Attachment_J-1_(2_of_4).pdf

PDF 10 MB Posted

Attached to
Building 14 and Building 53A Renovation Federal contract opportunity
Solicitation number
15-223-SOL-00107
Issued by
Department of Health and Human Services Food and Drug Administration

About this file

Attachment J-1 (2 of 4)

View the file

Other files for this federal contract opportunity

Other files attached to Building 14 and Building 53A Renovation, newest first.
File Type Posted
amendment_7.pdf PDF
Attachment_2_23_08_00_-_Commissioning_Of_HVAC_Systems_53A.pdf PDF
Amendment_6.pdf PDF
Attachment_1_23_08_00_-_Commissioning_Of_HVAC_Systems_bldg_14.pdf PDF
Attachment_2-_Revised_drawing_MH101_in_attachment_J-3_of_solicitation.pdf PDF
Attachment_3-_architectural_revisions.pdf PDF
amendment_5.pdf PDF
Attachment_1_site_visit_list.pdf PDF
amendment_4.pdf PDF
Attachment_J-10.pdf PDF
Amendment_3.pdf PDF
Attachment_1.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Attachment_J-1_(1_of_4).pdf PDF
Attachment_J-12_SAMPLE_CLIENT__LETTER.doc DOC document
Attachment_J-5_(_1_of_3)_Building_53A_Replace_Air_Handlers_ _2nd_Floor_Offices.pdf PDF
Attachment_J-11_FDA_Form_3398.pdf PDF
Attachment_J-4_Bldg_53A__Renovate_Animal_Rms__Labs__Specs.pdf PDF
Attachment_J-10_FDA_Form_3391.pdf PDF
Attachment_J-5_(_2_of_3)_Building_53A_Replace_Air_Handlers_ _2nd_Floor_Offices.pdf PDF
Attachment_J-5_(_3_of_3)_Building_53A_Replace_Air_Handlers_ _2nd_Floor_Offices.pdf PDF
Attachment_J-7_Building_53_Chiller_Replacement.pdf PDF
15-223-SOL-00107.pdf PDF
Attachment_J-6_Bldg_53A__Air_Handlers_ _2nd_Floor_Offices__TME_Specs.pdf PDF
Attachment_J-6_Bldg_53A__Air_Handlers_ _2nd_Floor_Offices__Stuck_Specs.pdf PDF
Attachment_J-2_Bldg_14_-_Renovate_Labs_-_Specs.pdf PDF
Attachment_J-9_Wage_Decision.pdf PDF
Attachment_J-8_bldg_53A_chiller_2_replacement.pdf PDF
Attachment_J-3_(1_of_3).pdf PDF
Attachment_J-3_(2_of_3).pdf PDF
Attachment_J-1_(3_of_4).pdf PDF
Attachment_J-1_(4_of_4).pdf PDF
Attachment_J-3_(3_of_3).pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

S-701

S-701

2'

- 4

1/ 2"

2' - 7 3/4" 2' - 2"

COPE BOTTOM FLANGE OF

STRINGER AROUND COLUMN

1 1/4" GRATING (19W4) AT LANDING

11 3/4" 4' - 0"

2'

- 8

1/ 2"

1'

- 1

1/ 2"

C10X15.3

C1 0X

.3

C6 X1

0.5

C6X10.5

C1 0X

.3

C1 0X

.3

L3X3X3/16

L3X3X3/16

1' - 5 3/4" 3' - 0"

FINISHED FLOOR

0' - 0"

1'

- 6

1'

- 6

EXISTING COLUMN

FOOTING

1' - 0" 2' - 2" 1' - 0"

4' - 2"

L6x4x5/16 w/2 - 3/4"Ø H.S.

BOLTS, TYP, WELD 3-SIDES

C10X15.3

HS

S4

X4 X1

/4

HS

S4

X4 X1

/4

BASE PLATE AND ANCHOR RODS, SEE 8/S-301

4' - 0"11 3/4"

SEE 1/S-303

#5 AT 9" O.C. EA WAY TOP & BOT

FINISHED FLOOR

0' - 0"

CD

1 1/2" GRATING (19W4) AT LANDING

S-302

S-701

S-701

22' - 3"

2' - 4" 11 1/2"

L3X3X3/16

C6X10.5

HS

S4

X4 X1

/4

HS

S4

X4 X1

/4

1' - 6" 1' - 6" 1' - 6" 1' - 6"

3' - 0" 3' - 0"

2' - 8 1/2" 1' - 1 1/2"

19 EQ TREADS

17' - 5"

1'

- 6

1'

- 6

S-701

COORDINATE HANDRAIL w/ARCH

3/16 3/16

1"

3/8" CAP PLATE

C10X15.3

C6X10.5

C6X10.5

L3X3X3/16

1 1 /4"

L6x4x5/16 w/2 - 3/4"Ø H.S.

BOLTS, TYP

3/16

3-SIDES,

TYP

CROMWELL

ARCHITECTS/

ENGINEERS

#5ARKANS A S-ENGINEER

CE

RT

IFI

CATEOF AUTHORIZATION PROFESSIONAL

REGISTERED

ARKANSAS

ENGINEER

No. 12965

A N

T H O N Y G . J A C U Z

Z I

S T A T E O F

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

STAIR FRAMING AND DETAILS

S-70107/15/2015

3/4" = 1'-0"1 FRAMING PLAN AT STAIR LANDING

1/2" = 1'-0"2 SECTION THRU STAIR FRAMING

1/2" = 1'-0"3 SECTION THRU STAIR

1" = 1'-0"4 STAIR FRAMING DETAIL

1/4" CAP PLATE AT

HSS COLUMN, TYP

D

0.70.5

S-702

3'

- 0

1/ 8"

6'

- 6

S-702

1' - 3 1/2" 5' - 8" 3' - 11"

FIELD VERIFY

3' - 0"

2" CLR

FACE OF EXISTING WALL

S-702

1 1/2" GRATING (19W4) AT LANDING

REMOVABLE HANDRAIL AROUND

LANDING - COORDINATE

HANDRAIL w/ARCH

9"

VERIFY LOCATION w/ARCH

AND NEW DOOR LOCATION

IN EXISTING WALL

C1 0X

.3

C1 0X

.3

W12X26

S-702

W 8X

W12X26

C1 0X

.3

1' - 5 1/2" 1' - 6 1/2"

3' - 0"

FINISHED FLOOR

0' - 0"

D

2' - 0" 2' - 0" 2' - 0" 2' - 0"

19 EQ TREADS

17' - 5"

E

Q

RI

SE

RS

2"

3' - 0 1/8" 6' - 6"

4"

S-702

1/2" CAP PLATE w/4 -

3/4"Ø H.S. BOLTS

1'

- 6

1'

- 6

W48: 4' - 0" W48: 4' - 0"

#5 AT 9" O.C. EA WAY TOP & BOT

1'

- 6

1'

- 6

S-302

6' - 6"

COORDINATE HANDRAIL w/ARCH

REMOVABLE HANDRAIL AROUND

LANDING - COORDINATE

HANDRAIL w/ARCH

3/16

TYP AT

STRINGER

NOTE:

ALL STEEL COMPONENTS INCLUDED HARDWARE

AND FASTENERS TO BE HOT DIP GALVANIZED

C10X15.3

BRACE, SEE 6/S-702

BASE PLATE & ANCHOR

RODS, SEE 8/S-301

CONCRETE PAVING, SEE CIVIL

24"Ø CONCRETE COVER

AROUND COLUMN

COAL TAR EPOXY ALL AROUND

AT COLUMN , BASE PLATE AND

ANCHOR RODS BELOW TOP OF

PAVEMENT, TYP

HS

S4

X4 X1

/4

HS

S4

X4 X1

/4

D

HSS8X3X1/4 (LSH)

HS

S8

X3 X1

/4

HS

S8

X3 X1

/4

WT4x9 w/4 - 3/4"Ø H.S.

BOLTS AT POSTS AT

LANDING

REMOVABLE HANDRAIL AROUND

LANDING - COORDINATE

HANDRAIL w/ARCH

6' - 6" 3' - 0 1/8"

EXISTING RIGID FRAME

1/2" CAP PLATE w/4 -

3/4"Ø H.S. BOLTS

1/2" BASE PLATE w/4 -

3/4"Ø H.S. BOLTS

3/8" FULL DEPTH STIFFENER

EA SIDE OF WEB CENTERED

UNDER COLUMN

3/16 3/16

TYP

5/16" BENT PLATE EA SIDE OF

HSS COLUMN w/1 - 3/4"Ø THRU

BOLT IN 1 1/2" VERTICAL SLOT

3-SIDES, TYP

3/16

TYP

PL3/8"x6"x0'-8" w/2 -

3/4"Ø THRU BOLTS

BRACE, SEE 6/S-702

W8X18

1/4"x4" KICKPLATE AROUND LANDING0 60°

C10X15.3

1 1/2" GRATING (19W4) AT LANDING

4"11"

GRATING TREAD, TYP

C10X15.3 L6x4x5/16 w/2 - 3/4"Ø H.S.

BOLTS, TYP

C10X15.3

1 1/2" GRATING (19W4) AT LANDING

FINISHED FLOOR

0' - 0"

10.70.5

S-702

S-702

1'

- 6

1'

- 6

W48: 4' - 0"

2' - 0" 2' - 0" 2' - 0" 2' - 0"

W48: 4' - 0"

1'

- 6

1'

- 6

HS

S4

X4 X1

/4

HS

S4

X4 X1

/4

W12X26

5' - 8"1' - 3 1/2"

9"

3'

- 0

HSS4X4X1/4

HSS8X3X1/4

5' - 8" 3' - 11"

2"3' - 0"

HSS4X4X1/4

1/2" PLATE w/4 - 3/4"Ø

H.S. BOLTS, TYP

3/16

TYP

1/4 1/4

TYP

TYP

1' - 3 1/2"

CROMWELL

ARCHITECTS/

ENGINEERS

#5ARKANS A S-ENGINEER

CE

RT

IFI

CATEOF AUTHORIZATION PROFESSIONAL

REGISTERED

ARKANSAS

ENGINEER

No. 12965

A N

T H O N Y G . J A C U Z

Z I

S T A T E O F

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

STAIR FRAMING AND DETAILS

S-70207/15/2015

3/4" = 1'-0"1 FRAMING PLAN AT STAIR LANDING

1/2" = 1'-0"2 SECTION THRU STAIR

1/2" = 1'-0"3 DOOR FRAME AT STAIR LANDING AT EXISTING WALL

1" = 1'-0"4 STAIR FRAMING DETAIL

1" = 1'-0"5 STAIR FRAMING DETAIL

1/2" = 1'-0"6 SECTION THRU STAIR LANDING

A

B

C

D

E

F

1 1.4 2 2.5 3 3.5 4 4.5 5 5.5 6

EXTENTS OF PHASE I

CONSTRUCTION

F.2

E.9

F.3

F.4

F.6

W1

PHASE I PHASE II

PHASE I PHASE II

EXTENTS OF PHASE I

CONSTRUCTION

D.3

4A

3A

GENERAL DEMOLITION REQUIREMENTS:

REFER TO ARCH DEMO SHEETS (AD101 & AD102)

1. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT

ACCORDANCE WITH OSHA REGULATIONS.

2. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK

INCLUDES, BUT IS NOT LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS,

CEILINGS, ROOFING, DOORS, FIXTURES, PLUMBING, MECHANICAL AND ELECTRICAL

ITEMS INCLUDING CONDUITS AND DUCTWORK AS SHOWN ON DRAWING OR AS

REQUIRED FOR THE INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB. THE

CONTRACTOR SHALL REPLACE ANY/ALL FLOOR, WALL, OR CEILING FINISHES DAMAGED

AS A RESULT OF DEMOLITION. MATCH EXISTING ADJACENT FINISHES.

3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A MINIMUM OF 8" BELOW FINISH

FLOOR OR A MINIMUM OF 6" ABOVE FINISH CEILING UNLESS NOTED OTHERWISE

4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING,

BRACING AND SUPPORT SYSTEMS FOR EXISTING STRUCTURE AND TO KEEP THE

EXISTING STRUCTURE INTACT AND IN A SAFE CONDITION DURING DEMOLITION AND

NEW CONSTRUCTION. THE CONTRACTOR SHALL RETAIN A REGISTERED

PROFESSIONAL ENGINEER TO DESIGN THE SHORING OR BRACING AND SPECIFY

DEMOLITION PROCEDURES. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR MEANS

AND METHODS OF DEMOLITION AND NEW CONSTRUCTION.

5. DURING DEMOLITION AND RECONSTRUCTION, THE CONTRACTOR SHALL

COORDINATE WITH THE OWNER ANY REQUIRED SAFETY BARRIERS OR BARRICADES.

PROVIDE BARRICADES SO AS TO PRECLUDE INTRUSION OF PUBLIC INTO

CONSTRUCTION AREAS.

6. REFER TO THE OWNER APPROVED CONSTRUCTION PHASING SCHEDULE FOR

PHASING OF DEMOLITION AND NEW CONSTRUCTION. COORDINATE DEMOLITION

WITH NEW CONSTRUCTION IN ORDER THAT THE FACILITY WILL HAVE

UNINTERRUPTED WATER, SEWER, ELECTRICAL, GAS AND FIRE PROTECTION SERVICE.

THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALL NECESSARY TEMPORARY

UTILITY PROVISIONS REQUIRED.

7. ALL DEMOLITION MATERIALS NOT SALVAGED BY THE OWNER SHALL BE REMOVED BY

THE CONTRACTOR. COORDINATE WITH THE OWNER REGARDING MATERIALS TO BE

SALVAGED BY THE OWNER. REFER ALSO TO SPECIFICATIONS FOR SALVAGED ITEMS.

8. CONSTRUCT DUST PARTITION PRIOR TO BEGINNING DEMOLITION. DO NOT USE

TEMPORARY DUST PARTITION AS SHORING AND/OR BRACING OF EXISTING BUILDING

COMPONENTS.

9. TEMPORARY DUST PARTITIONS ARE AS FOLLOWS. COORDINATE TYPES FOR EACH

LOCATION WITH THE OWNER. BRACE DUST PARTITIONS SO AS TO PRECLUDE

LATERAL MOVEMENT OF PARTITION.

TYPE "A"

CONSTRUCTED OF 2x4'S AT 24" OC BELOW CEILING AND 48" OC FROM CEILING TO ROOF DECK, PROVIDE 4'-0"x8'-0" HORIZONTAL SHEETS OF 1/2" CD PLYWOOD

SHEATHING FROM FLOOR TO ROOF DECK WITH 6 MIL. POLY SHEETING.

TYPE "B"

CONSTRUCTED SAME AS TYPE "A", EXCEPT 6 MIL. CLEAR POLY SHEETING. FROM

CEILING TO ROOF DECK IN LIEU OF WOOD STUDS AND PLYWOOD. OVERLAP SHEETING

AT JOINTS A MINIMUM OF 1'-0" AND CONTINUOUSLY TAPE JOINTS. ATTACH SHEETING

FROM CEILING TO ROOF DECK FOR DUSTPROOF CONDITION.

TYPE "C"

CONSTRUCTED OF 2x4'S AT 24" OC FROM FLOOR TO ABOVE DEMOLITION AREA THEN FRAME 2x4'S AT ANGLE BACK TO EXISTING WALL. PROVIDE 1/2" CD EXTERIOR

PLYWOOD SHEATHING.

TYPE "D"

CONSTRUCTED SAME AS TYPE "A" EXCEPT ADD THERMAL BATT R-11 (BLANKET)

INSULATION AT STUD SPACE.

DUST DRAPES

6 MIL. CLEAR POLY SHEETING. OVERLAP SHEETING AT JOINTS A MINIMUM 1'-0" AND

CONTINUOUSLY TAPE JOINTS. ATTACH SHEETING FROM CEILING TO FINISH FLOOR

FOR DUSTPROOF CONDITION. IF ATTACHMENT TO CEILING IS IMPOSSIBLE, LIGHT

FRAMING SHALL BE INSTALLED WITH SHEETING ATTACHED ALL AROUND TO PROHIBIT

DUST PENETRATION.

10. CONSTRUCT A MAXIMUM OF 40'-0" OF "TEMPORARY DUST WALL" IN 8 HOUR

PERIOD.

11. ALL DUST PARTITIONS SHALL HAVE SINGLE ACTING DOORS WITH CLOSURES

CLOSING AGAINST GASKETED STOPS ON FRAMES TO REDUCE PASSAGE OF AIR, DUST

AND MOISTURE. PROVIDE MATS AT DOORS TO REDUCE TRACKING OF DUST. REPLACE

OR CLEAN DAILY.

12. SEAL PERIMETER OF DUST PARTITIONS AND DOORS TO PREVENT PASSAGE OF

DUST. TAPE FASTEN DEPRESSIONS, JOINTS BETWEEN PANELS AND JOINTS BETWEEN

PANELS AND FLOORS, CEILING AND COLUMNS WITH 2 IN. WIDE PRESSURE SENSITIVE

TAPE.

13. REMOVE EXISTING FLOORING SYSTEM AT EXISTING BUILDING FLOOR AREAS AND

REPAIR CONCRETE SUBSTRATE FOR NEW FLOORING SYSTEM.

14. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND

ELECTRICAL DRAWINGS FOR NECESSARY FLOOR SLAB DEMOLITION FOR THE

INSTALLATION OF NEW FOUNDATIONS, PIPING OR CONDUITS.

15. THE CONTRACTOR SHALL USE A WET SAW FOR SLAB SAWING. NO JACK HAMMERS

WILL BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE OWNER.

PREPARE CONCRETE SUBSTRATE, CEMENT GROUT INFILL DEPRESSED AREAS. FLUSH

AND LEVEL FOR NEW FLOOR FINISH FOR SMOOTH TRANSITION TO ADJACENT FLOOR

AREAS.

16. WHEN DEMOLISHING AN EXISTING CMU/CLAY TILE WALL FOR A NEW OPENING,

REMOVE EXISTING CMU/CLAY TILE 8" BELOW FINISH FLOOR AND A MINIMUM OF 1'-4"

WIDER THAN EACH JAMB FOR THE INSTALLATION OF NEW LINTEL AND TOOTH-IN NEW

CMU/CLAY TILE AT EACH JAMB.

17. PROTECT ALL WATER PIPING AT AREAS OF DEMOLITION, EXPANSION AND

REMODEL, WHERE EXISTING PIPING IS SUBJECT TO FREEZING. PROTECT PIPING SO

AS NOT TO FREEZE.

DEMO LEGEND

EXISTING BUILDING ELEMENTS TO BE REMOVED,

REF. KEYED NOTES

EXISTING SLAB TO BE REMOVED

PHASE BOUNDARY

REMOVE ALL NON LOAD BEARING WALLS, CEILINGS, FINISHES, DOORS, FRAMES,

SHOWN AS DASHED. REMOVE ALL HARDWARE, HANGERS MECHANICAL AND

ELECTRICAL DEVICES FROM EXISTING STRUCTURE, REMOVE ALL EXISTING

ABANDONED EQUIPMENT. PREP EXISTING ROOF DECK, COVER BOARD, STRUCTURE,

FLOORS AND SUBSTRATE AS REQUIRED TO RECEIVE NEW FINISHES AS REQUIRED BY

THE SPECIFICATIONS AND AS REQUIRED TO INSTALL NEW CONSTRUCTION.

REFERENCE GENERAL DEMOLITION REQUIREMENTS FOR ADDITIONAL INFORMATION.

DEMOLITION KEYNOTES

PORTIONS OF EXISTING SHEAR WALL TO REMAIN. VERIFY THE EXTENT OF

REQUIRED DEMOLITION WITH ARCHITECTURE FLOOR PLAN SHEETS AND

STRUCUTRAL

REMOVE PORTION OF EXISTING SLAB AS REQUIRED FOR NEW UTILITIES

COORDINATE WITH MECHANICAL, ELECTRICAL AND PLUMBING FOR EXTENT OF

NEW UTILITIES COORDINATE WITH STRUCTURE FOR INFILL A PORTIONS OF

REMOVED SLAB.

4 REMOVE EXISTING METAL STAIR AND ALL ASSOCIATED FRAMING ENTIRELY.

5 REMOVE EXISTING SIDEWALK, REFERENCE CIVIL SITE DEMOLITION PLAN

6 COMPLETELY REMOVE EXISTING MECHANICAL APPENDAGE REMOVE ALL

MECHANICAL, ELECTRICAL, PLUMBING , WALLS, DOORS, FRAMES,

HARDWARE, SLABS, FOUNDATION AND STRUCTURE AS REQUIRED FOR

NEW CONSTRUCTION . REFER TO GENERAL DEMOLITION REQUIREMENTS

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

CROMWELL

ARCHITECTS/

ENGINEERS

#5A

R

KANSAS -ENG

IN

EE

R

C E R T

IF

IC

AT

EOF

AUTHORIZ

A T

IO

N R

E G

IS

T E

RED A R CH IT E C

T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

DEMOLITION PLAN - PHASE I

AD10107/15/15

1/8" = 1'-0"

1 DEMO PLAN - PHASE I

SCALE : 1/8" = 1'-0"

0 4 8 16

TR

UE

N

OR

TH

PL

AN

N O

RT

H

7 8 9 10

B

C

E

F

D

A

B

C

D

E

F

6 6.5 7 7.5 8 8.6 9 9.3

1A

EXTENTS OF PHASE II

CONSTRUCTION

EXTENTS OF PHASE II

CONSTRUCTION

F.2

E.9

F.3

F.4

F.6

W1

EXTENTS OF PHASE II

CONSTRUCTION

PHASE IIPHASE I

PHASE IIPHASE I

D.3

4A

3A

GENERAL DEMOLITION REQUIREMENTS:

REFER TO ARCH DEMO SHEETS (AD101 & AD102)

1. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT

ACCORDANCE WITH OSHA REGULATIONS.

2. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK

INCLUDES, BUT IS NOT LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS,

CEILINGS, ROOFING, DOORS, FIXTURES, PLUMBING, MECHANICAL AND ELECTRICAL

ITEMS INCLUDING CONDUITS AND DUCTWORK AS SHOWN ON DRAWING OR AS

REQUIRED FOR THE INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB. THE

CONTRACTOR SHALL REPLACE ANY/ALL FLOOR, WALL, OR CEILING FINISHES DAMAGED

AS A RESULT OF DEMOLITION. MATCH EXISTING ADJACENT FINISHES.

3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A MINIMUM OF 8" BELOW FINISH

FLOOR OR A MINIMUM OF 6" ABOVE FINISH CEILING UNLESS NOTED OTHERWISE

4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING,

BRACING AND SUPPORT SYSTEMS FOR EXISTING STRUCTURE AND TO KEEP THE

EXISTING STRUCTURE INTACT AND IN A SAFE CONDITION DURING DEMOLITION AND

NEW CONSTRUCTION. THE CONTRACTOR SHALL RETAIN A REGISTERED

PROFESSIONAL ENGINEER TO DESIGN THE SHORING OR BRACING AND SPECIFY

DEMOLITION PROCEDURES. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR MEANS

AND METHODS OF DEMOLITION AND NEW CONSTRUCTION.

5. DURING DEMOLITION AND RECONSTRUCTION, THE CONTRACTOR SHALL

COORDINATE WITH THE OWNER ANY REQUIRED SAFETY BARRIERS OR BARRICADES.

PROVIDE BARRICADES SO AS TO PRECLUDE INTRUSION OF PUBLIC INTO

CONSTRUCTION AREAS.

6. REFER TO THE OWNER APPROVED CONSTRUCTION PHASING SCHEDULE FOR

PHASING OF DEMOLITION AND NEW CONSTRUCTION. COORDINATE DEMOLITION

WITH NEW CONSTRUCTION IN ORDER THAT THE FACILITY WILL HAVE

UNINTERRUPTED WATER, SEWER, ELECTRICAL, GAS AND FIRE PROTECTION SERVICE.

THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALL NECESSARY TEMPORARY

UTILITY PROVISIONS REQUIRED.

7. ALL DEMOLITION MATERIALS NOT SALVAGED BY THE OWNER SHALL BE REMOVED BY

THE CONTRACTOR. COORDINATE WITH THE OWNER REGARDING MATERIALS TO BE

SALVAGED BY THE OWNER. REFER ALSO TO SPECIFICATIONS FOR SALVAGED ITEMS.

8. CONSTRUCT DUST PARTITION PRIOR TO BEGINNING DEMOLITION. DO NOT USE

TEMPORARY DUST PARTITION AS SHORING AND/OR BRACING OF EXISTING BUILDING

COMPONENTS.

9. TEMPORARY DUST PARTITIONS ARE AS FOLLOWS. COORDINATE TYPES FOR EACH

LOCATION WITH THE OWNER. BRACE DUST PARTITIONS SO AS TO PRECLUDE

LATERAL MOVEMENT OF PARTITION.

TYPE "A"

CONSTRUCTED OF 2x4'S AT 24" OC BELOW CEILING AND 48" OC FROM CEILING TO ROOF DECK, PROVIDE 4'-0"x8'-0" HORIZONTAL SHEETS OF 1/2" CD PLYWOOD

SHEATHING FROM FLOOR TO ROOF DECK WITH 6 MIL. POLY SHEETING.

TYPE "B"

CONSTRUCTED SAME AS TYPE "A", EXCEPT 6 MIL. CLEAR POLY SHEETING. FROM

CEILING TO ROOF DECK IN LIEU OF WOOD STUDS AND PLYWOOD. OVERLAP SHEETING

AT JOINTS A MINIMUM OF 1'-0" AND CONTINUOUSLY TAPE JOINTS. ATTACH SHEETING

FROM CEILING TO ROOF DECK FOR DUSTPROOF CONDITION.

TYPE "C"

CONSTRUCTED OF 2x4'S AT 24" OC FROM FLOOR TO ABOVE DEMOLITION AREA THEN FRAME 2x4'S AT ANGLE BACK TO EXISTING WALL. PROVIDE 1/2" CD EXTERIOR

PLYWOOD SHEATHING.

TYPE "D"

CONSTRUCTED SAME AS TYPE "A" EXCEPT ADD THERMAL BATT R-11 (BLANKET)

INSULATION AT STUD SPACE.

DUST DRAPES

6 MIL. CLEAR POLY SHEETING. OVERLAP SHEETING AT JOINTS A MINIMUM 1'-0" AND

CONTINUOUSLY TAPE JOINTS. ATTACH SHEETING FROM CEILING TO FINISH FLOOR

FOR DUSTPROOF CONDITION. IF ATTACHMENT TO CEILING IS IMPOSSIBLE, LIGHT

FRAMING SHALL BE INSTALLED WITH SHEETING ATTACHED ALL AROUND TO PROHIBIT

DUST PENETRATION.

10. CONSTRUCT A MAXIMUM OF 40'-0" OF "TEMPORARY DUST WALL" IN 8 HOUR

PERIOD.

11. ALL DUST PARTITIONS SHALL HAVE SINGLE ACTING DOORS WITH CLOSURES

CLOSING AGAINST GASKETED STOPS ON FRAMES TO REDUCE PASSAGE OF AIR, DUST

AND MOISTURE. PROVIDE MATS AT DOORS TO REDUCE TRACKING OF DUST. REPLACE

OR CLEAN DAILY.

12. SEAL PERIMETER OF DUST PARTITIONS AND DOORS TO PREVENT PASSAGE OF

DUST. TAPE FASTEN DEPRESSIONS, JOINTS BETWEEN PANELS AND JOINTS BETWEEN

PANELS AND FLOORS, CEILING AND COLUMNS WITH 2 IN. WIDE PRESSURE SENSITIVE

TAPE.

13. REMOVE EXISTING FLOORING SYSTEM AT EXISTING BUILDING FLOOR AREAS AND

REPAIR CONCRETE SUBSTRATE FOR NEW FLOORING SYSTEM.

14. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND

ELECTRICAL DRAWINGS FOR NECESSARY FLOOR SLAB DEMOLITION FOR THE

INSTALLATION OF NEW FOUNDATIONS, PIPING OR CONDUITS.

15. THE CONTRACTOR SHALL USE A WET SAW FOR SLAB SAWING. NO JACK HAMMERS

WILL BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE OWNER.

PREPARE CONCRETE SUBSTRATE, CEMENT GROUT INFILL DEPRESSED AREAS. FLUSH

AND LEVEL FOR NEW FLOOR FINISH FOR SMOOTH TRANSITION TO ADJACENT FLOOR

AREAS.

16. WHEN DEMOLISHING AN EXISTING CMU/CLAY TILE WALL FOR A NEW OPENING,

REMOVE EXISTING CMU/CLAY TILE 8" BELOW FINISH FLOOR AND A MINIMUM OF 1'-4"

WIDER THAN EACH JAMB FOR THE INSTALLATION OF NEW LINTEL AND TOOTH-IN NEW

CMU/CLAY TILE AT EACH JAMB.

17. PROTECT ALL WATER PIPING AT AREAS OF DEMOLITION, EXPANSION AND

REMODEL, WHERE EXISTING PIPING IS SUBJECT TO FREEZING. PROTECT PIPING SO

AS NOT TO FREEZE.

DEMO LEGEND

EXISTING BUILDING ELEMENTS TO BE REMOVED,

REF. KEYED NOTES

EXISTING SLAB TO BE REMOVED

PHASE BOUNDARY

REMOVE ALL NON LOAD BEARING WALLS, CEILINGS, FINISHES, DOORS, FRAMES,

SHOWN AS DASHED. REMOVE ALL HARDWARE, HANGERS MECHANICAL AND

ELECTRICAL DEVICES FROM EXISTING STRUCTURE, REMOVE ALL EXISTING

ABANDONED EQUIPMENT. PREP EXISTING ROOF DECK, COVER BOARD, STRUCTURE,

FLOORS AND SUBSTRATE AS REQUIRED TO RECEIVE NEW FINISHES AS REQUIRED BY

THE SPECIFICATIONS AND AS REQUIRED TO INSTALL NEW CONSTRUCTION.

REFERENCE GENERAL DEMOLITION REQUIREMENTS FOR ADDITIONAL INFORMATION.

DEMOLITION KEYNOTES

PORTIONS OF EXISTING SHEAR WALL TO REMAIN. VERIFY THE EXTENT OF

REQUIRED DEMOLITION WITH ARCHITECTURE FLOOR PLAN SHEETS AND

STRUCUTRAL

REMOVE PORTION OF EXISTING SLAB AS REQUIRED FOR NEW UTILITIES

COORDINATE WITH MECHANICAL, ELECTRICAL AND PLUMBING FOR EXTENT OF

NEW UTILITIES COORDINATE WITH STRUCTURE FOR INFILL A PORTIONS OF

REMOVED SLAB.

4 REMOVE EXISTING METAL STAIR AND ALL ASSOCIATED FRAMING ENTIRELY.

5 REMOVE EXISTING SIDEWALK, REFERENCE CIVIL SITE DEMOLITION PLAN

6 COMPLETELY REMOVE EXISTING MECHANICAL APPENDAGE REMOVE ALL

MECHANICAL, ELECTRICAL, PLUMBING , WALLS, DOORS, FRAMES,

HARDWARE, SLABS, FOUNDATION AND STRUCTURE AS REQUIRED FOR

NEW CONSTRUCTION . REFER TO GENERAL DEMOLITION REQUIREMENTS

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

CROMWELL

ARCHITECTS/

ENGINEERS

#5A

R

KANSAS -ENGIN

EE

R

C E

R T

IF

IC

ATEOFAUTHORIZ

A

T

IO

N R E

G

IS

T E RE D A R CH IT E C

T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

DEMOLITION PLAN - PHASE II

AD10207/15/15

1/8" = 1'-0"

1 DEMO PLAN - PHASE II

TR

UE

N

OR

TH

PL

AN

N O

RT

H

SCALE : 1/8" = 1'-0"

0 4 8 16

A A

B B

C C

D D

E E

F F

.7

.7

1.4

1.4

2.5

2.5

3.5

3.5

4.5

4.5

5.5

5.5

1A1A

F.2 F.2

E.9 E.9

EXISTING STAIR CONSTRUCTION TO BE

REMOVED IN PHASE 1. SEE DRAWING AD101 REMOVE EXISTING METAL SOFFIT PANELSREMOVE EXISTING METAL WALL PANELS

EXISTING SOFFIT PANELS TO REMAIN.

PROTECT FROM DAMAGE

EXISTING METAL WALL PANELS TO

REMAIN. PROTECT FROM DAMAGE.

PREPARE SURFACE TO RECEIVE NEW

COATING.

REMOVE EXISTING METAL SOFFIT PANELS

REMOVE EXISTING METAL WALL PANELS AS REQUIRED FOR NEW CONSTRUCTION

REMOVE EXISTING MECHANICAL EQUIPMENT AS INDICATED ON MECHANICAL DRAWINGS.

REMOVE EXISTING EQUIPMENT SUPPORTS & CURBS.

EXISTING ROOF CONSISTS OF SPRAYED URETHANE INSULATION WITH AN

ELASTOMERIC TOP COAT OVER BUILT UP ROOFING OVER POURED GYPSUM

DECKING O/ STEEL BAR JOISTS. REMOVE EXISTING ROOFING DOWN TO THE

POURED GYPSUM DECK. PATCH PENETRATIONS NOT TO BE RE-USED PER

STRUCTURAL DETAILS.

REMOVE EXISTING ROOF DRAINS & SUMP.

EXISTING DRAIN PIPE SHALL REMAIN. CLEAN

& PREPARE FOR RE-USE PER ROOF PLAN

NOTES SHEET A-106.

3' - 11" 203' - 11"

1'

3'

D.3 D.3

PORTION OF EXISTING ROOFING SYSTEM TO REMAIN

CROMWELL

ARCHITECTS/

ENGINEERS

#5A

R

KANSAS -ENG

IN

EE

R

C E R T

IF

IC

AT

EOF

AUTHORIZ

A T

IO

N R

E G

IS

T E

RED A R CH IT E C

T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

MECH PLATFORM DEMO PLAN PHASE 1

AD10307/15/15

1/8" = 1'-0"

1 MECH PLATFORM DEMOLITION PLAN PHASE 1

GENERAL SITE VERIFICATION REQUIREMENTS:

A. EXISTING CONDITIONS SHOWN IN THESE PLANS ARE BASED ON LIMITED FIELD OBSERVATIONS BY THE ARCHITECT AND ORIGINAL DESIGN DRAWINGS. ALL EXISTING MATERIAL, DIMENSIONS, ELEVATIONS, AND GENERAL CONDITIONS OF THE BUILDING SHALL BE VERIFIED BEFORE PURCHASE OF MATERIAL AND CONSTRUCTION. NOTIFY THE (OWNER/GOVERNMENT) (CONSTRUCTION MANAGER/CONTRACTING OFFICER) OF ANY DISCREPANCIES BETWEEN PLANS AND

FIELD CONDITIONS IMMEDIATELY.

B. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES (WHETHER SHOWN OR NOT) PRIOR TO THE SUBMISSION OF HIS BID OR THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE (OWNER/GOVERNMENT) CONSTRUCTION MANAGER OF THE DISCOVERY OF EXISTING UTILITIES NOT SHOWN OR NOTED ON DRAWINGS. THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF UNDERGROUND UTILITY SERVICES PRIOR TO ANY EXCAVATION.

GENERAL DEMOLITION REQUIREMENTS:

1. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT ACCORDANCE WITH OSHA REGULATIONS.

2. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK INCLUDES, BUT IS NOT LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS, CEILINGS, ROOFING, DOORS, FIXTURES, PLUMBING, MECHANICAL AND ELECTRICAL ITEMS INCLUDING CONDUITS AND DUCTWORK AS SHOWN ON DRAWING OR AS REQUIRED FOR THE INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB. THE CONTRACTOR SHALL REPLACE ANY/ALL FLOOR, WALL, OR CEILING FINISHES DAMAGED AS A RESULT OF

DEMOLITION. MATCH EXISTING ADJACENT FINISHES.

3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A MINIMUM OF 8" BELOW FINISH FLOOR OR A MINIMUM OF 6" ABOVE FINISH CEILING.

4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING, BRACING AND SUPPORT SYSTEMS FOR EXISTING STRUCTURE AND TO KEEP THE EXISTING STRUCTURE INTACT AND IN A SAFE CONDITION DURING DEMOLITION AND NEW CONSTRUCTION. THE CONTRACTOR SHALL RETAIN A REGISTERED PROFESSIONAL ENGINEER TO DESIGN THE SHORING OR BRACING AND SPECIFY DEMOLITION PROCEDURES. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR MEANS AND METHODS OF DEMOLITION AND NEW

CONSTRUCTION.

5. DURING DEMOLITION AND RECONSTRUCTION, THE CONTRACTOR SHALL COORDINATE WITH THE (OWNER/GOVERNMENT) (CONSTRUCTION MANAGER/CONTRACTING OFFICER) ANY REQUIRED SAFETY BARRIERS OR BARRICADES. PROVIDE BARRICADES SO AS TO PRECLUDE INTRUSION OF PUBLIC INTO CONSTRUCTION AREAS.

6. REFER TO THE (OWNER/GOVERNMENT) APPROVED CONSTRUCTION PHASING SCHEDULE FOR PHASING OF DEMOLITION AND NEW CONSTRUCTION. COORDINATE DEMOLITION WITH NEW CONSTRUCTION IN ORDER THAT THE FACILITY WILL HAVE UNINTERRUPTED WATER, SEWER, ELECTRICAL, GAS AND FIRE PROTECTION SERVICE. THE CONTRACTOR IS

RESPONSIBLE FOR MAKING ALL NECESSARY TEMPORARY UTILITY PROVISIONS REQUIRED.

7. ALL DEMOLITION MATERIALS NOT SALVAGED BY THE (OWNER/GOVERNMENT) SHALL BE REMOVED BY THE CONTRACTOR. COORDINATE WITH THE (OWNER/GOVERNMENT) (CONSTRUCTION MANAGER/CONTRACTING OFFICER) REGARDING MATERIALS TO BE SALVAGED BY THE (OWNER/GOVERNMENT). REFER ALSO TO SPECIFICATIONS FOR SALVAGED

ITEMS.

8. THE CONTRACTOR SHALL USE A WET SAW FOR SLAB SAWING. NO JACK HAMMERS WILL BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE (OWNER/GOVERNMENT)

(CONSTRUCTION MANAGER/CONTRACTING OFFICER).

9. PROTECT ALL WATER PIPING AT AREAS OF DEMOLITION, EXPANSION AND REMODEL, WHERE EXISTING PIPING IS SUBJECT TO FREEZING. PROTECT PIPING SO AS NOT TO

FREEZE.

SCALE : 1/8" = 1'-0"

0 4 8 16

TR

UE

N

OR

TH

PL

AN

N O

B

C

D

E

F

6.5

6.5

7.5

7.5

8.6

8.6

9.3

9.3 10.1

1A

F.2

E.9

REMOVE EXISTING METAL WALL PANELS

AS REQUIRED FOR NEW CONSTRUCTION

EXISTING ROOF CONSISTS OF SPRAYED URETHANE INSULATION WITH AN

ELASTOMERIC TOP COAT OVER BUILT UP ROOFING OVER POURED GYPSUM

DECKING O/ STEEL BAR JOISTS. REMOVE EXISTING ROOFING DOWN TO THE

POURED GYPSUM DECK. PATCH PENETRATIONS NOT TO BE RE-USED PER

STRUCTURAL DETAILS.

REMOVE EXISTING METAL SOFFIT PANELS

REMOVE EXISTING MECHANICAL EQUIPMENT AS INDICATED ON MECHANICAL DRAWINGS.

REMOVE EXISTING EQUIPMENT SUPPORTS & CURBS.

REMOVE EXISTING ROOF DRAIN & SUMP TYP.

EXISTING DRAIN PIPE SHALL REMAIN. CLEAN

& PREPARE FOR RE-USE PER ROOF PLAN

NOTES SHEET A-106.

REMOVE PORTION OF THE

BUILDING IN ITS ENTIRETY.

SEE DRAWING AD102 FOR

DEMOLITION NOTES.

EXISTING STAIR TO BE REMOVED

IN PHASE 2. REFER TO NOTES

ON DRAWING AD102

122' - 3" 4' - 11" 26' - 3"

1'

3'

/8

D.3

CROMWELL

ARCHITECTS/

ENGINEERS

#5A

R

KANSAS -ENG

IN

EE

R

C E R T

IF

IC

AT

EOF

AUTHORIZ

A T

IO

N R

E G

IS

T E

RED A R CH IT E C

T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

MECH PLATFORM DEMO PLAN PHASE 2

AD10407/15/15

1/8" = 1'-0"

1 MECH PLATFORM DEMOLITION PLAN PHASE 2

SCALE : 1/8" = 1'-0"

0 4 8 16

TR

UE

N

OR

TH

PL

AN

N O

RT

H

GENERAL SITE VERIFICATION REQUIREMENTS:

A. EXISTING CONDITIONS SHOWN IN THESE PLANS ARE BASED ON LIMITED FIELD OBSERVATIONS BY THE ARCHITECT AND ORIGINAL DESIGN DRAWINGS. ALL EXISTING MATERIAL, DIMENSIONS, ELEVATIONS, AND GENERAL CONDITIONS OF THE BUILDING SHALL BE VERIFIED BEFORE PURCHASE OF MATERIAL AND CONSTRUCTION. NOTIFY THE (OWNER/GOVERNMENT) (CONSTRUCTION MANAGER/CONTRACTING OFFICER) OF ANY DISCREPANCIES BETWEEN PLANS AND

FIELD CONDITIONS IMMEDIATELY.

B. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES (WHETHER SHOWN OR NOT) PRIOR TO THE SUBMISSION OF HIS BID OR THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE (OWNER/GOVERNMENT) CONSTRUCTION MANAGER OF THE DISCOVERY OF EXISTING UTILITIES NOT SHOWN OR NOTED ON DRAWINGS. THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF UNDERGROUND UTILITY SERVICES PRIOR TO ANY EXCAVATION.

GENERAL DEMOLITION REQUIREMENTS:

1. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT ACCORDANCE WITH OSHA REGULATIONS.

2. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK INCLUDES, BUT IS NOT LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS, CEILINGS, ROOFING, DOORS, FIXTURES, PLUMBING, MECHANICAL AND ELECTRICAL ITEMS INCLUDING CONDUITS AND DUCTWORK AS SHOWN ON DRAWING OR AS REQUIRED FOR THE INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB. THE CONTRACTOR SHALL REPLACE ANY/ALL FLOOR, WALL, OR CEILING FINISHES DAMAGED AS A RESULT OF DEMOLITION. MATCH EXISTING

ADJACENT FINISHES.

3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A MINIMUM OF 8" BELOW FINISH FLOOR OR A MINIMUM OF 6" ABOVE FINISH CEILING.

4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING, BRACING AND SUPPORT SYSTEMS FOR EXISTING STRUCTURE AND TO KEEP THE EXISTING STRUCTURE INTACT AND IN A SAFE CONDITION DURING DEMOLITION AND NEW CONSTRUCTION. THE CONTRACTOR SHALL RETAIN A REGISTERED PROFESSIONAL ENGINEER TO DESIGN THE SHORING OR BRACING AND SPECIFY DEMOLITION PROCEDURES. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR MEANS AND METHODS OF DEMOLITION AND NEW CONSTRUCTION.

5. DURING DEMOLITION AND RECONSTRUCTION, THE CONTRACTOR SHALL COORDINATE WITH THE (OWNER/GOVERNMENT) (CONSTRUCTION MANAGER/CONTRACTING OFFICER) ANY REQUIRED SAFETY BARRIERS OR BARRICADES. PROVIDE BARRICADES SO AS TO PRECLUDE INTRUSION OF PUBLIC INTO CONSTRUCTION AREAS.

6. REFER TO THE (OWNER/GOVERNMENT) APPROVED CONSTRUCTION PHASING SCHEDULE FOR PHASING OF DEMOLITION AND NEW CONSTRUCTION. COORDINATE DEMOLITION WITH NEW CONSTRUCTION IN ORDER THAT THE FACILITY WILL HAVE UNINTERRUPTED WATER, SEWER, ELECTRICAL, GAS AND FIRE PROTECTION SERVICE. THE CONTRACTOR IS

RESPONSIBLE FOR MAKING ALL NECESSARY TEMPORARY UTILITY PROVISIONS REQUIRED.

7. ALL DEMOLITION MATERIALS NOT SALVAGED BY THE (OWNER/GOVERNMENT) SHALL BE REMOVED BY THE CONTRACTOR. COORDINATE WITH THE (OWNER/GOVERNMENT) (CONSTRUCTION MANAGER/CONTRACTING OFFICER) REGARDING MATERIALS TO BE SALVAGED BY THE (OWNER/GOVERNMENT). REFER ALSO TO SPECIFICATIONS FOR SALVAGED

ITEMS.

8. THE CONTRACTOR SHALL USE A WET SAW FOR SLAB SAWING. NO JACK HAMMERS WILL BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE (OWNER/GOVERNMENT)

(CONSTRUCTION MANAGER/CONTRACTING OFFICER).

9. PROTECT ALL WATER PIPING AT AREAS OF DEMOLITION, EXPANSION AND REMODEL, WHERE EXISTING PIPING IS SUBJECT TO FREEZING. PROTECT PIPING SO AS NOT TO FREEZE.

AS401

AS401

OVERHEAD PIPE, REF.

MECH. & PLUMBING

EXISTING PAVING, REF.

CIVIL

NEW PAVING, REF. CIVIL

AHU, REF.

MECH.

EXISTING PAVING,

REF. CIVIL

PRE-ENGINEERED METAL

CANOPY, TO MATCH EXIST.

PHASE I PHASE II

PHASE I PHASE II

NEW CANOPY /

PIPE RACK

BUILDING 14

BUILDING 6

BUILDING 4

BUILDING 10

BUILDING 54

A-101

GENERAL SITE VERIFICATION REQUIREMENTS:

1. REFER TO CIVIL DRAWINGS CD101 FOR ALL SITE DEMOLITION TO BE PERFORMED

2. EXISTING CONDITIONS SHOWN IN THESE PLANS ARE BASED ON LIMITED FIELD OBSERVATIONS BY THE ARCHITECT AND ORIGINAL DESIGN DRAWINGS. ALL EXISTING MATERIAL, DIMENSIONS, ELEVATIONS, AND GENERAL CONDITIONS OF THE BUILDING SHALL BE VERIFIED BEFORE PURCHASE OF MATERIAL AND CONSTRUCTION. NOTIFY THE A/E OF ANY DISCREPANCIES BETWEEN PLANS AND FIELD CONDITIONS

IMMEDIATELY.

3. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES (WHETHER SHOWN OR NOT) PRIOR TO THE SUBMISSION OF HIS BID OR THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE A/E OF THE DISCOVERY OF EXISTING UTILITIES NOT SHOWN OR NOTED ON DRAWINGS. THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF UNDERGROUND UTILITY SERVICES PRIOR TO ANY EXCAVATION.

4. THE CONTRACTOR SHALL VERIFY ALL GRADES AND PROPOSED FINAL GRADES. IF RAMPS, STOOPS OR STAIRS ARE INSTALLED, VERIFY FINAL GRADES SURROUNDING THE NEW CONSTRUCTION AND ADJUST STAIR RISERS, RAMP LENGTHS, ETC. TO ACCOMMODATE THE REQUIRED RAMP SLOPE OR RISER HEIGHTS. ALL RAMPS AND STAIRS SHALL MEET ADA AND LOCAL HANDICAP ACCESSIBILITY REQUIREMENTS. IF THERE IS A CONFLICT IN FIELD CONDITIONS, NOTIFY THE A/E PRIOR TO CONSTRUCTION OR ORDERING OF MATERIALS.

5. THE CONTRACTOR SHALL VERIFY THE EXISTING FINISH FLOOR ELEVATION AT ALL NEW OPENINGS OF THE EXISTING BUILDING PRIOR TO ESTABLISHING THE FINISH FLOOR ELEVATION. THE CONTRACTOR SHALL VERIFY EXISTING FOUNDATION DEPTHS TO INSURE PROPER BLOCK COURSING. ANY DISCREPANCY SHALL BE REPORTED TO THE A/E PRIOR TO CONSTRUCTION.

CROMWELL

ARCHITECTS/

ENGINEERS

#5A

R

KANS A S -ENGIN

EE

R

C E

R T

IF

IC

ATEOF AUTHORIZ

A

T

IO

N R E

G

IS

T E R E D A R C H IT E C

T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

ARCHITECTURAL SITE PLAN

AS10107/15/15

1" = 30'-0"

1 ARCH. SITE PLAN

SCALE : 1" = 30'

0 15 30 60

TR

UE

N

OR

TH

PL

AN

N O

Y1

Y2

41 42 43 44X2

ALIGN

ALIGN

AS401

AS401

10' - 3" 2' - 0" 10' - 3" 2' - 0" 10' - 3" 2' - 0" 10' - 3" 2' - 0"

AS402

AS402

SLOPE SLOPE

REMOVE EXISTING STEEL

AND CMU COLUMN

REMOVE EXISTING STEEL

AND CMU COLUMNBLDG. 10

BLDG. 54

AS402

FINISHED FLOOR

0' - 0"

41424344 X2

AS402

AS402

ALIGN TOP

OF CMU

EXISTING SPLIT-FACE

CMU COLUMN

NEW SPLIT-FACE

CMU COLUMN

STANDING SEAM METAL ROOF

STEEL BEAMS AND COLUMNS,

PAINTED. SEE STRUCT.

BLDG. 10BLDG. 54

CANOPY ROOF PLAN

16' - 0"

.0

:1

9.00

4" X 4" PREFINISHED

METAL GUTTER, TO

MATCH CANOPY

FINISHED FLOOR

0' - 0"

41 42 43 44X2

AS402

AS402

BLDG. 54

CANOPY ROOF PLAN

16' - 0"

.0

:1

4" X 4" PRE-

FINISHED METAL

GUTTER, TO MATCH

CANOPY

AS402

Y1

Y2

41 42 43 44X2

AS402

AS402

.0

:1

.0

:1

9.00:12 9.00:12

9.00:12

9.00:12

4" X 4" PRE-FINISHED

METAL GUTTER, TO

MATCH CANOPY

12' - 0" 45' - 0" 21' - 0" 41' - 6" 11' - 0" 62' - 6" 11' - 0" 47' - 10 1/2"

PRE-ENGINEERED METAL

CANOPY TO MATCH EXISTING.

REF. SPECS.

ALL DIMENSIONS TO BE FIELD VERIFY TO

COORDINATE WITH EXISTING SIDEWALKBUILDING 14

EXISTING CANOPY

NEW CANOPY TO TIE

INTO EXISTING CANOPY

EXISTING SIDEWALK, FIELD

VERIFY LOCATION &

DIMENSIONS OF ALL

EXISTING CONSTRUCTION

CROMWELL

ARCHITECTS/

ENGINEERS

#5A R

K

ANS A S -ENGIN

EE

R

C E

R T

IF

IC

ATEOF AUTHORIZ

A

T

IO

N R E

G

IS

T E R E D A R C H IT

E

C T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

ARCH. SITE PLAN LARGE SCALE PLANS AND

ELEVATIONS

AS40107/15/15

1/8" = 1'-0"

1 CANOPY 'A' PLAN BETWEEN BLDGS. 10 & 54 1/8" = 1'-0"

3 CANOPY 'A' NORTH ELEVATION

1/8" = 1'-0"

4 CANOPY 'A' SOUTH ELEVATION

1/8" = 1'-0"

20 CANOPY 'A' ROOF PLAN BETWEEN BLDGS. 10 & 54

1/16" = 1'-0"

2 ENLARGED PLAN AT PRE-ENGINEERED CANOPY

Y2

STANDING SEAM METAL ROOF

ICE AND WATER MEMBRANE

CONCEALED CLIP

MTL. ROOF DECK

EAVE TRIM TRIP EDGE

CLEAT

1-1/2" FURRING CHANNEL

METAL SOFFIT PANEL

LIGHT GUAGE METAL TRUSS

STEEL BEAM & COLUMN.

SEE STRUCT.

2' - 0"

1/4" STEEL PLATE

CMU COLUMN

1"

1"

1"

STANDING SEAM METAL ROOF

ICE & WATER MEMBRANE

CONCEALED CLIP

MTL. ROOF DECK

LIGHT GUAGE METAL TRUSS

MECHANICAL PIPING

SUPPORTED BY METAL

ROOF TRUSS

ZEE CLOSURE

RIDGE TRIP

FINISHED FLOOR

0' - 0"

Y1Y2

CANOPY ROOF PLAN

16' - 0"

FINISHED FLOOR

0' - 0"

Y1 Y2

AS402

AS402

CANOPY ROOF PLAN

16' - 0"

2.12:12

STEEL FRAMING,

PAINT ALL EXPOSED

SURFACES TO MATCH

EXISTING

BASE PLATES AND

FOUNDATIONS

ADJACENT GRADE

4"x8"x16" SPLIT FACE

CMU, COLOR TO MATCH

EXISTING

1/8" STEEL SLOPED

STEEL PLATE, PAINT TO

MATCH EXISTING

GROUT SOLID AT BASE

AND SLOPE, PROVIDE 2

WEEPS EACH SIDE

CROMWELL

ARCHITECTS/

ENGINEERS

#5A R

K

ANSAS -ENG

IN

EE

R

C E R T

IF

IC

AT

EOF

AUTHORIZ

A T

IO

N R

E G

IS

T E

RED A R CH IT

E C T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

ARCH. CANOPY DETAILS

AS40207/15/15

1 1/2" = 1'-0"

1 CANOPY 'A' EAVE DETAIL

1 1/2" = 1'-0"

2 CANOPY 'A' RIDGE DETAIL

1/4" = 1'-0"

4 CANOPY 'A' SECTION LOOKING WEST

1/4" = 1'-0"

5 CANOPY 'A' SECTION LOOKING EAST

3/4" = 1'-0"

3 SECTION AT CANOPY COLUMNS

B B

C C

D D

E E

F F

.7 1 1.4 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7 7.5 8 8.6 9 9.3 10.1

3' - 11" 18' - 7" 22' - 0" 20' - 9" 20' - 1" 20' - 5" 20' - 5" 20' - 5" 20' - 5" 20' - 5" 20' - 5" 20' - 5" 20' - 5" 20' - 5" 20' - 5" 22' - 0" 18' - 7" 4' - 11" 23' - 10"

2' - 5"

CORRIDOR

OMIPRINT MS LAB

MOLECULAR LAB 1

CELL LAB

1048B

AMES LAB

TC LAB

ACBPCR LAB

C O R R

ID

O R

TC LAB

PCR LAB

RAPID B-FLOW

CYTOMETRY

GENERAL STORAGE

MASS SPEC LAB

LOW CONCENTRATION

PREP LAB

HIGH CONCENTRATION

PREP LAB

C O R R

ID

O R

ULTRA COOL

CHEMISTRY LAB

HUMAN SAMPLE PREP

PENCE MASS SPEC LAB

CELL CULTURE LAB

SAMPLE PREP

PROTEOMICS MASS SPEC

LAB

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

LOBBY S.E.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SPRINKLER

OFFICE

OFFICE

VENDING

ENTRY

VENDING

ENTRY

A-201

A-201

A-201

A-201

LOBBY N.E.

CORRIDOR

362' - 4"

1070 1072 1074 1076 1078 1080 1082 10841071 1073 1075 1077 1079 1081 1083 1085 1086

1145 1144 1143 1142 1141 1140 1139 1138 1137 1136 1134 1133 1132 1131 1130 1129 1128

1088A 1088B 1100109910981097109610951094109310921091

1124 1123 1122 1121 1120 1119 1118 1117 1116 1115

1127A

1127B

1062A

1055B

1063B

1063A

1065A

1057B

1067A

1068A

1059B

1047B

1055A

1053 1057A

1051B

1059A

1054A

1051A

1048A

1047A

1026B

1027A

1024B

1024A 10361026A

1037B1035B

1037A

1044B1044A

1016A

1015B

1014B

1014A

1015A

1016B

1009B

1008B

1007B

1006B

1006A

1002A

1007A

1008A

1004A

1005A

1009A

1010A

1033 1034

1039 1041

1040 1042

1022 1023

1021 1025

1005B

1004B

1002B

1001A

1031A

1031B

1048C

1046B 1060B

1060A1046A 1052A

1052B1011B 1017B1001C

1001B 1011A 1017A

1048B

1065B

1068B

1067B

1027B

1062B

1069A

1114B

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SPRINKLER

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

ULTRA COOL

VESTIBULE

CORRIDOR

1001A

C O R R

ID

O R

B

OZONE FREE LAB

CELL CULTURE LAB

GENERAL PURPOSE LAB

CHEM LAB

INHALATION CHEM LAB

HPLC LAB 2

HPLC LAB 3

GC/ICP MASS SPEC LAB

TMP LAB

MASS SPEC

MOLECULAR LAB 1

MOLECULAR LAB 2

CORRIDOR

CORRIDOR

1114B

GENERAL STORAGE

MOLECULAR BIOLOGY

MOLECULAR BIO LAB

1016A

GENETICS LAB

1016B

CORRIDOR

1069A

MEN

WOMEN

TISSUE CULTURE

TELE/DATA

CORRIDOR

GEN. STORAGE

1022 ICE MACHINE

COMET PRINT

GPT LAB

SMOKE LAB

MLA LAB

CART OFFICE

CORRIDOR

CORRIDOR

TELE/DATA

ICE MACHINE

GLASS WASH

CHEMICAL STORAGE

GENE EXPRESS LAB 1

TC/HPRT LAB

1035A

FLO CYTOMETRY LAB 2

1035B

FLO CYTOMETRY LAB 3

1037A

FLO CYTOMETRY LAB 1

1037B

CORRIDOR

MEN

WOMEN

GENE EXPRESN LAB 2

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

1087 CONFERENCE

1A 1A

2A 2A

1054B

1010B

1033A

1101A

1035A

F.2 F.2

E.9 E.9

F.3 F.3

F.4 F.4

F.6 F.6

W1 W1

D.3 D.3

4A 4A

3A 3A

0'

3'

5' 1"

5'

4'

2'

1'

3'

7'

7'

7'

9" 2'

A-102

A-103

FLOOR PLAN GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF FINISH UNLESS NOTED OTHERWISE.

2. THE CONTRACTOR SHALL PROVIDE A SMOOTH TRANSITION BETWEEN

THE EXISTING AND NEW FLOOR SLAB ELEVATIONS. VERIFICATION OF

EXISTING ELEVATIONS IS CRITICAL PRIOR TO THE PLACEMENT OF THE

NEW SLAB.

3. CLEAN, PATCH AND REPAIR EXISTING WALL SURFACES SCHEDULED TO

BE REFINISHED. ALL EXISTING GYPSUM BOARD SURFACES, WHICH ARE

DAMAGED IN ANY WAY SHALL BE REPAIRED PRIOR TO THE APPLICATION

OF SCHEDULED WALL. REMOVE WALL STANDARDS PRIOR TO

REFINISHING EXISTING WALLS. FILL ANCHOR HOLES IN EXISTING WALLS

WHERE STANDARDS ARE REMOVED. COORDINATE REPAIR AND

REFINISHING WALLS WITH THE (OWNER/GOVERNMENT) (CONSTRUCTION

MANAGER/CONTRACTING OFFICER).

4. THE CONTRACTOR SHALL CLEAN NEW RESILIENT FLOORING. ALL NEW

FLOOR TILE AND/OR PVC FLOORING SHALL BE PROTECTED FROM

SCRATCHING, MARKING, STAINING, ETC. DURING CONSTRUCTION. ANY

TILE AND/OR PVC FLOORING THAT IS DAMAGED BY CONSTRUCTION AND

DOES NOT APPEAR IN NEW CONDITION AT THE TIME OF POSSESSION WILL

BE REPLACED BY THE GENERAL CONTRACTOR AT HIS EXPENSE. INSTALL

RESILIENT TRANSITION STRIP WHERE FLOOR TILE ABUTS EXPOSED

CONCRETE FLOOR.

5. CLEAN ALL EXISTING HVAC GRILLES WHICH REMAIN, PRIOR TO

CONTRACT COMPLETION.

CROMWELL

ARCHITECTS/

ENGINEERS

#5A

R

KANSAS -ENG

IN

EE

R

C E R T

IF

IC

AT

EOF

AUTHORIZ

A T

IO

N R

E G

IS

T E

RED A R CH IT E C

T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

OVERALL FLOOR PLAN

A-10107/15/15

3/32" = 1'-0"

1 OVERALL FLOOR PLAN TR

UE

N

OR

TH

PL

AN

N O

RT

H

SCALE : 3/32" = 1'-0"

0 8 16 32

B

C

D

E

F

.7

.7

1.4

1.4

2.5

2.5

3.5

3.5

4.5

4.5

5.5

5.5

BSC

(OFCI)

FH6

(CFCI)

FH6

(CFCI)

GENERAL PURPOSE LAB

CELL CULTURE LAB

OZONE FREE LAB

VESTIBULE

1000 CORRIDOR

1001A

ULTRA COOL

GC/ICP MASS SPEC LAB

HPLC LAB 3

HPLC LAB 2

INHALATION CHEM LAB

CHEM LAB

TMP LAB

GENERAL STORAGE

MASS SPEC

BIOCHEM LAB

NAN LAB

CAO LAB

MOLECULAR BIO LAB

1016A

GENETICS LAB

1016B

MEN

WOMEN

CORRIDOR

TELE/DATA

ICE MACHINE

GENE EXPRESN LAB 1

GLASS WASH SUPPORT

1033 CHEMICAL STORAGE

CORRIDOR

COMET PRINT

GPT LAB

GEN. STORAGE

ICE MACHINE

SMOKE LAB

MLA LAB

CART STORAGE

CORRIDOR

MEN

WOMEN

1025 TISSUE CULTURE

TELE/DATA

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

CORRIDOR

1114B

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SPRINKLER

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

DIRECTOR'S OFFICE

CONFERENCE

GENE EXPRESN LAB 2

TC/HPRT LAB

1035A

FLO CYTOMETRY LAB 3

1037A

FLO CYTOMETRY LAB 2

1035B

FLO CYTOMETRY LAB 1

1037B

CORRIDOR

1069A

OFFICE

CORRIDOR

C O

R R

ID

O

R

B

CORRIDOR

4' - 8" 40' - 0" 4' - 0" 36' - 10" 4' - 0" 36' - 10" 4' - 0" 36' - 10" 4' - 0" 36' - 10"

114311441145 1142 1141 1140 1139 1138 1137 1136 1135 1134 1133 1132 1131 1130 1129 1128

1127A

1127B

0"

4' - 8" 40' - 0" 4' - 0" 36' - 10" 4' - 0" 36' - 10" 4' - 0" 36' - 10" 4' - 0" 36' - 10"

1001B

1002A

1006A

1002B

1001A

1008A

1007A

1004B

1004A

1005A

1009A

1005B

1010A

1001C

1006B

1011A

1007B

1008B 1014A

1009B

1015A

1016B

1011B

1016A

1015B

1014B

1017B

1017A

1039 1041

1033 1034

1031A

1024A

1022 1023 1024B

1021 1025 1027A 1030

1026B

1026A 1036

1035B 1037B

1037A

1044A 1044B

1031B

1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088A 1088B

FH6

(CFCI)

FH6

(CFCI)

FH6

(CFCI)

A-402

A-403

A-401

A-404

FH6

(CFCI)

A-407

A-407

A-408

A-408

1114B

1069A

1027B

1A

2A

2'

1'

9'

0"

1'

/2

6'

6'

6'

/2

8" 9"

32' - 0" 8' - 6" 1' - 8" 30' - 8" 8' - 6" 17' - 3 1/8" 15' - 0 7/8" 8' - 6" 20' - 3" 2' - 0" 18' - 7" 1' - 8" 40' - 10"

FH6

(CFCI)

34' - 6" 6' - 0" 1' - 8" 30' - 8" 8' - 6" 1' - 8" 15' - 6" 15' - 2" 8' - 6" 1' - 8" 19' - 9 7/16" 21' - 0 9/16" 19' - 10 5/8" 19' - 3 3/8" 10" 10"

1'

7/ 8"

/4

/8

9"

32' - 0" 8' - 6"

GLASS WASH

1033A

1033A

4' - 0"

F.2

E.9

F.3

F.4

F.6

W1

D.3

A-201

A-201

A-201

FH6

(CFCI)

FH6

(CFCI)

BSC

(OFCI)

BSC

(OFCI)

FH6

(CFCI)

FH6

(CFCI)

FH-PLASTIC

(CFCI)

BSC

(OFCI)

BSC

(OFCI)

BSC

(OFCI)

BSC

(OFCI)

BSC

(OFCI)

4A

3A

FLOOR PLAN GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF FINISH UNLESS NOTED OTHERWISE.

2. THE CONTRACTOR SHALL PROVIDE A SMOOTH TRANSITION BETWEEN

THE EXISTING AND NEW FLOOR SLAB ELEVATIONS. VERIFICATION OF

EXISTING ELEVATIONS IS CRITICAL PRIOR TO THE PLACEMENT OF THE

NEW SLAB.

3. CLEAN, PATCH AND REPAIR EXISTING WALL SURFACES SCHEDULED TO

BE REFINISHED. ALL EXISTING GYPSUM BOARD SURFACES, WHICH ARE

DAMAGED IN ANY WAY SHALL BE REPAIRED PRIOR TO THE APPLICATION

OF SCHEDULED WALL. REMOVE WALL STANDARDS PRIOR TO

REFINISHING EXISTING WALLS. FILL ANCHOR HOLES IN EXISTING WALLS

WHERE STANDARDS ARE REMOVED. COORDINATE REPAIR AND

REFINISHING WALLS WITH THE (OWNER/GOVERNMENT) (CONSTRUCTION

MANAGER/CONTRACTING OFFICER).

4. THE CONTRACTOR SHALL CLEAN NEW RESILIENT FLOORING. ALL NEW

FLOOR TILE AND/OR PVC FLOORING SHALL BE PROTECTED FROM

SCRATCHING, MARKING, STAINING, ETC. DURING CONSTRUCTION. ANY

TILE AND/OR PVC FLOORING THAT IS DAMAGED BY CONSTRUCTION AND

DOES NOT APPEAR IN NEW CONDITION AT THE TIME OF POSSESSION WILL

BE REPLACED BY THE GENERAL CONTRACTOR AT HIS EXPENSE. INSTALL

RESILIENT TRANSITION STRIP WHERE FLOOR TILE ABUTS EXPOSED

CONCRETE FLOOR.

5. CLEAN ALL EXISTING HVAC GRILLES WHICH REMAIN, PRIOR TO

CONTRACT COMPLETION.

CROMWELL

ARCHITECTS/

ENGINEERS

#5A

R

KANS A S -ENGIN

EE

R

C E

R T

IF

IC

ATEOF AUTHORIZ

A

T

IO

N R E

G

IS

T E R E D A R C H IT E C

T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

FLOOR PLAN - PHASE I

A-10207/15/15

1/8" = 1'-0"

1 FLOOR PLAN - PHASE I

TR

UE

N

OR

TH

PL

AN

N O

RT

H

A

B

C

D

E

F

6.5

6.5

7.5

7.5

8.6

8.6

9.3

9.3

10.1

10.1

ENTRY

VENDING

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

MOLECULAR LAB 1

OMIPRINT MS LAB

CORRIDOR

AMES LAB

CELL LAB

1048B

TC LAB

TC LAB

ACBPCR LAB

PCR LAB

HIGH CONCENTRATION

PREP LAB

LOW CONCENTRATION

PREP LAB

MASS SPEC LAB

GENERAL STORAGE

ULTRA COOL

RAPID B-FLOW

CYTOMETRY

CHEMISTRY LAB

HUMAN SAMPLE PREP

PENCE MASS SPEC LAB

CELL CULTURE LAB

SAMPLE PREP

PROTEOMICS MASS SPEC

LAB

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SPRINKLER

OFFICE

OFFICE

VENDING

ENTRY

CORRIDOR

LOBBY S.E.

LOBBY N.E.

CORRIDOR

A-201

1100109910981097109610951094109310921091

1124 1123 1122 1121 1120 1119 1118 1117 1116 1115

1062A

1055B

1063B

1063A

1065A

1057B

1067A

1068A

1059B

1047B

1055A

1053 1057A

1051B

1059A

1054A

1051A

1048A

1047A

1048C

1046B 1060B

1060A1046A 1052A

1052B

1048B 1065B

1068B

1067B

1062B

A-405

A-406

A-409

A-410

A-410

A-409

2' - 0" 18' - 5" 18' - 5" 2' - 0"2' - 0" 18' - 5" 18' - 5" 2' - 0"2' - 0" 20' - 0" 18' - 7" 2' - 9"2' - 2"2' - 6" 21' - 4" 2' - 5"

36' - 10" 4' - 0" 36' - 10" 4' - 0" 41' - 4" 4' - 8"

4'

4'

4'

4'

4'

4'

6'

1'

0'

2' - 0" 18' - 5" 18' - 5" 2' - 0"2' - 0" 18' - 5" 18' - 5" 2' - 0"2' - 0" 20' - 0" 18' - 7" 2' - 9"2' - 2"2' - 6" 17' - 5" 3' - 11"1"

36' - 10" 4' - 0" 36' - 10" 4' - 0" 41' - 4" 4' - 8" 17' - 5" 4' - 0"

A-201

1054B

1A

2A

1'

5/ 8"

/2

/2

/8

6" 9"

1'

/8

/2

/2

5/ 8"

1'

9' 0"

1'

8' - 6" 30' - 8" 1' - 8" 8' - 6" 30' - 8" 1' - 8" 8' - 6" 30' - 5" 1' - 7" 11' - 0" 13' - 10" 1' - 2"

/8

15' - 4" 15' - 2 5/8" 1' - 9 3/8"

15' - 10" 16' - 6"

STAIR

2' /2

F.2

E.9

F.3

F.4

F.6

W1

A-709

CORRIDOR

1069A

CORRIDOR

1114B

D.3

A-201

1101A

FH6

(CFCI)

BSC

(OFCI)

BSC

(OFCI)

BSC

(OFCI)

BSC

(OFCI)

FH6

(CFCI)

FH6

(CFCI)

BSC

(OFCI)

FH6

(CFCI)

FH6

(CFCI)

FH6

(CFCI)

FH6

(CFCI)

FH6

(CFCI)

FH6

(CFCI)

FH6

(CFCI)

BSC

(OFCI)

FH6

(CFCI)

FH6

(CFCI)

4A

3A

FLOOR PLAN GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF FINISH UNLESS NOTED OTHERWISE.

2. THE CONTRACTOR SHALL PROVIDE A SMOOTH TRANSITION BETWEEN

THE EXISTING AND NEW FLOOR SLAB ELEVATIONS. VERIFICATION OF

EXISTING ELEVATIONS IS CRITICAL PRIOR TO THE PLACEMENT OF THE

NEW SLAB.

3. CLEAN, PATCH AND REPAIR EXISTING WALL SURFACES SCHEDULED TO

BE REFINISHED. ALL EXISTING GYPSUM BOARD SURFACES, WHICH ARE

DAMAGED IN ANY WAY SHALL BE REPAIRED PRIOR TO THE APPLICATION

OF SCHEDULED WALL. REMOVE WALL STANDARDS PRIOR TO

REFINISHING EXISTING WALLS. FILL ANCHOR HOLES IN EXISTING WALLS

WHERE STANDARDS ARE REMOVED. COORDINATE REPAIR AND

REFINISHING WALLS WITH THE (OWNER/GOVERNMENT) (CONSTRUCTION

MANAGER/CONTRACTING OFFICER).

4. THE CONTRACTOR SHALL CLEAN NEW RESILIENT FLOORING. ALL NEW

FLOOR TILE AND/OR PVC FLOORING SHALL BE PROTECTED FROM

SCRATCHING, MARKING, STAINING, ETC. DURING CONSTRUCTION. ANY

TILE AND/OR PVC FLOORING THAT IS DAMAGED BY CONSTRUCTION AND

DOES NOT APPEAR IN NEW CONDITION AT THE TIME OF POSSESSION WILL

BE REPLACED BY THE GENERAL CONTRACTOR AT HIS EXPENSE. INSTALL

RESILIENT TRANSITION STRIP WHERE FLOOR TILE ABUTS EXPOSED

CONCRETE FLOOR.

5. CLEAN ALL EXISTING HVAC GRILLES WHICH REMAIN, PRIOR TO

CONTRACT COMPLETION.

CROMWELL

ARCHITECTS/

ENGINEERS

#5A

R

KANSAS -ENG

IN

EE

R

C E R T

IF

IC

AT

EOF

AUTHORIZ

A T

IO

N R

E G

IS

T E

RED A R CH IT E C

T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

FLOOR PLAN - PHASE II

A-10307/15/15 1/8" = 1'-0"

1 FLOOR PLAN - PHASE II

TR

UE

N

OR

TH

PL

AN

N O

RT

H

OS OS

OS OS

OS OS

OS OS

OS

OS

OS

OS

OSOS

OS OS

OS

OS OS

OSOS

OS OS

OS OS

OS

OS OS

OS

OS

OS

OS

OSOS

OS

OS

OS

OS

OS

OS

OS

OS

OS OS OS

OS

OS OS

OS OS

OS OS OS OS OS OS

OS

OS

OS

OS

OS

OS

OSOS OS OS

OS

OS

A

B

C

D

E

F

.7 1 1.4 2 2.5 3 3.5 4 4.5 5 5.5 6

A-301

A-301

A-302

1A

2A

A.F.F.

2' x 2' ACT System

9' - 0"

A.F.F.

2' x 2' ACT System

8' - 0"A.F.F.

2' x 2' ACT System

8' - 0"

A.F.F.

2' x 2' ACT System

8' - 0" A.F.F.

2' x 2' ACT System

8' - 0"

A.F.F.

2' x 2' ACT System 10' - 0"

A.F.F.

2' x 2' ACT System

9' - 0"

A.F.F.

2' x 2' ACT System 10' - 0"

VESTIBULE

CORRIDOR

1001B

ULTRA COOL

OZONE FREE LAB

CELL CULTURE LAB

GENERAL PURPOSE LAB

GC/ICP MASS SPEC LAB

HPLC LAB 3

INHALATION CHEM LAB

CHEM LAB

CORRIDOR

TMP LAB

MASS SPEC

NAN LAB

CAO LAB

MOLECULAR BIO LAB

1016A

CORRIDOR

GENERAL STORAGE

BIOCHEM LAB

CORRIDOR

MEN

GEN. STORAGE

ICE MACHINE

GPT LAB

WOMEN

SMOKE LAB

TISSUE CULTURE

CART STORAGE

TELE/DATA

CORRIDOR

COMET PRINT

GLASS WASH SUPPORT

1033 CHEMICAL STORAGE

TC/HPRT LAB

1035A

MLA LAB

FLO CYTOMETRY LAB 3

1037A

CORRIDOR

TELE/DATA

MEN

ICE MACHINE

WOMEN

GENE EXPRESN LAB 1

GENE EXPRESN LAB 2

CORRIDOR

1069A

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

1076 OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

CORRIDOR

1114B

CONFERENCE

DIRECTOR'S OFFICE

1128OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SPRINKLER

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

1001A

GENETICS LAB

1016B

FLO CYTOMETRY LAB 2

1035B

FLO CYTOMETRY LAB 1

1037B

HPLC LAB 2

GLASS WASH

1033A

COMPOSITE METAL SOFFIT PANEL

COMPOSITE METAL SOFFIT PANEL

SUSPENDED

LIGHT FIXTURES,

REF. ELECTRICAL

EXPOSED STRUCTURE, TO

RECEIVE INTERIOR/EXTERIOR

LAGGING ENCAPSULANT

SYSTEM AS SPECIFIED, TYP.

F.2

E.9

F.3

F.4

F.6

W1

D.3

4A 4A

3A

LAY-IN ACOUSTICAL

CEILING GRID

LIGHT FIXTURE - SEE

ELECTRICAL DRAWINGS

RETURN AIR GRILLE

SUPPLY AIR GRILLE

SYMBOLS LEGEND

CEILING MOUNTED EXIT LIGHT

EMERGENCY LIGHT

FIXTURE - SEE

ELECTRICAL DRAWINGS

EMERGENCY LIGHT

FIXTURE W/BATTERY PACK -

SEE ELECTRICAL DRAWINGS

GYP. BOARD CEILING -

FINISH AS SCHEDULED

REFLECTED CEILING PLAN GENERAL NOTES

1.ALL AREAS OF EXPOSED EXISTING ROOF STRUCTURE AND DECK

SHALL BE PATCHED, REPAIRED, AND COATED WITH

INTERIOR/EXTERIOR LAGGING ENCAPSULANT SYSTEM

INSTALLED PER MANUFACTURER'S SPECIFICATIONS TO PROVIDE

A SMOOTH, WASHABLE FINISH.

2.REFER TO FINISH SCHEDULE FOR ADDITIONAL CEILING

INFORMATION

3.REFER TO LIFE SAFETY, MECHANICAL, AND ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION NOT SHOWN

CROMWELL

ARCHITECTS/

ENGINEERS

#5A

R

KANSAS -ENG

IN

EE

R

C E R T

IF

IC

AT

EOF

AUTHORIZ

A T

IO

N R

E G

IS

T E

RED A R CH IT E C

T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

REFLECTED CEILING PLAN - PHASE I

A-10407/15/15

1/8" = 1'-0"

1 REFLECTED CEILING PLAN - PHASE I

SCALE : 1/8" = 1'-0"

0 4 8 16

TR

UE

N

OR

TH

PL

AN

N O

OS

OS OS

OS

OS

OS

OS

OS

OS

OS

OS

OSOS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS OS OS OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS OS OS

OS

A

B

C

D

E

F

6 6.5 7 7.5 8 8.6 9 9.3 10.1

A-301

A-303

1A

2A

A-303

A.F.F.

2' x 2' ACT System

9' - 0"

A.F.F.

2' x 2' ACT System

9' - 0"

A.F.F.

2' x 2' ACT System 10' - 0"

A.F.F.

2' x 2' ACT System

9' - 0"

A.F.F.

2' x 2' ACT System 10' - 0"

A.F.F.

2' x 2' ACT System

9' - 0"

A.F.F.

2' x 2' ACT System 14' - 0"

A.F.F.

2' x 2' ACT System 14' - 0"

CORRIDOR

OMIPRINT MS LAB

MOLECULAR LAB 1

CELL LAB

1048B

AMES LAB

TC LAB

ACBPCR LAB

CORRIDOR

TC LAB

PCR LAB

RAPID B-FLOW

CYTOMETRY

GENERAL STORAGE

MASS SPEC LAB

LOW CONCENTRATION

PREP LAB

HIGH CONCENTRATION

PREP LAB

CORRIDOR

ULTRA COOL

CHEMISTRY LAB

HUMAN SAMPLE PREP

PENCE MASS SPEC LAB

CELL CULTURE LAB

SAMPLE PREP

PROTEOMICS MASS SPEC

LAB

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

LOBBY S.E.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SPRINKLER

OFFICE

OFFICE

1124VENDING

ENTRY

VENDING

ENTRY

LOBBY N.E.

CORRIDOR

STAIR

F.2

E.9

F.3

F.4

F.6

W1

D.3

COMPOSITE METAL

SOFFIT PANEL

COMPOSITE METAL

SOFFIT PANEL

.5

:1

.5

:1

.5

:1

9' - 0"

8' - 0"

8' - 0"

9' - 0"

.5

:1

.5

:1

.5

:1

8' - 0"

4A

3A

A-301

A-301

LAY-IN ACOUSTICAL

CEILING GRID

LIGHT FIXTURE - SEE

ELECTRICAL DRAWINGS

RETURN AIR GRILLE

SUPPLY AIR GRILLE

SYMBOLS LEGEND

CEILING MOUNTED EXIT LIGHT

EMERGENCY LIGHT

FIXTURE - SEE

ELECTRICAL DRAWINGS

EMERGENCY LIGHT

FIXTURE W/BATTERY PACK -

SEE ELECTRICAL DRAWINGS

GYP. BOARD CEILING -

FINISH AS SCHEDULED

REFLECTED CEILING PLAN GENERAL NOTES

1.ALL AREAS OF EXPOSED EXISTING ROOF STRUCTURE AND DECK

SHALL BE PATCHED, REPAIRED, AND COATED WITH

INTERIOR/EXTERIOR LAGGING ENCAPSULANT SYSTEM

INSTALLED PER MANUFACTURER'S SPECIFICATIONS TO PROVIDE

A SMOOTH, WASHABLE FINISH.

2.REFER TO FINISH SCHEDULE FOR ADDITIONAL CEILING

INFORMATION

3.REFER TO LIFE SAFETY, MECHANICAL, AND ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION NOT SHOWN

CROMWELL

ARCHITECTS/

ENGINEERS

#5A

R

KANSAS -ENG

IN

EE

R

C E R T

IF

IC

AT

EOF

AUTHORIZ

A T

IO

N R

E G

IS

T E

RED A R CH IT E C

T

A R K A N S A S

GREGORY B.

COCKMON

15-JUL-2015

SHEETDRAWING NOSUBMITTED

SCALE DATE DRAWN CHECK

REVISIONS

NO. DATE DESCRIPTION BY CHECK

JEFFERSON,ARKANSAS 72079

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

N C T R

BUILDING 14 RENOVATION

REFLECTED CEILING PLAN - PHASE II

A-10507/15/15

1/8" = 1'-0"

1 REFLECTED CEILING PLAN - PHASE II

TR

UE

N

OR

TH

PL

AN

N O

RT

H

B B

C C

D D

E E

F F

.7

.7

1.4

1.4

2.5

2.5

3.5

3.5

4.5

4.5

5.5

5.5

6.5

6.5

7.5

7.5

8.6

8.6

9.3

9.3

1A1A

EXISTING MECHANICAL

EQUIPMENT PLATFORM.

F.2 F.2

E.9 E.9

REMOVE EXISTING DOOR AND

PATCH WITH LIKE MATERIAL

TO ENSURE WATER-TIGHT

CONSTRUCTION

EQUIPMENT SUPPORTS. SEE STRUCTURAL DRAWINGS FOR

CONSTRUCTION. SEE DETAIL 10/A-540 FOR ROOF FLASHING.

SEE MECHANICAL DRAWINGS FOR EQUIPMENT LOCATIONS.

EQUIPMENT SUPPORTS. SEE STRUCTURAL DRAWINGS FOR

CONSTRUCTION. SEE DETAIL 10/A-540 FOR ROOF FLASHING.

SEE MECHANICAL DRAWINGS FOR EQUIPMENT LOCATIONS.

EQUIPMENT SUPPORTS. SEE STRUCTURAL DRAWINGS FOR

CONSTRUCTION. SEE DETAIL 10/A-540 FOR ROOF FLASHING.

SEE MECHANICAL DRAWINGS FOR EQUIPMENT LOCATIONS.

EQUIPMENT SUPPORTS. SEE STRUCTURAL DRAWINGS FOR

CONSTRUCTION. SEE DETAIL 10/A-540 FOR ROOF FLASHING.

SEE MECHANICAL DRAWINGS FOR EQUIPMENT LOCATIONS.

TYPICAL ROOF DRAIN. (RD)

PROVIDE NEW RECEIVER PIPE &

AND STRAINER. PROVIDE ROOF

FLASH PER DETAIL 11/A-540

RD RD

RD

RD

RD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .