This is a technical engineering drawing for a water infrastructure project at Death Valley National Park. The document depicts a plan and profile view for the Furnace Creek Water system, specifically the South Alignment section. The drawing illustrates an 8-inch HDPE DR 17 water main installation with associated infrastructure components including gate valves located at stations FW 260+44.18 and FW 260+51.85, with top-of-pipe elevations of 155.13 and 155.58 respectively. The project includes integration with existing water systems, a reverse osmosis treatment plant, a 2.0 million gallon water tank to be protected in place, and a pipe vault/storage room facility. The design specifies a minimum cover of 2.50 feet (with 2.86 feet shown), tie-in points to existing water lines located 5 feet from the pipe vault wall, and coordination with existing underground utilities including electric and telephone lines. The drawing also indicates fencing and erosion control measures, a proposed propane tank and generator location, and a 50-foot disturbance limit boundary.

The document is drawn to scale with both horizontal and vertical profiles shown, includes a key map referencing related architectural and engineering sheets (C1.22, C1.46, C1.48, C8.12, and DC3.12), and was prepared for Death Valley National Park by L. Graef (designer and technical reviewer M. Whelehon), dated January 17, 2025. The drawing is identified as Sheet C1.47 (72 of 513) within PMIS/Package 178069 (Drawing 318717) and is part of a comprehensive water infrastructure design package.

View the file

Other files

File Type Posted
B09_Amd11_-_B08_Attach3_-_WD_CA20260020_Mod2_0011.pdf PDF
Sol_140P2025R0082_Amd_0011.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_42_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_38_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_01-C4_40_Jan2026_0010.pdf PDF
B09_Amd10_QR_Tracker_-_DEVA_318717_Final_0010.xlsx XLSX spreadsheet
B09_Amd10_-_QR55_Attach_Drawing_01-C4_39_Jan2026_0010.pdf PDF
B09_Amd10_-_QR55_Attach_Drawing_00-C8_27_Jan2026_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40_0010.pdf PDF
B09_Amd10_-_Drawing_G1_22_0010.pdf PDF
B09_Amd10_-_QR86_Attach_Drawing_C1_40B_0010.pdf PDF
Sol_140P2025R0082_Amd_0010.pdf PDF
B09_Amd10_-_B08_Attach4_-_DetailedContractPriceSchedule_0010.xlsx XLSX spreadsheet
B09_Amd10_-_Drawing_G1_2_0010.pdf PDF
B09_Amd10_-_Drawing_Coversheet_00_DEVA_318717_Jan2026x_0010.pdf PDF
B09_Amd10_-_Drawing_G1_21_0010.pdf PDF
Sol_140P2025R0082_Amd_0009.pdf PDF
B09_Amd8_-_Drawing_02-C5_29_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_33_14_19_-_VALVES___HYDRANTS_FOR_WATER_UTILITY_SERVICE_0008.pdf PDF
B09_Amd8_-_Drawing_02-G1_16_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_08_33_22_-_ALUMINUM_ROLLING_OVERHEAD_DOORS_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_29_Jan2026_0008.pdf PDF
B09_Amd8_-_QR22_Attach_Drawing_00-C7_1_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_25_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C8_30_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C4_42_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_32_00_-_WASTEWATER_PUMPING_STATIONS_0008.pdf PDF
B09_Amd8_-_Spec_33_31_11_-_GRAVITY_SEWER_PIPELINE___MANHOLE_INSTALLATION_0008.pdf PDF
B09_Amd8_QR_Tracker_-_DEVA_318717_0008.xlsx XLSX spreadsheet
B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008.pdf PDF
Sol_140P2025R0082_Amd_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_31_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C6_7_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_15_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_00-G1_2_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-C7_5_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_11_13_-_POTABLE_WATER_SUPPLY_WELLS_0008.pdf PDF
B09_Amd8_-_Drawing_00-C3_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_42_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_20_Dec2025_0008.pdf PDF
B09_Amd8_-_Spec_33_31_05_-_MANHOLE_LINING___REHABILITATION_0008.pdf PDF
B09_Amd8_-_Drawing_01-G1_15_Jan2026_0008.pdf PDF
B09_Amd8_-_QR56_Attach_Drawing_02-C2_18_Dec2025_0008.pdf PDF
B09_Amd8_-_Drawing_01-C1_67_Jan2026_0008.pdf PDF
B09_Amd8_-_Spec_46_33_11_-_CHEMICAL_FEED_-_LIQUID_SYSTEMS_0008.pdf PDF
B09_Amd8_-_Drawing_02-C2_22_Jan2026_0008.pdf PDF
B09_Amd8_-_Drawing_02-X1_2_Jan2026_0008.pdf PDF
Show 40 more

Latest 50 of 109 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

WV

EW(B) EW(B) EW(B) EW(B) EW(B) EW(B) EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW(B)

EW

(B)

EW

(B)

EW

(B)

EW

(B)

EW(B)

EW(B)

EW(B)

EW(B) EW(B) EW(B) EW(B) EW(B) EW(B) EW(B) EW(B) EW(B) EW(B) EW(B) EW(B) EW(B)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D) UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGT(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

UGP(D)

E

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B)

ES(B) ES(B)

ES(B)

ES(B)

MH

MH

S

WV

UGT(D) UGT(D) UGT(D) UGT(D) UGT(D) UGT(D) UGT(D) UGT(D)

5 15

5 16

0 16 5 17

175175175

5 16

159 16

2 163

8'' GATE VALVE

STA:FW 260+44.18

W 8'' W 8'' W 8''

W 8''

W 8''

W 8''

W 8''

W 8''

W 8''

X

X X X X

X

X

X

X

X

X

X

X

X

X

X X

X X

GVGV

G V

GV FW 260+78FW 259+00

FW 260+00

8'' GATE VALVE

STA:FW 260+51.85

FW 260+00

5.

1.

8.

3.

0.

4.

9.

6.

FW 260+90

ST

A:

FW

+4

4.

T.

O

.P . E

LE

V:

5.

8" G

AT

E

VA

LV

E

ST

A:

FW

+5

1.

T.

O

.P . E

LE

V:

5.

8" G

AT

E

VA

LV

E

FO(D)

FO(D)

H YD

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

FURNACE CREEK WATER

PLAN & PROFILE

SOUTH ALIGNMENT

178069

72 513

L. GRAEF

L. GRAEF

M. WHELEHON

1.17.2025

DEATH VALLEY

NATIONAL PARK

318717 01-

C1.47

20 0 20 40

SCALE OF FEET

10 0 10 20

HORIZ.

VERT.

PLAN

PROFILE

KEY MAP

NTS

SEE SHEET C1.22

EXISTING 2.0 MG WATER TANK

PROTECT IN PLACE

SEE SHEET C1.48

RO TREATMENT PLANT

SEE ARCHITECTURAL SHEETS

FENCING AND EROSION

CONTROL SEE SHEET C8.12

PIPE VAULT/STORAGE ROOM

SEE ARCHITECTURAL SHEETS

2.86' COVER

(MIN COVER = 2.50')

TIE INTO EXISTING LINE 5 FT

FROM PIPE VAULT WALL

DISTURBANCE

LIMIT 50'

EXISTING

WATER MAIN

EXISTING

WATER MAIN

SE

E

SH

EE

T C

1.

D C3.12

EDGE OF GRAVEL

EXISTING UNDERGROUND

ELECTRIC CROSSING

EXISTING UNDERGROUND

TELEPHONE LINE

APPROXIMATE EXISTING

GROUND SURFACE

8'' HDPE DR 17

WATER MAIN

8'' HDPE DR 17

WATER MAIN

END STATIONING

TIE INTO EXISTING LINE 5 FT

FROM PIPE VAULT

PROPOSED PROPANE

TANK AND GENERATOR.

(SEE ARCHITECTURAL

SHEETS)

A C3.12

EXISTING WATER PIPE FROM

PIPE VAULT

A C3.12