This is a technical drawing document for wastewater infrastructure design at Death Valley National Park. Specifically, it depicts a lift station plan view (Sheet C7.6) showing the wet well and overflow tank configuration for a wastewater system rehabilitation project (Drawing No. 318717, PMIS/PKG No. 178069). The drawing is dated January 17, 2025, and was designed by V. Neary with technical review by C. Weaver.

The lift station is specified to utilize an Everlast 4000 Series duplex pump station with Smith & Loveless 4B2D*1 pumps or approved equal, capable of handling 250 GPM at 83 feet of total dynamic head with a 15 HP, 480V 3-phase motor and 9.125-inch impeller trim. The system includes a precast concrete wet well (6 feet diameter, 13 feet deep), a 15,000-gallon precast overflow tank with a 30-inch diameter access riser, vacuum priming pumps, and an 8-inch HDPE forcemain discharge line. Control is managed through a QuickSmart control panel with PLC controller, VFD pump starters, five float demand settings, individual hand-off-auto switches, elapsed time meters, pump cycle counters, and alarms for pump failure and water level conditions in a NEMA Type 4 steel enclosure. The design incorporates a 4-inch gate valve for draining the overflow tank, 6-inch Schedule 40 PVC overflow line, 4-inch Schedule 40 PVC drain line with flapper valve, and an 8-inch SDR 35 PVC inlet from collection manhole SSMH-CC-101. Link-seals are required at all concrete penetrations, and backfill specifications are referenced to specification section 31 23 33.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

/16

/25

:39 K

EL

LY

.K

ER

O F :\7

4.0

5 D

EV

A W

AT

ER

A

ND

W

AS

TE

W

AT

ER

S

YS

TE

M

RE

HA

B\

DR

AW

IN

GS

\D

W G\

CI

VI

L\5 S

HE

ET

P

RO

DU

CT

IO

N\

6_

DE

VA

W

_W W

D

ET

AI

LS

W W

.D W

G

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

178069

318717

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

WASTEWATER DETAILS

LIFT STATION PLAN

178069

312 513

V. NEARY

V. NEARY

C. WEAVER

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 02-

C7.6NTS

A

C7.6

LIFT STATION WET WELL AND OVERFLOW TANK PLAN VIEW

4" GATE VALVE FOR DRAINING

OVERFLOW TANK INTO WET WELL

15,000-GALLON PRECAST

OVERFLOW TANK

30" DIA. ACCESS RISER

FOR OVERFLOW TANK,

TYP.

PROPOSED LIFT STATION BUILDING

SEE ARCHITECTURAL SHEETS

6" SCH 40 PVC WET

WELL OVERFLOW LINE

4" SCH 40 PVC DRAIN FROM VALVE

VAULT WITH FLAPPER VALVE

FOOTNOTES:

PUMP STATION TO BE EVERLAST 4000 SERIES DUPLEX WITH SMITH & LOVELESS

4B2D*1 PUMPS OR APPROVED EQUAL

· PUMP DESIGN CONDITION: 250 GPM @ 83FT TDH

· PUMP MUST BE CAPABLE OF PASSING SOLIDS 3" IN DIAMETER.

· PUMP MOTOR IS 15 HP - 480V 3-PHASE

· IMPELLER TRIM OF 9.125"

QUICKSMART CONTROL PANEL FUNCTIONAL REQUIREMENTS

· PLC CONTROLLER / INTERFACE

· VFD PUMP STARTERS

· 5 FLOAT DEMAND SETTINGS

· INDIVIDUAL HAND-OFF-AUTO SWITCHES FOR EACH PUMP

· ELAPSED TIME METER AND PUMP CYCLE COUNTER FOR EACH PUMP

· AUDIBLE AND VISUAL ALARM - PUMP FAILURE TO START, FAILURE TO PRIME,

HIGH/LOW WATER LEVEL

· DUPLEX GFI PROTECTED OUTLETS

· NEMA TYPE 4 STEEL ENCLOSURE

· SEE SPECIFICATION 33 32 00 FOR ALL PANEL REQUIREMENTS

NOTES:

1. SEE SHEETS C5.6, C8.21 AND C8.22 FOR PLAN VIEW, AND GENERAL ARRANGEMENT

OF STATION. DETAIL DOES NOT REFLECT OVERFLOW TANK AND WET WELL

ARRANGEMENT TO SCALE.

2. LINK-SEALS ARE TO BE INSTALLED AT ALL PENETRATIONS IN CONCRETE FOR PIPE

AND CONDUIT.

2. SEE SPECIFICATION SECTION 33 32 00 FOR EQUIPMENT REQUIREMENTS.

3. BACKFILL AROUND WET WELL AND OVERFLOW TANK SHALL BE PER SPECIFICATION

SECTION 31 23 33.

WET WELL

ACCESS HATCH

PRECAST CONCRETE WET WELL

6' DIAMETER - 13' DEEP

DISCHARGE

8" HDPE FORCEMAIN

EVERLAST 4000

SERIES PACKAGED

DUPLEX STATION

VACUUM PRIMING

PUMPS

QUICKSMART

PUMP CONTROL

PANEL

ROLL UP

GARAGE DOOR

ACCESS

133"

375" N

INLET

8" SDR 35 PVC

FROM SSMH-CC-101

Sheets and Views
WASTEWATER DETAILS 7