Attachment_J-6_Bldg_53A__Air_Handlers_ _2nd_Floor_Offices__Stuck_Specs.pdf

PDF 886 KB Posted

Attached to
Building 14 and Building 53A Renovation
Solicitation number
15-223-SOL-00107
Issued by

About this file

Attachment J-6 (1 of 2)

View the file

Other files

File Type Posted
amendment_7.pdf PDF
Amendment_6.pdf PDF
Attachment_1_23_08_00_-_Commissioning_Of_HVAC_Systems_bldg_14.pdf PDF
Attachment_2_23_08_00_-_Commissioning_Of_HVAC_Systems_53A.pdf PDF
amendment_5.pdf PDF
Attachment_1_site_visit_list.pdf PDF
Attachment_3-_architectural_revisions.pdf PDF
Attachment_2-_Revised_drawing_MH101_in_attachment_J-3_of_solicitation.pdf PDF
amendment_4.pdf PDF
Attachment_J-10.pdf PDF
Amendment_3.pdf PDF
Attachment_1.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Attachment_J-3_(3_of_3).pdf PDF
Attachment_J-4_Bldg_53A__Renovate_Animal_Rms__Labs__Specs.pdf PDF
Attachment_J-1_(2_of_4).pdf PDF
Attachment_J-10_FDA_Form_3391.pdf PDF
Attachment_J-1_(1_of_4).pdf PDF
Attachment_J-12_SAMPLE_CLIENT__LETTER.doc DOC document
Attachment_J-5_(_2_of_3)_Building_53A_Replace_Air_Handlers_ _2nd_Floor_Offices.pdf PDF
Attachment_J-5_(_3_of_3)_Building_53A_Replace_Air_Handlers_ _2nd_Floor_Offices.pdf PDF
Attachment_J-5_(_1_of_3)_Building_53A_Replace_Air_Handlers_ _2nd_Floor_Offices.pdf PDF
Attachment_J-8_bldg_53A_chiller_2_replacement.pdf PDF
Attachment_J-3_(1_of_3).pdf PDF
Attachment_J-3_(2_of_3).pdf PDF
Attachment_J-7_Building_53_Chiller_Replacement.pdf PDF
Attachment_J-1_(3_of_4).pdf PDF
Attachment_J-1_(4_of_4).pdf PDF
Attachment_J-11_FDA_Form_3398.pdf PDF
Attachment_J-2_Bldg_14_-_Renovate_Labs_-_Specs.pdf PDF
Attachment_J-9_Wage_Decision.pdf PDF
Attachment_J-6_Bldg_53A__Air_Handlers_ _2nd_Floor_Offices__TME_Specs.pdf PDF
15-223-SOL-00107.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual

National Center for Toxicological Research Building 53A - 2nd Floor

2015 HVAC Redesign & Architectural Improvements Jefferson, Arkansas

Comm. No. 2-3877-14

June 1, 2015

100% FINAL DESIGN

1308 MAIN STREET

LITTLE ROCK, AR 72202

(501) 378-0059 Phone

(501) 378-0415 Fax www.stuckarch.com http://www.stuckarch.com/�

Stuck Associates Bldg. 53A 2nd Floor June 1, 2015 Table of Contents HVAC Redesign & Arch. Improvements Comm. No. 2-3877-14 NCTR Page 1 of 2 Jefferson, Arkansas

TECHNICAL SPECIFICATIONS

TABLE OF CONTENTS

00005 Certifications 00010 Table of Contents (TOC)

DIVISION 01 – GENERAL REQUIREMENTS

01100 Summary 01300 Administrative Requirements 01400 Quality Requirements 01600 Product Requirements 01616 Volatile Organic Compound (VOC) Content Restrictions 01700 Execution Requirements 01734 Indoor Air Quality 01780 Close-Out Submittals 01820 Demonstration and Training

DIVISION 02 – SITE CONSTRUCTION

02225 Demolition

DIVISION 03 – CONCRETE

03300 Cast in Place Concrete 03505 Self-Leveling Underlayment

DIVISION 04 – MASONRY

04810 Unit Masonry Assemblies

DIVISION 05 – METALS

05120 Structural Steel Framing

DIVISION 06 – WOOD AND PLASTICS

06100 Rough Carpentry

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07920 Joint Sealants

DIVISION 08 – DOOR AND WINDOWS

08110 Steel Doors and Frames 08121 – Hollow Metal Frames 08710 Door Hardware

DIVISION 09 – FINISHES

09260 Gypsum Board Assemblies 09511 Suspended Acoustical Ceilings 09650 Resilient Flooring 09670 Vinyl Flake Flooring 09681 Tile Carpeting 09900 Paints and Coatings 09960 Vinyl Flake Wall Coating

DIVISION 10 – SPECIALTIES

10211 Plastic Toilet Compartments

DIVISION 11 – EQUIPMENT - NOT USED

DIVISION 12 – FURNISHINGS

Stuck Associates Bldg. 53A 2nd Floor June 1, 2015 Table of Contents HVAC Redesign & Arch. Improvements Comm. No. 2-3877-14 NCTR Page 2 of 2 Jefferson, Arkansas

12211 Horizontal Metal Blinds

DIVISION 13 – SPECIAL CONSTRUCTION - NOT USED

DIVISION 14 – CONVEYING SYSTEMS – NOT USED

DIVISION 15 – MECHANICAL

15000 Supplementary Mechanical General Conditions 15060 Pipe and Pipe Fittings 15073 Vibration and Seismic Control for HVAC Components 15090 Supports, Anchors and Seals 15100 Valves and Specialties 15250 Mechanical Systems Insulation 15400 Plumbing Equipment 15500 Fire Protection System 15600 HVAC Equipment 15800 Air Distribution 15899 Water Treatment 15900 Automatic Temperature Controls 15990 Testing, Adjusting, and Balancing

DIVISION 16 - ELECTRICAL

16010 Basic Electrical Requirements 16047 Electrical Demolition 16055 Electrical Identification 16110 Raceways 16120 Wires and Cables 16135 Electrical Boxes and Fittings 16140 Wiring Devices 16160 Panelboards 16170 Motor and Circuit Disconnects 16180 Overcurrent Protective Devices 16190 Supporting Devices 16452 Grounding and Ground-Fault Protection 16510 Interior Building Lighting

END OF TABLE OF CONTENTS

Stuck Associates 00002 Bldg. 53A 2nd Floor June 1, 2015 Architectural Certification HVAC Redesign & Arch. Improvements Comm. No. 2-3877-14 NCTR Page 1 of 1 Jefferson, Arkansas

I hereby certify that the architectural portions of the work of these plans and specifications, except as otherwise indicated by other registered professionals, have been prepared by me or under my direct supervision.

J. Rodgers Critz, AIA Date

Stuck Associates 1308 South Main Little Rock, Arkansas 72201

June 1, 2015

Stuck Associates Architects 01100 Bldg. 53A 2nd Floor June 1, 2015 SUMMARY HVAC Redesign & Arch. Improvements Comm. No. 2-3877-14 NCTR Page 1 of 3 Jefferson, Arkansas

SECTION 01100

SUMMARY

PART 1 GENERAL

1.01 PROJECT

A. Project Name: Bldg. 53A 2nd Floor HVAC Redesign and Architectural Improvements .

B. Owner's Name: National Center for Toxicological Research.

1.02 CONTRACT DESCRIPTION

A. Contract Type: A single prime contract based on a Stipulated Price.

1.03 WORK BY OWNER

A. Items noted NIC (Not in Contract) will be supplied and installed by National Center for Toxicological Research before Substantial Completion.

B. National Center for Toxicological Research will supply the following for installation by Contractor:

1.04 OWNER OCCUPANCY

A. National Center for Toxicological Research intends to continue to occupy adjacent portions of the existing building during the entire construction period.

B. National Center for Toxicological Research intends to occupy the Project upon Substantial Completion.

C. Cooperate with National Center for Toxicological Research to minimize conflict and to facilitate National Center for Toxicological Research's operations.

D. Schedule the Work to accommodate National Center for Toxicological Research occupancy.

1.05 CONTRACTOR USE OF SITE AND PREMISES

A. Conform to the following "Procedure for Attaining Clearance to the Nonhuman Primate Facility"

B. Construction Operations: Limited to areas noted on Drawings.

C. Arrange use of site and premises to allow:

1. National Center for Toxicological Research occupancy.

2. Work by National Center for Toxicological Research.

D. Provide access to and from site as required by law and by National Center for Toxicological Research:

1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.

2. Do not obstruct roadways, sidewalks, or other public ways without permit.

E. Utility Outages and Shutdown:

1. Do not disrupt or shut down life safety systems, including but not limited to fire sprinklers and fire alarm system, without 14 days notice to National Center for Toxicological Research and authorities having jurisdiction.

2. Prevent accidental disruption of utility services to other facilities.

Comm. No. 2-3877-14 NCTR Page 2 of 3 Jefferson, Arkansas

1.06 WORK SEQUENCE

A. The general scope of MEP work includes the removal and replacement of the existing HVAC equipment and systems serving Building 53A with associated electrical work and structural steel framing to support the new equipment on the roof. The Building will be partially or fully occupied during construction and as a result, the equipment and air systems will be required to be operational.

1. The project was divided into Four (4) Phases to minimize downtime.

2. In addition to Construction Phasing, Five (5) Bid Options are shown to be priced as alternates.

Phase 1:

Consists of revising existing conditions and installing much of the major equipment in the three Mechanical Rooms and roof, stopping short of connections to existing.

1. Selective demolition and offsetting of utilities in the Second floor Mechanical Air Handling Room and equipment on the roof

2. Install new steam piping and electrical variable frequency drive (VFD) work in Bldg. 53 Main Mechanical room.

3. Install new heat recovery system components and electrical VFD work in the Second Floor Exhaust Mechanical Room

4. Install the new air handling equipment (three units and the exhaust air handler), ductwork, piping, structural steel , and electrical work on the roof.

5. Install new duct connections to existing in the perimeter Offices.

Phase 1 – Option #1:

1. Provide an alternate bid price to provide and install a steam-to-steam type humidifier in AHU-53A-1A in lieu of a direct injection type steam humidifier.

Phase 2:

Consists of making the new HVAC duct connections to existing.

1. Selective demolition of supply ducts in the Second Floor Mechanical Air Handling Room.

2. Selective demolition of exhaust ducts/plenum in the Second floor Exhaust Mechanical Room.

3. Install the new supply air plenum through the roof and connecting to the installed Phase 1 supply ductwork on the roof.

a. The extent of downtime for the owner shall be no more than 12 consecutive hours for this task.

4. Install the new offset section of exhaust air ductwork in the Exhaust Mechanical Room connecting the existing first and second floor ducts to the exhaust duct through the roof.

a. The extent of downtime for the owner shall be no more than 12 consecutive hours for this task. (This work is not required to be concurrent with the supply side downtime).

5. New supply and return air duct roof penetrations from AHU-53A-3.

Phase 3:

Consists of demolishing the existing mechanical equipment and the renovation of the one Mechanical Room.

1. Demolition of the existing air handling unit, blower coil unit, ductwork, piping, controls, electrical and outside air intake louver in the Second Floor Mechanical Air Handling Room.

CLinen Polygon

CLinen Polygon

CLinen Typewritten Text

SEE DRAWINGS FOR PHASING. THERE ARE NO OPTIONS IN THIS PORTION OF THE CONTRACT

Comm. No. 2-3877-14 NCTR Page 3 of 3 Jefferson, Arkansas

2. Demolition of the existing exhaust air handling unit, ductwork, piping, electrical and controls in the Second floor Exhaust Mechanical Room

3. New HVAC and electrical systems for the Freezer room and existing Exhaust Mechanical room.

Phase 4:

Consists of full evacuation of the perimeter Offices and the demolition and replacement of the existing HVAC air distribution system.

1. Relocate the new VFD drives installed in Phase 1.

a. The extent of downtime for the owner shall be no more than 12 consecutive hours

Phase 4 – Option #2:

1. Provide an alternate bid price to provide and install a return air plenum system in lieu of the fully ducted return air system.

Phase 4 – Option #3:

1. Provide an alternate bid price to provide and install a Variable Air Volume (VAV) diffuser system with controls and the combination partially ducted and plenum return.

Phase 4 – Option #4:

1. Provide an alternate bid price to provide and install a sprinkler line above the perimeter Office ceilings.

Phase 4 – Option #5:

1. Provide an alternate bid price to renovate the existing Toilet Rooms and provide a new Janitor’s Closet.

B. Contractor to provide a detailed schedule showing starting and completion dates of all phases and the major items of work in each phase.

C. Coordinate construction schedule and operations with National Center for Toxicological Research.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION

CLinen Polygon

CLinen Typewritten Text

SEE DRAWINGS FOR PHASING. THERE ARE NO OPTIONS IN THIS PORTION OF THE CONTRACT

Stuck Associates Architects 01300 Bldg. 53A 2nd Floor June 1, 2015 ADMINISTRATIVE REQUIREMENTS HVAC Redesign & Arch. Improvements Comm. No. 2-3877-14 NCTR Page 1 of 4 Jefferson, Arkansas

SECTION 01300

ADMINISTRATIVE REQUIREMENTS

1.01 SECTION INCLUDES

A. Preconstruction meeting.

B. Progress meetings.

C. Construction progress schedule.

D. Coordination drawings.

E. Submittals for review, information, and project closeout.

F. Number of copies of submittals.

G. Submittal procedures.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 PRECONSTRUCTION MEETING

A. National Center for Toxicological Research will schedule a meeting after Notice of Award.

B. Attendance Required:

1. National Center for Toxicological Research.

2. Contracting Officer.

3. Contractor.

C. Agenda:

1. Execution of National Center for Toxicological Research-Contractor Agreement.

2. Submission of executed bonds and insurance certificates.

3. Distribution of Contract Documents.

4. Submission of list of Subcontractors, list of Products, schedule of values, and progress schedule.

5. Designation of personnel representing the parties to Contract, and Contracting Officer.

6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.

7. Scheduling.

D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Contracting Officer, National Center for Toxicological Research, participants, and those affected by decisions made.

3.02 PROGRESS MEETINGS

A. Schedule and administer meetings throughout progress of the Work at maximum monthly intervals.

B. Make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.

C. Attendance Required: Job superintendent, major Subcontractors and suppliers, National Center for Toxicological Research, Contracting Officer, as appropriate to agenda topics for each meeting.

D. Agenda:

1. Review minutes of previous meetings.

Comm. No. 2-3877-14 NCTR Page 2 of 4 Jefferson, Arkansas

2. Review of Work progress.

3. Field observations, problems, and decisions.

4. Identification of problems that impede, or will impede, planned progress.

5. Review of submittals schedule and status of submittals.

6. Review of off-site fabrication and delivery schedules.

7. Maintenance of progress schedule.

8. Corrective measures to regain projected schedules.

9. Planned progress during succeeding work period.

10. Coordination of projected progress.

11. Maintenance of quality and work standards.

12. Effect of proposed changes on progress schedule and coordination.

13. Other business relating to Work.

E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Contracting Officer, National Center for Toxicological Research, participants, and those affected by decisions made.

3.03 CONSTRUCTION PROGRESS SCHEDULE

A. Within 10 days after date of the Agreement, submit preliminary schedule defining planned operations for the first 60 days of Work, with a general outline for remainder of Work.

B. If preliminary schedule requires revision after review, submit revised schedule within 10 days.

C. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.

1. Include written certification that major contractors have reviewed and accepted proposed schedule.

D. Within 10 days after joint review, submit complete schedule.

E. Submit updated schedule with each Application for Payment.

F. Submit updated schedule with each Application for Payment.

3.04 COORDINATION DRAWINGS

A. Review drawings prior to submission to Contracting Officer.

3.05 SUBMITTALS FOR REVIEW

A. When the following are specified in individual sections, submit them for review:

1. Product data.

2. Shop drawings.

3. Samples for selection.

4. Samples for verification.

B. Submit to Contracting Officer for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.

C. Samples will be reviewed only for aesthetic, color, or finish selection.

D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01780 - CLOSEOUT

SUBMITTALS.

3.06 SUBMITTALS FOR INFORMATION

A. When the following are specified in individual sections, submit them for information:

1. Design data.

2. Certificates.

3. Test reports.

Comm. No. 2-3877-14 NCTR Page 3 of 4 Jefferson, Arkansas

4. Inspection reports.

5. Manufacturer's instructions.

6. Manufacturer's field reports.

7. Other types indicated.

B. Submit for Contracting Officer's knowledge as contract administrator or for National Center for Toxicological Research. No action will be taken.

3.07 SUBMITTALS FOR PROJECT CLOSEOUT

A. When the following are specified in individual sections, submit them at project closeout:

1. Project record documents.

2. Operation and maintenance data.

3. Warranties.

4. Bonds.

5. Other types as indicated.

B. Submit for National Center for Toxicological Research's benefit during and after project completion.

3.08 NUMBER OF COPIES OF SUBMITTALS

A. Documents for Review:

1. Small Size Sheets, Not Larger Than 8-1/2 x 11 inches (215 x 280 mm): Submit the number of copies that Contractor requires, plus two copies that will be retained by Contracting Officer.

B. Documents for Information: Submit two copies.

C. Documents for Project Closeout: Make one reproduction of submittal originally reviewed.

Submit one extra of submittals for information.

D. Samples: Submit the number specified in individual specification sections; one of which will be retained by Contracting Officer.

1. After review, produce duplicates.

2. Retained samples will not be returned to Contractor unless specifically so stated.

E. O & M Manuals: Submit four (4) copies.

3.09 SUBMITTAL PROCEDURES

A. Transmit each submittal with approved form.

B. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.

C. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number, and specification section number, as appropriate on each copy.

D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents.

E. Schedule submittals to expedite the Project, and coordinate submission of related items.

F. For each submittal for review, allow 15 days excluding delivery time to and from the Contractor.

G. Identify variations from Contract Documents and Product or system limitations that may be detrimental to successful performance of the completed Work.

H. Provide space for Contractor and Contracting Officer review stamps.

I. When revised for resubmission, identify all changes made since previous submission.

Comm. No. 2-3877-14 NCTR Page 4 of 4 Jefferson, Arkansas

J. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.

K. Submittals not requested will not be recognized or processed.

END OF SECTION

Stuck Associates Architects 01400 Bldg. 53A 2nd Floor June 1, 2015 QUALITY REQUIREMENTS HVAC Redesign & Arch. Improvements Comm. No. 2-3877-14 NCTR Page 1 of 4 Jefferson, Arkansas

SECTION 01400

QUALITY REQUIREMENTS

1.01 SECTION INCLUDES

A. References and standards.

B. Mock-ups.

C. Control of installation.

D. Testing and inspection services.

E. Manufacturers' field services.

1.02 SUBMITTALS

A. Testing Agency Qualifications:

1. Prior to start of Work, submit agency name, address, and telephone number, and names of full time registered Engineer and responsible officer.

2. Submit copy of report of laboratory facilities inspection made by NIST Construction

Materials Reference Laboratory during most recent inspection, with memorandum of remedies of any deficiencies reported by the inspection.

B. Test Reports: After each test/inspection, promptly submit two copies of report to Contracting Officer and to Contractor.

1. Include:

a. Date issued.

b. Project title and number.

c. Name of inspector.

d. Date and time of sampling or inspection.

e. Identification of product and specifications section.

f. Location in the Project.

g. Type of test/inspection.

h. Date of test/inspection.

i. Results of test/inspection.

j. Conformance with Contract Documents.

k. When requested by Contracting Officer, provide interpretation of results.

2. Test report submittals are for Contracting Officer's knowledge as contract administrator for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents, or for National Center for Toxicological Research's information.

C. Certificates: When specified in individual specification sections, submit certification by the manufacturer and Contractor or installation/application subcontractor to Contracting Officer, in quantities specified for Product Data.

1. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

1.03 REFERENCES AND STANDARDS

A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

Page 2 of 4 Jefferson, Arkansas

B. Conform to reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.

C. Obtain copies of standards where required by product specification sections.

D. Maintain copy at project site during submittals, planning, and progress of the specific work, until Substantial Completion.

E. Should specified reference standards conflict with Contract Documents, request clarification from Contracting Officer before proceeding.

F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Contracting Officer shall be altered from the Contract Documents by mention or inference otherwise in any reference document.

1.04 TESTING AND INSPECTION AGENCIES

A. Contractor shall employ and pay for services of an independent testing agency to perform other specified testing.

B. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.

C. Contractor Employed Agency:

1. Laboratory: Authorized to operate in Jefferson, Arkansas.

2. Testing Equipment: Calibrated at reasonable intervals either by NIST or using an NIST established Measurement Assurance Program, under a laboratory measurement quality assurance program.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Contracting Officer before proceeding.

D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Have Work performed by persons qualified to produce required and specified quality.

F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.

G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.

3.02 MOCK-UPS

A. Tests will be performed under provisions identified in this section and identified in the respective product specification sections.

B. Assemble and erect specified items with specified attachment and anchorage devices, flashings, seals, and finishes.

Comm. No. 2-3877-14 NCTR Page 3 of 4 Jefferson, Arkansas

C. Accepted mock-ups shall be a comparison standard for the remaining Work.

D. Where mock-up has been accepted by Contracting Officer and is specified in product specification sections to be removed, remove mock-up and clear area when directed to do so.

3.03 TESTING AND INSPECTION

A. Testing Agency Duties:

1. Provide qualified personnel at site. Cooperate with Contracting Officer and Contractor in performance of services.

2. Perform specified sampling and testing of products in accordance with specified standards.

3. Ascertain compliance of materials and mixes with requirements of Contract Documents.

4. Promptly notify Contracting Officer and Contractor of observed irregularities or non-conformance of Work or products.

5. Perform additional tests and inspections required by Contracting Officer.

6. Submit reports of all tests/inspections specified.

B. Limits on Testing/Inspection Agency Authority:

1. Agency may not release, revoke, alter, or enlarge on requirements of Contract Documents.

2. Agency may not approve or accept any portion of the Work.

3. Agency may not assume any duties of Contractor.

4. Agency has no authority to stop the Work.

C. Contractor Responsibilities:

1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs.

2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities.

3. Provide incidental labor and facilities:

a. To provide access to Work to be tested/inspected.

b. To obtain and handle samples at the site or at source of Products to be tested/inspected.

c. To facilitate tests/inspections.

d. To provide storage and curing of test samples.

4. Notify Contracting Officer and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.

5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.

6. Arrange with National Center for Toxicological Research's agency and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.

D. Re-testing required because of non-conformance to specified requirements shall be performed by the same agency on instructions by Contracting Officer.

E. Re-testing required because of non-conformance to specified requirements shall be paid for by Contractor.

3.04 MANUFACTURERS' FIELD SERVICES

A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and balance of equipment as applicable, and to initiate instructions when necessary.

B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.

3.05 DEFECT ASSESSMENT

A. Replace Work or portions of the Work not conforming to specified requirements.

Comm. No. 2-3877-14 NCTR Page 4 of 4 Jefferson, Arkansas

B. If, in the opinion of Contracting Officer, it is not practical to remove and replace the Work, Contracting Officer will direct an appropriate remedy or adjust payment.

Stuck Associates Architects 01600 Bldg. 53A 2nd Floor June 1, 2015 PRODUCT REQUIREMENTS HVAC Redesign & Arch. Improvements Comm. No. 2-3877-14 NCTR Page 1 of 5 Jefferson, Arkansas

SECTION 01600

PRODUCT REQUIREMENTS

1.01 SECTION INCLUDES

A. LEED-related product requirements.

B. Re-use of existing products.

C. Transportation, handling, storage and protection.

D. Product option requirements.

E. Substitution limitations and procedures.

F. Procedures for National Center for Toxicological Research-supplied products.

G. Spare parts and maintenance materials.

1.02 SUBMITTALS

A. Proposed Products List: Submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.

1. Submit within 15 days after date of Agreement.

2. For products specified only by reference standards, list applicable reference standards.

B. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

C. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

D. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.

E. LEED Submittals: Use forms provided in Sections 01357-01363.

PART 2 PRODUCTS

2.01 EXISTING PRODUCTS

A. Do not use materials and equipment removed from existing premises unless specifically required or permitted by the Contract Documents.

B. Existing materials and equipment indicated to be removed, but not to be re-used, relocated, reinstalled, delivered to the National Center for Toxicological Research, or otherwise indicated as to remain the property of the National Center for Toxicological Research, become the property of the Contractor; remove from site.

C. Reused Products: Reused products include materials and equipment previously used in this or other construction, salvaged and refurbished as specified.

D. Overall Project Requirement: Use reused products for at least 5 percent of all products used on project.

Page 2 of 5 Jefferson, Arkansas

1. This provision is applicable to LEED Credits MR 3.1 and 3.2; show quantity on LEED report.

E. LEED Submittals: State cost of each reused product, quantity installed, and total cost of reused products.

2.02 NEW PRODUCTS

A. Provide new products unless specifically required or permitted by the Contract Documents.

B. Do not use products having any of the following characteristics:

C. Regionally-Sourced Products:

1. Overall Project Requirement: Provide materials amounting to a minimum of 10 percent of the total value of all materials (excluding plumbing, HVAC, electrical, elevators, and other equipment) that have been extracted, harvested, or recovered, as well as manufactured, within a radius of 500 miles (535 km) from the project site.

a. This provision is applicable to LEED Credit MR 5.1; show quantity on LEED report.

2. Specific Product Categories: Provide regionally-sourced products as specified elsewhere.

3. LEED Submittals: Indicate location of manufacture; in all cases indicate location of final assembly; for harvested products, indicate location of harvest; for extracted (i.e. mined) products, indicate location of extraction; for products involving multiple manufacturing steps, indicate all locations of manufacture or assembly; provide manufacturer or supplier certification of location information.

D. Products with Recycled Content:

1. Overall Project Requirement: Provide products with recycled content such that the sum of post-consumer recycled content plus one-half of the post-industrial recycled content constitutes at least 10 percent (2 points) of the total value of all products installed, except mechanical and electrical components.

a. This provision is applicable to LEED Credit MR 4; show quantity and calculations on

LEED report.

2. Specific Product Categories: Provide recycled content as specified elsewhere.

3. Calculations: Where information about recycled content is required to be submitted:

a. Determine percentage of post-consumer and post-industrial content separately, using the guidelines contained in 16 CFR 260.7(e).

b. Previously used, reused, refurbished, and salvaged products are not considered recycled.

c. Wood fabricated from timber abandoned in transit to original mill is considered reused, not recycled.

d. Determine percentage of recycled content of any item by dividing the weight of recycled content in the item by the total weight of all material in the item.

e. Determine value of recycled content of each item separately, by multiplying the content percentage by the value of the item.

4. LEED Submittals: State unit cost, post-consumer and post-industrial content percentages, quantity installed, total material cost, and total recycled content value; attach evidence of contents from either manufacturer or an independent agency.

E. Sustainably Harvested Wood:

1. Definition: Wood-based materials include but are not limited to structural framing, dimension lumber, flooring, wood doors, finishes, and furnishings that are permanently installed in the project. Wood and wood-based products not permanently installed in the project are not included in the definition.

2. Overall Project Requirement: Provide a minimum of 50 percent of all wood-based materials made of sustainably harvested wood.

Page 3 of 5 Jefferson, Arkansas

a. This provision is applicable to LEED Credit MR 7; show quantity on LEED report and submit certificates.

3. Specific Wood-Based Fabrications: Fabricate of sustainably harvested wood when so specified elsewhere.

4. Certification: Provide wood certified or labeled by an organization accredited by one of the following:

a. The Forest Stewardship Council, The Principles for Natural Forest Management; for

Canada visit http://www.fsccanada.org, for the USA visit http://www.fscus.org.

5. LEED Submittals: State unit cost of each wood-based item, quantity installed, quantity certified as sustainably harvested, total wood-based material cost, and total sustainably harvested value; provide letter of certification signed by supplier of each item, indicating compliance with the specified requirements and identifying the certifying organization.

a. Include the certifying organization's certification numbers for each certified product, itemized on a line-item basis.

b. Attach copies of invoices bearing the certifying organization's certification numbers.

F. Adhesives and Joint Sealants:

1. Definition: This provision applies to gunnable, trowelable, and liquid-applied adhesives, sealants, and sealant primers used anywhere on the interior of the building inside the weather barrier, including duct sealers.

2. Provide only products having lower volatile organic compound (VOC) content than required by South Coast Air Quality Management District Rule No.1168.

a. This provision is applicable to LEED Credit EQ 4.1; submit LEED Prohibited Content

Installer Certification Forms.

b. Require each installer to certify compliance and submit product data showing product content.

3. Specific Product Categories: Comply with limitations specified elsewhere.

G. Aerosol Adhesives:

1. Provide only products having lower volatile organic compound (VOC) content than required by GreenSeal GS-36.

a. This provision is applicable to LEED Credit EQ 4.1; submit LEED Prohibited Content

Installer Certification Forms.

b. Require each installer to certify compliance and submit product data showing product content.

2. Specific Product Categories: Comply with limitations specified elsewhere.

2.03 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions:

Submit a request for substitution for any manufacturer not named.

2.04 SPARE PARTS AND MAINTENANCE PRODUCTS

A. Provide spare parts, maintenance, and extra products of types and in quantities specified in individual specification sections.

B. Deliver to Project site; obtain receipt prior to final payment.

PART 3 EXECUTION

3.01 SUBSTITUTION PROCEDURES

Comm. No. 2-3877-14 NCTR Page 4 of 5 Jefferson, Arkansas

A. Acceptability of substitutions will not be considered during bidding period.

B. Contracting Officer will consider requests for substitutions only within 15 days after date of Agreement.

C. Substitutions will not be considered when a product becomes unavailable through no fault of the Contractor.

D. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents.

E. A request for substitution constitutes a representation that the submitter:

1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.

2. Will provide the same warranty for the substitution as for the specified product.

3. Will coordinate installation and make changes to other Work that may be required for the

Work to be complete with no additional cost to National Center for Toxicological Research.

4. Waives claims for additional costs or time extension that may subsequently become apparent.

F. Substitution Submittal Procedure:

1. Submit three copies of request for substitution for consideration. Limit each request to one proposed substitution.

2. Submit shop drawings, product data, and certified test results attesting to the proposed product equivalence. Burden of proof is on proposer.

3. The Contracting Officer will notify Contractor in writing of decision to accept or reject request.

3.02 OWNER-SUPPLIED PRODUCTS

A. National Center for Toxicological Research's Responsibilities:

1. Arrange for and deliver National Center for Toxicological Research reviewed shop drawings, product data, and samples, to Contractor.

2. Arrange and pay for product delivery to site.

3. On delivery, inspect products jointly with Contractor.

4. Submit claims for transportation damage and replace damaged, defective, or deficient items.

5. Arrange for manufacturers' warranties, inspections, and service.

B. Contractor's Responsibilities:

1. Review National Center for Toxicological Research reviewed shop drawings, product data, and samples.

2. Receive and unload products at site; inspect for completeness or damage jointly with

National Center for Toxicological Research.

3. Handle, store, install and finish products.

4. Repair or replace items damaged after receipt.

3.03 TRANSPORTATION AND HANDLING

A. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.

B. Transport and handle products in accordance with manufacturer's instructions.

C. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.

D. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.

E. Provide equipment and personnel to handle products by methods to prevent soiling, Comm. No. 2-3877-14 NCTR Page 5 of 5 Jefferson, Arkansas disfigurement, or damage.

F. Arrange for the return of packing materials, such as wood pallets, where economically feasible.

3.04 STORAGE AND PROTECTION

A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication.

B. Store and protect products in accordance with manufacturers' instructions.

C. Store with seals and labels intact and legible.

D. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.

E. For exterior storage of fabricated products, place on sloped supports above ground.

F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

G. Prevent contact with material that may cause corrosion, discoloration, or staining.

H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

Stuck Associates Architects 01616 Bldg. 53A 2nd Floor June 1, 2015 VOC CONTENT RESTRICTIONS HVAC Redesign & Arch. Improvements

SECTION 01616

VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

1.01 SECTION INCLUDES

A. VOC restrictions for product categories listed below under "DEFINITIONS."

B. All products of each category that are installed in the project must comply; National Center for Toxicological Research's project goals do not allow for partial compliance.

1.02 DEFINITIONS

A. VOC-Restricted Products: All products of each of the following categories when installed or applied on-site in the building interior:

1. Adhesives, sealants, and sealer coatings.

2. Carpet.

3. Carpet cushion.

4. Carpet tile.

5. Paints and coatings.

6. Cabinet work.

B. Interior of Building: Anywhere inside the exterior weather barrier.

C. Adhesives: All gunnable, trowelable, liquid-applied, and aerosol adhesives, whether specified or not; including flooring adhesives, resilient base adhesives, and pipe jointing adhesives.

D. Sealants: All gunnable, trowelable, and liquid-applied joint sealants and sealant primers, whether specified or not; including firestopping sealants and duct joint sealers.

1.03 REFERENCE STANDARDS

A. CRI (GLCC) - Green Label Testing Program - Approved Product Categories for Carpet Cushion; Carpet and Rug Institute; current listings at www.carpet-rug.org.

B. CRI (GLP) - Green Label Plus Carpet Testing Program - Approved Products; Carpet and Rug Institute; current listings at www.carpet-rug.org.

C. GreenSeal GS-36 - Commercial Adhesives; Green Seal, Inc.; 2000.

D. SCAQMD 1168 - South Coast Air Quality Management District Rule No.1168; current edition;

www.aqmd.gov.

1.04 SUBMITTALS

A. See Section 01300 - Administrative Requirements, for submittal procedures.

B. Evidence of Compliance: Submit for each different product in each applicable category.

1. Identify evidence submittals with the words "LEED Report".

C. Product Data: For each VOC-restricted product used in the project, submit product data showing compliance, except when another type of evidence of compliance is required.

D. Installer Certifications for Accessory Materials: Require each installer of any type of product (not just the products for which VOC restrictions are specified) to certify that either 1) no adhesives, joint sealants, paints, coatings, or composite wood or agrifiber products have been used in the installation of his products, or 2) that such products used comply with these requirements.

Comm. No. 2-3877-14 NCTR Page 2 of 3 Jefferson, Arkansas

1.05 QUALITY ASSURANCE

A. Testing Agency Qualifications: Independent firm specializing in performing testing and inspections of the type specified in this section.

PART 2 PRODUCTS

2.01 MATERIALS

A. Adhesives and Joint Sealants: Provide only products having volatile organic compound (VOC) content not greater than required by South Coast Air Quality Management District Rule No.1168.

1. Evidence of Compliance: Acceptable types of evidence are:

a. Report of laboratory testing performed in accordance with requirements.

B. Aerosol Adhesives: Provide only products having volatile organic compound (VOC) content not greater than required by GreenSeal GS-36.

1. Evidence of Compliance: Acceptable types of evidence are:

a. Current GreenSeal Certification.

C. Paints and Coatings:

1. Provide coatings that comply with the most stringent requirements specified in the following:

a. 40 CFR 59, Subpart D--National Volatile Organic Compound Emission Standards for

Architectural Coatings.

b. Ozone Transport Commission (OTC) Model Rule, Architectural, Industrial, and

Maintenance Coatings; www.otcair.org; specifically:

1) Opaque, Flat: 50 g/L, maximum.

2) Opaque, Nonflat: 150 g/L, maximum.

3) Opaque, High Gloss: 250 g/L, maximum.

4) Varnishes: 350 g/L, maximum.

c. USGBC LEED Rating System, edition as stated in Section 01355; for interior wall and ceiling finish (all coats), anti-corrosive paints on interior ferrous metal, clear wood stains and finishes, sanding sealers, other sealers, shellac, and floor coatings.

2. Determination of VOC Content: Testing and calculation in accordance with 40 CFR 59, Subpart D (EPA Method 24), exclusive of colorants added to a tint base and water added at project site; or other method acceptable to authorities having jurisdiction.

3. Evidence of Compliance: Acceptable types of evidence are:

a. Report of laboratory testing performed in accordance with requirements.

D. Carpet and Adhesive: Provide products having VOC content not greater than that required for CRI Green Label Plus certification.

1. Evidence of Compliance: Acceptable types of evidence are:

a. Current Green Label Plus Certification.

b. Report of laboratory testing performed in accordance with requirements.

E. Carpet Cushion: Provide products having VOC content not greater than that required for CRI Green Label certification.

1. Evidence of Compliance: Acceptable types of evidence are:

a. Current Green Label Certification.

b. Report of laboratory testing performed in accordance with requirements.

F. Carpet Tile and Adhesive: Provide products having VOC content not greater than that required for CRI Green Label Plus certification.

1. Evidence of Compliance: Acceptable types of evidence are:

a. Current Green Label Plus Certification.

b. Report of laboratory testing performed in accordance with requirements.

Comm. No. 2-3877-14 NCTR Page 3 of 3 Jefferson, Arkansas

G. Carpet Tile and Adhesive: Provide products having VOC content as specified in Section 09685.

H. Other Product Categories: Comply with limitations specified elsewhere.

PART 3 EXECUTION - NOT USED

3.01 FIELD QUALITY CONTROL

A. National Center for Toxicological Research reserves the right to reject non-compliant products, whether installed or not, and require their removal and replacement with compliant products at no extra cost to National Center for Toxicological Research.

B. All additional costs to restore indoor air quality due to installation of non-compliant products will be borne by Contractor.

Stuck Associates Architects 01700 Bldg. 53A 2nd Floor June 1, 2015 EXECUTION REQUIREMENTS HVAC Redesign & Arch. Improvements Comm. No. 2-3877-14 NCTR Page 1 of 6 Jefferson, Arkansas

SECTION 01700

EXECUTION REQUIREMENTS

1.01 SECTION INCLUDES

A. Examination, preparation, and general installation procedures.

B. Requirements for alterations work, including selective demolition, except removal, disposal, and/or remediation of hazardous materials and toxic substances.

C. Cutting and patching.

D. Cleaning and protection.

E. Starting of systems and equipment.

F. Demonstration and instruction of National Center for Toxicological Research personnel.

G. Closeout procedures, except payment procedures.

1.02 SUBMITTALS

A. See Section 01300 - Administrative Requirements, for submittal procedures.

B. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:

1. Structural integrity of any element of Project.

2. Integrity of weather exposed or moisture resistant element.

3. Efficiency, maintenance, or safety of any operational element.

4. Visual qualities of sight exposed elements.

5. Work of National Center for Toxicological Research or separate Contractor.

6. Include in request:

a. Identification of Project.

b. Location and description of affected work.

c. Necessity for cutting or alteration.

d. Description of proposed work and products to be used.

e. Effect on work of National Center for Toxicological Research or separate Contractor.

f. Written permission of affected separate Contractor.

g. Date and time work will be executed.

C. Project Record Documents: Accurately record actual locations of capped and active utilities.

1.03 PROJECT CONDITIONS

A. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.

B. Noise Control: Provide methods, means, and facilities to minimize noise produced by construction operations.

C. Pest Control: Provide methods, means, and facilities to prevent pests and insects from damaging the work.

D. Rodent Control: Provide methods, means, and facilities to prevent rodents from accessing or invading premises.

Page 2 of 6 Jefferson, Arkansas

1.04 COORDINATION

A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.

B. Verify that utility requirements and characteristics of new operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

C. Coordinate space requirements, supports, and installation of mechanical and electrical work that are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

D. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.

E. Coordinate completion and clean-up of work of separate sections.

F. After National Center for Toxicological Research occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with Contract Documents, to minimize disruption of National Center for Toxicological Research's activities.

PART 2 PRODUCTS

2.01 PATCHING MATERIALS

A. New Materials: As specified in product sections; match existing products and work for patching and extending work.

B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.

C. Product Substitution: For any proposed change in materials, submit request for substitution described in Section 01600.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.

Start of work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.

E. Verify that utility services are available, of the correct characteristics, and in the correct locations.

F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.

3.02 PREPARATION

Comm. No. 2-3877-14 NCTR Page 3 of 6 Jefferson, Arkansas

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.

3.03 GENERAL INSTALLATION REQUIREMENTS

A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.

B. Make vertical elements plumb and horizontal elements level, unless otherwise…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .