Text version
XX X
X
X
X
X X X X
X
X
X
X
X
X
X
X
X X X X X X
XX XXX
XXX XXX XXX XX
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
X
XXX X XX X X X X X X X X X XX XX X X XX X XX X XXX XXXX XX X XXX XXXX
X X X XXX X X
X
X
X
X
X
X
X
X
X
XX
X
X X X X XX XX X
X
X
X
X
X
X
X
X
X X
X X X X
X X
X X
X XX
X X
XX
X X
X X
X
X
XXXX
X X
X X
XXX X XX XX XXX
X
X
X
X
X
X
X
X
X
T
XXX
X
X
X
X
X
XX XXX XX X X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX X X X
X
X
X
X
X
X
X
XX XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXX XXXX XX X XXX X XX XXX XX
XXXX XX XXX XXXX XXXX XXX XXX X XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X X
X
X
XXX XXX XXXX X X X
X
X
X
X
X
X
X
X
X
X
XX X X X X X
X
ARL
21 28
20 20
I. OCCUPANCY CLASSIFICATION: (302-312,508) GROUP _____
OCCUPANCY LOAD: (TABLE 1004.1.2) 100 GROSS SF/OCCUPANT
FIRST FLOOR _____SF/100=___ OCCUPANTS
SECOND FLOOR
II. CONSTRUCTION: (TABLE 601) TYPE ____
ALLOWABLE HEIGHT (TABLE 503) 1 STORY
SPRINKLER INCREASE (504.2) 1 STORY
TOTAL ALLOWABLE STORIES: ____ STORIES
ALLOWABLE AREA: (TABLE 503) _____ SF
FRONTAGE INCREASE (506.2) _____ SF
SPRINKLER INCREASE (506.3) _____ SF
TOTAL ALLOWABLE AREA _____ SF
FIRE RESISTENT RATINGS: (TABLE 601 & 602)
STRUCTURAL FRAME 0
FLOOR/ CEILING & ROOF/ CEILING 0
EXTERIOR NON-LOAD BEARING WALLS 0
BEARING WALLS 0
EXIT CORRIDOR WALLS (TABLE 1017.1) 0
SHAFT & STAIR ENCLOSURES (TABLE 1020) 1
PERMANENT PARTITIONS 0
FIRE WALLS 0
III. BUILDING SYSTEMS:
FIRE EXTINGUISHERS: EVERY 3000 SF, OR 75' ALONG EXIT CORRIDOR.
IV. EXIT REQUIREMENTS:
EGRESS WIDTH (TABLE 1005.1)
STAIRS 0.3 INCH/OCCUPANT SERVED
OTHER 0.2 INCH/OCCUPANT SERVED
MINIMUM NUMBER OF EXITS (1019) 2
MINIMUM CLEAR OPENING AT EXITS 32 IN.
EXIT TRAVEL DISTANCE (TABLE 1016.1) ____ FT.
CORRIDOR WIDTH (TABLE 1017.2) ____ IN.
DEAD END CORRIDORS (TABLE 1017.3) ____ FT.
MINIMUM EXITS PER FLOOR (TABLE 1019.1) ___
MINIMUM STAIR WIDTH (1009.1) ___ IN.
HANDRAILS: 34"-38" HIGH, 12" BEYOND TOP AND BOTTOM RISERS.
GUARDRAILS: 42" HIGH, WHERE 30" ABOVE GRADE.
EXIT SIGNS: NO POINT IN CORRIDOR GREATER THAN 100' FROM SIGN
INTERNATIONAL BUILDING CODE 2006 / ARKANSAS 2007
A101
SIM
Name Elevation
DETAIL CALLOUT
(DETAIL #/ SHEET #)
LEVEL MARKER
(LEVEL NAME/ ELEVATION IN FEET)
WALL TAG
(WALL TYPE #)
WINDOW TAG
(WINDOW TYPE #)
DOOR TAG
(DOOR TYPE #)
ROOM NAME AND NUMBER
KEYNOTE
SYMBOL LEGEND
1t
1i
A101
1 1
A101
ELEVATION CALLOUT (MULTIPLE IN A ROOM)
(DETAIL #/ SHEET #)
ELEVATION CALLOUT (SINGLE IN A ROOM)
(DETAIL #/ SHEET #)
Name
XXX
GRID LINEA
ENLARGED DETAIL CALL OUT1
A101
1i SIGNAGE TAGTS TOILET ACCESSORY TAG
AFPC 2007 CODE DATA CERTIFICATION
"I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS HAVE BEEN
PREPARED BY ME OR UNDER MY SUPERVISION. I FURTHER CERTIFY THAT, TO
THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE AS
REQUIRED BY LOW AND IN COMPLIANCE WITH THE ARKANSAS FIRE PREVENTION
CODE FOR THE STATE OF ARKANSAS."
SHEET INDEX
G.1 COVER SHEET
A1.1 DEMO & FLOOR PLAN
A4.1 REFLECTED CEILING PLAN
A5.1 ROOF PLAN
A7.1 ENLARGED PLANS
S1.1 STRUCTURAL NOTES, PARTIAL ROOF PLAN
AND FRAMING SECTIONS
F1.1 FIRE PROTECTION PLANS - PHASE 4 - OPTION 4
P1.1 SECOND FLOOR PLUMBING PLANS - PHASE 4 -
NEW - OPTION #5
M1.1 FIRST AND SECOND FLOOR MECHANICAL ROOM
PLANS - PHASE 1 - NEW AND DEMOLITION - BASE BID
M1.2 SECOND FLOOR AND ROOF LEVEL MECHANICAL
PLAN - PHASE 1 - DEMOLITION AND NEW - BASE BID
M1.3 SECOND FLOOR AND ROOF LEVEL MECHANICAL
PLAN - PHASE 1 - NEW OPTION #1
M2.1 SECOND FLOOR MECHANICAL ROOM
PLANS - PHASE 2 - DEMOLITION AND NEW - BASE BID
M2.2 ROOF LEVEL MECHANICAL PLAN - PHASE 2 - NEW BASE BID
M3.1 SECOND FLOOR MECHANICAL ROOM PLANS -
PHASE 3 - DEMOLITION AND NEW - BASE BID
M4.1 SECOND FLOOR MECHANICAL ROOM PLANS -
PHASE 4 - DEMOLITION AND NEW - BASE BID & OPTION #2
M4.2 SECOND FLOOR MECHANICAL ROOM PLANS -
PHASE 4 - DEMOLITION AND NEW - OPTION #2 & #5
M5.1 MECHANICAL DETAILS
M5.2 MECHANICAL DETAILS
M5.3 MECHANICAL DETAILS
M6.1 MECHANICAL CONTROLS LEGEND
M6.2 MECHANICAL CONTROLS DETAILS
M6.3 MECHANICAL CONTROLS DIAGRAM
M6.4 MECHANICAL CONTROLS DIAGRAM
M6.5 MECHANICAL CONTROLS DIAGRAM
M6.6 MECHANICAL CONTROLS DIAGRAM
M7.1 MECHANICAL LEGENDS AND SCHEDULES
M7.2 MECHANICAL SCHEDULES
E1.1 FIRST AND SECOND MECHANICAL ROOM PLANS -
PHASE 1 - ELECTRICAL - BASE BID
E1.2 ROOF LEVEL - PHASE 1 - DEMOLITION AND NEW
E3.1 SECOND FLOOR - ENLARGED ELECTRICAL ROOM PLAN -
PHASE 3 - BASE BID
E4.1 ELECTRICAL PLANS - PHASE 4 - BASE BID
E4.2 ELECTRICAL PLANS - PHASE 4 - OPTION #3 & #5
E5.1 SCHEDULES, LEGENDS AND GENERAL NOTES - ELECTRICAL
SHEET 1 OF 33
SHEET 2 OF 33
SHEET 3 OF 33
SHEET 4 OF 33
SHEET 5 OF 33
SHEET 6 OF 33
SHEET 7 OF 33
SHEET 8 OF 33
SHEET 9 OF 33
SHEET 10 OF 33
SHEET 11 OF 33
SHEET 12 OF 33
SHEET 13 OF 33
SHEET 14 OF 33
SHEET 15 OF 33
SHEET 16 OF 33
SHEET 17 OF 33
SHEET 18 OF 33
SHEET 19 OF 33
SHEET 20 OF 33
SHEET 21 OF 33
SHEET 22 OF 33
SHEET 23 OF 33
SHEET 24 OF 33
SHEET 25 OF 33
SHEET 26 OF 33
SHEET 27 OF 33
SHEET 28 OF 33
SHEET 29 OF 33
SHEET 30 OF 33
SHEET 31 OF 33
SHEET 32 OF 33
SHEET 33 OF 33
BUILDING 53A
SITE
62A
45T
LITTLE
TO DALLAS
TEXARKANA
ROCK
PINE
BLUFF
RIVER
FORT SMITH
TO OKLAHOMA CITY
ARKANSAS
40 MEMPHIS
TO
S
T.
L
O U
IS
TOXICOLOGICAL RESEARCH
NCTR/JEFFERSON
EXIT
PINE
BLUFF
JEFFRSON PINE BLUFF
ARSENAL
RIVER
TO FORT SMITH
LITTLE ROCK
TO TEXARKANA
TO MEMPHIS
NATIONAL CENTER FOR
PROJECT LOCATION
AR
KAN
SAS
REDFIELD
HW
Y 365
NORTH LITTLE ROCK40
KEY PLAN
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
2015 HVAC REDESIGN & ARCHITECTURAL IMPROVEMENTS
R
D
EG
I S
TERE A
T
RCHITEC
STUCK
ASSOCIATES,
PLLC
A SR K A N S A
NO LL-112
As indicated
6/9/2015 4:45:03
PM
100% FINAL CONTRACT DOCUMENTS
Author06.01.2015
COVER SHEET
Bldg 53A - Second Floor
G.1
Designer
3877.14 / 01-15-007
JEFFERSON LABORATORIES OF THE FDA
BUILDING 53A - SECOND FLOOR
2015 - HVAC RE-DESIGN & ARCHITECTURAL IMPROVEMENTS
1/4" = 1'-0" A5 Site Map 3/8" = 1'-0"
A1 State Location Map
3/8" = 1'-0" D1 Project Location Map
1" = 40'-0"
H3 AREAS OF WORK
100% FINAL CONTRACT DOCUMENTS
SHEET 1 OF 33
ksmith Image
CLinen Typewritten Text
CLinen Typewritten Text
CLinen Typewritten Text
CLinen Typewritten Text
PHASE 2
CLinen Typewritten Text
PHASE 2
CLinen Typewritten Text
PHASE 1
CLinen Typewritten Text
CLinen Typewritten Text
PHASE 1
CLinen Typewritten Text
PHASE 2
CLinen Typewritten Text
PHASE 2
CLinen Typewritten Text
PHASE 2
CLinen Typewritten Text
PHASE 2
CLinen Typewritten Text
PHASE 2
CLinen Typewritten Text
PHASE 2
CLinen Typewritten Text
CLinen Typewritten Text
CLinen Typewritten Text
BUILDING 53A REPLACE AIR HANDLERS & 2ND FLOOR OFFICES
CLinen Typewritten Text
BUILDING 53A REPLACE AIR HANDLERS & 2ND FLOOR OFFICES
IT ROOM
53A-219
OFF
53A-218
OFF
53A-217
OFF
53A-201
OFF
53A-202
OFF
53A-202A
OFF
53A-203
OFF
53A-204
OFF
53A-205
OFF
53A-206
OFF
53A-207
OFF
53A-208
OFF
53A-209
OFF
53A-210
ELECT.
53A-211A
FREEZER ROOM
53A-211
A7.1 A1
16 17 18 19 20
A
B
C
D
E
F
G
J
K
4'
0"
JANITOR
53A-213
MECH.
53A-212
WOMEN
53A-214
MEN
53A-215
Verify 6' - 0"
Ve ri f y
4'
0"
Ve ri f y
3'
0"
MECHANICAL
CHASE
MECHANICAL
CHASE
6' - 10"
2'
0" 3'
3"
ICEMAKER ALCOVE
1' - 4"
Verify
211A
9 10
9 10
9 10
9 10
9 10
9 10
9 10
9 9
H
12 13
21 21 21 21 21 21 21
16 17 18 19 20
A
B
C
D
E
F
G
J
K
6 4
6 4 6 4 6 4
H
11 19
14 13
4 6 4 6
5 5 5 5
TYPE: HOLLOW METAL
DOOR (HM) IN HM FRAME
TYPE: UNEVEN HM
DOOR IN HM FRAME
1' - 6" 2' - 6" 1'-0" 3'-0"
TYPICAL INTERIOR FINISH
SELECTIONS
CARPET
CPT: MANNINGTON BENCHMARK III - INFINITY MODULAR, CHINCHILLA (INTEGRA HP BACKING)
VINYL COMPOSITION TILE:
VCT: ARMSTRONG IMPERIAL TEXTURE, STANDARD EXCELON, 51873 BRUSHED SAND. SUBMIT SAMPLE FOR FDA
PROJECT MANAGER'S APPROVAL.
VINYL FLAKE FLOOR AND WALLCOATING SYSTEM:
VFC: SIKA FLOOR, 1/8" VINYL FLAKE FLOORING SYSTEM. SIKA FLOOR, 48" INTEGRAL VINYL FLAKE FLOORING
SYSTEM WAINSCOT. SUBMIT COLOR SAMPLES FOR FDA PROJECT MANAGER'S APPROVAL.
BASE:
B #1: JOHNSONITE, 45 SANDALWOOD
B #2: SIKA FLOOR, 6" INTEGRAL 1/8" VINYL FLAKE FLOORING SYSTEM BASE
PAINT:
PT #1:SHERWIN WILLIAMS 1102 CHENILLE WHITE, PROMAR 200 ZERO VOC LATEX SEMI-GLOSS. NOTE: BEFORE MAKING A FINAL PAINT COLOR/MFR. SELECTION OR ORDERING PAINT, GC/PAINTING SUBCONTRACTOR IS TO CONFIRM THE PAINT COLOR WITH THE FDA PROJECT MANAGER. THIS INCLUDES ANY GENERAL NOTES
INDICATING TO "MATCH THE EXISTING PAINT COLOR OF ADJACENT PAINTED SURFACE.
PT #2: SHERWIN WILLIAMS COLOR TO MATCH EXISTING DOOR AND FRAME COLOR. GC TO SUBMIT SAMPLE TO
THE FDA PROJECT MANAGER FOR APPROVAL.
SOLID SURFACE MATERIAL:
SSM: FORMICA TRADITIONS - WHEAT MATRIX - 333. GC TO SUBMIT SAMPLE TO THE FDA PROJECT MANAGER FOR
APPROVAL.
PLASTIC LAMINATE:
PL #1:FORMICA SAIL WHITE 463-58
CEILING:
CL #1:ARMSTRONG 1732 FINE FISSURED ANGLED TEGULAR HUMIGUARD PLUS, 2' X 2' WITH 15/16" GRID CL #2:W.R. GYPSUM BOARD W/ EPOXY PAINT - SHERWIN WILLIAMS SW 7007 CEILING BRIGHT WHITE
MISCELLANEOUS:
HOLLOW METAL DOORS: PT #2
HOLLOW METAL DOOR FRAMES: PT #2
WINDOW SILLS: SSM
WINDOW TREATMENTS: 1" MINI BLINDS - COLOR TO BE SELECTED
TOILET PARTITIONS: SOLID PLASTIC PARTITIONS - COLOR TO BE SELECTED
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
2015 HVAC REDESIGN & ARCHITECTURAL IMPROVEMENTS
R
D
EG
I S
TERE A
T
RCHITEC
STUCK
ASSOCIATES,
PLLC
A SR K A N S A
NO LL-112
As indicated
6/9/2015 4:44:27
PM
100% FINAL CONTRACT DOCUMENTS
Author06.01.2015
DEMO & FLOOR PLAN
Bldg 53A - Second Floor
A1.1
Designer
3877.14 / 01-15-007 1/8" = 1'-0"
A5 SECOND FLOOR PLAN
1/8" = 1'-0"
A1 SECOND FLOOR DEMOLITION PLAN
ROOM FINISH SCHEDULE
Room Number Room Name Floor Finish Base Finish
Wall Finish Ceilings
CommentsNorth Wall South Wall East Wall West Wall Ceiling Finish
53A-201 OFF CPT B #1 PT PT PT PT CL #1
53A-202 OFF CPT B #1 PT PT PT PT CL #1
53A-202A OFF CPT B #1 PT PT PT PT CL #1
53A-203 OFF CPT B #1 PT PT PT PT CL #1
53A-204 OFF CPT B #1 PT PT PT PT CL #1
53A-205 OFF CPT B #1 PT PT PT PT CL #1
53A-206 OFF CPT B #1 PT PT PT PT CL #1
53A-207 OFF CPT B #1 PT PT PT PT CL #1
53A-208 OFF CPT B #1 PT PT PT PT CL #1
53A-209 OFF CPT B #1 PT PT PT PT CL #1
53A-210 OFF CPT B #1 PT PT PT PT CL #1
53A-211 FREEZER ROOM VCT B #1 PT PT PT PT PT
53A-211A ELECT. ----- ----- ----- PT ----- PT ----- NO CEILING
53A-212 MECH. VCT B #1 PT PT PT PT ----- NO CEILING
53A-213 JANITOR VCT B #1 PT PT / VFC PT PT / VFC CL #1 VINYL FLAKE TO 36" AFF
53A-214 WOMEN VFC B #2 PT PT PT PT / VFC CL #2 VINYL FLAKE TO 48" AFF
53A-215 MEN VFC B #2 PT PT PT / VFC PT CL #2 VINYL FLAKE TO 48" AFF
53A-217 OFF CPT B #1 PT PT PT PT CL #1
53A-218 OFF CPT B #1 PT PT PT PT CL #1
53A-219 IT ROOM VCT B #1 PT PT PT PT CL #1
DEMOLITION GENERAL NOTES
A Areas to be removed are shown only as an approximation. The General
Contractor is responsible for all demolition or relocation on drawings.
B The Contractor shall verify information shown as existing and report any discrepancies.
C Prior to demolition, the General Contractor will notify the Owner in sufficient time to salvage miscellaneous items before demolition work commences.
D All flooring (VCT, carpet, conductive tile, etc.) designated by note shall be removed to concrete slab or terrazzo flooring.
E The ceiling (gypsum board, acoustical tile, sprayed-on texture, etc.)
including associated ceiling devices and fixtures (ceiling grid, mechanical, electrical, plumbing items, etc.) designated by note shall be removed. See Mechanical, Electrical, and Plumbing demolition plans for more information.
F All walls (metal stud partitions, hollow clay tile, etc.) including associated devices and fixtures (windows, frames, finishes, toilet partitions & accessories, mechanical, electrical and plumbing fixtures, etc.) designated by note shall be removed. See Mechanical, Electrical, and Plumbing demolition plans for additional information.
G During demolition, if asbestos is found, notify Architect immediately.
Asbestos removal will be provided by Owner (or separate Contractor.)
H Remove miscellaneous items (Architectural, Electrical, Mechanical, Plumbing, etc.) on walls designated to be moved.
I Provide dust barriers, both floor and ceiling, to isolate demolition and construction work from occupied portions of the building.
DEMOLITION KEY NOTES
1 REMOVE EXISTING LOUVER
2 REMOVE EXISTING DOOR & ASSOCIATED FRAMING
3 REMOVE EXISTING WALL & BASE & ASSOCIATED ELECTRICAL ITEMS INCLUDING, BUT NOT
LIMITED TO, ELECTRICAL OUTLETS AND SWITCHES - RE: ELECTRICAL DEMOLITION DRAWINGS.
4 REMOVE EXISTING BASE & FLOORING TO CONCRETE SLAB
5 REMOVE EXISTING PANELING/WOOD TRIM AND ASSOCIATED FURRING INCLUDING PANELING &
FURRING WRAPED TO WINDOW (IF APPLICABLE). NOTE REMOVE EXISTING BLINDS AND
RETURN TO OWNER.
6 REMOVE 2 EXISTING CEILINGS & ASSOCIATED MPE ITEMS INCLUDING, BUT NOT LIMITED TO, LIGHTS & SUPPLY/RETURN DIFFUSERS - RE: MECH. DEMOLITION PLAN.
7 REMOVE EXISTING PLUMBING FIXTURES INCLUDING JANITOR SINK, WALL LAVATORIES,
TOILETS. RE: PLUMBING DRAWINGS.
8 REMOVE EXISTING TOILET PARTITIONS
9 REMOVE AND SALVAGE CEILING TILES (FOR FUTURE RE-INSTALLATION) FOR MECHANICAL
INSTALLATION - RE: MECHANICAL DRAWINGS
10 REMOVE EXISTING RAISED CONCRETE FORM THIS AREA TO LEVEL WITH FLOOR
11 REMOVE PORTION OF CEILING AS REQUIRED TO INSTALL NEW COLUMN & GYP. BD. SURROUND.
COORDINATE WITH OWNER THE REMOVAL & REPLACEMENT OF THE EXISTING LAB CASEWORK
FOR INSTALLATION OF NEW COLUMN & GYP. BD. SURROUND
12 REMOVE PORTION OF WALL AS REQUIRED FOR REMOVAL OF DUCTING & PIPING. RE:
MECHANICAL DRAWINGS
13 REMOVE EXISTING PAPER TOWEL DISPENSERS & DISPOSALS, SOAP DISPENSERS,TOILET
PAPER DISPENSERS & SANITARY NAPLIN DISPOSALS AND SAVE FOR REUSE
14 REMOVE EXISTING CEILINGS, LIGHTING, MECHANICAL DIFFUSERS AND ACCESS PANELS.
15 REMOVE EXISTING CONCRETE HOUSEKEEPING SLAB
16 REF: MPE DRAWINGS FOR INFORMATION ON REMOVAL OF EQUIPMENT THIS ROOM
17 REMOVE EXISTING VCT THIS AREA THAT WILL RECEIVE EPOXY FLOORING IN TOILET ROOM
EXPANSION
18 REMOVE PORTION OF CONC. SLAB TO BEAM BELOW FOR NEW COLUMN INSTALLATION. RE:
STRUCTURAL DRAWINGS.
19 REMOVE PORTION OF WALL AS REQD. FOR NEW COLUMN INSTALLATION.
20 REMOVE EXISTING BUCKEYE SMART CENTER AND HOLD FOR FUTURE INSTALLATION.
FLOOR PLAN GENERAL NOTES
A All construction shall be in accordance with the requirements of the applicable codes, engineering shall conform to all applicable municipal, state and federal regulation having jurisdiction including accessibility standards and requirements of "Americans with Disabilities Act."
B Each trade is advised that information pertinent to its work may occur in various sections of the contract documents. Refer to every sheet of drawings for notes and symbols. Notes shall be reviewed and applied to related building components regardless of their locations in the drawings and specifications.
C Unless noted otherwise, any note, detail, or feature indicated for one condition shall be applicable for all alike and similar conditions.
D The Contractor shall furnish and install all blocking, stiffeners, bracing, backing plated and supporting brackets required for the proper installation of all building components as recommended by the manufacturer and required by code. In walls, provide blocking attached to studs as backing supports for wall-mounted items.
E All dissimilar metals shall be effectively isolated from each other to avoid molecular breakdown.
F All exterior joints around window and door frames, between walls and founds, between walls and roof, between wall panels, at penetration of utilities through the envelope shall be sealed or weather-stripped to prevent air and moisture leakage/infiltration.
G Finish floor elevations are to the top of concrete, unless noted otherwise.
H Interior partitions are dimensioned to face of stud, unless noted otherwise. Do not scale drawings. Questions regarding dimensions shall be reported to the
Architect.
FLOOR PLAN KEY NOTES
1 WHERE LOUVER HAS BEEN REMOVED FILL IN AT EXISTING WALL WITH CMU TO MATCH EXISTING. PAINT EXTERIOR TO
MATCH EXISTING COLORS WITH SHERWIN WILLIAMS "SUPERPAINT".
2 ONE HOUR RATED PARTITION - RE: H8/A4.1
3 5/8" GYP. BD. ONE SIDE OF 2 1/2" MET. STUDS @ 16" O.C. TO 10 FT.
4 TYPICAL SHAFTWALL PARTITION - RE:B5/A4.1
5 STORAGE ROOM PARTITION - RE: B8/A4.1
6 WET WALL PARTITION: 5/8" GYP. BD. ONE SIDE OF 3 5/8" MET. STUDS @ 16" O.C.
7 TYPICAL PARTITION - RE: H5/A4.1
8 EXISTING ELECTRICAL EQUIPMENT TO REMAIN
9 NEW CARPET & RUBBER BASE & LAY-IN CEILING. PAINT ALL WALLS AND DOOR.
10 EXTERIOR WALL: 5/8" GYP. BD. ON 1 7/8" FURRING CHANNELS TO 8'-3". RETURN FURRING AND GYP BD. TO WINDOW
FRAME. PROVIDE NEW MINI BLINDS & SOLID SURFACE WINDOW SILL - RE B7/A7.1
11 PATCH FLOOR THIS AREA WITH VCT TO MATCH EXISTING
12 WHERE CONC. FLOOR HAS BEEN REMOVED G.C. TO FORM FOR NEW CONC. SLAB AFTER INSTALLATION OF COLUMNS.
RE:STRUCTURAL DRAWINGS & SPECIFICATIONS. FURR AROUND STEEL COL. WITH MET. STUD FRAMING TO UNDERSIDE OF ROOF STRUCTURE. ATTACH 5/8" GYP. BD. TO 3" ABOVE CEILING. TAPE, FLOAT, TEXTURE & PAINT #1. INSTALL BASE
& PATCH CORRIDOR FLOOR AS REQD.
13 WHERE WALL HAS BEEN REMOVED G.C. TO INSTALL MET. STUDS TO UNDERSIDE OF ROOF STRUCTURE. ATTACH 5/8" FIRECODE GYP. BD. TO STRUCTURE ON BOTH SIDES OF STUDS TO UNDERSIDE OF ROOF STRUCTURE TO MAINTAIN INTEGRITY OF RATED WALLS. RE: H8/A4.1 FOR SIMILAR - TAPE, FLOAT, TEXTURE & PAINT #1 TO MATCH EXISTING.
INSTALL BASE.
14 PATCH WALL AS REQD. TO AIR TIGHTNESS W/5/8" FIRECODE GYP. BD. AFTER REMOVAL OF MECH EQUIP.
15 INSTALL SALVAGE CEILING TILES AFTER MECH INSTALLATION.
16 INSTALL PATCHING & LEVELING COMPOUND WHERE HOUSEKEEPING SLAB & RAISED CONC. FORM WAS REMOVED.
17 INSTALL VINYL FLAKE WALL COATING AT HEIGHT OF 36" ON INDICATED WALLS.
18 FLOOR DRAIN - RE: PLUMBING DRAWINGS
20 RE: DEMOLITION KEYNOTE #20. RE-INSTALL SLAVAGED BUCKEYE SMART CENTER: GC TO MOUNT AT THE SAME
HEIGHT AS IT IS CURRENTLY MOUNTED W/ ADDED BLOCKING IN WALL. GC TO MOUNT IN THE SAME WALL LAYOUT W/ THE STAINLESS STEEL DRIP LEDGE DIRECTLY BELOW THE SMART CENTER & CENTERED ON THE JANITOR SINK FAUCET.
21 EXISTING EXTERIOR WALL W/ PLASTER FINISH IS FLAKING AND CRUMBLING. PRIOR TO INSTALLING GYP. BD. OVERLAY TO WALL, REMOVE PLASTER DEBRIS, CLEAN EXISTING SURFACES, AND PATCH ANY OPENINGS/HOLES LARGE ENOUGH
TO ALLOW INSECT OR RODENT INFESTATION.
22 FOR INSTALLATION OF HVAC DUCTLESS SPLIT UNIT THIS ROOM, PROVIDE ROOF AND EXTERIOR WALL PENETRATION AS
REQUIRED FOR CONNECTION LINES.
DOOR SCHEDULE
Door Mark Width x Height
Door Type
Frame Type
Door Details Label
Hdwr.
Set Comments
211 1 211A 3'-0" x 7'-0" HM 2" Head 1 1/2 hr 2 213 3'-0" x 7'-0" HM 2" Head 1 1/2 hr 2 214 3'-0" x 7'-0" HM 2" Head 1 1/2 hr 3
1/4" = 1'-0"
Door Type Legend
4'-0" X 7'-0" HM 2" Head 1 1/2 hr
SHEET 2 OF 33
CLinen Typewritten Text
CLinen Typewritten Text
PHASE 2
CLinen Typewritten Text
PHASE 2
CLinen
2' X 4' FLUORESCENT
LIGHT FIXTURE
MECHANICAL
SUPPLY DIFFUSER
MECHANICAL
RETURN DIFFUSER
GYPSUM BOARD
CEILING
OCCUPANCY SENSOR
SUSPENDED
ACOUSTICAL CEILING
OS
SUPPLY/EXHAUST DIFFUSER
1' X 4' FLUORESCENT
STRIP FIXTURE
16 17 18 19 20
A
B
C
D
E
F
G
J
K
ELECT.
53A-211A
FREEZER ROOM
53A-211
MECH.
53A-212
WOMEN
53A-214
MEN
53A-215
JANITOR
53A-213
OFF
53A-210
OFF
53A-209
OFF
53A-208
OFF
53A-207
OFF
53A-206
OFF
53A-205
OFF
53A-204
OFF
53A-203
OFF
53A-202A
OFF
53A-202
OFF
53A-201
OFF
53A-217
OFF
53A-218
IT ROOM
53A-219
NO CEILING
NO CEILING
OS OS
OS
H
1 1 1
3"
BRACE TOP OF
PART. TO
STRUCT. ABOVE
CEILING :
REFER TO
CEILING PLAN
SOUND
ATTENUATION BATTS
3 5/8" MTL.
STUDS @ 16"
OC
5/8" GYP. BD.
BOTH SIDES
FLOOR
4 7/8" 4 7/8"
Sound Attenuation Batts
3 5/8" Mtl. Studs
@ 16" OC
5/8" Fire Code Gyp. Bd.
Floor
Provide Stenciling Above Ceilings. Suggested Wording: "Fire and Smoke Barrier Protect All Openings."
Extend Gyp. Bd. to Bottom of Deck and Seal with Fire Barrier Caulk
UL #U495
Ceiling: Refer To Ceiling Plan
Install fire safing between and scribe gyp.
bd. around metal deck where rated walls go to deck.
2 1/2" Mtl. C-H Studs @ 16" OC
5/8" Fire Code Gyp. Bd.
Floor
Provide Stenciling Above Ceilings. Suggested Wording: "Fire and Smoke Barrier Protect All Openings."
Extend Gyp. Bd. to Bottom of Deck and Seal with Fire Barrier Caulk
Ceiling: Refer To Ceiling Plan
Install fire safing between and scribe gyp.
bd. around metal deck where rated walls go to deck.
MECH. SHAFT
1" FIRECODE SHAFTWALL
LINER PANELS
3"
BRACE TOP OF
PART. TO
STRUCT. ABOVE
CEILING :
REFER TO
CEILING PLAN
SOUND
ATTENUATION BATTS
3 5/8" MTL.
STUDS @ 16"
OC
5/8" GYP. BD. TO
UNDERSIDE OF
STRUCTURE
FLOOR
4 7/8"
5/8" GYP. BD.
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
2015 HVAC REDESIGN & ARCHITECTURAL IMPROVEMENTS
R
D
EG
I S
TERE A
T
RCHITEC
STUCK
ASSOCIATES,
PLLC
A SR K A N S A
NO LL-112
As indicated
6/9/2015 4:44:40
PM
100% FINAL CONTRACT DOCUMENTS
Author06.01.2015
REFLECTED CEILING PLAN
Bldg 53A - Second Floor
A4.1
Designer
3877.14 / 01-15-007
CEILING PLAN GENERAL NOTES
A This reflected ceiling plan constitutes a graphic representation of ceiling-mounted elements for the purpose of coordination. Refer to the appropriate discipline drawings and specifications for specific information regarding each of these elements.
B Light fixtures shall be located centered in the room or space, unless noted otherwise.
C When light fixtures are shown to be recessed in ceiling tiles, they shall be centered in ceiling tile, unless noted otherwise.
D All suspended acoustical ceiling grids shall be centered within room or space unless noted otherwise.
E Provide access panels in drywall ceilings at locations shown, or, if not shown, as required to access all mechanical equipment in ceiling cavity requiring normal maintenance or operation.
This includes but is not limited to CAV and VAV boxes, A.W. reheat coils, valve, exhaust fans, balancing dampers, fire dampers, smoke dampers, fire/smoke dampers, clean-outs, or, if not shown, as required to access all mechanical equipment and junction boxes. Submit layout of all ceiling elements, including access panels for Architect to review prior to installation.
CEILING PLAN KEY NOTES
1 Acoustical Ceiling at 8'-0" - Verify per existing height 2 Gypsum board ceiling at 8'-0" - Verify per existing height 3 Gypsum board ceiling patch on metal stud framing tied into existing ceiling. Tape and float and paint to match.
4 24" Sq. Ceiling Access Door - Acudor UF-5000 (or equal) 24" x
24" . Locate per Owner's Instruction.
1/8" = 1'-0"
CEILING LEGEND
1/8" = 1'-0"
1 SECOND FLOOR REFLECTED CEILING PLAN
1 1/2" = 1'-0"
H5 TYPICAL PARTITION
1 1/2" = 1'-0"
H8 ONE HOUR PARTITION
1 1/2" = 1'-0"
B5 ONE HOUR SHAFTWALL PARTITION
1 1/2" = 1'-0"
B8 STORAGE ROOM PARTITION
SHEET 3 OF 33
CLinen Typewritten Text
PHASE 2
CLinen
16 2019181715
J
H
G
F
E
D
C
B
K
A
EXISTING
ROOF DRAIN EXISTING
ROOF
DRAIN
M
1 1 2
1 1
8" M in
ROLL LEAD FLASHING DOWN 1"
INTO PIPE
VENT STACK
LEAD FLASHING - EXTEND 8" AWAY
FROM PIPE
PROVIDE MASTIC AT EDGE OF
ROOFING MATERIAL
MODIFIED BITUMEN COLLAR
FLASHING
MODIFIED BITUMEN ROOFING
MATERIAL
EXISTING ROOF SYSTEM
VERIFY EXISTING ROOF DECK AND
STRUCTURAL CONDITIONS.
NOTE: THIS VTR DETAIL IS INCLUDED FOR CONTRACTOR'S
USE IN THE EVENT NEW VTRs ARE REQUIRED. IT IS ANTICIPATED THAT EXISTING VTRs WILL BE USED TO
ACCOMMODATE NEW TOILET ROOM REVISIONS.
STEEL HHS COL. AT PLATFORM FRAMING -
SEE STRUCTURAL
CONT. SEALANT
DRAWBAND
WATERTIGHT SHEET METAL RAIN COLLAR /
COUNTERFLASHING OVER PENETRATION
POCKET.
EXISTING POURED GYP. DECK. PATCH NEW
OPENING AT COLUMNS AS REQUIRED.
VERIFY EXISTING SUPPORT FOR GYP. DECK.
CONTRACTOR TO VERIFY EXISTING CONDITIONS.
4" MIN.
SHEET METAL PITCH PAN SOLDERED/WELDED
WATERTIGHT. 4" MIN. HEIGHT
NON-SHRINK GROUT
POURABLE SEALANT
ROOF CEMENT
BASE FLASHING PLY, 6" MIN., ALL
PLIES SET IN BITUMEN.
MODIFIED MEMBRANE FLASHING PLY, 9" MIN.,
ALL PLIES SET IN BITUMEN.
ROOF
MEMBRANE
OPTIONAL WOOD NAILERS; VARIES DEPENDING
UPON SIZE OF PENETRATION.
NOTE: THIS PITCH POCKET DETAIL IS SHOWN
AT COLUMN PENETRATIONS OUT IN THE FIELD
OF THE ROOF. WHERE NEW COLUMS OCCUR
AT EXTERIOR WALL, MODIFY PITCH POCKET
SHAPE AND FLANGE AS REQUIRED.
PITCH POCKET AT STEAM VENT THRU ROOF SIMILAR.
Sealant
S.S clamp and screw
Pre-molded pipe boot (peel & stick) w/ factory applied tape
Existing membrane
Acceptable fastener and plate (4 min.)
Sealing mastic between pipe and neck of boot
Verify existing roof deck and structural materials and conditions.
Insulation and deck membrane primer over membrane where tape will be applied
Factory applied peel & stick tape around entire perimeter of boot.
Pressure roll onto primed membrane.
2X wood blocking
2X wood blocking
Counterflashing 24 gauge min.
Flashing receiver
Existing insulation
Existing membrane.
Bonding adhesive
Membrane flashing
Per mfr's recommendation
2x wood blocking
8" m in
Verify existing roof deck and structural materials and conditions.
Patch deck around pentrations as required at all new openings.
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
R
D
EG
I S
TERE A
T
RCHITEC
STUCK
ASSOCIATES,
PLLC
A SR K A N S A
NO LL-112
As indicated
6/9/2015 4:44:47
PM
100% FINAL CONTRACT DOCUMENTS
Author06.01.2015
ROOF PLAN
A5.1
Designer
3877.14 / 01-15-007
ROOF GENERAL NOTES
A Contractor shall field verify all dimensions and report any discrepancies.
B Unless otherwise noted, any note, detail, or feature indicated for one condition shall be applicable for all alike and similar conditions.
C The approximate location of roof devices and penetrations are shown on the plans for information only. The Contractor shall be responsible for understanding the actual location of these and all other items prior to beginning construction.
D Do not apply roofing system to wet, damp or frozen deck.
E Protect existing roofing system in accordance with the existing roofing system’s manufacturer's recommendations. Protect roof throughout duration of exterior demolition and construction work. Owner has indicated roof is no longer under warranty.
F Maintain existing building weatherproofing at all times. Schedule and regulate all activities in order to complete each day’s work in weather-tight conditions. Protect all penetrations through existing roof at all times. Contractor is to keep roof and building weather-tight during the course of work. Do not make any overnight openings in roof.
G Remove only that portion of the existing roofing system necessary to accommodate new construction. Install roofing manufacturer's termination system as a means to protect existing roofing system.
H There shall be no traffic on existing roof except over roof protection consisting of 1/2" CDX plywood over 1/2" blackboard (insulation.)
I Contractor is to consult with Owner for Asbestos Survey on file regarding existing roofing materials. Contractor to stop work immediately if asbestos is encountered and notify Owner.
J Contractor to verify quantities and locations of new conduit and/or pipe roof pentrations related to this scope of work. Provide flashing per Detail H5/A5.1
K Contractor is responsible under this contract to provide appropriate roof tie-in and flashing as required at every new penetration including, but not limited to, conduit and pipe pentrations, equipment curbs, VTRs, column penetrations, and mounting pedestals. Refer to MPE drawings for the various roof penetrations.
1/8" = 1'-0" A1 Partial Roof Plan
3" = 1'-0" E5 Vent Thru Roof
3" = 1'-0" A5 Pitch Pocket with Umbrella at Column Penetrations at Roof
ROOF KEY NOTES
1 Refer to Detail A5/A5.1 for Pitch Pocket Detail at new steel column penetration of roof at new platform framing for HVAC Equipment.
2 Pitch Pocket detail where steel column penetrates roof at this location is similar to Detail
A5/A5.1. The sheet metal pitch pocket will have to be modified in size and shape due to the close proximity to the exterior wall. Contractor to verify existing conditions prior to commencement. Repair any disturbance to existing fascia to match existing. Ensure watertight tie in.
3 Refer to Sheet S1.1 for Platform Framing Plan and associated structural details.
4 Provide new membrane roof flashing at pipe mounting pedestal as required for watertight condition - typical at all new pedestals.
5 Refer to Detail H8/A5.1 for flashing at new equipment curbs - typical.
6 Existing opening where existing penthouse louver is scheduled to be removed and preserved. New equipmnet penetration will occur at same opening within existing curb.
Mechanical contractor to ensure watertight housing.
7 Roofing subcontractor to provide new walk-type isolation pad beneath each duct and pipe support - typical at all supports - per roofing mfr's recommendations. Refer to Detail 16/M5.2.
8 Refer to HVAC Drawings for penetrations for HVAC Ductless split system. Roofer is responsible to flash penetrations per details this sheet.
3" = 1'-0"
H5 CONDUIT/ SMALL PIPE ROOF PENETRATION
3" = 1'-0"
H8 ROOF FLASHING @ EQUIP. CURB
SHEET 4 OF 33
CLinen Typewritten Text
PHASE 1
CLinen
1'
5" H
.C
ST
D
2'
0"
3'
6" 1'
0"
2' - 0"
" M
AX
Min.
1' - 3"
URINAL
LAVATORY OR VANITY
SINK
" M
IN
TYPICAL ACCESSORIES MOUNTING HEIGHTS - REFERENCE ONLY
1' - 4 255/256"
MAX 6"
M
IN
9"
MIN 8"
4'
0"
M
AX
3'
4"
" M
AX
MIRROR SOAP
DISPENSER
PAPER TOWEL
DISPENSER
2'
0"
TOILET PAPER
HOLDER
MOP & BROOM
HOLDER
4'
0"
FLOOR MTD TOILET
4' - 11"
4'
1'
0"
1'
3" 7"
3' - 6" MIN 1' - 0" MAX
MIN
1' - 0"
MIN
2' - 0"
16"-18"
M
IN
1/
2"
WATER CLOSET SIDE
WALL
WATER CLOSET BACK
WALL
H .C
5' - 0"
9"
6"
WALL MTD TOILET
4' - 8"
4' - 6" MIN
3' - 0" MIN
1'
0"
M
IN
" M
AX
16 17
G
A7.1J3 J1
J8
J6
MEN
53A-215
WOMEN
53A-214
A7.1 G3G1
G8
G6
WR
SD
TP
TP
TP
SD
M
MM
M
WR
SN
SN
GB
SN
GB
TP
GB
GB
TP
MS
JANITOR
53A-213
MECH.
53A-212
H
APT APT
SOLID SURFACE COUNTER-
TOP & BACKSPLASH
ADA REMOVABLE PANEL-
PLASTIC LAMINATE
EPOXY CONCRETE
COATING- TURN UP 48" @
WET WALL
VINYL FLAKE COATING
BASE 6"
PAINTED GYP BD
NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS
INSTALL EXISTING
MIRRORS
INSTALL EXIST. GRAB
BARS & TOILET
PAPER DISP.
4'
0"
SOLID SURFACE COUNTER-
TOP & BACKSPLASH
ADA REMOVABLE PANEL-
PLASTIC LAMINATE
EPOXY CONCRETE
COATING- TURN UP
48" @ WET WALL
VINYL FLAKE COATING
BASE 6"
PAINTED GYP BD
SOLID PLASTIC
TOILET PARTITION
NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS
INSTALL EXIST.
GRAB BARS,
TOILET PAPEER
DISP AND
SANITARY
NAPKIN DISP.
4'
0"
VINYL PLAKE
COATING BASE 6"
PAINTED GYP BD
SOLID PLASTIC
TOILET PARTITION
NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS
INSTALL EXIST.
PAPER TOWEL DISP.
INSTALL EXIST.
AUTOMATIC PAPER
TOWEL DISP.
VINYL FLAKE
COATING BASE 6"
PAINTED GYP BD
SOLID PLASTIC
TOILET PARTITION
NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS
INSTALL EXIST.
PAPER TOWEL DISP.
INSTALL EXIST. AUTOMATIC
PAPER TOWEL DISP.
SOLID SURFACE
COUNTER-TOP
VINYL FLAKE
COATING BASE 6"
PAINTED GYP BD
SOLID PLASTIC
TOILET PARTITION
NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS
INSTALL EXIST.
SOAP DISP.
NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS
SOLID SURFACE
COUNTER-TOP
VINYL FLAKE
COATING BASE 6"
PAINTED GYP BD
SOLID SURFACE
COUNTER-TOP
PAINTED GYP BD
NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS
DOOR AS
SCHEDULED
VINYL FLAKE
COATING BASE 6"
SOLID SURFACE
COUNTER-TOP &
BACKSPLASH
VINYL FLAKE
COATING BASE 6"
PAINTED GYP BD
SOLID PLASTIC
TOILET PARTITION
NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS
2' -1 0"
MAX. A.D.A. REACH
REMOVABLE 3/4"
BIRCH PLYW'D.
PANEL W/ STAINLESS
STEEL SCREWS AND
ESCUTCHEONS
2 X FRAMING -
ATTACH TO WALL
BLOCKING
NOTE: BLOCK IN
WALL TO RECEIVE
COUNTERTOP
SUPPORT
2x4 BLOCKING
INSULATE PIPING
SOLID SURFACE TOP,
EDGE AND SPLASH
SOLID
SURFACE SKIRT
1' - 10"
2'
2'
5" M
IN
2'
3" M
IN
8" MAX
"6" MAX
1' - 7"
CAULK TO MATCH SOLID
SURFACE COLOR
SOLID SURFACE
WOOD BLOCKING
RIGID INSULATION
1 7/8" FURRING CHANNEL
EXISTING WINDOW
5/8" GYP. BD.
CAULK
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES ARCHITECTS
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
2015 HVAC REDESIGN & ARCHITECTURAL IMPROVEMENTS
R
D
EG
I S
TERE A
T
RCHITEC
STUCK
ASSOCIATES,
PLLC
A SR K A N S A
NO LL-112
As indicated
6/9/2015 4:44:55
PM
100% FINAL CONTRACT DOCUMENTS
Author06.01.2015
ENLARGED PLANS
Bldg 53A - Second Floor
A7.1
Designer
3877.14 / 01-15-007 1/4" = 1'-0"
MOUNTING HEIGHT LEGEND
ACCESSORIES LEGEND
APT Automatic Paper Towel Dispenser GB Grab Bar -
Reuse Existing M Mirror - Reuse Existing MS Mop Strip - Reuse Existing SD Soap Dispenser - Reuse Existing TP Toilet Paper Dispenser - Reuse Existing WR Waste Receptacle / Paper Towel Dispenser
1/4" = 1'-0"
A1 ENLARGED RESTROOMS/ MECH. ROOM PLAN
3/8" = 1'-0"
J1 MEN 53A-215 - ELEVATION A
3/8" = 1'-0"
G1 WOMEN 53A-214 - ELEVATION A
3/8" = 1'-0"
J3 MEN 53A-215 - ELEVATION B
3/8" = 1'-0"
G3 WOMEN 53A-214 - ELEVATION B
3/8" = 1'-0"
J6 MEN 53A-215 - ELEVATION C
3/8" = 1'-0"
J8 MEN 53A-215 - ELEVATION D
3/8" = 1'-0"
G6 WOMEN 53A-214 - ELEVATION C
3/8" = 1'-0"
G8 WOMEN 53A-214 - ELEVATION D
1" = 1'-0"
B8 ADA VANITY SECTION
3" = 1'-0"
B7 WINDOW SILL
SHEET 5 OF 33
CLinen Typewritten Text
PHASE 2
CLinen
CLinen
CLinen Typewritten Text
PHASE 1
CLinen Typewritten Text
PHASE 1
CLinen
PHASE 2
CLinen Typewritten Text
PHASE 2
CLinen
PHASE 2
CLinen Typewritten Text
PHASE 2
CLinen Typewritten Text
PHASE 2
CLinen
CLinen Typewritten Text
PHASE 1A
CLinen Typewritten Text
PHASE 1A
CLinen Typewritten Text
CLinen Typewritten Text
CLinen Typewritten Text
PHASE 1A
CLinen