AND INFILL LAYOUT

C3 DOOR STIFFENER AND FILL LAYOUT - MIDDLE DOOR SECTION C5 DOOR TOP LAYOUT

VAA MTW CWJ

AS SHOWN

S-703

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

C2 SECTION C4 SECTION

A2 SECTION A4 AIR INTAKE DETAIL GRAPHIC SCALES

VAA MTW CWJ

AS SHOWN

S-704

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_S

TR

UC

T\ S-

5 V

EN

TI

LA

TO

R

DE

TA

ILS

S

EC

TI

ON

S

AN

D

EL

EV

AT

IO

NS

.dw g

LA

YO

UT

N

AM

E:

V

EN

TI

LA

TO

R

DE

TA

ILS

S

EC

TI

ON

S

AN

D

EL

EV

AT

IO

NS

P

LO

TT

ED

: T ue sd ay , M ar ch

, 2

6 -

1:

pm U

SE

R:

m igu el.

wa lke r

SCALE: 3/4" = 1'-0"B3 ELEVATION AT VENTILATOR

SCALE: 3/4" = 1'-0"B4 SECTION AT VENTILATOR

SCALE: 3/4" = 1'-0"A4 SECTION AT VENTILATOR

SCALE: 3/4" = 1'-0"A3 SECTION AT VENTILATOR

SCALE: 3/4" = 1'-0"A1 SECTION

SCALE: 3/4" = 1'-0"C3 DETAIL AT VENTILATOR

SCALE: 3" = 1'-0"D4 DETAIL

SCALE: 3" = 1'-0"C4 DETAIL

GRAPHIC SCALES

VAA MTW CWJ

AS SHOWN

S-705

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

A3 PIPE THRU MAGAZINE WALL DETAIL A4 HONEYCOMB SECURITY DEVICE DETAIL

B3 PIPE THRU MECHANICAL ROOM WALL DETAIL B4 CONCRETE ENCASED PIPE DETAIL

GRAPHIC SCALES

VAA MTW CWJ

AS SHOWN

S-706

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

A1 DOUBLE BAY TRENCH DRAINAGE ISOMETRIC

VAA MTW CWJ

AS SHOWN

S-707

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

1737010

03/26/2026

Approved by LCDR VINCE DEL

SECTION THROUGH EXTERIOR STAIR A3

EDGE OF RAMP DETAIL C3

TYP DTL AT RAILING D4

DETAIL AT RAMP BOTTOM C4

FDN AND SLAB AT DOCK LEVELER A1

RAMP PLAN B1

RAMP ELEVATION D1

GRAPHIC SCALE

KEYNOTES

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

VAA MTW CWJ

S-708

DLB

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

M

ID

LA

N T

PD

C

C O

R E

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

P-

W

EA

PO

N S

M

AG

AZ

IN

ES

MME/WJW

JWJ

HPN

03/26/2026

Approved by LCDR VINCE DEL

FI

LE

N

AM

E:

K

:\V A\

Yo rkt ow n\M

ILC

ON

\20

_1

_P

1_ W ea po ns _M ag az ine s\B

_D es ign \D

W

GS

MA

GA

ZI

NE

\S he et\

_E

LE

C\

P1

-1

-M

AG

Z- E-

1.d wg L

AY

OU

T

NA

ME

: P

1-

0-

MA

GZ

-E -0

P

LO

TT

ED

: T ue sd ay , M ar ch

, 2

6 -

6:

am U

SE

R:

cl ay ton .ob rie n

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

XX-XXXX

Y X

KVA

SPD

WH

DMP

RTM

OR

SV OR

CPT

3Ø,4W 208/120V

LP100

ATS

OL

7 1/2 HP

GFP

CB

CONDUIT RUN BETWEEN DEVICES CONCEALED IN

NON-ARCHITECTURALLY FINISHED AREAS OR UNDER

FLOOR SLAB. CONDUIT AND CONDUCTOR SIZES MUST

BE THE SAME AS THE HOMERUN FOR THE CIRCUIT.

ELECTRICAL CONNECTION

NO ELECTRICAL CONNECTION

CURRENT TRANSFORMER (CT)

VOLTAGE TRANSFORMER (VT OR PT)

UTILITY WATT-HOUR METER PER UTILITY REQUIREMENTS

SOLENOID VALVE

CONTROL/RELAY COIL; X INDICATES TYPE,

Y INDICATES LOOP NO. WHEN USED

TYPES:

CONTROL POWER TRANSFORMER (CPT)

NORMALLY OPEN CONTACT (N.O.)

NORMALLY CLOSED CONTACT (N.C.)

GROUND

LIGHTNING ARRESTER

DIGITAL METERING PACKAGE

RUN TIME METER

LOW VOLTAGE SURGE PROTECTIVE DEVICE

QUAD-DUPLEX RECEPTACLE, TWO NEMA 5-20R UNDER

COMMON COVER PLATE

X Y

SWITCHBOARD OR PANELBOARD; NAME, VOLTAGE,

PHASE, NUMBER OF WIRES WHEN INDICATED

CONDUIT TAG OR CIRCUIT NUMBER - WIRE AND CONDUIT

SIZE AS SPECIFIED IN CIRCUIT SCHEDULE ON THE

SHEETS

CONDUIT STUBBED OUT AND CAPPED

CIRCUIT CONTINUATION

NON-MOTOR LOAD WITH DESIGN KVA, KW, OR AMP

NON-FUSED SWITCH, CURRENT RATING, AND NUMBER

OF POLES AS NOTED

MCCB - MOLDED CASE

ICCB - INSULATED CASE

LVP - LOW - VOLTAGE POWER

MCP - MOTOR CIRCUIT PROTECTOR

(RATING PER CONNECTED LOAD)

GROUNDING CONDUCTOR

SUBSCRIPTS:

Y

X DUPLEX RECEPTACLE, NEMA 5-20R

GROUND FAULT PROTECTION

CIRCUIT RUN BETWEEN DEVICES EXPOSED IN

NON-ARCHITECTURALLY FINISHED AREAS; CONCEALED

IN ARCHITECTURALLY FINISHED AREAS. CONDUIT AND

CONDUCTOR SIZES MUST BE THE SAME AS THE

HOMERUN FOR THE CIRCUIT.

CONDUIT TURNING DOWN

CONDUIT TURNING UP

OR

3-PHASE, 4-WIRE GROUNDED WYE

CONNECTION

3-PHASE, 3-WIRE DELTA CONNECTION

TRANSFORMER

TRANSFER SWITCH, CURRENT RATING, AND

NUMBER OF POLES AS NOTED

GENERATOR

MOTOR WITH DESIGN HORSEPOWER

(WHEN INDICATED)

DISCONNECT OR SAFETY SWITCH, 30A, 3P, NON-

FUSED UNLESS OTHERWISE NOTED

THERMAL OVERLOAD ELEMENT

FUSIBLE SWITCH, CURRENT RATING, FUSE SIZE, AND

QUANTITY AS NOTED

FUSED CUTOUT, CURRENT RATING, FUSE SIZE,

AND NUMBER OF POLES AS NOTED

FUSE, SIZE, AND NUMBER OF FUSES AS NOTED

OR

SEPARATELY MOUNTED CIRCUIT BREAKER; SEE

ELECTRICAL ONE - LINE DIAGRAM OR SCHEDULE FOR

DESCRIPTION

THERMAL OVERLOAD RELAY CONTACT

LOW - VOLTAGE CIRCUIT BREAKER (CB).

RATINGS AND NO. OF POLES AS SHOWN.

WHEN SPECIFIC TYPE IS REQUIRED, X INDICATES TYPE.

TYPES:

ATS - AUTOMATIC

MTS - MANUAL

CR - CONTROL RELAY

DP - DEFINITE PURPOSE RELAY

LC - LIGHTING CONTACTOR

M - MOTOR STARTER

PC - PHOTO CELL

TC - TIME CLOCK

TR - TIMING RELAY

OR

MOTOR

DISCONNECT OR SAFETY SWITCH WITH AUXILIARY

CONTACTS, 30A, 3P, NON-FUSED UNLESS

OTHERWISE NOTED

G

SPECIAL DEVICE AND/OR CONNECTION AS NOTED

S

PHOTOCELLPC

Y

Y

SUBSCRIPTS:

TOGGLE SWITCH

LIGHTING FIXTURE SUBSCRIPTS:

CEILING/PENDANT MOUNTED LUMINAIRE - FLUORESCENT OR LEDY

WALL MOUNTED LUMINAIRE - COMPACT FLUORESCENT OR LEDYX

X Y

X - INDICATES FIXTURE TYPE PER LIGHTING

FIXTURE SCHEDULE

Y - INDICATES CIRCUIT NUMBER FROM PANELBOARD

z - INDICATES CONTROLLING SWITCH (IF REQUIRED)

X - INDICATES TYPE

NONE - SINGLE POLE

3 - THREE-WAY

4 - FOUR-WAY

M - TOGGLE SWITCH, HORSEPOWER/MOTOR RATED

K - KEY SWITCH

TE - MANUAL MOTOR STARTER WITH THERMAL ELEMENT

P - PILOT LIGHT

L - LIGHTED HANDLE

Y - INDICATES CONTROLLING SWITCH (IF REQUIRED)

WP - WEATHER PROOF

DS - 0-10V DIMMING

OS - DUAL TECH OCCUPANCY SENSOR

X

X

X z z z z

OCCUPANCY SENSOR - CEILING MOUNTEDOS

OS OCCUPANCY SENSOR - WALL MOUNTED

CEILING/PENDANT MOUNTED LUMINAIRE - FLUORESCENT OR LED

(NORMAL/EMERGENCY)

WALL/SURFACE MOUNTED LUMINAIRE - FLUORESCENT OR LED

(NORMAL/EMERGENCY)

GROUND ROD

E

OHE

UNDERGROUND ELECTRICAL DUCT BANK

OVERHEAD SECONDARY CIRCUIT AND CONDUCTORS

HH: HANDHOLE

MH: MANHOLE

XX

GROUND TEST WELL

EE DIRECT BURIED CONDUIT

AIR TERMINAL

GROUND CONNECTION

C UNDERGROUND COMMUNICATIONS CONCRETE ENCASED

DUCT BANK

X

X

LENS COLORS:

PUSH TO TEST INDICATING LIGHT, X INDICATES LENS

COLOR

INDICATING LIGHT, X INDICATES LENS COLOR

NORMALLY CLOSED PUSHBUTTON, MOMENTARY

CONTACT UNLESS OTHERWISE NOTED

NORMALLY OPEN PUSHBUTTON, MOMENTARY

CONTACT UNLESS OTHERWISE NOTED

3 POSITION SELECTOR SWITCH, MAINTAINED CONTACTS; UNLESS

OTHERWISE NOTED, 2-POSITION SIMILAR

OOX

XOO

HAND AUTO

OFF

R - RED

G - GREEN

B - BLUE

Y - YELLOW

W- WHITE

A - AMBER

J

CONTROL PANEL WITH DISCONNECT SWITCH INTEGRAL

OR PROVIDED WITH ASSOCIATED EQUIPMENT

ELECTRICAL EQUIPMENT ENCLOSURE: PANELBOARD,

SWITCHBOARD, MOTOR CONTROL CENTER, CONTROL PANEL,

OR OTHER EQUIPMENT AS INDICATED

JUNCTION OR PULL BOX

CONTROL PANEL INTEGRAL OR PROVIDED WITH

ASSOCIATED EQUIPMENT

PUSHBUTTON

SELECTOR SWITCHSS

T TRANSFORMER

CS CONTROL STATION

480/277V PANELBOARD

208/120V PANELBOARD

GENERAL NOTES:

1. PROJECT DESIGN AND EXECUTION MUST CONFORM TO THE LATEST

VERSIONS OF:

(A) NFPA 70 (NATIONAL ELECTRICAL CODE)

(B) NESC (NATIONAL ELECTRICAL SAFETY CODE)

(C) NFPA 101 (LIFE SAFETY CODE)

(D) NFPA 780 (STANDARD FOR INSTALLATION OF LIGHTNING PROTECTION

SYSTEMS)

(E) NAVSEA OP 5 (AMMUNITION AND EXPLOSIVES SAFETY ASHORE)

(F) APPLICABLE LOCAL, STATE AND FEDERAL CODES.

2. CONTRACTOR MUST COORDINATE FINAL LOCATION OF ELECTRICAL EQUIPMENT AND

COMPONENTS WITH ALL OTHER TRADES PRIOR TO INSTALLATION. THE CONTRACTOR

MUST BE RESPONSIBLE FOR SECURING SPACE REQUIREMENTS FOR ELECTRICAL

EQUIPMENT CLEARANCE AND CORRECT ROUGH-IN LOCATIONS OF ELECTRICAL

CONNECTIONS.

3. DRAWINGS ARE IN GENERAL DIAGRAMMATIC IN NATURE. FIELD ADJUST CONDUIT

AND TRAY ROUTING BASED ON COORDINATION WITH OTHER NEW UTILITIES,

STRUCTURES AND EQUIPMENT. NOT ALL COMPONENTS, CONDUITS, AND EQUIPMENT

ARE SHOWN IN ALL VIEWS. THE CONTRACTOR MUST MAKE USE OF THE ENTIRE

SET OF DRAWINGS, REQUIREMENTS, AND SPECIFICATIONS IN ORDER TO INCLUDE ALL

COMPONENTS NECESSARY TO CONSTRUCT A FULLY OPERATIONAL SYSTEM.

6. ALL EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S

APPROVED, PUBLISHED LITERATURE.

7. ALL UTILITY SERVICES SUCH AS ELECTRIC, TELECOM, SECURITY,INTRUSION

DETECTION SYSTEM, FIRE ALARM SYSTEM MUST BE ROUTED UNDERGROUND AT

MINIMUM OF 50-FEET AWAY FROM BUILDING FOR SERVICE CONNECTION.

8. ALL CONDUITS MUST BE A RIGID GALVANIZED STEEL CONDUIT (RGS) OR

LIQUID-TIGHT, METAL FLEXIBLE CONDUIT. CONDUIT PENETRATIONS THROUGH

CONCRETE MUST BE PVC-COATED RIGID GALVANIZED STEEL CONDUIT (PVC-RGS)

THROUGH THE LENGTH OF THE PENETRATION, WITH 3" TO 6" AT BOTH

PENETRATION ENDS FOR CLEARANCE. CONDUITS PENETRATING UNDERNEATH

FOUNDATION IS PROHIBITED. CONDUIT ELBOW PLACEMENT MUST CONSIDER THIS

CLEARANCE DURING DESIGN AND INSTALLATION.

9. PROVIDE AND INSTALL THW OR THWN INSULATED CONDUCTORS WITH MINIMUM OF

#12 AWG, STRANDED COPPER.

10. ALL NEMA ENCLOSURE RATINGS INDICATED ON DOCUMENTS MAY BE

REVISED AS REQUIRED BY THE ENVIRONMENTAL CONDITIONS DURING SITE

ADAPTATION PROJECTS.

HOME RUN TO PANEL, 2 #12, 1 #12G IN 3/4"C UNLESS

OTHERWISE NOTED

UNDERGROUND CONDUIT

X - INDICATES TYPE

GFCI - GROUND FAULT CIRCUIT INTERRUPTER

WP - WEATHER PROOF

C - CONTROLLED RECEPTACLE, MARKING PER NEC 406.3(E), GREEN Y -

INDICATES CIRCUIT NUMBER FROM PANELBOARD

1. THIS IS A STANDARD ELECTRICAL SYMBOLOGY SHEET. NOT ALL

SYMBOLS MAY BE USED ON THIS PROJECT.

2. SCREENING OR SHADING OF WORK IS USED TO INDICATE EXISTING

COMPONENTS OR TO DE-EMPHASIZE PROPOSED IMPROVEMENTS TO

HIGHLIGHT SELECTED TRADE WORK. REFER TO CONTEXT OF EACH

SHEET FOR USAGE.

x

100AF

80AT

3P

X 20A 3P

LP LIGHTNING PROTECTION CONDUCTOR

A AMPERES OR TRIP AMPERES

AC ALTERNATING CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AIC SYMMETRICAL AMPS INTERRUPTING

CAPACITY

AWG AMERICAN WIRE GAUGE

A/R AS REQUIRED

ARR. ARRESTOR

BLDG BUILDING

BRKT BRACKET

C CONDUIT

CB CIRCUIT BREAKER

CKT CIRCUIT

CL CURRENT LIMITING

CO CONDUIT ONLY

CTL CONTROL

DC DIRECT CURRENT

D.T.C. DATA TERMINAL CABINET

EMCS ENERGY MONITORING AND

CONTROL SYSTEM

FACP FIRE ALARM CONTROL PANEL

FT FOOT, FEET

GFCI GROUND FAULT CIRCUIT

INTERRUPTER, 5MA PERSONNEL

PROTECTION UNLESS OTHERWISE

NOTED.

GND GROUND

HZ HERTZ

IAW IN ACCORDANCE WITH

IG ISOLATED GROUND

IN INCH, INCHES

IR INFRARED

KV KILOVOLTS

KVA KILOVOLT AMPERES

KVAR KILOVOLT AMPS REACTIVE

KWH KILOWATT HOURS

L-L LINE TO LINE

L-N LINE TO NEUTRAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MTD MOUNTED

MTG MOUNTING

NAFSEANAVAL SEA SYSTEMS COMMAND

N.C. NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NOSSA NAVAL ORDNANCE SAFETY &

SECURITY ACTIVITY

ELECTRICAL ABBREVIATIONS

E

LE

C

TR

IC

A

L S

Y M

B O

LS

L E

G E

N D

CPO CPO JDU

NONE

12942018

E-001

WRB

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

LA

N

T

PD

C C

O R

E N

AV

AL

S

TA

TI

O

N N

O R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

W

EA

PO

N S

ST

AT

IO

N

YO

R

KT

O

W N

, V

IR

G

IN

IA

03/26/2026

MME/WJW

JWJ

HPN

1737010

Approved by LCDR VINCE DEL GRECO, ROICC with

PWD YORKTOWN, via Email.

P -1

W

E A

P O

N S

M A

G A

ZI

N

E S

B

ROUTED VIA

CONTACTOR.

RE: C1/E-503

(TYP OF TYPE C)

B

B

(TYP)

DP2-15

10'-0"

DP2-15

10'-0"

DP2-15

10'-0"

DP2-15

10'-0"DP2-15

10'-0"

B

GFI

DP2-4

c c c c c c c A

DP2-7

24'-0" c a a a a a a a a a a a5

LIGHTING CONTACTOR

PANEL 'LCP1' WITH

HOA SWITCH PANEL 'DP1'

SINGLE POINT GROUND BAR 'SPGB'

TO MAIN DISTRIBUTION

PANEL 'MDP-M'

ON HEADWALL, FACING

NORTH RE: C1/E-503

DP1-4

GFI

DP1-4

GFI

B DP1-15

10'-0"

B DP1-15

10'-0"

B DP1-15

10'-0"B DP1-15

10'-0"TO DP1-1,3,5

RE: A1/E-505

BLAST DOOR

LIGHTING CONTACTOR

PANEL 'LCP2' WITH

HOA SWITCH

ON HEADWALL, FACING

NORTH RE: C1/E-503

PANEL 'DP2'

TO MAIN DISTRIBUTION

PANEL 'MDP-M'

WP

WP

C4 E-504

B

DP1-15

10'-0"

GFI

DP1-4

B

DP1-15

10'-0"

GFI DP2-4

B

DP2-15

10'-0"

GFI

DP2-4

A

DP2-7

24'-0"

A

DP2-7

24'-0"

A

DP2-7

24'-0"

A

DP2-7

24'-0"

A

DP2-7

24'-0"

A

DP2-7

24'-0"

A

DP1-13

24'-0"

A

DP1-13

24'-0"

A

DP1-13

24'-0"

A

DP1-13

24'-0"

A

DP1-13

24'-0"

A

DP1-13

24'-0"

A

DP1-13

24'-0"

A

DP1-13

24'-0"

5 BLAST DOOR

BLAST DOOR CONTROL PANEL.

11'-6" A.F.F (TYP)

1 9

A

DP2-9

24'-0"

A

DP2-11

24'-0"

A

DP2-13

24'-0"

A

DP1-11

24'-0"

A

DP1-9

24'-0"

A

DP1-7

24'-0"

CANOPY

(TYP)

TO DP2-1,3,5

RE: A1/E-505

C

14'-6" AFF

DP2-17

C

14'-6" AFF

DP2-17

C

14'-6" AFF

DP2-17

C

14'-6" AFF

DP2-17

D

24'-0" AFF

DP2-19

D

24'-0" AFF

DP2-19

D

24'-0" AFF

DP2-19

C

14'-6" AFF

DP2-17

C

14'-6" AFF

DP1-17

D

24'-0" AFF

DP1-19

C

14'-6" AFF

DP1-17

D

24'-0" AFF

DP1-19

C

14'-6" AFF

DP1-17

D

24'-0" AFF

DP1-19

C

14'-6" AFF

DP1-17

C

14'-6" AFF

DP1-17

d d d b b b

DOOR CONTROL

BUTTON (TYP)

DOOR CONTROL

BUTTON (TYP)

c c a A

DP1-13

24'-0" c A

DP2-7

24'-0" a a a

A

DP1-11

24'-0"

A

DP1-9

24'-0"

A

DP1-7

24'-0" a a a

A

DP1-11

24'-0"

A

DP1-9

24'-0"

A

DP1-7

24'-0" a a a

A

DP1-11

24'-0"

A

DP1-9

24'-0"

A

DP1-7

24'-0" a a a

A

DP1-11

24'-0"

A

DP1-9

24'-0"

A

DP1-7

24'-0" a a a

A

DP1-11

24'-0"

A

DP1-9

24'-0"

A

DP1-7

24'-0" a a a

A

DP1-11

24'-0"

A

DP1-9

24'-0"

A

DP1-7

24'-0" a a a

A

DP1-11

24'-0"

A

DP1-9

24'-0"

A

DP1-7

24'-0" a a a

A

DP1-11

24'-0"

A

DP1-9

24'-0"

A

DP1-7

24'-0" c A

DP2-7

24'-0" c

A

DP2-9

24'-0"

A

DP2-11

24'-0"

A

DP2-13

24'-0" c c c

A

DP2-9

24'-0"

A

DP2-11

24'-0"

A

DP2-13

24'-0" c c c

A

DP2-9

24'-0"

A

DP2-11

24'-0"

A

DP2-13

24'-0" c c c

A

DP2-9

24'-0"

A

DP2-11

24'-0"

A

DP2-13

24'-0" c c c

A

DP2-9

24'-0"

A

DP2-11

24'-0"

A

DP2-13

24'-0" c c c

A

DP2-9

24'-0"

A

DP2-11

24'-0"

A

DP2-13

24'-0" c c c

A

DP2-9

24'-0"

A

DP2-11

24'-0"

A

DP2-13

24'-0" c c c

A

DP2-9

24'-0"

A

DP2-1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .