Attachment_J-5_(_1_of_3)_Building_53A_Replace_Air_Handlers_ _2nd_Floor_Offices.pdf

PDF 7 MB Posted

Attached to
Building 14 and Building 53A Renovation
Solicitation number
15-223-SOL-00107
Issued by

About this file

Attachment J-5 (1 of 3)

View the file

Other files

File Type Posted
amendment_7.pdf PDF
Amendment_6.pdf PDF
Attachment_1_23_08_00_-_Commissioning_Of_HVAC_Systems_bldg_14.pdf PDF
Attachment_2_23_08_00_-_Commissioning_Of_HVAC_Systems_53A.pdf PDF
amendment_5.pdf PDF
Attachment_1_site_visit_list.pdf PDF
Attachment_3-_architectural_revisions.pdf PDF
Attachment_2-_Revised_drawing_MH101_in_attachment_J-3_of_solicitation.pdf PDF
amendment_4.pdf PDF
Attachment_J-10.pdf PDF
Amendment_3.pdf PDF
Attachment_1.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Attachment_J-3_(3_of_3).pdf PDF
Attachment_J-4_Bldg_53A__Renovate_Animal_Rms__Labs__Specs.pdf PDF
Attachment_J-1_(2_of_4).pdf PDF
Attachment_J-10_FDA_Form_3391.pdf PDF
Attachment_J-1_(1_of_4).pdf PDF
Attachment_J-12_SAMPLE_CLIENT__LETTER.doc DOC document
Attachment_J-5_(_2_of_3)_Building_53A_Replace_Air_Handlers_ _2nd_Floor_Offices.pdf PDF
Attachment_J-5_(_3_of_3)_Building_53A_Replace_Air_Handlers_ _2nd_Floor_Offices.pdf PDF
Attachment_J-8_bldg_53A_chiller_2_replacement.pdf PDF
Attachment_J-3_(1_of_3).pdf PDF
Attachment_J-3_(2_of_3).pdf PDF
Attachment_J-7_Building_53_Chiller_Replacement.pdf PDF
Attachment_J-1_(3_of_4).pdf PDF
Attachment_J-1_(4_of_4).pdf PDF
Attachment_J-11_FDA_Form_3398.pdf PDF
Attachment_J-2_Bldg_14_-_Renovate_Labs_-_Specs.pdf PDF
Attachment_J-9_Wage_Decision.pdf PDF
Attachment_J-6_Bldg_53A__Air_Handlers_ _2nd_Floor_Offices__TME_Specs.pdf PDF
15-223-SOL-00107.pdf PDF
Attachment_J-6_Bldg_53A__Air_Handlers_ _2nd_Floor_Offices__Stuck_Specs.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XX X

X

X

X

X X X X

X

X

X

X

X

X

X

X

X X X X X X

XX XXX

XXX XXX XXX XX

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXX

X

XXX X XX X X X X X X X X X XX XX X X XX X XX X XXX XXXX XX X XXX XXXX

X X X XXX X X

X

X

X

X

X

X

X

X

X

XX

X

X X X X XX XX X

X

X

X

X

X

X

X

X

X X

X X X X

X X

X X

X XX

X X

XX

X X

X X

X

X

XXXX

X X

X X

XXX X XX XX XXX

X

X

X

X

X

X

X

X

X

T

XXX

X

X

X

X

X

XX XXX XX X X X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX X X X

X

X

X

X

X

X

X

XX XXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXXX XXXX XX X XXX X XX XXX XX

XXXX XX XXX XXXX XXXX XXX XXX X XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X X

X

X

XXX XXX XXXX X X X

X

X

X

X

X

X

X

X

X

X

XX X X X X X

X

ARL

21 28

20 20

I. OCCUPANCY CLASSIFICATION: (302-312,508) GROUP _____

OCCUPANCY LOAD: (TABLE 1004.1.2) 100 GROSS SF/OCCUPANT

FIRST FLOOR _____SF/100=___ OCCUPANTS

SECOND FLOOR

II. CONSTRUCTION: (TABLE 601) TYPE ____

ALLOWABLE HEIGHT (TABLE 503) 1 STORY

SPRINKLER INCREASE (504.2) 1 STORY

TOTAL ALLOWABLE STORIES: ____ STORIES

ALLOWABLE AREA: (TABLE 503) _____ SF

FRONTAGE INCREASE (506.2) _____ SF

SPRINKLER INCREASE (506.3) _____ SF

TOTAL ALLOWABLE AREA _____ SF

FIRE RESISTENT RATINGS: (TABLE 601 & 602)

STRUCTURAL FRAME 0

FLOOR/ CEILING & ROOF/ CEILING 0

EXTERIOR NON-LOAD BEARING WALLS 0

BEARING WALLS 0

EXIT CORRIDOR WALLS (TABLE 1017.1) 0

SHAFT & STAIR ENCLOSURES (TABLE 1020) 1

PERMANENT PARTITIONS 0

FIRE WALLS 0

III. BUILDING SYSTEMS:

FIRE EXTINGUISHERS: EVERY 3000 SF, OR 75' ALONG EXIT CORRIDOR.

IV. EXIT REQUIREMENTS:

EGRESS WIDTH (TABLE 1005.1)

STAIRS 0.3 INCH/OCCUPANT SERVED

OTHER 0.2 INCH/OCCUPANT SERVED

MINIMUM NUMBER OF EXITS (1019) 2

MINIMUM CLEAR OPENING AT EXITS 32 IN.

EXIT TRAVEL DISTANCE (TABLE 1016.1) ____ FT.

CORRIDOR WIDTH (TABLE 1017.2) ____ IN.

DEAD END CORRIDORS (TABLE 1017.3) ____ FT.

MINIMUM EXITS PER FLOOR (TABLE 1019.1) ___

MINIMUM STAIR WIDTH (1009.1) ___ IN.

HANDRAILS: 34"-38" HIGH, 12" BEYOND TOP AND BOTTOM RISERS.

GUARDRAILS: 42" HIGH, WHERE 30" ABOVE GRADE.

EXIT SIGNS: NO POINT IN CORRIDOR GREATER THAN 100' FROM SIGN

INTERNATIONAL BUILDING CODE 2006 / ARKANSAS 2007

A101

SIM

Name Elevation

DETAIL CALLOUT

(DETAIL #/ SHEET #)

LEVEL MARKER

(LEVEL NAME/ ELEVATION IN FEET)

WALL TAG

(WALL TYPE #)

WINDOW TAG

(WINDOW TYPE #)

DOOR TAG

(DOOR TYPE #)

ROOM NAME AND NUMBER

KEYNOTE

SYMBOL LEGEND

1t

1i

A101

1 1

A101

ELEVATION CALLOUT (MULTIPLE IN A ROOM)

(DETAIL #/ SHEET #)

ELEVATION CALLOUT (SINGLE IN A ROOM)

(DETAIL #/ SHEET #)

Name

XXX

GRID LINEA

ENLARGED DETAIL CALL OUT1

A101

1i SIGNAGE TAGTS TOILET ACCESSORY TAG

AFPC 2007 CODE DATA CERTIFICATION

"I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS HAVE BEEN

PREPARED BY ME OR UNDER MY SUPERVISION. I FURTHER CERTIFY THAT, TO

THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE AS

REQUIRED BY LOW AND IN COMPLIANCE WITH THE ARKANSAS FIRE PREVENTION

CODE FOR THE STATE OF ARKANSAS."

SHEET INDEX

G.1 COVER SHEET

A1.1 DEMO & FLOOR PLAN

A4.1 REFLECTED CEILING PLAN

A5.1 ROOF PLAN

A7.1 ENLARGED PLANS

S1.1 STRUCTURAL NOTES, PARTIAL ROOF PLAN

AND FRAMING SECTIONS

F1.1 FIRE PROTECTION PLANS - PHASE 4 - OPTION 4

P1.1 SECOND FLOOR PLUMBING PLANS - PHASE 4 -

NEW - OPTION #5

M1.1 FIRST AND SECOND FLOOR MECHANICAL ROOM

PLANS - PHASE 1 - NEW AND DEMOLITION - BASE BID

M1.2 SECOND FLOOR AND ROOF LEVEL MECHANICAL

PLAN - PHASE 1 - DEMOLITION AND NEW - BASE BID

M1.3 SECOND FLOOR AND ROOF LEVEL MECHANICAL

PLAN - PHASE 1 - NEW OPTION #1

M2.1 SECOND FLOOR MECHANICAL ROOM

PLANS - PHASE 2 - DEMOLITION AND NEW - BASE BID

M2.2 ROOF LEVEL MECHANICAL PLAN - PHASE 2 - NEW BASE BID

M3.1 SECOND FLOOR MECHANICAL ROOM PLANS -

PHASE 3 - DEMOLITION AND NEW - BASE BID

M4.1 SECOND FLOOR MECHANICAL ROOM PLANS -

PHASE 4 - DEMOLITION AND NEW - BASE BID & OPTION #2

M4.2 SECOND FLOOR MECHANICAL ROOM PLANS -

PHASE 4 - DEMOLITION AND NEW - OPTION #2 & #5

M5.1 MECHANICAL DETAILS

M5.2 MECHANICAL DETAILS

M5.3 MECHANICAL DETAILS

M6.1 MECHANICAL CONTROLS LEGEND

M6.2 MECHANICAL CONTROLS DETAILS

M6.3 MECHANICAL CONTROLS DIAGRAM

M6.4 MECHANICAL CONTROLS DIAGRAM

M6.5 MECHANICAL CONTROLS DIAGRAM

M6.6 MECHANICAL CONTROLS DIAGRAM

M7.1 MECHANICAL LEGENDS AND SCHEDULES

M7.2 MECHANICAL SCHEDULES

E1.1 FIRST AND SECOND MECHANICAL ROOM PLANS -

PHASE 1 - ELECTRICAL - BASE BID

E1.2 ROOF LEVEL - PHASE 1 - DEMOLITION AND NEW

E3.1 SECOND FLOOR - ENLARGED ELECTRICAL ROOM PLAN -

PHASE 3 - BASE BID

E4.1 ELECTRICAL PLANS - PHASE 4 - BASE BID

E4.2 ELECTRICAL PLANS - PHASE 4 - OPTION #3 & #5

E5.1 SCHEDULES, LEGENDS AND GENERAL NOTES - ELECTRICAL

SHEET 1 OF 33

SHEET 2 OF 33

SHEET 3 OF 33

SHEET 4 OF 33

SHEET 5 OF 33

SHEET 6 OF 33

SHEET 7 OF 33

SHEET 8 OF 33

SHEET 9 OF 33

SHEET 10 OF 33

SHEET 11 OF 33

SHEET 12 OF 33

SHEET 13 OF 33

SHEET 14 OF 33

SHEET 15 OF 33

SHEET 16 OF 33

SHEET 17 OF 33

SHEET 18 OF 33

SHEET 19 OF 33

SHEET 20 OF 33

SHEET 21 OF 33

SHEET 22 OF 33

SHEET 23 OF 33

SHEET 24 OF 33

SHEET 25 OF 33

SHEET 26 OF 33

SHEET 27 OF 33

SHEET 28 OF 33

SHEET 29 OF 33

SHEET 30 OF 33

SHEET 31 OF 33

SHEET 32 OF 33

SHEET 33 OF 33

BUILDING 53A

SITE

62A

45T

LITTLE

TO DALLAS

TEXARKANA

ROCK

PINE

BLUFF

RIVER

FORT SMITH

TO OKLAHOMA CITY

ARKANSAS

40 MEMPHIS

TO

S

T.

L

O U

IS

TOXICOLOGICAL RESEARCH

NCTR/JEFFERSON

EXIT

PINE

BLUFF

JEFFRSON PINE BLUFF

ARSENAL

RIVER

TO FORT SMITH

LITTLE ROCK

TO TEXARKANA

TO MEMPHIS

NATIONAL CENTER FOR

PROJECT LOCATION

AR

KAN

SAS

REDFIELD

HW

Y 365

NORTH LITTLE ROCK40

KEY PLAN

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

2015 HVAC REDESIGN & ARCHITECTURAL IMPROVEMENTS

R

D

EG

I S

TERE A

T

RCHITEC

STUCK

ASSOCIATES,

PLLC

A SR K A N S A

NO LL-112

As indicated

6/9/2015 4:45:03

PM

100% FINAL CONTRACT DOCUMENTS

Author06.01.2015

COVER SHEET

Bldg 53A - Second Floor

G.1

Designer

3877.14 / 01-15-007

JEFFERSON LABORATORIES OF THE FDA

BUILDING 53A - SECOND FLOOR

2015 - HVAC RE-DESIGN & ARCHITECTURAL IMPROVEMENTS

1/4" = 1'-0" A5 Site Map 3/8" = 1'-0"

A1 State Location Map

3/8" = 1'-0" D1 Project Location Map

1" = 40'-0"

H3 AREAS OF WORK

100% FINAL CONTRACT DOCUMENTS

SHEET 1 OF 33

ksmith Image

CLinen Typewritten Text

CLinen Typewritten Text

CLinen Typewritten Text

CLinen Typewritten Text

PHASE 2

CLinen Typewritten Text

PHASE 2

CLinen Typewritten Text

PHASE 1

CLinen Typewritten Text

CLinen Typewritten Text

PHASE 1

CLinen Typewritten Text

PHASE 2

CLinen Typewritten Text

PHASE 2

CLinen Typewritten Text

PHASE 2

CLinen Typewritten Text

PHASE 2

CLinen Typewritten Text

PHASE 2

CLinen Typewritten Text

PHASE 2

CLinen Typewritten Text

CLinen Typewritten Text

CLinen Typewritten Text

BUILDING 53A REPLACE AIR HANDLERS & 2ND FLOOR OFFICES

CLinen Typewritten Text

BUILDING 53A REPLACE AIR HANDLERS & 2ND FLOOR OFFICES

IT ROOM

53A-219

OFF

53A-218

OFF

53A-217

OFF

53A-201

OFF

53A-202

OFF

53A-202A

OFF

53A-203

OFF

53A-204

OFF

53A-205

OFF

53A-206

OFF

53A-207

OFF

53A-208

OFF

53A-209

OFF

53A-210

ELECT.

53A-211A

FREEZER ROOM

53A-211

A7.1 A1

16 17 18 19 20

A

B

C

D

E

F

G

J

K

4'

0"

JANITOR

53A-213

MECH.

53A-212

WOMEN

53A-214

MEN

53A-215

Verify 6' - 0"

Ve ri f y

4'

0"

Ve ri f y

3'

0"

MECHANICAL

CHASE

MECHANICAL

CHASE

6' - 10"

2'

0" 3'

3"

ICEMAKER ALCOVE

1' - 4"

Verify

211A

9 10

9 10

9 10

9 10

9 10

9 10

9 10

9 9

H

12 13

21 21 21 21 21 21 21

16 17 18 19 20

A

B

C

D

E

F

G

J

K

6 4

6 4 6 4 6 4

H

11 19

14 13

4 6 4 6

5 5 5 5

TYPE: HOLLOW METAL

DOOR (HM) IN HM FRAME

TYPE: UNEVEN HM

DOOR IN HM FRAME

1' - 6" 2' - 6" 1'-0" 3'-0"

TYPICAL INTERIOR FINISH

SELECTIONS

CARPET

CPT: MANNINGTON BENCHMARK III - INFINITY MODULAR, CHINCHILLA (INTEGRA HP BACKING)

VINYL COMPOSITION TILE:

VCT: ARMSTRONG IMPERIAL TEXTURE, STANDARD EXCELON, 51873 BRUSHED SAND. SUBMIT SAMPLE FOR FDA

PROJECT MANAGER'S APPROVAL.

VINYL FLAKE FLOOR AND WALLCOATING SYSTEM:

VFC: SIKA FLOOR, 1/8" VINYL FLAKE FLOORING SYSTEM. SIKA FLOOR, 48" INTEGRAL VINYL FLAKE FLOORING

SYSTEM WAINSCOT. SUBMIT COLOR SAMPLES FOR FDA PROJECT MANAGER'S APPROVAL.

BASE:

B #1: JOHNSONITE, 45 SANDALWOOD

B #2: SIKA FLOOR, 6" INTEGRAL 1/8" VINYL FLAKE FLOORING SYSTEM BASE

PAINT:

PT #1:SHERWIN WILLIAMS 1102 CHENILLE WHITE, PROMAR 200 ZERO VOC LATEX SEMI-GLOSS. NOTE: BEFORE MAKING A FINAL PAINT COLOR/MFR. SELECTION OR ORDERING PAINT, GC/PAINTING SUBCONTRACTOR IS TO CONFIRM THE PAINT COLOR WITH THE FDA PROJECT MANAGER. THIS INCLUDES ANY GENERAL NOTES

INDICATING TO "MATCH THE EXISTING PAINT COLOR OF ADJACENT PAINTED SURFACE.

PT #2: SHERWIN WILLIAMS COLOR TO MATCH EXISTING DOOR AND FRAME COLOR. GC TO SUBMIT SAMPLE TO

THE FDA PROJECT MANAGER FOR APPROVAL.

SOLID SURFACE MATERIAL:

SSM: FORMICA TRADITIONS - WHEAT MATRIX - 333. GC TO SUBMIT SAMPLE TO THE FDA PROJECT MANAGER FOR

APPROVAL.

PLASTIC LAMINATE:

PL #1:FORMICA SAIL WHITE 463-58

CEILING:

CL #1:ARMSTRONG 1732 FINE FISSURED ANGLED TEGULAR HUMIGUARD PLUS, 2' X 2' WITH 15/16" GRID CL #2:W.R. GYPSUM BOARD W/ EPOXY PAINT - SHERWIN WILLIAMS SW 7007 CEILING BRIGHT WHITE

MISCELLANEOUS:

HOLLOW METAL DOORS: PT #2

HOLLOW METAL DOOR FRAMES: PT #2

WINDOW SILLS: SSM

WINDOW TREATMENTS: 1" MINI BLINDS - COLOR TO BE SELECTED

TOILET PARTITIONS: SOLID PLASTIC PARTITIONS - COLOR TO BE SELECTED

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

2015 HVAC REDESIGN & ARCHITECTURAL IMPROVEMENTS

R

D

EG

I S

TERE A

T

RCHITEC

STUCK

ASSOCIATES,

PLLC

A SR K A N S A

NO LL-112

As indicated

6/9/2015 4:44:27

PM

100% FINAL CONTRACT DOCUMENTS

Author06.01.2015

DEMO & FLOOR PLAN

Bldg 53A - Second Floor

A1.1

Designer

3877.14 / 01-15-007 1/8" = 1'-0"

A5 SECOND FLOOR PLAN

1/8" = 1'-0"

A1 SECOND FLOOR DEMOLITION PLAN

ROOM FINISH SCHEDULE

Room Number Room Name Floor Finish Base Finish

Wall Finish Ceilings

CommentsNorth Wall South Wall East Wall West Wall Ceiling Finish

53A-201 OFF CPT B #1 PT PT PT PT CL #1

53A-202 OFF CPT B #1 PT PT PT PT CL #1

53A-202A OFF CPT B #1 PT PT PT PT CL #1

53A-203 OFF CPT B #1 PT PT PT PT CL #1

53A-204 OFF CPT B #1 PT PT PT PT CL #1

53A-205 OFF CPT B #1 PT PT PT PT CL #1

53A-206 OFF CPT B #1 PT PT PT PT CL #1

53A-207 OFF CPT B #1 PT PT PT PT CL #1

53A-208 OFF CPT B #1 PT PT PT PT CL #1

53A-209 OFF CPT B #1 PT PT PT PT CL #1

53A-210 OFF CPT B #1 PT PT PT PT CL #1

53A-211 FREEZER ROOM VCT B #1 PT PT PT PT PT

53A-211A ELECT. ----- ----- ----- PT ----- PT ----- NO CEILING

53A-212 MECH. VCT B #1 PT PT PT PT ----- NO CEILING

53A-213 JANITOR VCT B #1 PT PT / VFC PT PT / VFC CL #1 VINYL FLAKE TO 36" AFF

53A-214 WOMEN VFC B #2 PT PT PT PT / VFC CL #2 VINYL FLAKE TO 48" AFF

53A-215 MEN VFC B #2 PT PT PT / VFC PT CL #2 VINYL FLAKE TO 48" AFF

53A-217 OFF CPT B #1 PT PT PT PT CL #1

53A-218 OFF CPT B #1 PT PT PT PT CL #1

53A-219 IT ROOM VCT B #1 PT PT PT PT CL #1

DEMOLITION GENERAL NOTES

A Areas to be removed are shown only as an approximation. The General

Contractor is responsible for all demolition or relocation on drawings.

B The Contractor shall verify information shown as existing and report any discrepancies.

C Prior to demolition, the General Contractor will notify the Owner in sufficient time to salvage miscellaneous items before demolition work commences.

D All flooring (VCT, carpet, conductive tile, etc.) designated by note shall be removed to concrete slab or terrazzo flooring.

E The ceiling (gypsum board, acoustical tile, sprayed-on texture, etc.)

including associated ceiling devices and fixtures (ceiling grid, mechanical, electrical, plumbing items, etc.) designated by note shall be removed. See Mechanical, Electrical, and Plumbing demolition plans for more information.

F All walls (metal stud partitions, hollow clay tile, etc.) including associated devices and fixtures (windows, frames, finishes, toilet partitions & accessories, mechanical, electrical and plumbing fixtures, etc.) designated by note shall be removed. See Mechanical, Electrical, and Plumbing demolition plans for additional information.

G During demolition, if asbestos is found, notify Architect immediately.

Asbestos removal will be provided by Owner (or separate Contractor.)

H Remove miscellaneous items (Architectural, Electrical, Mechanical, Plumbing, etc.) on walls designated to be moved.

I Provide dust barriers, both floor and ceiling, to isolate demolition and construction work from occupied portions of the building.

DEMOLITION KEY NOTES

1 REMOVE EXISTING LOUVER

2 REMOVE EXISTING DOOR & ASSOCIATED FRAMING

3 REMOVE EXISTING WALL & BASE & ASSOCIATED ELECTRICAL ITEMS INCLUDING, BUT NOT

LIMITED TO, ELECTRICAL OUTLETS AND SWITCHES - RE: ELECTRICAL DEMOLITION DRAWINGS.

4 REMOVE EXISTING BASE & FLOORING TO CONCRETE SLAB

5 REMOVE EXISTING PANELING/WOOD TRIM AND ASSOCIATED FURRING INCLUDING PANELING &

FURRING WRAPED TO WINDOW (IF APPLICABLE). NOTE REMOVE EXISTING BLINDS AND

RETURN TO OWNER.

6 REMOVE 2 EXISTING CEILINGS & ASSOCIATED MPE ITEMS INCLUDING, BUT NOT LIMITED TO, LIGHTS & SUPPLY/RETURN DIFFUSERS - RE: MECH. DEMOLITION PLAN.

7 REMOVE EXISTING PLUMBING FIXTURES INCLUDING JANITOR SINK, WALL LAVATORIES,

TOILETS. RE: PLUMBING DRAWINGS.

8 REMOVE EXISTING TOILET PARTITIONS

9 REMOVE AND SALVAGE CEILING TILES (FOR FUTURE RE-INSTALLATION) FOR MECHANICAL

INSTALLATION - RE: MECHANICAL DRAWINGS

10 REMOVE EXISTING RAISED CONCRETE FORM THIS AREA TO LEVEL WITH FLOOR

11 REMOVE PORTION OF CEILING AS REQUIRED TO INSTALL NEW COLUMN & GYP. BD. SURROUND.

COORDINATE WITH OWNER THE REMOVAL & REPLACEMENT OF THE EXISTING LAB CASEWORK

FOR INSTALLATION OF NEW COLUMN & GYP. BD. SURROUND

12 REMOVE PORTION OF WALL AS REQUIRED FOR REMOVAL OF DUCTING & PIPING. RE:

MECHANICAL DRAWINGS

13 REMOVE EXISTING PAPER TOWEL DISPENSERS & DISPOSALS, SOAP DISPENSERS,TOILET

PAPER DISPENSERS & SANITARY NAPLIN DISPOSALS AND SAVE FOR REUSE

14 REMOVE EXISTING CEILINGS, LIGHTING, MECHANICAL DIFFUSERS AND ACCESS PANELS.

15 REMOVE EXISTING CONCRETE HOUSEKEEPING SLAB

16 REF: MPE DRAWINGS FOR INFORMATION ON REMOVAL OF EQUIPMENT THIS ROOM

17 REMOVE EXISTING VCT THIS AREA THAT WILL RECEIVE EPOXY FLOORING IN TOILET ROOM

EXPANSION

18 REMOVE PORTION OF CONC. SLAB TO BEAM BELOW FOR NEW COLUMN INSTALLATION. RE:

STRUCTURAL DRAWINGS.

19 REMOVE PORTION OF WALL AS REQD. FOR NEW COLUMN INSTALLATION.

20 REMOVE EXISTING BUCKEYE SMART CENTER AND HOLD FOR FUTURE INSTALLATION.

FLOOR PLAN GENERAL NOTES

A All construction shall be in accordance with the requirements of the applicable codes, engineering shall conform to all applicable municipal, state and federal regulation having jurisdiction including accessibility standards and requirements of "Americans with Disabilities Act."

B Each trade is advised that information pertinent to its work may occur in various sections of the contract documents. Refer to every sheet of drawings for notes and symbols. Notes shall be reviewed and applied to related building components regardless of their locations in the drawings and specifications.

C Unless noted otherwise, any note, detail, or feature indicated for one condition shall be applicable for all alike and similar conditions.

D The Contractor shall furnish and install all blocking, stiffeners, bracing, backing plated and supporting brackets required for the proper installation of all building components as recommended by the manufacturer and required by code. In walls, provide blocking attached to studs as backing supports for wall-mounted items.

E All dissimilar metals shall be effectively isolated from each other to avoid molecular breakdown.

F All exterior joints around window and door frames, between walls and founds, between walls and roof, between wall panels, at penetration of utilities through the envelope shall be sealed or weather-stripped to prevent air and moisture leakage/infiltration.

G Finish floor elevations are to the top of concrete, unless noted otherwise.

H Interior partitions are dimensioned to face of stud, unless noted otherwise. Do not scale drawings. Questions regarding dimensions shall be reported to the

Architect.

FLOOR PLAN KEY NOTES

1 WHERE LOUVER HAS BEEN REMOVED FILL IN AT EXISTING WALL WITH CMU TO MATCH EXISTING. PAINT EXTERIOR TO

MATCH EXISTING COLORS WITH SHERWIN WILLIAMS "SUPERPAINT".

2 ONE HOUR RATED PARTITION - RE: H8/A4.1

3 5/8" GYP. BD. ONE SIDE OF 2 1/2" MET. STUDS @ 16" O.C. TO 10 FT.

4 TYPICAL SHAFTWALL PARTITION - RE:B5/A4.1

5 STORAGE ROOM PARTITION - RE: B8/A4.1

6 WET WALL PARTITION: 5/8" GYP. BD. ONE SIDE OF 3 5/8" MET. STUDS @ 16" O.C.

7 TYPICAL PARTITION - RE: H5/A4.1

8 EXISTING ELECTRICAL EQUIPMENT TO REMAIN

9 NEW CARPET & RUBBER BASE & LAY-IN CEILING. PAINT ALL WALLS AND DOOR.

10 EXTERIOR WALL: 5/8" GYP. BD. ON 1 7/8" FURRING CHANNELS TO 8'-3". RETURN FURRING AND GYP BD. TO WINDOW

FRAME. PROVIDE NEW MINI BLINDS & SOLID SURFACE WINDOW SILL - RE B7/A7.1

11 PATCH FLOOR THIS AREA WITH VCT TO MATCH EXISTING

12 WHERE CONC. FLOOR HAS BEEN REMOVED G.C. TO FORM FOR NEW CONC. SLAB AFTER INSTALLATION OF COLUMNS.

RE:STRUCTURAL DRAWINGS & SPECIFICATIONS. FURR AROUND STEEL COL. WITH MET. STUD FRAMING TO UNDERSIDE OF ROOF STRUCTURE. ATTACH 5/8" GYP. BD. TO 3" ABOVE CEILING. TAPE, FLOAT, TEXTURE & PAINT #1. INSTALL BASE

& PATCH CORRIDOR FLOOR AS REQD.

13 WHERE WALL HAS BEEN REMOVED G.C. TO INSTALL MET. STUDS TO UNDERSIDE OF ROOF STRUCTURE. ATTACH 5/8" FIRECODE GYP. BD. TO STRUCTURE ON BOTH SIDES OF STUDS TO UNDERSIDE OF ROOF STRUCTURE TO MAINTAIN INTEGRITY OF RATED WALLS. RE: H8/A4.1 FOR SIMILAR - TAPE, FLOAT, TEXTURE & PAINT #1 TO MATCH EXISTING.

INSTALL BASE.

14 PATCH WALL AS REQD. TO AIR TIGHTNESS W/5/8" FIRECODE GYP. BD. AFTER REMOVAL OF MECH EQUIP.

15 INSTALL SALVAGE CEILING TILES AFTER MECH INSTALLATION.

16 INSTALL PATCHING & LEVELING COMPOUND WHERE HOUSEKEEPING SLAB & RAISED CONC. FORM WAS REMOVED.

17 INSTALL VINYL FLAKE WALL COATING AT HEIGHT OF 36" ON INDICATED WALLS.

18 FLOOR DRAIN - RE: PLUMBING DRAWINGS

20 RE: DEMOLITION KEYNOTE #20. RE-INSTALL SLAVAGED BUCKEYE SMART CENTER: GC TO MOUNT AT THE SAME

HEIGHT AS IT IS CURRENTLY MOUNTED W/ ADDED BLOCKING IN WALL. GC TO MOUNT IN THE SAME WALL LAYOUT W/ THE STAINLESS STEEL DRIP LEDGE DIRECTLY BELOW THE SMART CENTER & CENTERED ON THE JANITOR SINK FAUCET.

21 EXISTING EXTERIOR WALL W/ PLASTER FINISH IS FLAKING AND CRUMBLING. PRIOR TO INSTALLING GYP. BD. OVERLAY TO WALL, REMOVE PLASTER DEBRIS, CLEAN EXISTING SURFACES, AND PATCH ANY OPENINGS/HOLES LARGE ENOUGH

TO ALLOW INSECT OR RODENT INFESTATION.

22 FOR INSTALLATION OF HVAC DUCTLESS SPLIT UNIT THIS ROOM, PROVIDE ROOF AND EXTERIOR WALL PENETRATION AS

REQUIRED FOR CONNECTION LINES.

DOOR SCHEDULE

Door Mark Width x Height

Door Type

Frame Type

Door Details Label

Hdwr.

Set Comments

211 1 211A 3'-0" x 7'-0" HM 2" Head 1 1/2 hr 2 213 3'-0" x 7'-0" HM 2" Head 1 1/2 hr 2 214 3'-0" x 7'-0" HM 2" Head 1 1/2 hr 3

1/4" = 1'-0"

Door Type Legend

4'-0" X 7'-0" HM 2" Head 1 1/2 hr

SHEET 2 OF 33

CLinen Typewritten Text

CLinen Typewritten Text

PHASE 2

CLinen Typewritten Text

PHASE 2

CLinen

2' X 4' FLUORESCENT

LIGHT FIXTURE

MECHANICAL

SUPPLY DIFFUSER

MECHANICAL

RETURN DIFFUSER

GYPSUM BOARD

CEILING

OCCUPANCY SENSOR

SUSPENDED

ACOUSTICAL CEILING

OS

SUPPLY/EXHAUST DIFFUSER

1' X 4' FLUORESCENT

STRIP FIXTURE

16 17 18 19 20

A

B

C

D

E

F

G

J

K

ELECT.

53A-211A

FREEZER ROOM

53A-211

MECH.

53A-212

WOMEN

53A-214

MEN

53A-215

JANITOR

53A-213

OFF

53A-210

OFF

53A-209

OFF

53A-208

OFF

53A-207

OFF

53A-206

OFF

53A-205

OFF

53A-204

OFF

53A-203

OFF

53A-202A

OFF

53A-202

OFF

53A-201

OFF

53A-217

OFF

53A-218

IT ROOM

53A-219

NO CEILING

NO CEILING

OS OS

OS

H

1 1 1

3"

BRACE TOP OF

PART. TO

STRUCT. ABOVE

CEILING :

REFER TO

CEILING PLAN

SOUND

ATTENUATION BATTS

3 5/8" MTL.

STUDS @ 16"

OC

5/8" GYP. BD.

BOTH SIDES

FLOOR

4 7/8" 4 7/8"

Sound Attenuation Batts

3 5/8" Mtl. Studs

@ 16" OC

5/8" Fire Code Gyp. Bd.

Floor

Provide Stenciling Above Ceilings. Suggested Wording: "Fire and Smoke Barrier Protect All Openings."

Extend Gyp. Bd. to Bottom of Deck and Seal with Fire Barrier Caulk

UL #U495

Ceiling: Refer To Ceiling Plan

Install fire safing between and scribe gyp.

bd. around metal deck where rated walls go to deck.

2 1/2" Mtl. C-H Studs @ 16" OC

5/8" Fire Code Gyp. Bd.

Floor

Provide Stenciling Above Ceilings. Suggested Wording: "Fire and Smoke Barrier Protect All Openings."

Extend Gyp. Bd. to Bottom of Deck and Seal with Fire Barrier Caulk

Ceiling: Refer To Ceiling Plan

Install fire safing between and scribe gyp.

bd. around metal deck where rated walls go to deck.

MECH. SHAFT

1" FIRECODE SHAFTWALL

LINER PANELS

3"

BRACE TOP OF

PART. TO

STRUCT. ABOVE

CEILING :

REFER TO

CEILING PLAN

SOUND

ATTENUATION BATTS

3 5/8" MTL.

STUDS @ 16"

OC

5/8" GYP. BD. TO

UNDERSIDE OF

STRUCTURE

FLOOR

4 7/8"

5/8" GYP. BD.

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

2015 HVAC REDESIGN & ARCHITECTURAL IMPROVEMENTS

R

D

EG

I S

TERE A

T

RCHITEC

STUCK

ASSOCIATES,

PLLC

A SR K A N S A

NO LL-112

As indicated

6/9/2015 4:44:40

PM

100% FINAL CONTRACT DOCUMENTS

Author06.01.2015

REFLECTED CEILING PLAN

Bldg 53A - Second Floor

A4.1

Designer

3877.14 / 01-15-007

CEILING PLAN GENERAL NOTES

A This reflected ceiling plan constitutes a graphic representation of ceiling-mounted elements for the purpose of coordination. Refer to the appropriate discipline drawings and specifications for specific information regarding each of these elements.

B Light fixtures shall be located centered in the room or space, unless noted otherwise.

C When light fixtures are shown to be recessed in ceiling tiles, they shall be centered in ceiling tile, unless noted otherwise.

D All suspended acoustical ceiling grids shall be centered within room or space unless noted otherwise.

E Provide access panels in drywall ceilings at locations shown, or, if not shown, as required to access all mechanical equipment in ceiling cavity requiring normal maintenance or operation.

This includes but is not limited to CAV and VAV boxes, A.W. reheat coils, valve, exhaust fans, balancing dampers, fire dampers, smoke dampers, fire/smoke dampers, clean-outs, or, if not shown, as required to access all mechanical equipment and junction boxes. Submit layout of all ceiling elements, including access panels for Architect to review prior to installation.

CEILING PLAN KEY NOTES

1 Acoustical Ceiling at 8'-0" - Verify per existing height 2 Gypsum board ceiling at 8'-0" - Verify per existing height 3 Gypsum board ceiling patch on metal stud framing tied into existing ceiling. Tape and float and paint to match.

4 24" Sq. Ceiling Access Door - Acudor UF-5000 (or equal) 24" x

24" . Locate per Owner's Instruction.

1/8" = 1'-0"

CEILING LEGEND

1/8" = 1'-0"

1 SECOND FLOOR REFLECTED CEILING PLAN

1 1/2" = 1'-0"

H5 TYPICAL PARTITION

1 1/2" = 1'-0"

H8 ONE HOUR PARTITION

1 1/2" = 1'-0"

B5 ONE HOUR SHAFTWALL PARTITION

1 1/2" = 1'-0"

B8 STORAGE ROOM PARTITION

SHEET 3 OF 33

CLinen Typewritten Text

PHASE 2

CLinen

16 2019181715

J

H

G

F

E

D

C

B

K

A

EXISTING

ROOF DRAIN EXISTING

ROOF

DRAIN

M

1 1 2

1 1

8" M in

ROLL LEAD FLASHING DOWN 1"

INTO PIPE

VENT STACK

LEAD FLASHING - EXTEND 8" AWAY

FROM PIPE

PROVIDE MASTIC AT EDGE OF

ROOFING MATERIAL

MODIFIED BITUMEN COLLAR

FLASHING

MODIFIED BITUMEN ROOFING

MATERIAL

EXISTING ROOF SYSTEM

VERIFY EXISTING ROOF DECK AND

STRUCTURAL CONDITIONS.

NOTE: THIS VTR DETAIL IS INCLUDED FOR CONTRACTOR'S

USE IN THE EVENT NEW VTRs ARE REQUIRED. IT IS ANTICIPATED THAT EXISTING VTRs WILL BE USED TO

ACCOMMODATE NEW TOILET ROOM REVISIONS.

STEEL HHS COL. AT PLATFORM FRAMING -

SEE STRUCTURAL

CONT. SEALANT

DRAWBAND

WATERTIGHT SHEET METAL RAIN COLLAR /

COUNTERFLASHING OVER PENETRATION

POCKET.

EXISTING POURED GYP. DECK. PATCH NEW

OPENING AT COLUMNS AS REQUIRED.

VERIFY EXISTING SUPPORT FOR GYP. DECK.

CONTRACTOR TO VERIFY EXISTING CONDITIONS.

4" MIN.

SHEET METAL PITCH PAN SOLDERED/WELDED

WATERTIGHT. 4" MIN. HEIGHT

NON-SHRINK GROUT

POURABLE SEALANT

ROOF CEMENT

BASE FLASHING PLY, 6" MIN., ALL

PLIES SET IN BITUMEN.

MODIFIED MEMBRANE FLASHING PLY, 9" MIN.,

ALL PLIES SET IN BITUMEN.

ROOF

MEMBRANE

OPTIONAL WOOD NAILERS; VARIES DEPENDING

UPON SIZE OF PENETRATION.

NOTE: THIS PITCH POCKET DETAIL IS SHOWN

AT COLUMN PENETRATIONS OUT IN THE FIELD

OF THE ROOF. WHERE NEW COLUMS OCCUR

AT EXTERIOR WALL, MODIFY PITCH POCKET

SHAPE AND FLANGE AS REQUIRED.

PITCH POCKET AT STEAM VENT THRU ROOF SIMILAR.

Sealant

S.S clamp and screw

Pre-molded pipe boot (peel & stick) w/ factory applied tape

Existing membrane

Acceptable fastener and plate (4 min.)

Sealing mastic between pipe and neck of boot

Verify existing roof deck and structural materials and conditions.

Insulation and deck membrane primer over membrane where tape will be applied

Factory applied peel & stick tape around entire perimeter of boot.

Pressure roll onto primed membrane.

2X wood blocking

2X wood blocking

Counterflashing 24 gauge min.

Flashing receiver

Existing insulation

Existing membrane.

Bonding adhesive

Membrane flashing

Per mfr's recommendation

2x wood blocking

8" m in

Verify existing roof deck and structural materials and conditions.

Patch deck around pentrations as required at all new openings.

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

R

D

EG

I S

TERE A

T

RCHITEC

STUCK

ASSOCIATES,

PLLC

A SR K A N S A

NO LL-112

As indicated

6/9/2015 4:44:47

PM

100% FINAL CONTRACT DOCUMENTS

Author06.01.2015

ROOF PLAN

A5.1

Designer

3877.14 / 01-15-007

ROOF GENERAL NOTES

A Contractor shall field verify all dimensions and report any discrepancies.

B Unless otherwise noted, any note, detail, or feature indicated for one condition shall be applicable for all alike and similar conditions.

C The approximate location of roof devices and penetrations are shown on the plans for information only. The Contractor shall be responsible for understanding the actual location of these and all other items prior to beginning construction.

D Do not apply roofing system to wet, damp or frozen deck.

E Protect existing roofing system in accordance with the existing roofing system’s manufacturer's recommendations. Protect roof throughout duration of exterior demolition and construction work. Owner has indicated roof is no longer under warranty.

F Maintain existing building weatherproofing at all times. Schedule and regulate all activities in order to complete each day’s work in weather-tight conditions. Protect all penetrations through existing roof at all times. Contractor is to keep roof and building weather-tight during the course of work. Do not make any overnight openings in roof.

G Remove only that portion of the existing roofing system necessary to accommodate new construction. Install roofing manufacturer's termination system as a means to protect existing roofing system.

H There shall be no traffic on existing roof except over roof protection consisting of 1/2" CDX plywood over 1/2" blackboard (insulation.)

I Contractor is to consult with Owner for Asbestos Survey on file regarding existing roofing materials. Contractor to stop work immediately if asbestos is encountered and notify Owner.

J Contractor to verify quantities and locations of new conduit and/or pipe roof pentrations related to this scope of work. Provide flashing per Detail H5/A5.1

K Contractor is responsible under this contract to provide appropriate roof tie-in and flashing as required at every new penetration including, but not limited to, conduit and pipe pentrations, equipment curbs, VTRs, column penetrations, and mounting pedestals. Refer to MPE drawings for the various roof penetrations.

1/8" = 1'-0" A1 Partial Roof Plan

3" = 1'-0" E5 Vent Thru Roof

3" = 1'-0" A5 Pitch Pocket with Umbrella at Column Penetrations at Roof

ROOF KEY NOTES

1 Refer to Detail A5/A5.1 for Pitch Pocket Detail at new steel column penetration of roof at new platform framing for HVAC Equipment.

2 Pitch Pocket detail where steel column penetrates roof at this location is similar to Detail

A5/A5.1. The sheet metal pitch pocket will have to be modified in size and shape due to the close proximity to the exterior wall. Contractor to verify existing conditions prior to commencement. Repair any disturbance to existing fascia to match existing. Ensure watertight tie in.

3 Refer to Sheet S1.1 for Platform Framing Plan and associated structural details.

4 Provide new membrane roof flashing at pipe mounting pedestal as required for watertight condition - typical at all new pedestals.

5 Refer to Detail H8/A5.1 for flashing at new equipment curbs - typical.

6 Existing opening where existing penthouse louver is scheduled to be removed and preserved. New equipmnet penetration will occur at same opening within existing curb.

Mechanical contractor to ensure watertight housing.

7 Roofing subcontractor to provide new walk-type isolation pad beneath each duct and pipe support - typical at all supports - per roofing mfr's recommendations. Refer to Detail 16/M5.2.

8 Refer to HVAC Drawings for penetrations for HVAC Ductless split system. Roofer is responsible to flash penetrations per details this sheet.

3" = 1'-0"

H5 CONDUIT/ SMALL PIPE ROOF PENETRATION

3" = 1'-0"

H8 ROOF FLASHING @ EQUIP. CURB

SHEET 4 OF 33

CLinen Typewritten Text

PHASE 1

CLinen

1'

5" H

.C

ST

D

2'

0"

3'

6" 1'

0"

2' - 0"

" M

AX

Min.

1' - 3"

URINAL

LAVATORY OR VANITY

SINK

" M

IN

TYPICAL ACCESSORIES MOUNTING HEIGHTS - REFERENCE ONLY

1' - 4 255/256"

MAX 6"

M

IN

9"

MIN 8"

4'

0"

M

AX

3'

4"

" M

AX

MIRROR SOAP

DISPENSER

PAPER TOWEL

DISPENSER

2'

0"

TOILET PAPER

HOLDER

MOP & BROOM

HOLDER

4'

0"

FLOOR MTD TOILET

4' - 11"

4'

1'

0"

1'

3" 7"

3' - 6" MIN 1' - 0" MAX

MIN

1' - 0"

MIN

2' - 0"

16"-18"

M

IN

1/

2"

WATER CLOSET SIDE

WALL

WATER CLOSET BACK

WALL

H .C

5' - 0"

9"

6"

WALL MTD TOILET

4' - 8"

4' - 6" MIN

3' - 0" MIN

1'

0"

M

IN

" M

AX

16 17

G

A7.1J3 J1

J8

J6

MEN

53A-215

WOMEN

53A-214

A7.1 G3G1

G8

G6

WR

SD

TP

TP

TP

SD

M

MM

M

WR

SN

SN

GB

SN

GB

TP

GB

GB

TP

MS

JANITOR

53A-213

MECH.

53A-212

H

APT APT

SOLID SURFACE COUNTER-

TOP & BACKSPLASH

ADA REMOVABLE PANEL-

PLASTIC LAMINATE

EPOXY CONCRETE

COATING- TURN UP 48" @

WET WALL

VINYL FLAKE COATING

BASE 6"

PAINTED GYP BD

NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS

INSTALL EXISTING

MIRRORS

INSTALL EXIST. GRAB

BARS & TOILET

PAPER DISP.

4'

0"

SOLID SURFACE COUNTER-

TOP & BACKSPLASH

ADA REMOVABLE PANEL-

PLASTIC LAMINATE

EPOXY CONCRETE

COATING- TURN UP

48" @ WET WALL

VINYL FLAKE COATING

BASE 6"

PAINTED GYP BD

SOLID PLASTIC

TOILET PARTITION

NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS

INSTALL EXIST.

GRAB BARS,

TOILET PAPEER

DISP AND

SANITARY

NAPKIN DISP.

4'

0"

VINYL PLAKE

COATING BASE 6"

PAINTED GYP BD

SOLID PLASTIC

TOILET PARTITION

NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS

INSTALL EXIST.

PAPER TOWEL DISP.

INSTALL EXIST.

AUTOMATIC PAPER

TOWEL DISP.

VINYL FLAKE

COATING BASE 6"

PAINTED GYP BD

SOLID PLASTIC

TOILET PARTITION

NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS

INSTALL EXIST.

PAPER TOWEL DISP.

INSTALL EXIST. AUTOMATIC

PAPER TOWEL DISP.

SOLID SURFACE

COUNTER-TOP

VINYL FLAKE

COATING BASE 6"

PAINTED GYP BD

SOLID PLASTIC

TOILET PARTITION

NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS

INSTALL EXIST.

SOAP DISP.

NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS

SOLID SURFACE

COUNTER-TOP

VINYL FLAKE

COATING BASE 6"

PAINTED GYP BD

SOLID SURFACE

COUNTER-TOP

PAINTED GYP BD

NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS

DOOR AS

SCHEDULED

VINYL FLAKE

COATING BASE 6"

SOLID SURFACE

COUNTER-TOP &

BACKSPLASH

VINYL FLAKE

COATING BASE 6"

PAINTED GYP BD

SOLID PLASTIC

TOILET PARTITION

NOTE(S): REFER TO ENLARGED PLAN FOR SPECIFIC TOILET ACCESSORY LOCATIONS

2' -1 0"

MAX. A.D.A. REACH

REMOVABLE 3/4"

BIRCH PLYW'D.

PANEL W/ STAINLESS

STEEL SCREWS AND

ESCUTCHEONS

2 X FRAMING -

ATTACH TO WALL

BLOCKING

NOTE: BLOCK IN

WALL TO RECEIVE

COUNTERTOP

SUPPORT

2x4 BLOCKING

INSULATE PIPING

SOLID SURFACE TOP,

EDGE AND SPLASH

SOLID

SURFACE SKIRT

1' - 10"

2'

2'

5" M

IN

2'

3" M

IN

8" MAX

"6" MAX

1' - 7"

CAULK TO MATCH SOLID

SURFACE COLOR

SOLID SURFACE

WOOD BLOCKING

RIGID INSULATION

1 7/8" FURRING CHANNEL

EXISTING WINDOW

5/8" GYP. BD.

CAULK

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES ARCHITECTS

DRAWING NO. SHEET:

CHECKED BY:DRAWN BY:DATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

2015 HVAC REDESIGN & ARCHITECTURAL IMPROVEMENTS

R

D

EG

I S

TERE A

T

RCHITEC

STUCK

ASSOCIATES,

PLLC

A SR K A N S A

NO LL-112

As indicated

6/9/2015 4:44:55

PM

100% FINAL CONTRACT DOCUMENTS

Author06.01.2015

ENLARGED PLANS

Bldg 53A - Second Floor

A7.1

Designer

3877.14 / 01-15-007 1/4" = 1'-0"

MOUNTING HEIGHT LEGEND

ACCESSORIES LEGEND

APT Automatic Paper Towel Dispenser GB Grab Bar -

Reuse Existing M Mirror - Reuse Existing MS Mop Strip - Reuse Existing SD Soap Dispenser - Reuse Existing TP Toilet Paper Dispenser - Reuse Existing WR Waste Receptacle / Paper Towel Dispenser

1/4" = 1'-0"

A1 ENLARGED RESTROOMS/ MECH. ROOM PLAN

3/8" = 1'-0"

J1 MEN 53A-215 - ELEVATION A

3/8" = 1'-0"

G1 WOMEN 53A-214 - ELEVATION A

3/8" = 1'-0"

J3 MEN 53A-215 - ELEVATION B

3/8" = 1'-0"

G3 WOMEN 53A-214 - ELEVATION B

3/8" = 1'-0"

J6 MEN 53A-215 - ELEVATION C

3/8" = 1'-0"

J8 MEN 53A-215 - ELEVATION D

3/8" = 1'-0"

G6 WOMEN 53A-214 - ELEVATION C

3/8" = 1'-0"

G8 WOMEN 53A-214 - ELEVATION D

1" = 1'-0"

B8 ADA VANITY SECTION

3" = 1'-0"

B7 WINDOW SILL

SHEET 5 OF 33

CLinen Typewritten Text

PHASE 2

CLinen

CLinen

CLinen Typewritten Text

PHASE 1

CLinen Typewritten Text

PHASE 1

CLinen

PHASE 2

CLinen Typewritten Text

PHASE 2

CLinen

PHASE 2

CLinen Typewritten Text

PHASE 2

CLinen Typewritten Text

PHASE 2

CLinen

CLinen Typewritten Text

PHASE 1A

CLinen Typewritten Text

PHASE 1A

CLinen Typewritten Text

CLinen Typewritten Text

CLinen Typewritten Text

PHASE 1A