B09_Amd8_-_QR22_Attach_Drawing_02-C5_48_Jan2026_0008.pdf

PDF 309 KB Posted

Attached to
DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
Solicitation number
140P2025R0082
Issued by

About this file

This is an engineering drawing that documents the plan and profile for the Cow Creek Wastewater Main LS Force Main project at Death Valley National Park, located along Death Valley Scenic Byway SR-190 in California. The drawing, dated January 17, 2025, was designed by T. Francis, technically reviewed by M. Whelehon, and is sheet 2 of 513 in the overall project package (PMIS/PKG No. 178069, Drawing No. 318717-C5.48). The drawing depicts an 8-inch HDPE DR 11 sewer force main extending across multiple survey stations (CS 312+00 through CS 316+00) with elevation details ranging from approximately -136 to -144 feet.

The drawing shows plan and profile views of the force main installation, including the installation of a combination air/vacuum valve located at station CS 312+63.06. Notable project constraints include existing fiber optic lines that must be protected in place and an existing pavement edge along the Death Valley Scenic Byway. The installation clearance limit is marked at 50 feet, and the drawing references an existing ground surface profile and installation cleanout point. Cross-sectional details indicate a 4.87-foot cover with a main cover of 3.30 feet. The drawing is part of a comprehensive utility infrastructure project for Death Valley National Park's wastewater management system.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W V

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B) EFM(B) EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B) EFM(B) EFM(B) EFM(B) EFM(B) EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

EFM(B)

INSTALL CLEANOUT

STA: CS 311+01.00

FM

FM

FM

FM

FM

FMFM

FM

FM

FM

CS 310+00

CS 311+00 CS 312+00

CS 313+00

CS 314+00

CS 315+00

CS 316+00

AR

V

-142

-137

-1

-136

-13

COMBINATION

AIR/VACUUM VALVE

STA: CS 312+63.06

-170

-160

-150

-140

-130

-120

-110

-100

-170

-160

-150

-140

-130

-120

-110

-100

CS 310+00

-1

.3

-1

.4

-1

.1

-1

.9

-1

.2

-1

.4

-1

.3

-1

.9

-1

.4

-1

.4

CS 311+00

-1

.0

-1

.0

-1

.3

-1

.7

-1

.0

-1

.3

-1

.3

-1

.0

-1

.0

-1

.7

CS 312+00

-1

.3

-1

.3

-1

.7

-1

.0

-1

.9

-1

.6

-1

.4

-1

.3

-1

.2

-1

.4

CS 313+00

-1

.0

-1

.6

-1

.0

-1

.8

-1

.2

-1

.0

-1

.0

-1

.2

-1

.5

-1

.4

CS 314+00

-1

.6

-1

.6

-1

.5

-1

.7

-1

.8

-1

.0

-1

.6

-1

.8

-1

.9

-1

.5

CS 315+00

-1

.3

-1

.3

8" HDPE DR 11 SEWER FORCE MAIN

APPROXIMATE EXISTING

GROUND SURFACE

IN

ST

AL

L

C

LE

AN

O

U T

ST

A:

C S

1+

.0

C O

M

BI

N

AT

IO

N

AI

R

/V

AC

U U

M V

AL

VE

ST

A:

C S

2+

.0

FM

ARV

20 0 20 40

SCALE OF FEET

10 0 10 20

HORIZ.

VERT.

1/5 /26

:05

K

EL

LY

.K

ER

O F

:\7

4.0 5 D

EV

A

W

AT

ER

A

ND

W

AS

TE

W

AT

ER

S

YS

TE

M

RE

HA

B\

DR

AW

IN

GS

\D W

G\

CI

VI

L\5

S

HE

ET

P

RO

DU

CT

IO

N\ 4_

DE

VA

C C

W W

_C C

MA

IN

LS

F

M_

RE

V

PLAN

PROFILE

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

COW CREEK WASTEWATER

PLAN & PROFILE

MAIN LS FORCE MAIN

178069

269 513

T. FRANCIS

T. FRANCIS

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 02-

C5.48

KEY MAP

NTS

KEY MAP

NTS

DEATH VALLEY SCENIC

BYWAY, CA SR-190

EDGE OF

PAVEMENT

DISTURBANCE

LIMIT 50'

D C3.12

4.83' COVER

(MIN. COVER = 3.00')

SE

E

SH

EE

T C5

.4

SEE SH

EET C

5.47

E C7.0

EXISTING FIBER OPTIC LINE,

PROTECT IN PLACE

C C7.1

Kelly.Kero Cloud

Kelly.Kero Cloud

Kelly.Kero Polygon

Kelly.Kero Text Box

Kelly.Kero Text Box

Kelly.Kero Polygon

Kelly.Kero Text Box

COMBINATION AIR RELEASE VALVE

Kelly.Kero Text Box

COMBINATION AIR RELEASE VALVE

Sheets and Views
Sheet - (308)

File details come from the government source that posted it. Updated .